{"canonical":"https://sealedbidder.com/opportunities/70z03826ib0000024","key":"70Z03826IB0000024","url":"https://sealedbidder.com/opportunities/70z03826ib0000024","title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","solicitation_number":"70Z03826IB0000024","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-12-19T17:00:00Z","first_posted":"2025-12-03","last_posted":"2025-12-17","department":"HOMELAND SECURITY, DEPARTMENT OF","subagency":"US COAST GUARD","office":"AVIATION LOGISTICS CENTER (ALC)(00038)","naics":"336413","psc":null,"set_aside":null,"place_state":null,"place_scope":"unknown","site":null,"place_state_source":null,"place_evidence":null,"place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"2a24a13e3f784220a37e59dc71cd71bb","title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","solicitation_number":"70Z03826IB0000024","notice_type":"r","base_type":"r","posted":"2025-12-03","posted_at":"2025-12-03T20:19:45.307Z","due_at":"2025-12-19T17:00:00Z","due_date":"2025-12-19","cancelled":false,"archived":true,"archive_date":"2026-01-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2a24a13e3f784220a37e59dc71cd71bb/view","enriched":true,"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}]},{"notice_id":"5b58e1d456794927bd9bdc86d0a33659","title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","solicitation_number":"70Z03826IB0000024","notice_type":"r","base_type":"r","posted":"2025-12-15","posted_at":"2025-12-15T15:23:35.794Z","due_at":"2025-12-19T17:00:00Z","due_date":"2025-12-19","cancelled":false,"archived":true,"archive_date":"2026-01-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/5b58e1d456794927bd9bdc86d0a33659/view","enriched":true,"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}]},{"notice_id":"765f55387a9c4fe5ae6b5ab78d901eb6","title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","solicitation_number":"70Z03826IB0000024","notice_type":"r","base_type":"r","posted":"2025-12-15","posted_at":"2025-12-15T15:24:37.429Z","due_at":"2025-12-19T17:00:00Z","due_date":"2025-12-19","cancelled":false,"archived":true,"archive_date":"2026-01-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/765f55387a9c4fe5ae6b5ab78d901eb6/view","enriched":true,"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}]},{"notice_id":"92dd5f5990144b16a903085660739b87","title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","solicitation_number":"70Z03826IB0000024","notice_type":"r","base_type":"r","posted":"2025-12-17","posted_at":"2025-12-17T17:39:02.852Z","due_at":"2025-12-19T17:00:00Z","due_date":"2025-12-19","cancelled":false,"archived":true,"archive_date":"2026-01-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/92dd5f5990144b16a903085660739b87/view","enriched":true,"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}]}],"latest_notice_id":"92dd5f5990144b16a903085660739b87","first_type":"r","notices":[{"dates":{"posted":"2025-12-03","posted_at":"2025-12-03T20:19:45.307Z","created_at":"2025-12-03T19:46:01.045Z","modified_at":"2026-01-20T05:00:07.577Z","response_deadline":{"raw":"2025-12-19T12:00:00-05:00","utc":"2025-12-19T17:00:00Z","date":"2025-12-19","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2a24a13e3f784220a37e59dc71cd71bb/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","agency":{"office":{"code":"70Z038","name":"AVIATION LOGISTICS CENTER (ALC)(00038)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"27909","city":"Elizabeth City","state":"NC","country":"USA"},"organization_id":"100168424","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-19","archive_type":"auto_custom"},"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}],"contacts":[{"name":"Mary Elaina Price","role":"primary","email":"elaina.m.price@uscg.mil","phone":"2523356372"},{"name":"Alyson Harrison","role":"secondary","email":"alyson.s.harrison2@uscg.mil","phone":"5716135816"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"2a24a13e3f784220a37e59dc71cd71bb","lineage_id":"2a24a13e3f784220a37e59dc71cd71bb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-20T02:51:14.120935927Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"2a98ed82b9cdb2c3dceb96409368d3f3fd6d14dcbdb174da16724cd0d8c10df9","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-20T02:51:14.120935927Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Request for Information (RFI):&nbsp;</p>\n\n<p>This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e).&nbsp; This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement.&nbsp; The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.&nbsp;</p>\n\n<p>The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter.&nbsp; Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&nbsp;&nbsp;</p>\n\n<p>Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.</p>\n\n<p>Please respond to the following questions in addition to submission of your company&rsquo;s capability statement:</p>\n\n<ol>\n\t<li>Is your business a large or small business?&nbsp;</li>\n\t<li>If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?&nbsp;</li>\n\t<li>If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?&nbsp;</li>\n\t<li>Is your firm a certified &quot;hub zone&quot; firm?&nbsp;</li>\n\t<li>Is your firm a woman-owned or operated business?&nbsp;</li>\n\t<li>Is your firm a certified Service-Disabled Veteran-Owned?&nbsp;</li>\n\t<li>Is your product listed on a GSA schedule?&nbsp;</li>\n\t<li>Do you have other government agencies using the product, and if so which agencies, POC&#39;s and contract numbers?&nbsp;</li>\n\t<li>If possible, any POC&#39;s for civilian users for general usage of product questions.</li>\n</ol>\n\n<p>Additional Project Details and Objectives</p>\n\n<p>1.0 Scope</p>\n\n<p>The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.</p>\n\n<p>2.0 Background</p>\n\n<p>The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft.&nbsp; The current configuration is similar to the AS 365N3.&nbsp; The aircraft is powered by two Turbomeca Arriel 2C2&minus; CG engines. &nbsp;</p>\n\n<p>The aircraft was originally built to Federal Aviation Regulations Part 29 standards.&nbsp; Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.&nbsp; <strong>&nbsp;</strong></p>\n\n<p>The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (<strong>CAAS</strong>) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system.&nbsp; However, there is a now a greater need for cooling air in the cabin.&nbsp;</p>\n\n<p>The MH-65 was originally equipped with a bleed air ECS.&nbsp; The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines.&nbsp; The bleed air heat function was retained.&nbsp; A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.&nbsp;</p>\n\n<p>The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.</p>\n\n<p>3.0 Support</p>\n\n<p>A Performance Based Logistics (PBL) support strategy is desired.&nbsp; The support structure will be based on existing Coast Guard support contracts.&nbsp; The support strategy will be included in the system procurement process.&nbsp;&nbsp;</p>\n\n<p>3.1 Open Architecture</p>\n\n<p>The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.</p>\n\n<p>A full documentation package is desired.&nbsp; The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.</p>\n\n<p>Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.</p>\n\n<p>3.2 Integration</p>\n\n<p>Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.&nbsp;</p>\n\n<p>4. Vendor Qualification</p>\n\n<p>The supplier must be an original equipment manufacturer for aircraft environmental control systems.&nbsp; The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.&nbsp;&nbsp;</p>\n\n<p>The supplier must have experience working with civil and/or military airworthiness authorities.&nbsp; The supplier must explain in their response how they would support the airworthiness certification of the installation.