# CO NP BLCA 10(1) South Rim Drive

Canonical: https://sealedbidder.com/opportunities/6982af26q000022

- Solicitation number: 6982AF26Q000022
- Notice type: Award notice (first published as solicitation)
- Status: Awarded to GCS LLC for $951,200.00
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Set-aside: Total small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 237310)
- Place of performance: Montrose, Colorado
- County: Montrose County (FIPS 08085). https://sealedbidder.com/counties/montrose-county-co-08085
- City: Montrose. https://sealedbidder.com/cities/montrose-co-0851745
- First posted: September 17, 2026
- Last posted: October 28, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/f1867ec2cc5348efa689aa380d2ca412/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Who may compete: Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 21 days from the day the solicitation was posted, September 17, 2026, to the deadline.
- How it ended: Awarded to GCS LLC on October 28, 2026, 20 days after offers were due. The contracting office reported 7 offers (competed under simplified acquisition procedures).

## Description

This is a Request for Quote.  Plans and specifications are available.

PROJECT NUMBER:  CO NP BLCA 10(1)

PROJECT NAME:  South Rim Drive Improvement

PROJECT DESCRIPTION:

The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.

SCOPE OF THE WORK:

The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve (12) distinct locations along South Rim Drive.

Principal work elements include, but are not limited to, the following:

	Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.

	Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.

	Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).

	Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors.

Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.

To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.

ANTICIPATED SCHEDULE:

	Advertisement: Mid-September 15, 2026

	Award: Mid-October 2026

	Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter)

	Construction: Early April 2027 &ndash; Late May 2027

ESTIMATED COST RANGE:

The estimated bid range for Schedule A is between $700,000 and $2,000,000.

## Attachments

- [6982AF26Q000022.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c8b6291878b24f90b15a9c8cb820a392/download)

## Award on USAspending

- Recipient: GCS LLC (UEI JJXLTLEU5UN5)
- Contract: 6982AF27P000001, purchase order
- Obligated: $956,200.00
- Competition: Competed Under SAP, 7 offers received
- Link: solicitation number 6982AF26Q000022 equals the FPDS solicitation identifier; same awarding office 6982AF (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_6982AF27P000001_6925_-NONE-_-NONE-/


## Open now in the same industry

36 open in NAICS 237310.

- GAOA Brainard Lake Recreation Area Deferred Maintenance (1240LT27Q0004), due December 17, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0004
- Administrative Parking Lot Repairs (1240LT27Q0019), due December 18, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/1240lt27q0019
- AL-WHEELER NWR-WATERMAN GATE (140FF027Q0077), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/140ff027q0077

## Publications

- September 17, 2026: Solicitation, removed from SAM.gov September 24, 2026, due October 8, 2026 at 4:00 PM EDT. Notice 9ff615863acb4fef9c7c4272bd410d2a. https://sam.gov/workspace/contract/opp/9ff615863acb4fef9c7c4272bd410d2a/view
- September 17, 2026: Combined synopsis and solicitation, due October 8, 2026 at 4:00 PM EDT. Notice bb67e9035828449ab88aa39f52604199. https://sam.gov/workspace/contract/opp/bb67e9035828449ab88aa39f52604199/view
- September 23, 2026: Combined synopsis and solicitation, due October 8, 2026 at 4:00 PM EDT. Notice 2527e80594a6426faed8777264036173. https://sam.gov/workspace/contract/opp/2527e80594a6426faed8777264036173/view
- September 25, 2026: Combined synopsis and solicitation, due October 8, 2026 at 4:00 PM EDT. Notice c64ad7b388eb45508fbf6c83c5e17976. https://sam.gov/workspace/contract/opp/c64ad7b388eb45508fbf6c83c5e17976/view
- September 29, 2026: Combined synopsis and solicitation, due October 8, 2026 at 4:00 PM EDT. Notice 4bba033fec194d59a06ba9a607336214. https://sam.gov/workspace/contract/opp/4bba033fec194d59a06ba9a607336214/view
- October 1, 2026: Combined synopsis and solicitation, due October 8, 2026 at 4:00 PM EDT. Notice 8017030241ca445f932342aaaafee2ad. https://sam.gov/workspace/contract/opp/8017030241ca445f932342aaaafee2ad/view
- October 2, 2026: Combined synopsis and solicitation, due October 8, 2026 at 4:00 PM EDT. Notice 22ad1a2e8b3f43029f96bc109801cdc9. https://sam.gov/workspace/contract/opp/22ad1a2e8b3f43029f96bc109801cdc9/view
- October 28, 2026: Award notice. Notice f1867ec2cc5348efa689aa380d2ca412. https://sam.gov/workspace/contract/opp/f1867ec2cc5348efa689aa380d2ca412/view

## Points of contact

- Denise Martinez, CFLAcquisitions@dot.gov
- Jorey Deml, CFLAcquisitions@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/6982af26q000022.
