Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Sources sought

NV FLAP 500(1) Red Rock Trail

6982AF24SS0019

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

July 16, 2024 at 4:00 PM EDT

Closed 863 days ago. Posted July 1, 2024. Scheduled to archive July 31, 2024.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed in 2024

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of July 1, 2024. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Laura Vallejos) for receipt by close of business (2 p.m. local Denver time) on July 16, 2024:

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the NV FLAP 500(1) Red Rock Trail project in which you performed roadway and trail construction including installation of pedestrian bridge. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.

The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.

All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION: The Red Rock Trail project is in Las Vegas, Nevada in the outskirts of Summerlin and into the entrance of Red Rock Conservation Area. This project includes construction of a multi-use trail and pedestrian bridge along with reconstruction of State Highway 159 widening.

SCOPE OF THE WORK: The project is located adjacent to the Red Rock Conservation Area which is a highly environmentally sensitive area. It includes construction of approximately 1 mile of paved multi-use trail, widening of State Highway 159 for additional turn lane width and construction of a 210-foot pedestrian bridge with drilled shafts. The project includes multiple Partners with Bureau of Land Management, Nevada Department of Transportation and Clark County Public Works. The project will be broken up into a Schedule A and an Option X. Schedule A includes all the trail and bridge. Option X includes work related to State Highway 159. PRINCIPAL WORK ITEMS:

Schedule A: Embankment construction – 6,000 CUYD Riprap, Class 7 – 1,400 CUYD Roadway aggregate – 2,000 TON Asphalt concrete pavement – 1,400 TON Precast, Prestressed concrete box beam – 820 LNFT Drilled shaft – 260 LNFT Option X: Roadway aggregate – 800 TON Asphalt concrete pavement – 2,100 TON ANTICIPATED SCHEDULE: Advertisement – August 2024 Award – November 2024 Construction Start – December 2024 Construction Finish – December 2025 The estimated price range of the project work is between $5,000,000 and $10,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 1, 2024

    Sources sought

    Due July 16, 2024 at 4:00 PM EDT. SAM.gov, notice 423e7e2947554fa9b9b43519ed89adf4

Points of contact