</p>\n\n<p>The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel.&nbsp; All system documentation must be available in readily understandable English language format.</p>\n\n<p>5. Evaluation</p>\n\n<p>After evaluation of the information received, the Coast Guard may issue a separate request for proposals.&nbsp;</p>\n\n<p>It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.</p>\n\n<p>If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process.&nbsp; This process will be designed to consider each offeror&#39;s capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced.&nbsp; An integrated assessment of the strengths, weaknesses, and risks of each offeror&#39;s proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.</p>\n\n<p>Enclosures: *See attachments 1, 2, &amp; 3*</p>\n\n<ol>\n\t<li>H-65 Environmental Control System (ECS), Performance Objectives&nbsp;</li>\n\t<li>H-65 Data</li>\n\t<li>ECS Compartment CAD model</li>\n</ol>\n\n<p>Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. <u>Telephone</u> <u>responses will not be accepted.</u>&nbsp; Responses should be submitted to <u>Elaina.M.Price@uscg.mil</u>. Please indicate 70Z03826IB0000024 in the subject line.&nbsp;</p>\n\n<p></p>","text":"Request for Information (RFI):\n\nThis is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.\n\nThe United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.\n\nNote: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.\n\nPlease respond to the following questions in addition to submission of your company’s capability statement:\n\n• Is your business a large or small business?\n\n• If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?\n\n• If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?\n\n• Is your firm a certified \"hub zone\" firm?\n\n• Is your firm a woman-owned or operated business?\n\n• Is your firm a certified Service-Disabled Veteran-Owned?\n\n• Is your product listed on a GSA schedule?\n\n• Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers?\n\n• If possible, any POC's for civilian users for general usage of product questions.\n\nAdditional Project Details and Objectives\n\n1.0 Scope\n\nThe environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.\n\n2.0 Background\n\nThe MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2− CG engines.\n\nThe aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.\n\nThe original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin.\n\nThe MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.\n\nThe Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.\n\n3.0 Support\n\nA Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process.\n\n3.1 Open Architecture\n\nThe aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.\n\nA full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.\n\nUniversal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.\n\n3.2 Integration\n\nVendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.\n\n4. Vendor Qualification\n\nThe supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.\n\nThe supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation.\n\nThe supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format.\n\n5. Evaluation\n\nAfter evaluation of the information received, the Coast Guard may issue a separate request for proposals.\n\nIt is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.\n\nIf more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.\n\nEnclosures: *See attachments 1, 2, & 3*\n\n• H-65 Environmental Control System (ECS), Performance Objectives\n\n• H-65 Data\n\n• ECS Compartment CAD model\n\nClosing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"70Z03826IB0000024"},{"dates":{"posted":"2025-12-15","posted_at":"2025-12-15T15:23:35.794Z","created_at":"2025-12-15T15:19:56.479Z","modified_at":"2026-01-20T05:00:07.577Z","response_deadline":{"raw":"2025-12-19T12:00:00-05:00","utc":"2025-12-19T17:00:00Z","date":"2025-12-19","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/5b58e1d456794927bd9bdc86d0a33659/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","agency":{"office":{"code":"70Z038","name":"AVIATION LOGISTICS CENTER (ALC)(00038)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"27909","city":"Elizabeth City","state":"NC","country":"USA"},"organization_id":"100168424","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-19","archive_type":"auto_custom"},"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}],"contacts":[{"name":"Mary Elaina Price","role":"primary","email":"elaina.m.price@uscg.mil","phone":"2523356372"},{"name":"Alyson Harrison","role":"secondary","email":"alyson.s.harrison2@uscg.mil","phone":"5716135816"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"5b58e1d456794927bd9bdc86d0a33659","lineage_id":"2a24a13e3f784220a37e59dc71cd71bb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T01:54:47.522642105Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"10c36944bc201ac19784bd610cdb87437dcd0b382b76872bea2d33951b607c3e","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T01:54:47.522642105Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Amendment 01- Vendor question with answer see see below:&nbsp;</p>\n\n<p>QUESTION #1:</p>\n\n<p>I have a question for this RFI. Notice ID <strong>70Z03826IB0000024.&nbsp;</strong></p>\n\n<p><strong>MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)</strong></p>\n\n<p>It says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?</p>\n\n<p>ANSWER #1:</p>\n\n<p>The Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Request for Information (RFI):&nbsp;</p>\n\n<p>This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e).&nbsp; This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement.&nbsp; The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.&nbsp;</p>\n\n<p>The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter.&nbsp; Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&nbsp;&nbsp;</p>\n\n<p>Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.</p>\n\n<p>Please respond to the following questions in addition to submission of your company&rsquo;s capability statement:</p>\n\n<ol>\n\t<li>Is your business a large or small business?&nbsp;</li>\n\t<li>If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?&nbsp;</li>\n\t<li>If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?&nbsp;</li>\n\t<li>Is your firm a certified &quot;hub zone&quot; firm?&nbsp;</li>\n\t<li>Is your firm a woman-owned or operated business?&nbsp;</li>\n\t<li>Is your firm a certified Service-Disabled Veteran-Owned?&nbsp;</li>\n\t<li>Is your product listed on a GSA schedule?&nbsp;</li>\n\t<li>Do you have other government agencies using the product, and if so which agencies, POC&#39;s and contract numbers?&nbsp;</li>\n\t<li>If possible, any POC&#39;s for civilian users for general usage of product questions.</li>\n</ol>\n\n<p>Additional Project Details and Objectives</p>\n\n<p>1.0 Scope</p>\n\n<p>The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.</p>\n\n<p>2.0 Background</p>\n\n<p>The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft.&nbsp; The current configuration is similar to the AS 365N3.&nbsp; The aircraft is powered by two Turbomeca Arriel 2C2&minus; CG engines. &nbsp;</p>\n\n<p>The aircraft was originally built to Federal Aviation Regulations Part 29 standards.&nbsp; Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.&nbsp; <strong>&nbsp;</strong></p>\n\n<p>The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (<strong>CAAS</strong>) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system.&nbsp; However, there is a now a greater need for cooling air in the cabin.&nbsp;</p>\n\n<p>The MH-65 was originally equipped with a bleed air ECS.&nbsp; The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines.