Combined synopsis and solicitation, total small business set-aside
USCGC POLAR STAR MTG FUEL VALVE POSITIONER DRIVER REPLACE
70Z08524P0004908
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
May 28, 2024 at 11:00 AM EDT
Closed 912 days ago. Posted May 17, 2024. Scheduled to archive June 12, 2024.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2024
107 like it are open now in ship building and repairing
- Maintenance, Repair, and Preservation of 60DS1701
Department of the Navy, Puget Sound Naval Shipyard Imf
Sources soughtNAICS 336611WashingtonN4523A27Q1005Due tomorrowNov 27 - USCGC HEALY Integrated Power Plant Support Services Contract Fiscal Year 2028-2033
US Coast Guard, Cg-Sea-C22
Sources soughtNAICS 336611Seattle, WA70ZU027ILREP1113Due in 4 daysNov 30 - Dockside (DS) – USCGC STORIS Fiscal Year 2027
US Coast Guard, Cg-Sea-C22
Combined synopsis and solicitationSmall businessNAICS 336611Seattle, WA70Z08526QLREP0026Closes in 25 daysDec 21
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 11 days from the day the solicitation was posted, May 17, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
[1/17 1:04 PM] Fisk, Kyler C PO2 USCG SFLC (USA) This is a combined synopsis/solicitation for commercial items/services prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.
This Request for Quotations incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-65 dated January 29, 2013. The NAICS Code is 336611. The small business size standard is 1250. This is a total small business set aside. All responsible sources may submit proposals that will be considered by the agency. The contract will be awarded on a firm-fixed-price basis using simplified acquisition procedures in accordance with FAR Part 13.5.
All responses from interested vendors must be received on/before 0800am Pacific Time, Nov 20th, 2023, and will be reviewed by the Government. The United States Coast Guard Surface Force Logistics Center has a requirement for the following:
The CTR shall provide:
Scope of Work: MGT Fuel Positioning Driver, Replace 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to remove the obsolete GS3/LQ Fuel Positioning Drivers and install a new Digital Valve Positioners (DVP) for all three Gas Turbines onboard. 1.1.1 The Period of performance for installation of MGT fuel drivers and pier side operational test shall be performed between the targeted dates of 01SEP24 to 15OCT24 based on cutter’s availability and discretion.
1.1.2 The Period of Performance for underway operations test shall be performed between targeted dates of 15OCT24 to 15NOV24 based on cutter’s availability and discretion. 1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST ($/UNIT) N Driver, Digital Valve Positioner (DVP) 4810-01-700-6814 / 8200-507 3 $12,000 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 400 WAGB 0103-3, Rev AJ, Booklet of General Plans (POLAR STAR) Coast Guard Drawing 400-WAGB-6000-017, Rev V, Electrical Distribution Sys One Line Diagram (WAGB 10) Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Coast Guard Technical Publication (TP) 4390A, 01-MAY-22, Woodward – GS3 Valve Driver Other References Woodward Product Manual, 26329, Rev AE, 11/2019, Digital Valve Positioner Instruction Manual Woodward Product Manual, 26912, Rev E, 1/2021, Digital Valve Positioner Diagnostic Tool Woodward Drawing 9971-1257, Rev C, Control Wiring Diagram USCG Polar Ice Breaker Control 3. REQUIREMENTS 3.1 General.
3.1.1 Tech Rep. The technical representative must be qualified to install, calibrate, and test Woodward Fuel System Controls on the ships Gas Turbines (GT) and will provide the following:
Manufacturer's information, software, tools, and equipment pertinent to the equipment/system installation. 3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). 3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include:
Control wiring. note Coast Guard personnel will operate all shipboard machinery and equipment. 3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.3 Removal.
Using the references in Section 2, the contractor must conduct the following tasks in the following local control panels (LCP): #1 GT LCP 4-127-4 #2 GT LCP 4-127-2 #3 GT LCP 4-135-2 3.3.1 Label then disconnect wiring to the GS3/LQ Fuel Positioner Drivers 3.3.2 Remove the GS3/LQ Fuel Positioner Drivers. 3.3.2.1 Turn the removed drivers to the CG Inspector. 3.3.3 Prepare each LCP to receive the new DVP Drivers. 3.4 Installation.
Using the references in Section 2, the contractor must conduct the following tasks: 3.4.1 Fasten the new DVP drivers to the LCPs using new hardware. 3.4.2 Wire the new DVP drivers in accordance with the DVP installation instructions. 3.4.2.1 Document the new DVP control wiring configuration by red-line markup on Woodward Drawing 9971-1257, Rev C, Control Wiring Diagram USCG Polar Ice Breaker Control. 3.5 Testing.
Using the references in Section 2, the contractor must conduct the following tasks: 3.5.1 Conduct start-up checks on all three DVPs in accordance with the DVP Instruction Manual. Note The ship has the necessary GAP software in order to push code to the new DVPs. 3.5.2 With assistance from the CG Inspector, set the parameters for all three DVP Drivers using the DVP Service and Diagnostic Tool in accordance with the DVP Service and Diagnostic Tool Installation and Operation Manual.
3.5.3 Under the direction of the ship’s crew, conduct the following inport tests on all three GTs: GT Normal Start/Emergency Stop GT Test Start/Normal Stop GT Test Start/Emergency Stop GT Test Start with TT2 Under Temperature Shutdown GT Test Start with N2 Reference Command Fault Alarm Emergency Shutdown Recognition Test (while running) 3.5.4 Under the direction of the ship’s crew, conduct the following underway tests on all three GTs: Validate the performance and dynamic response of the DVP and LQ25 Fuel Valve.
3.6 Reporting. The contractor must provide the following via CFR: 3.6.1 Provide a full report detailing the service visit and all parameters for the DVP units. 3.6.2 Provide a red-line mark-up of Woodward Governor drawing 9971-1257 Rev. C showing the as-built configuration.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 17, 2024
Combined synopsis and solicitation
Due May 28, 2024 at 11:00 AM EDT. SAM.gov, notice 716088a6a9874752a728bedafcf17ce2
Points of contact
- KYLER FISKKYLER.C.FISK@USCG.MIL9492881271