# HI FLAP CR562(1) Kilauea Point

Canonical: https://sealedbidder.com/opportunities/6982af27b000008

- Solicitation number: 6982AF27B000008
- Notice type: Solicitation (first published as presolicitation)
- Status: Open. Offers due December 17, 2026 at 4:00 PM EST
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237310)
- Place of performance: Hawaii
- County: Kauai County (FIPS 15007). https://sealedbidder.com/counties/kauai-county-hi-15007
- City: Kilauea. https://sealedbidder.com/cities/kilauea-hi-1536650
- First posted: October 15, 2026
- Last posted: November 17, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/40abc20233e54857b8a6f6f348978081/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. To compete, read the solicitation and its attachments, send questions to the contact named on the notice in writing, and submit the offer the way the solicitation says before the deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders have 30 days from the day the solicitation was posted, November 17, 2026, to the deadline.
- Before the solicitation: The agency published a presolicitation on October 15, 2026, 33 days before the solicitation.

## Description

Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook.

The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.

## Attachments

- [FP-14_Eng.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c56ff800618c417884e14ff122044168/download)
- [Schedule A Grading Summary.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e5d2c91a20dc4ead9d2173ceb3697d3d/download)
- [Pavement Design Report_09-2023.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ada111f1400e40d19b52b890725dbc10/download)
- [Kolo Horizontal Alignment.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/465ee9f0d7b742e1977e33ed4ad2a435/download)
- [Kilauea Horizontal Alignment.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c882bfa371b844e2837a52b6b5c688a3/download)
- [HI FLAP CR 562(1)_Kilauea Hyd Report_2026.10.01.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f1e80e4608544e41ade1ec02f9f7cb6c/download)
- [HI FLAP CR 562(1) Plans.2026.10.01.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f2f33b2e6aef49748056c2ea1cff8542/download)
- [XYZ Reports for grade finishing stakes.zip](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/16437dcc51d749df96031aecf701d146/download)
- [6982AF27B000008. HI FLAP CR562(1) Kilauea Point.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2d57cf80d3ae4857b1777b07aea6c962/download)

## Open now in the same industry

35 open in NAICS 237310.

- AL-WHEELER NWR-WATERMAN GATE (140FF027Q0077), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/140ff027q0077
- W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation (W912EK27BA003), due November 30, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/w912ek27ba003
- NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip (140PP027R0017), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/140pp027r0017

## Publications

- October 15, 2026: Presolicitation. Notice dc14203ba77443638a2488066e588f26. https://sam.gov/workspace/contract/opp/dc14203ba77443638a2488066e588f26/view
- November 17, 2026: Solicitation, due December 17, 2026 at 4:00 PM EST. Notice 40abc20233e54857b8a6f6f348978081. https://sam.gov/workspace/contract/opp/40abc20233e54857b8a6f6f348978081/view

## Points of contact

- Stephanie Navarro, cflcontracts@dot.gov
- Ryan Phillips, cflacquisitions@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/6982af27b000008.