&nbsp; The bleed air heat function was retained.&nbsp; A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.&nbsp;</p>\n\n<p>The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.</p>\n\n<p>3.0 Support</p>\n\n<p>A Performance Based Logistics (PBL) support strategy is desired.&nbsp; The support structure will be based on existing Coast Guard support contracts.&nbsp; The support strategy will be included in the system procurement process.&nbsp;&nbsp;</p>\n\n<p>3.1 Open Architecture</p>\n\n<p>The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.</p>\n\n<p>A full documentation package is desired.&nbsp; The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.</p>\n\n<p>Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.</p>\n\n<p>3.2 Integration</p>\n\n<p>Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.&nbsp;</p>\n\n<p>4. Vendor Qualification</p>\n\n<p>The supplier must be an original equipment manufacturer for aircraft environmental control systems.&nbsp; The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.&nbsp;&nbsp;</p>\n\n<p>The supplier must have experience working with civil and/or military airworthiness authorities.&nbsp; The supplier must explain in their response how they would support the airworthiness certification of the installation.</p>\n\n<p>The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel.&nbsp; All system documentation must be available in readily understandable English language format.</p>\n\n<p>5. Evaluation</p>\n\n<p>After evaluation of the information received, the Coast Guard may issue a separate request for proposals.&nbsp;</p>\n\n<p>It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.</p>\n\n<p>If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process.&nbsp; This process will be designed to consider each offeror&#39;s capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced.&nbsp; An integrated assessment of the strengths, weaknesses, and risks of each offeror&#39;s proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.</p>\n\n<p>Enclosures: *See attachments 1, 2, &amp; 3*</p>\n\n<ol>\n\t<li>H-65 Environmental Control System (ECS), Performance Objectives&nbsp;</li>\n\t<li>H-65 Data</li>\n\t<li>ECS Compartment CAD model</li>\n</ol>\n\n<p>Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. <u>Telephone</u> <u>responses will not be accepted.</u>&nbsp; Responses should be submitted to <u>Elaina.M.Price@uscg.mil</u>. Please indicate 70Z03826IB0000024 in the subject line.&nbsp;</p>\n\n<p></p>","text":"Amendment 01- Vendor question with answer see see below:\n\nQUESTION #1:\n\nI have a question for this RFI. Notice ID 70Z03826IB0000024.\n\nMH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)\n\nIt says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?\n\nANSWER #1:\n\nThe Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.\n\n______________________________________________________________________\n\nRequest for Information (RFI):\n\nThis is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.\n\nThe United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.\n\nNote: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.\n\nPlease respond to the following questions in addition to submission of your company’s capability statement:\n\n• Is your business a large or small business?\n\n• If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?\n\n• If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?\n\n• Is your firm a certified \"hub zone\" firm?\n\n• Is your firm a woman-owned or operated business?\n\n• Is your firm a certified Service-Disabled Veteran-Owned?\n\n• Is your product listed on a GSA schedule?\n\n• Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers?\n\n• If possible, any POC's for civilian users for general usage of product questions.\n\nAdditional Project Details and Objectives\n\n1.0 Scope\n\nThe environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.\n\n2.0 Background\n\nThe MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2− CG engines.\n\nThe aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.\n\nThe original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin.\n\nThe MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.\n\nThe Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.\n\n3.0 Support\n\nA Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process.\n\n3.1 Open Architecture\n\nThe aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.\n\nA full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.\n\nUniversal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.\n\n3.2 Integration\n\nVendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.\n\n4. Vendor Qualification\n\nThe supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.\n\nThe supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation.\n\nThe supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format.\n\n5. Evaluation\n\nAfter evaluation of the information received, the Coast Guard may issue a separate request for proposals.\n\nIt is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.\n\nIf more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.\n\nEnclosures: *See attachments 1, 2, & 3*\n\n• H-65 Environmental Control System (ECS), Performance Objectives\n\n• H-65 Data\n\n• ECS Compartment CAD model\n\nClosing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"70Z03826IB0000024"},{"dates":{"posted":"2025-12-15","posted_at":"2025-12-15T15:24:37.429Z","created_at":"2025-12-15T15:23:55.303Z","modified_at":"2026-01-20T05:00:07.577Z","response_deadline":{"raw":"2025-12-19T12:00:00-05:00","utc":"2025-12-19T17:00:00Z","date":"2025-12-19","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/765f55387a9c4fe5ae6b5ab78d901eb6/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","agency":{"office":{"code":"70Z038","name":"AVIATION LOGISTICS CENTER (ALC)(00038)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"27909","city":"Elizabeth City","state":"NC","country":"USA"},"organization_id":"100168424","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-19","archive_type":"auto_custom"},"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}],"contacts":[{"name":"Mary Elaina Price","role":"primary","email":"elaina.m.price@uscg.mil","phone":"2523356372"},{"name":"Alyson Harrison","role":"secondary","email":"alyson.s.harrison2@uscg.mil","phone":"5716135816"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"765f55387a9c4fe5ae6b5ab78d901eb6","lineage_id":"2a24a13e3f784220a37e59dc71cd71bb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T02:02:52.043139999Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"1e3a2e4a95c8ff4cd94151e8fbfed0ae7cbbce3d41bf72ef40b17c6164814d1b","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T02:02:52.043139999Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Amendment 01- Vendor question with answer. See below:&nbsp;</p>\n\n<p>QUESTION #1:</p>\n\n<p>I have a question for this RFI. Notice ID <strong>70Z03826IB0000024.&nbsp;</strong></p>\n\n<p><strong>MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)</strong></p>\n\n<p>It says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?</p>\n\n<p>ANSWER #1:</p>\n\n<p>The Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Request for Information (RFI):&nbsp;</p>\n\n<p>This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e).&nbsp; This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement.&nbsp; The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.&nbsp;</p>\n\n<p>The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter.&nbsp; Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&nbsp;&nbsp;</p>\n\n<p>Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.