Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,724 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Solicitation, first published as presolicitation

ND NP THRO 204(1) Buck Hill Road

6982AF25B000004

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

November 3, 2026 at 4:00 PM EST

Closed 22 days ago. Posted November 3, 2026, first published September 15, 2026. Scheduled to archive December 15, 2026.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed 22 days ago

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
Time to respond
Bidders had 33 days from the day the solicitation was posted, October 1, 2026, to the deadline. The deadline moved once: it was first September 30, 2026 and ended as November 3, 2026.
Before the solicitation
The agency published a presolicitation on September 15, 2026, 16 days before the solicitation.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

INVITATION FOR BID (IFB)

FULL AND OPEN COMPETITION WITH HUBZONE PREFERENCE

PROJECT NUMBER: ND NP THRO 204(1)

PROJECT NAME: Buck Hill Road

PROJECT DESCRIPTION: 

Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND.  The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet.  It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road.  The route then proceeds southeasterly for approximately ¾ of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area.  The route is located entirely within Theodore Roosevelt NP.  There is one (1) base schedule and no options.

SCOPE OF THE WORK:

The project includes three major components; 1) Approximately ¾ mile of roadway rehabilitation, 2) Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and 3) Reconstructing the existing Buck Hill Overlook parking lot.

The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail.  Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway.  This includes installation of several drainage inlets and culverts as well as new striping and signage.

The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage.  A geotechnical report will be provided with the PS&E package.

Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses.  The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement.  This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage.  New trash receptacles and stone benches will be installed as part of the new parking area.

Buck Hill Road may be closed for the duration of construction.

PRINCIPAL WORK ITEMS:

Approximate quantities for major work items:

  • 11,000 cubic yards of subexcavation
  • 1,000 linear feet of geocomposite sheet drain
  • 2,000 tons of hot asphalt concrete pavement
  • 5,000 tons of roadway aggregate
  • 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused)
  • 5,100 linear feet of concrete curb and gutter (tan and onyx colored)
  • 650 square yards of concrete sidewalk (tan colored)
  • 1,600 linear feet of guardrail

ANTICIPATED SCHEDULE: 

Advertisement – October 2026

Award - January 2027

Construction – April 2027 through November 2027

ESTIMATED COST RANGE: 

Between $5,000,000 and $10,000,000

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 15, 2026

    Presolicitation, originally sources sought

    Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice 79fd783a138c4712a511e5e338872f1d

    2 revisions on SAM
    • September 15, 2026: publish, presolicitation
    • October 30, 2024: publish, sources sought
  2. September 21, 2026

    Presolicitation

    Due September 30, 2026 at 4:00 PM EDT. SAM.gov, notice bcce73af1ed54e3aab636788582e30b7

    3 revisions on SAM
    • September 21, 2026: publish, presolicitation
    • September 15, 2026: publish, presolicitation
    • October 30, 2024: publish, sources sought
  3. October 1, 2026

    Solicitation, originally presolicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 8522769e61fa4b8e9ccca85a9f15254b

    2 revisions on SAM
    • October 1, 2026: publish, solicitation
    • September 21, 2026: publish, presolicitation
  4. October 7, 2026

    Solicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 725411ccc3ac46efb76d1069217bbfc2

    3 revisions on SAM
    • October 7, 2026: publish, solicitation
    • October 1, 2026: publish, solicitation
    • September 21, 2026: publish, presolicitation
  5. October 14, 2026

    Solicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice d603355264cf486e9f7167fc4cc3f0f2

    4 revisions on SAM
    • September 21, 2026: publish, presolicitation
    • October 14, 2026: publish, solicitation
    • October 7, 2026: publish, solicitation
    • October 1, 2026: publish, solicitation
  6. October 27, 2026

    Solicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice d12c6aab990d4811a5a120eba2152854

    5 revisions on SAM
    • October 27, 2026: publish, solicitation
    • September 21, 2026: publish, presolicitation
    • October 14, 2026: publish, solicitation
    • October 7, 2026: publish, solicitation
    • October 1, 2026: publish, solicitation
  7. October 29, 2026

    Solicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 627bc004858f4f58a44af35a6b332d13

    6 revisions on SAM
    • October 29, 2026: publish, solicitation
    • October 27, 2026: publish, solicitation
    • September 21, 2026: publish, presolicitation
    • October 14, 2026: publish, solicitation
    • October 7, 2026: publish, solicitation
    • October 1, 2026: publish, solicitation
  8. November 2, 2026

    Solicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 77f0f691f0a14919ae24ef180eb1eb4c

    7 revisions on SAM
    • November 2, 2026: publish, solicitation
    • October 29, 2026: publish, solicitation
    • October 27, 2026: publish, solicitation
    • September 21, 2026: publish, presolicitation
    • October 14, 2026: publish, solicitation
    • October 7, 2026: publish, solicitation
    • October 1, 2026: publish, solicitation
  9. November 3, 2026

    Solicitation

    Due November 3, 2026 at 4:00 PM EST. SAM.gov, notice 4dae81b8a8cd499e881dfa24739546c2

    8 revisions on SAM
    • November 3, 2026: publish, solicitation
    • November 2, 2026: publish, solicitation
    • October 29, 2026: publish, solicitation
    • October 27, 2026: publish, solicitation
    • September 21, 2026: publish, presolicitation
    • October 14, 2026: publish, solicitation
    • October 7, 2026: publish, solicitation
    • October 1, 2026: publish, solicitation

Points of contact