Combined synopsis and solicitation, total small business set-aside
Electric Submersible Pumps
70Z02925Q0000069
US Coast Guard, Base New Orleans. Industrial Machinery and Equipment Merchant Wholesalers.
Response deadline
February 7, 2025 at 1:00 AM EST
Closed 657 days ago. Posted February 3, 2025, first published January 30, 2025. Scheduled to archive February 22, 2025.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2025
3 like it are open now in industrial machinery and equipment merchant wholesalers
- CUTTING EDGE,MOLDBOARD
Defense Logistics Agency, DLA Troop Support
Combined synopsis and solicitationHUBZoneNAICS 423830Ship to the buyerSPE8EE27T0473Due in 5 daysNov 30 - Pneumatic Forklift
Food Safety and Inspection Service, Usda, Fsis, Oas PCMB
PresolicitationNAICS 423830Urban Honolulu, HI1178359Due in 5 daysDec 1 - W90VN927QA004- RFQ FOR TWO (2) 3.5 TON BUCKET TRUCKS
Department of the Army, 0906 Aq Co Det a Contracti
Combined synopsis and solicitationNAICS 423830Ship to the buyerW90VN927QA004Closes in 13 daysDec 9
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Combined synopsis and solicitation. A streamlined commercial-item buy where the notice itself is the solicitation. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 423830 (industrial machinery and equipment merchant wholesalers), means no more than 100 employees, counted with affiliates. Open Small business opportunities
- Time to respond
- Bidders had 8 days from the day the solicitation was posted, January 30, 2025, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Coast Guard requires the supply of two (2) Solid waste submersible pumps and one
(1) control panel. No labor will be required from the vendor.
SCOPE OF WORK: Contractor shall furnish two (2) Barnes SH model number 3SHVC50N4
submersible pumps and (1) Cox Research & Design Control Panel model number CP-5071 with four
(4) level control floats. No alterations outside of the Statement of Work criteria are authorized
without permission from the Contracting Officer (KO) or Contracting Officers Representative (COR)
1. PERFORMANCE REQUIREMENTS: Contractor shall furnish equipment as outline below. All
associated equipment shall be approved and designed to work with stated model number.
a) Two (2) Barnes SH model 3SHVC50N4 Electric Submersible pumps
3” ANSI flange discharge
5 HP
3-phase, 480v Electrical Service
Gorman Rupp guide shoe retrofit
b) Cox Research & Design Duplex Alternating Control Panel, model CP-5071
NEMA 4x SS enclosure
Four (4) level control floats
3-phase/480v Electrical Service
2. CONTRACT TIMELINE: The Contractor shall provide all required information and complete
this contract within this time schedule, unless approved by the Contracting Officer representative. Any delays on materials or labor issues that will impede the completion of thecontract shall be documented with the Contracting Officer or their representative.
a) Provide all required submittals to the Contracting Officer or Contracting Officers
Representative within 14 calendar days after contract award.
b) The U.S. Coast Guard will have 7 calendar days to review the submittals and respond to
Contractor.
c) Contractor shall provide projected delivery schedule during proposal and provide a firm
delivery date within 14 calendar days after the contract has been awarded.
d) The Contractor, upon receiving notification that the U.S. Coast Guard has approved the
submittals and having received the Contractors firm delivery date schedule, will have 14
Calendar days to begin work on the project & 30 Calendar days to complete. The
Contractor shall notify the Contracting Officer of any long lead time delivery of
equipment, so that the Contracting Officer can modify the delivery date of the contract.
SUBMITTALS: Once awarded, the following list of submittals required at time of delivery and
defines the specific minimum requirements for this contract.
c) Manufactures Technical Publications and Guides
d) Warranty Information
WARRANTY: Contractor shall provide a one-year warranty for all materials. All warranty claims
by the Coast Guard shall be honored by the vendor at no additional cost to the Coast Guard.
Yes, equivalent brands are acceptable as long as they match the standard. The issue you may run into is the physical layout of the pump in order to mount in our lift station. I have attached pictures of the current pump.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Sewage Lift station SOW.pdf444 KB, January 30, 2025
- Commercial Supplies Services Clauses Provisions FAC 2023-01.doc461 KB, January 30, 2025
- Sewage Pump 1.jpeg2.8 MB, February 3, 2025
- Sewage Pump 4.jpeg4.3 MB, February 3, 2025
- Sewage Pump 2.jpeg4.6 MB, February 3, 2025
- Sewage Pump 3.jpeg4.7 MB, February 3, 2025
- Name Brand and Equal.docx13 KB, February 3, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 30, 2025
Combined synopsis and solicitation
Due February 7, 2025 at 1:00 AM EST. SAM.gov, notice 95ca212ad7624f758431bb1298de4050
2 revisions on SAM
- February 3, 2025: publish, combined synopsis and solicitation
- January 30, 2025: publish, combined synopsis and solicitation
February 3, 2025
Combined synopsis and solicitation
Due February 7, 2025 at 1:00 AM EST. SAM.gov, notice 093bfa86335d4b8ba2ff3e2a40dbcbfb
2 revisions on SAM
- February 3, 2025: publish, combined synopsis and solicitation
- January 30, 2025: publish, combined synopsis and solicitation
Points of contact
- Clarence Henshaw Jrclarence.henshawjr@uscg.mil5042534509
- Wesley HannaWesley.K.Hanna@uscg.mil5042534749