</p>\n\n<p>Please respond to the following questions in addition to submission of your company&rsquo;s capability statement:</p>\n\n<ol>\n\t<li>Is your business a large or small business?&nbsp;</li>\n\t<li>If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?&nbsp;</li>\n\t<li>If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?&nbsp;</li>\n\t<li>Is your firm a certified &quot;hub zone&quot; firm?&nbsp;</li>\n\t<li>Is your firm a woman-owned or operated business?&nbsp;</li>\n\t<li>Is your firm a certified Service-Disabled Veteran-Owned?&nbsp;</li>\n\t<li>Is your product listed on a GSA schedule?&nbsp;</li>\n\t<li>Do you have other government agencies using the product, and if so which agencies, POC&#39;s and contract numbers?&nbsp;</li>\n\t<li>If possible, any POC&#39;s for civilian users for general usage of product questions.</li>\n</ol>\n\n<p>Additional Project Details and Objectives</p>\n\n<p>1.0 Scope</p>\n\n<p>The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.</p>\n\n<p>2.0 Background</p>\n\n<p>The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft.&nbsp; The current configuration is similar to the AS 365N3.&nbsp; The aircraft is powered by two Turbomeca Arriel 2C2&minus; CG engines. &nbsp;</p>\n\n<p>The aircraft was originally built to Federal Aviation Regulations Part 29 standards.&nbsp; Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.&nbsp; <strong>&nbsp;</strong></p>\n\n<p>The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (<strong>CAAS</strong>) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system.&nbsp; However, there is a now a greater need for cooling air in the cabin.&nbsp;</p>\n\n<p>The MH-65 was originally equipped with a bleed air ECS.&nbsp; The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines.&nbsp; The bleed air heat function was retained.&nbsp; A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.&nbsp;</p>\n\n<p>The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.</p>\n\n<p>3.0 Support</p>\n\n<p>A Performance Based Logistics (PBL) support strategy is desired.&nbsp; The support structure will be based on existing Coast Guard support contracts.&nbsp; The support strategy will be included in the system procurement process.&nbsp;&nbsp;</p>\n\n<p>3.1 Open Architecture</p>\n\n<p>The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.</p>\n\n<p>A full documentation package is desired.&nbsp; The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.</p>\n\n<p>Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.</p>\n\n<p>3.2 Integration</p>\n\n<p>Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.&nbsp;</p>\n\n<p>4. Vendor Qualification</p>\n\n<p>The supplier must be an original equipment manufacturer for aircraft environmental control systems.&nbsp; The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.&nbsp;&nbsp;</p>\n\n<p>The supplier must have experience working with civil and/or military airworthiness authorities.&nbsp; The supplier must explain in their response how they would support the airworthiness certification of the installation.</p>\n\n<p>The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel.&nbsp; All system documentation must be available in readily understandable English language format.</p>\n\n<p>5. Evaluation</p>\n\n<p>After evaluation of the information received, the Coast Guard may issue a separate request for proposals.&nbsp;</p>\n\n<p>It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.</p>\n\n<p>If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process.&nbsp; This process will be designed to consider each offeror&#39;s capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced.&nbsp; An integrated assessment of the strengths, weaknesses, and risks of each offeror&#39;s proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.</p>\n\n<p>Enclosures: *See attachments 1, 2, &amp; 3*</p>\n\n<ol>\n\t<li>H-65 Environmental Control System (ECS), Performance Objectives&nbsp;</li>\n\t<li>H-65 Data</li>\n\t<li>ECS Compartment CAD model</li>\n</ol>\n\n<p>Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. <u>Telephone</u> <u>responses will not be accepted.</u>&nbsp; Responses should be submitted to <u>Elaina.M.Price@uscg.mil</u>. Please indicate 70Z03826IB0000024 in the subject line.&nbsp;</p>\n\n<p></p>","text":"Amendment 01- Vendor question with answer. See below:\n\nQUESTION #1:\n\nI have a question for this RFI. Notice ID 70Z03826IB0000024.\n\nMH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)\n\nIt says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?\n\nANSWER #1:\n\nThe Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.\n\n______________________________________________________________________\n\nRequest for Information (RFI):\n\nThis is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.\n\nThe United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.\n\nNote: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.\n\nPlease respond to the following questions in addition to submission of your company’s capability statement:\n\n• Is your business a large or small business?\n\n• If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?\n\n• If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?\n\n• Is your firm a certified \"hub zone\" firm?\n\n• Is your firm a woman-owned or operated business?\n\n• Is your firm a certified Service-Disabled Veteran-Owned?\n\n• Is your product listed on a GSA schedule?\n\n• Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers?\n\n• If possible, any POC's for civilian users for general usage of product questions.\n\nAdditional Project Details and Objectives\n\n1.0 Scope\n\nThe environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.\n\n2.0 Background\n\nThe MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2− CG engines.\n\nThe aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.\n\nThe original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin.\n\nThe MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.\n\nThe Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.\n\n3.0 Support\n\nA Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process.\n\n3.1 Open Architecture\n\nThe aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.\n\nA full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.\n\nUniversal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.\n\n3.2 Integration\n\nVendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.\n\n4. Vendor Qualification\n\nThe supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.\n\nThe supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation.\n\nThe supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format.\n\n5. Evaluation\n\nAfter evaluation of the information received, the Coast Guard may issue a separate request for proposals.\n\nIt is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.\n\nIf more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.