Combined synopsis and solicitation
USCGC FIR BROW FAILURE
70Z08524P0003906
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
April 29, 2024 at 11:00 AM EDT
Closed 941 days ago. Posted April 23, 2024. Scheduled to archive May 14, 2024.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2024
107 like it are open now in ship building and repairing
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due tomorrowNov 27 - WATCH SUPV CHAIR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 336611Ship to the buyerN0010427QBB55Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 6 days from the day the solicitation was posted, April 23, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
STATEMENT OF WORK (SOW) FOR USCGC FIR BROW REPAIRS CGC FIR lost their brow into the water during a storm with wins around 100mph. Brow has been retrieved and requires repairs for tasks outlined in this Statement of Work (SOW). 1.0 GENERAL Background The 225’ WLB asset, USCGC FIR, lost their brow into the water during a storm with wins around 100mph. Brow has been retrieved and requires repairs. Scope The scope of this contract is defined by the efforts and tools required to support USCGC FIR (WLB 213).
The Contractor shall provide all labor, materials, and tools necessary to make repairs. OBJECTIVE The goal is to repair the brow to working and safe conditions. SPECIFIC REQUIREMENTS/TASKS Unless otherwise stated, this contract applies to on-site support for USCGC FIR (WLB 213) in Cordova, AK. 2.1 Brow Repairs The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work. The Contractor shall inspect and make repairs to the brow.
The Contractor shall preform any required test to repairs, as deemed necessary. 2.2 Test Thoroughly and Document The Contractor shall ensure the brow is fully functional by preforming a system operational test to be witnessed by Engineering Officer (EO) or the EO’s designated representative. 2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
CONTRACTOR PERSONNEL 3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW. OTHER APPLICABLE CONDITIONS 4.1 PERIOD of Performance The period of performance for this contract shall not exceed 5 calendar days from the date of award. 4.2 PLACE OF PERFORMANCE The primary place of performance will be at CGC FIR at 300 North Fill Pier, Cordova, AK unless an alternate location is approved by the Coast Guard.
Access to this installation will be coordinated with CGC FIR Engineering Officer. 4.3 HOURS OF OPERATION Contractor employees shall generally perform all work between the hours of 0730 and 1600 AKT, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW.
Precise times may be negotiated with the cutter Engineering Officer (EO) as scheduling is subject to ship’s operations. 4.4 Daily Progress Reports The Contractor shall hold a daily progress meeting with the Engineering Officer and/or Commanding Officer upon arrival at the asset each morning of the visit.
This report shall include a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work. 4.5 General Report Requirements The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES NA 6.0 CONTRACTOR FURNISHED PROPERTY The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0. GOVERNMENT ACCEPTANCE PERIOD The EO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance.
If the deliverable is acceptable, the EO will send an e-mail to the Contractor notifying it that the deliverable has been accepted. 8.0 DELIVERABLES The Contractor shall provide a trip report IAW 2.2 of this SOW.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 23, 2024
Combined synopsis and solicitation
Due April 29, 2024 at 11:00 AM EDT. SAM.gov, notice 81e41d36256c489286d0fa2c7f14d9a4
Points of contact
- KYLER FISKKYLER.C.FISK@USCG.MIL9492881271
- BRENDEN COXBRENDEN.S.COX@USCG.MIL12068315347