Solicitation, total small business set-aside
Dry-dock: USCG STA NOYO RIVER (47271) FY2024 UNPLANNED DRYDOCK REPAIRS
70Z04024QSBPL0020
US Coast Guard, SFLC Procurement Branch 3. Ship Building and Repairing.
Response deadline
September 9, 2024 at 2:00 PM EDT
Closed 808 days ago. Posted September 5, 2024, first published August 28, 2024. Scheduled to archive September 24, 2024.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2024
107 like it are open now in ship building and repairing
- USNS CITY OF BISMARCK (T-EPF 9) VRA KR
Department of the Navy, NAVSUP FLT Log CTR Yokosuka
SolicitationNAICS 336611Outside the USN6264927RK003Due tomorrowNov 27 - Ship Repair
Department of the Navy, NAVSUP FLC Sigonella Naples Office
SolicitationNAICS 336611Outside the USN6817127QN013Due tomorrowNov 27 - WATCH SUPV CHAIR
Department of the Navy, NAVSUP Weapon Systems Support Mech
SolicitationNAICS 336611Ship to the buyerN0010427QBB55Due tomorrowNov 27
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 336611 (ship building and repairing), means no more than 1,300 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 12 days from the day the solicitation was posted, August 28, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
USCG STA NOYO RIVER (47271) 70Z04024SBPL0020 00001 Amendment RFC question and answers There is a line item for Refuel, but there is not a line item for removal of the fuel. Should we assume that the boat will come with no fuel in it? Should we include the removal of fuel somewhere else in the bid? There is no need to defuel as the fuel tanks are above the red-line for welding. GFE Boat Hot Work Diagrams FL-085-2 The boat will arrive not at 95% fuel capacity just based on transit.
However, we want it to leave at 95% fueled. D-001 lists the port, starboard, bow, and stern fenders as GFM fenders. But there is no specific line item for removal of ALL the fenders. Are we to assume they are damaged? They are damaged and the PE is going to ask for them to be replaced. Listing them as GFE will save us time during the PoP as they have to be removed for completion on the deck renewal. Do you anticipate us needing to paint the faying surfaces or will that be change order work?
DeSpec does not contain a ‘fender faying preservation’ WI for the 47 MLB. Preservation will be handled via CR. In the creation of the Spec Package, no additional work outside of safety items was to be included. However, the rub rails must be removed (except for the stern). The following can be added into D-001 if needed (and a CR won’t suffice): 3.4 Preparation/Preservation.
The Contractor must prepare and preserve the area covered by the removed portions of the fendering system and aluminum faying surfaces (surfaces of similar or dissimilar materials that are fit closely together and fastened) in accordance with Coast Guard Drawing 47B-MLB 631-020 and SFLC Std Spec 6310. 3.5 Renewal. After the completion of all inspections and any authorized repairs, the Contractor must renew the designated rub rail sections.
Reuse existing washers, and renew all nylon insert locking nuts in accordance with SFLC Std Spec 0000. 3.5.1 The Contractor must apply sealant to the top and bottom of each renewed rub rail in accordance with CG Drawing 47B-MLB 611-020. It also lists rub rails under interference removals, but aren't the fenders the rub rail? It is the rub rail. DeSpec is inconsistent.
Fenders = Rub Rails and Rub Rails = Fenders USCG STA NOYO RIVER (47271) FY2024 UNPLANNED DRYDOCK REPAIRS Combined Synopsis/ Solicitation 70Z04024QSBPL0020, Specification package Rev-0, dated 26 AUG 2024, Past Performance Questionnaire, Schedule of Supplies and Services, information is provided as a PDF file and available for download. PERIOD OF PERFORMANCE IS 23SEP2024 TO 25OCT2024, A THIRTY-THREE (33) CALENDAR DAY AVAILIBILITY.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Regina M Elliott-DoughertyRegina.ElliottDougherty@uscg.mil5716101960
- Janet M DelaneyJanet.M.Delaney@uscg.mil5716076322