\n\nEnclosures: *See attachments 1, 2, & 3*\n\n• H-65 Environmental Control System (ECS), Performance Objectives\n\n• H-65 Data\n\n• ECS Compartment CAD model\n\nClosing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"70Z03826IB0000024"},{"dates":{"posted":"2025-12-17","posted_at":"2025-12-17T17:39:02.852Z","created_at":"2025-12-17T17:35:26.666Z","modified_at":"2026-01-20T05:00:07.577Z","response_deadline":{"raw":"2025-12-19T12:00:00-05:00","utc":"2025-12-19T17:00:00Z","date":"2025-12-19","time":"12:00:00","timezone":"America/New_York","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/92dd5f5990144b16a903085660739b87/view"},"naics":{"codes":["336413"],"primary":"336413"},"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","agency":{"office":{"code":"70Z038","name":"AVIATION LOGISTICS CENTER (ALC)(00038)"},"subtier":{"code":"7008","name":"US COAST GUARD"},"department":{"code":"070","name":"HOMELAND SECURITY, DEPARTMENT OF"},"office_address":{"zip":"27909","city":"Elizabeth City","state":"NC","country":"USA"},"organization_id":"100168424","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-01-19","archive_type":"auto_custom"},"history":[{"index":5,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-17T17:39:02.852Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"92dd5f5990144b16a903085660739b87","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":3,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:24:37.429Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"765f55387a9c4fe5ae6b5ab78d901eb6","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":2,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T15:23:35.794Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"modify","opportunity_id":"5b58e1d456794927bd9bdc86d0a33659","solicitation_number":"70Z03826IB0000024","parent_opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb"},{"index":1,"title":"MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-03T20:19:45.307Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"2a24a13e3f784220a37e59dc71cd71bb","solicitation_number":"70Z03826IB0000024"}],"contacts":[{"name":"Mary Elaina Price","role":"primary","email":"elaina.m.price@uscg.mil","phone":"2523356372"},{"name":"Alyson Harrison","role":"secondary","email":"alyson.s.harrison2@uscg.mil","phone":"5716135816"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"92dd5f5990144b16a903085660739b87","lineage_id":"2a24a13e3f784220a37e59dc71cd71bb","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-18T04:47:24.455605630Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"e268394f2d11f3249d79e5b200357b237fcf974878d703354f368e0a58ffd07f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-18T04:47:24.455605630Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Amendment 02- Vendor question with answer. See below:&nbsp;</p>\n\n<p><strong>Question #2: </strong></p>\n\n<p>Thank you for this information. We have one more question for you.</p>\n\n<p>From context, in the description, it states &ldquo;This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&rdquo;</p>\n\n<p>We are an engineering firm that designs first-of-a-kind systems.</p>\n\n<p><u>Are you considering engineering a new ECS system, OR are you asking industry what is currently available that you can use as a replacement?</u></p>\n\n<p><strong>Answer #2:</strong></p>\n\n<p>The USCG is asking industry what is currently available, with minor changes, that we can use as a replacement.</p>\n\n<p></p>\n\n<p>Amendment 01- Vendor question with answer. See below:&nbsp;</p>\n\n<p>QUESTION #1:</p>\n\n<p>I have a question for this RFI. Notice ID <strong>70Z03826IB0000024.&nbsp;</strong></p>\n\n<p><strong>MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)</strong></p>\n\n<p>It says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?</p>\n\n<p>ANSWER #1:</p>\n\n<p>The Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Request for Information (RFI):&nbsp;</p>\n\n<p>This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e).&nbsp; This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement.&nbsp; The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.&nbsp;</p>\n\n<p>The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter.&nbsp; Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&nbsp;&nbsp;</p>\n\n<p>Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.</p>\n\n<p>Please respond to the following questions in addition to submission of your company&rsquo;s capability statement:</p>\n\n<ol>\n\t<li>Is your business a large or small business?&nbsp;</li>\n\t<li>If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?&nbsp;</li>\n\t<li>If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?&nbsp;</li>\n\t<li>Is your firm a certified &quot;hub zone&quot; firm?&nbsp;</li>\n\t<li>Is your firm a woman-owned or operated business?&nbsp;</li>\n\t<li>Is your firm a certified Service-Disabled Veteran-Owned?&nbsp;</li>\n\t<li>Is your product listed on a GSA schedule?&nbsp;</li>\n\t<li>Do you have other government agencies using the product, and if so which agencies, POC&#39;s and contract numbers?&nbsp;</li>\n\t<li>If possible, any POC&#39;s for civilian users for general usage of product questions.</li>\n</ol>\n\n<p>Additional Project Details and Objectives</p>\n\n<p>1.0 Scope</p>\n\n<p>The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.</p>\n\n<p>2.0 Background</p>\n\n<p>The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft.&nbsp; The current configuration is similar to the AS 365N3.&nbsp; The aircraft is powered by two Turbomeca Arriel 2C2&minus; CG engines. &nbsp;</p>\n\n<p>The aircraft was originally built to Federal Aviation Regulations Part 29 standards.&nbsp; Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.&nbsp; <strong>&nbsp;</strong></p>\n\n<p>The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (<strong>CAAS</strong>) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system.&nbsp; However, there is a now a greater need for cooling air in the cabin.&nbsp;</p>\n\n<p>The MH-65 was originally equipped with a bleed air ECS.&nbsp; The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines.&nbsp; The bleed air heat function was retained.&nbsp; A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.&nbsp;</p>\n\n<p>The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.</p>\n\n<p>3.0 Support</p>\n\n<p>A Performance Based Logistics (PBL) support strategy is desired.&nbsp; The support structure will be based on existing Coast Guard support contracts.&nbsp; The support strategy will be included in the system procurement process.&nbsp;&nbsp;</p>\n\n<p>3.1 Open Architecture</p>\n\n<p>The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.</p>\n\n<p>A full documentation package is desired.&nbsp; The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.</p>\n\n<p>Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.</p>\n\n<p>3.2 Integration</p>\n\n<p>Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.&nbsp;</p>\n\n<p>4. Vendor Qualification</p>\n\n<p>The supplier must be an original equipment manufacturer for aircraft environmental control systems.&nbsp; The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.&nbsp;&nbsp;</p>\n\n<p>The supplier must have experience working with civil and/or military airworthiness authorities.&nbsp; The supplier must explain in their response how they would support the airworthiness certification of the installation.</p>\n\n<p>The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel.&nbsp; All system documentation must be available in readily understandable English language format.</p>\n\n<p>5. Evaluation</p>\n\n<p>After evaluation of the information received, the Coast Guard may issue a separate request for proposals.&nbsp;</p>\n\n<p>It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.</p>\n\n<p>If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process.&nbsp; This process will be designed to consider each offeror&#39;s capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced.&nbsp; An integrated assessment of the strengths, weaknesses, and risks of each offeror&#39;s proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.</p>\n\n<p>Enclosures: *See attachments 1, 2, &amp; 3*</p>\n\n<ol>\n\t<li>H-65 Environmental Control System (ECS), Performance Objectives&nbsp;</li>\n\t<li>H-65 Data</li>\n\t<li>ECS Compartment CAD model</li>\n</ol>\n\n<p>Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. <u>Telephone</u> <u>responses will not be accepted.</u>&nbsp; Responses should be submitted to <u>Elaina.M.Price@uscg.mil</u>. Please indicate 70Z03826IB0000024 in the subject line.&nbsp;</p>\n\n<p></p>","text":"Amendment 02- Vendor question with answer. See below:\n\nQuestion #2:\n\nThank you for this information. We have one more question for you.