Combined synopsis and solicitation
USCGC Polar star pintle forging
70Z08524P02856
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
August 2, 2024 at 11:00 AM EDT
Closed 845 days ago. Posted July 23, 2024. Scheduled to archive August 17, 2024.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2024
103 like it are open now in ship building and repairing
- Maintenance, Repair, and Preservation of 60DS1701
Department of the Navy, Puget Sound Naval Shipyard Imf
Sources soughtNAICS 336611WashingtonN4523A27Q1005Due in 2 daysNov 27 - USCGC HEALY Integrated Power Plant Support Services Contract Fiscal Year 2028-2033
US Coast Guard, Cg-Sea-C22
Sources soughtNAICS 336611Seattle, WA70ZU027ILREP1113Due in 5 daysNov 30 - Dockside (DS) – USCGC STORIS Fiscal Year 2027
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Seattle, WA70Z08526QLREP0026Closes in 26 daysDec 21
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 10 days from the day the solicitation was posted, July 23, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Forging to be Rough Machined, and shaped to the dimensions listed, and shipped to the address listed below. All information regarding the material composition, mechanical requirements and specific testing procedures are all listed within the MIL-S- 23284 Specification (series). Specifics of the material shall adhere to all requirements set forth for Class 1 material. Specific Requirements of Forging are:
Final, “Rough Machined”, Dimensions of 21”Dia x 36”Long, solid, not drilled through, all machined surfaces provided with a finish of 250Ra 2 holes, one centered on each end, and drilled 3-5/8 inches deep and tapped with 2” - 4-½ UNC 3 threads for full depth of hole(s).
Material Requirements: MIL-S-23284 Class 1, First article inspection required. Transverse mechanical and impact properties are required. Repair welding is not permitted.
Shipping Address: SFLC-CGC POLAR STAR Port Engineer Staff 1519 Alaskan Way South Seattle, WA 98134
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 23, 2024
Combined synopsis and solicitation
Due August 2, 2024 at 11:00 AM EDT. SAM.gov, notice 39542ef02df047e1b29fba4c9f34ed37
Points of contact
- KYLER FISKKYLER.C.FISK@USCG.MIL9492881271
- BRENDEN COXBRENDEN.S.COX@USCG.MIL12068315347