\n\nFrom context, in the description, it states “This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.”\n\nWe are an engineering firm that designs first-of-a-kind systems.\n\nAre you considering engineering a new ECS system, OR are you asking industry what is currently available that you can use as a replacement?\n\nAnswer #2:\n\nThe USCG is asking industry what is currently available, with minor changes, that we can use as a replacement.\n\nAmendment 01- Vendor question with answer. See below:\n\nQUESTION #1:\n\nI have a question for this RFI. Notice ID 70Z03826IB0000024.\n\nMH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)\n\nIt says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?\n\nANSWER #1:\n\nThe Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.\n\n______________________________________________________________________\n\nRequest for Information (RFI):\n\nThis is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.\n\nThe United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.\n\nNote: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.\n\nPlease respond to the following questions in addition to submission of your company’s capability statement:\n\n• Is your business a large or small business?\n\n• If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?\n\n• If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?\n\n• Is your firm a certified \"hub zone\" firm?\n\n• Is your firm a woman-owned or operated business?\n\n• Is your firm a certified Service-Disabled Veteran-Owned?\n\n• Is your product listed on a GSA schedule?\n\n• Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers?\n\n• If possible, any POC's for civilian users for general usage of product questions.\n\nAdditional Project Details and Objectives\n\n1.0 Scope\n\nThe environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.\n\n2.0 Background\n\nThe MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2− CG engines.\n\nThe aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.\n\nThe original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin.\n\nThe MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.\n\nThe Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.\n\n3.0 Support\n\nA Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process.\n\n3.1 Open Architecture\n\nThe aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.\n\nA full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.\n\nUniversal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.\n\n3.2 Integration\n\nVendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.\n\n4. Vendor Qualification\n\nThe supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.\n\nThe supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation.\n\nThe supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format.\n\n5. Evaluation\n\nAfter evaluation of the information received, the Coast Guard may issue a separate request for proposals.\n\nIt is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.\n\nIf more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.\n\nEnclosures: *See attachments 1, 2, & 3*\n\n• H-65 Environmental Control System (ECS), Performance Objectives\n\n• H-65 Data\n\n• ECS Compartment CAD model\n\nClosing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"70Z03826IB0000024"}],"due_at":"2025-12-19T17:00:00Z","due_date":"2025-12-19","closes_at":"2025-12-19T17:00:00Z","awardable":true,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z038","office_name":"AVIATION LOGISTICS CENTER (ALC)(00038)","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-18T04:56:43.547826Z","principal_notice_id":"92dd5f5990144b16a903085660739b87","description":{"text":"Amendment 02- Vendor question with answer. See below:\n\nQuestion #2:\n\nThank you for this information. We have one more question for you.\n\nFrom context, in the description, it states “This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.”\n\nWe are an engineering firm that designs first-of-a-kind systems.\n\nAre you considering engineering a new ECS system, OR are you asking industry what is currently available that you can use as a replacement?\n\nAnswer #2:\n\nThe USCG is asking industry what is currently available, with minor changes, that we can use as a replacement.\n\nAmendment 01- Vendor question with answer. See below:\n\nQUESTION #1:\n\nI have a question for this RFI. Notice ID 70Z03826IB0000024.\n\nMH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)\n\nIt says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?\n\nANSWER #1:\n\nThe Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.\n\n______________________________________________________________________\n\nRequest for Information (RFI):\n\nThis is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e). This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement. The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.\n\nThe United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter. Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.\n\nNote: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.\n\nPlease respond to the following questions in addition to submission of your company’s capability statement:\n\n• Is your business a large or small business?\n\n• If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?\n\n• If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?\n\n• Is your firm a certified \"hub zone\" firm?\n\n• Is your firm a woman-owned or operated business?\n\n• Is your firm a certified Service-Disabled Veteran-Owned?\n\n• Is your product listed on a GSA schedule?\n\n• Do you have other government agencies using the product, and if so which agencies, POC's and contract numbers?\n\n• If possible, any POC's for civilian users for general usage of product questions.\n\nAdditional Project Details and Objectives\n\n1.0 Scope\n\nThe environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.\n\n2.0 Background\n\nThe MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft. The current configuration is similar to the AS 365N3. The aircraft is powered by two Turbomeca Arriel 2C2− CG engines.\n\nThe aircraft was originally built to Federal Aviation Regulations Part 29 standards. Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.\n\nThe original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (CAAS) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system. However, there is a now a greater need for cooling air in the cabin.\n\nThe MH-65 was originally equipped with a bleed air ECS. The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines. The bleed air heat function was retained. A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.\n\nThe Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.\n\n3.0 Support\n\nA Performance Based Logistics (PBL) support strategy is desired. The support structure will be based on existing Coast Guard support contracts. The support strategy will be included in the system procurement process.\n\n3.1 Open Architecture\n\nThe aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.\n\nA full documentation package is desired. The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.\n\nUniversal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.\n\n3.2 Integration\n\nVendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.\n\n4. Vendor Qualification\n\nThe supplier must be an original equipment manufacturer for aircraft environmental control systems. The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.\n\nThe supplier must have experience working with civil and/or military airworthiness authorities. The supplier must explain in their response how they would support the airworthiness certification of the installation.\n\nThe supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel. All system documentation must be available in readily understandable English language format.\n\n5. Evaluation\n\nAfter evaluation of the information received, the Coast Guard may issue a separate request for proposals.\n\nIt is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.\n\nIf more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process. This process will be designed to consider each offeror's capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced. An integrated assessment of the strengths, weaknesses, and risks of each offeror's proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.\n\nEnclosures: *See attachments 1, 2, & 3*\n\n• H-65 Environmental Control System (ECS), Performance Objectives\n\n• H-65 Data\n\n• ECS Compartment CAD model\n\nClosing date and time for receipt of response is December 19, 2025 at 12:00pm EST. Telephone responses will not be accepted. Responses should be submitted to Elaina.M.Price@uscg.mil. Please indicate 70Z03826IB0000024 in the subject line.","html":"<p>Amendment 02- Vendor question with answer. See below:&nbsp;</p>\n\n<p><strong>Question #2: </strong></p>\n\n<p>Thank you for this information. We have one more question for you.</p>\n\n<p>From context, in the description, it states &ldquo;This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&rdquo;</p>\n\n<p>We are an engineering firm that designs first-of-a-kind systems.</p>\n\n<p><u>Are you considering engineering a new ECS system, OR are you asking industry what is currently available that you can use as a replacement?</u></p>\n\n<p><strong>Answer #2:</strong></p>\n\n<p>The USCG is asking industry what is currently available, with minor changes, that we can use as a replacement.</p>\n\n<p></p>\n\n<p>Amendment 01- Vendor question with answer. See below:&nbsp;</p>\n\n<p>QUESTION #1:</p>\n\n<p>I have a question for this RFI. Notice ID <strong>70Z03826IB0000024.&nbsp;</strong></p>\n\n<p><strong>MH-65 Environmental Control System (ECS), Procurement and Sustainment; Request for Information (RFI)</strong></p>\n\n<p>It says the contractor engineer would be required on site through the development and integration phase. Does this mean we would have to send someone down during this whole process or just when we are integrating and testing the final design into the helicopter?</p>\n\n<p>ANSWER #1:</p>\n\n<p>The Contractor Engineer would be required on site when the USCG ALC SRR Engineering are integrating and testing the final design into the helicopter.</p>\n\n<p>______________________________________________________________________</p>\n\n<p>Request for Information (RFI):&nbsp;</p>\n\n<p>This is not a request for proposals. This is a RFI released pursuant to Federal Acquisition Regulation (FAR) 15.201(e).&nbsp; This RFI is for information and planning purposes only and is not to be construed as a commitment by the Government. This is not a solicitation announcement for proposals and no contract will be awarded from this announcement.&nbsp; The information provided in this RFI is subject to change and is not binding on the Government. All submissions become the property of the Federal Government and will not be returned.&nbsp;</p>\n\n<p>The United States Coast Guard is requesting information from industry regarding an ECS that could replace the vapor cycle refrigeration system currently installed in the MH-65 Helicopter.&nbsp; Replacement systems must be lighter in weight and have greater cooling capacity than the system installed presently. This solicitation has been issued to survey the market to identify suitable candidate systems and suppliers for consideration.&nbsp;&nbsp;</p>\n\n<p>Note: this RFI pertains to cooling systems using any technology available to include but not limited to vapor cycle, bleed air, and electrically or mechanically driven.</p>\n\n<p>Please respond to the following questions in addition to submission of your company&rsquo;s capability statement:</p>\n\n<ol>\n\t<li>Is your business a large or small business?&nbsp;</li>\n\t<li>If small, does your firm qualify as a small, emergent business, or a small, disadvantaged business?&nbsp;</li>\n\t<li>If disadvantaged, specify under which disadvantaged group and is your firm certified under Section 8(a) of the Small Business Act?&nbsp;</li>\n\t<li>Is your firm a certified &quot;hub zone&quot; firm?&nbsp;</li>\n\t<li>Is your firm a woman-owned or operated business?&nbsp;</li>\n\t<li>Is your firm a certified Service-Disabled Veteran-Owned?&nbsp;</li>\n\t<li>Is your product listed on a GSA schedule?&nbsp;</li>\n\t<li>Do you have other government agencies using the product, and if so which agencies, POC&#39;s and contract numbers?&nbsp;</li>\n\t<li>If possible, any POC&#39;s for civilian users for general usage of product questions.</li>\n</ol>\n\n<p>Additional Project Details and Objectives</p>\n\n<p>1.0 Scope</p>\n\n<p>The environmental control system for cooling may be installed in all MH-65 aircraft. The requirement will include spare parts and support. The system and associated support plans will be designed to minimize government inventory requirements.</p>\n\n<p>2.0 Background</p>\n\n<p>The MH-65 is a derivative of the Airbus Helicopters Dauphin aircraft.&nbsp; The current configuration is similar to the AS 365N3.&nbsp; The aircraft is powered by two Turbomeca Arriel 2C2&minus; CG engines. &nbsp;</p>\n\n<p>The aircraft was originally built to Federal Aviation Regulations Part 29 standards.&nbsp; Modifications to the aircraft are designed to current Federal Aviation Regulations Part 29 standards with exceptions approved for Coast Guard specific requirements.&nbsp; <strong>&nbsp;</strong></p>\n\n<p>The original avionics system of the MH-65 aircraft has been upgraded to a Common Avionics Architecture System (<strong>CAAS</strong>) to provide substantial additional communication and sensor capabilities. The newer avionics components are capable of operating with less conditioned air than that required for the original MH-65 avionics system.&nbsp; However, there is a now a greater need for cooling air in the cabin.&nbsp;</p>\n\n<p>The MH-65 was originally equipped with a bleed air ECS.&nbsp; The bleed air cooling system was removed early in the development of the MH-65 in order to preserve the engines.&nbsp; The bleed air heat function was retained.&nbsp; A vapor cycle (Freon) system was installed to eliminate the need for the engines to provide bleed air for cooling. The current heat exchanger has been modified further to operate on FR-12 refrigerant.&nbsp;</p>\n\n<p>The Coast Guard is looking to the open market for solutions that can replace the current system while gaining weight savings and increased cooling capacity to meet present and future avionics upgrades.</p>\n\n<p>3.0 Support</p>\n\n<p>A Performance Based Logistics (PBL) support strategy is desired.&nbsp; The support structure will be based on existing Coast Guard support contracts.&nbsp; The support strategy will be included in the system procurement process.&nbsp;&nbsp;</p>\n\n<p>3.1 Open Architecture</p>\n\n<p>The aircraft will be designed to incorporate open architecture to the greatest extent possible and use standard government and commercial protocols. The system should minimize proprietary interfaces and systems. Data developed at government expense will be used by the government without restriction.</p>\n\n<p>A full documentation package is desired.&nbsp; The minimum documentation requirement will include a detailed interface control documentation and system data necessary for troubleshooting and maintenance.</p>\n\n<p>Universal connections are required for any interface to refrigerant servicing carts if proposed systems are maintained with their use.</p>\n\n<p>3.2 Integration</p>\n\n<p>Vendors submitting capability information must include information on their ability to supply an Engineer on-site throughout the development and integration phase. The Contractor Engineer would interface daily with ALC on-site engineers and will also be required to perform tasks inside the helicopter through all operational ground and flight-testing phases.&nbsp;</p>\n\n<p>4. Vendor Qualification</p>\n\n<p>The supplier must be an original equipment manufacturer for aircraft environmental control systems.&nbsp; The supplier must be FAA certified and must have been awarded a Supplemental Type Certificate (STC) for environmental control systems installed on other aircraft. The Coast Guard will use this STC information as a basis to gauge quality in regards to the product and customer support.&nbsp;&nbsp;</p>\n\n<p>The supplier must have experience working with civil and/or military airworthiness authorities.&nbsp; The supplier must explain in their response how they would support the airworthiness certification of the installation.</p>\n\n<p>The supplier must have or establish a permanent presence in the United States staffed with English speaking technical support personnel.&nbsp; All system documentation must be available in readily understandable English language format.</p>\n\n<p>5. Evaluation</p>\n\n<p>After evaluation of the information received, the Coast Guard may issue a separate request for proposals.&nbsp;</p>\n\n<p>It is critical that, prior to submitting a response to this RFI, the vendor will be responsible for the review all attached enclosures. The compartments that house the current ECS cannot be modified. Therefore, submissions that will not fit into the designated spaces will not be considered for Request for Proposal (RFP) development or as potential candidates for award. Any follow-on RFP will include this statement as well.</p>\n\n<p>If more than one qualified vendor is identified, the request for proposals will include an evaluation and source selection process.&nbsp; This process will be designed to consider each offeror&#39;s capability to provide a technical solution that best aligns with the project objectives, is within the proposed schedule, and is affordably priced.&nbsp; An integrated assessment of the strengths, weaknesses, and risks of each offeror&#39;s proposal, together with the cost proposed, will be used to determine which proposal offers the best overall value to the Government.</p>\n\n<p>Enclosures: *See attachments 1, 2, &amp; 3*</p>\n\n<ol>\n\t<li>H-65 Environmental Control System (ECS), Performance Objectives&nbsp;</li>\n\t<li>H-65 Data</li>\n\t<li>ECS Compartment CAD model</li>\n</ol>\n\n<p>Closing date and time for receipt of response is December 19, 2025 at 12:00pm EST. <u>Telephone</u> <u>responses will not be accepted.</u>&nbsp; Responses should be submitted to <u>Elaina.M.Price@uscg.mil</u>. Please indicate 70Z03826IB0000024 in the subject line.&nbsp;</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Mary Elaina Price","role":"primary","email":"elaina.m.price@uscg.mil","phone":"2523356372"},{"name":"Alyson Harrison","role":"secondary","email":"alyson.s.harrison2@uscg.mil","phone":"5716135816"}],"place_of_performance":null,"office_address":{"zip":"27909","city":"Elizabeth City","state":"NC","country":"USA"},"naics_codes":["336413"],"award":null,"attachments":[{"resource_id":"bd380379104d4a48910c318c827c5500","name":"Enclosure (3) ECS Compartment CAD model.pdf","kind":"file","mime_type":".pdf","size_bytes":657042,"posted_at":"2025-12-03T20:19:45.307Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bd380379104d4a48910c318c827c5500/download","mirrored":false}],"awards":[],"related":[{"key":"70Z03827QB0000024","latest_notice_id":"adadaac750a34487b30fcd78bd91a7c1","title":"MH-65 SPARE PARTS","solicitation_number":"70Z03827QB0000024","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-30T14:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T14:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z038","office_name":"AVIATION LOGISTICS CENTER (ALC)(00038)","naics":"336413","psc":"1670","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1670)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"70Z03827QB0000023","latest_notice_id":"74ce297c959441c097bafc4b48d99b91","title":"VARIOUS SPARE PARTS FOR USE ON THE MH-65 AIRCRAFT","solicitation_number":"70Z03827QB0000023","notice_type":"k","first_type":"k","first_posted":"2026-11-17","last_posted":"2026-11-23","notices":3,"due_at":"2026-11-30T16:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z038","office_name":"AVIATION LOGISTICS CENTER (ALC)(00038)","naics":"336413","psc":"1615","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1615)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"70Z03827IH0000004","latest_notice_id":"915ea81b5f46437a99613ac6d8e3fba2","title":"Repair of Multi-Function Control Display Units","solicitation_number":"70Z03827IH0000004","notice_type":"r","first_type":"r","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-30T17:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z038","office_name":"AVIATION LOGISTICS CENTER (ALC)(00038)","naics":"488190","psc":"J059","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"70Z03827QJ0000042","latest_notice_id":"f5c6178ad1f84f77a0bf4ab9ec8f7c32","title":"Bolt","solicitation_number":"70Z03827QJ0000042","notice_type":"k","first_type":"k","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z038","office_name":"AVIATION LOGISTICS CENTER (ALC)(00038)","naics":"336413","psc":"5306","set_aside":"SBA","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5306)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"70Z03827IJ0000005","latest_notice_id":"26c1f62fca6f4443b1cf2539b2c68191","title":"Bucket Assembly","solicitation_number":"70Z03827IJ0000005","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z038","office_name":"AVIATION LOGISTICS CENTER (ALC)(00038)","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"SPRHA127Q0993","latest_notice_id":"6065286d78f04e5ebd07038cb3c41cef","title":"BALLSCREW ASSEMBLY For C-130","solicitation_number":"SPRHA1-27-Q-0993","notice_type":"o","first_type":"o","first_posted":"2026-10-29","last_posted":"2026-10-29","notices":1,"due_at":"2026-11-28T21:00:00Z","due_date":"2026-11-28","closes_at":"2026-11-28T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97AS","sub_name":"DEFENSE LOGISTICS AGENCY","office_key":"o-SPRHA1","office_name":"DLA AVIATION AT OGDEN, UT","naics":"336413","psc":"1620","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1620)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"},{"key":"N0038326QFB63","latest_notice_id":"a1f0c31b0c824655b7aa459c1846f490","title":"16--FRAME,SEAT,AIRCRAFT, IN REPAIR/MODIFICATION OF","solicitation_number":"N0038326QFB63","notice_type":"o","first_type":"p","first_posted":"2026-08-11","last_posted":"2026-10-27","notices":4,"due_at":"2026-11-28T21:30:00Z","due_date":"2026-11-28","closes_at":"2026-11-28T21:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-N00383","office_name":"NAVSUP WEAPON SYSTEMS SUPPORT","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-28T04:01:09.175983Z"},{"key":"MOVINGISLANDACTUATORS","latest_notice_id":"30cc7f9970ac4c1988faafd47c9d94cd","title":"Sources Sought Synopsis (SSS) for Repair of C-5 Moving Island Actuators","solicitation_number":"MOVING_ISLAND_ACTUATORS","notice_type":"r","first_type":"r","first_posted":"2026-10-29","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-28T22:30:00Z","due_date":"2026-11-28","closes_at":"2026-11-28T22:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8538","office_name":"FA8538 AFSC PZAAB","naics":"336413","psc":"1680","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 1680)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":487,"indexable":false}