Sources sought
CA FTNP SEKI 13(2) Mineral King Road
6982AF24SS0017
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
July 2, 2024 at 4:00 PM EDT
Closed 877 days ago. Posted June 25, 2024, first published June 25, 2024. Scheduled to archive July 17, 2024.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- IDIQ SMALL BUSINESS SET-ASIDE MACC FOR PAVING PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN CA, AZ, NV, UT, CO, AND NM
Department of the Navy, Navfacsyscom Southwest
SolicitationSmall businessNAICS 237310San Diego, CAN6247325R0004Closes in 12 daysDec 8 - HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT
Forest Service, White River National Forest
Combined synopsis and solicitationNAICS 237310Bridgeport, CA1240LT27Q0026Closes in 16 daysDec 12 - ANF Suppression Damage Chantry
Forest Service, Usda-Fs, Csa Southwest 6
Combined synopsis and solicitationSmall businessNAICS 237310California127EAW27Q0003Closes in 19 daysDec 15
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of June 25, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Jorey Deml) for receipt by close of business (2 p.m. local Denver time) on July 2, 2024:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $20 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the Mineral King Road project in which you performed similar work. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT NUMBER: CA FTNP SEKI 13(2)
PROJECT NAME:
MINERAL KING ROAD PROJECT DESCRIPTION: The project proposes to rehabilitate up to 15.20 miles of Mineral King Road located within Sequoia and Kings Canyon National Park (SEKI). The project is located east of Visalia in Tulare County, CA.
SCOPE OF THE WORK: The scope includes pulverization of the existing pavement, aggregate base placement, and asphalt paving of the roadway. Parking lots will be rehabilitated or paved to improve visitor access. Soldier pile walls, soil nail walls, and areas of special rock embankment will be constructed throughout the project to stabilize the roadway. The project also includes drainage improvements such as ditch paving and grading, inlet installation, culvert replacement, and inlet and outlet protection measures.
The Mineral King Road Project is in remote mountainous terrain with areas of limited roadway bench width. Public access will have to be maintained during construction with intermittent allowable closures depending on season and time. The road is inaccessible during winter due to extreme weather and snowpack. The project is in an environmentally sensitive resource area within the National Park Service.
PRINCIPAL WORK ITEMS: 22,500 LF Ditch Excavation 1,900 CY Rip Rap 700 CY Special Rock Embankment 1800 SF Soil Nail Retaining Wall 6,500 Tons Roadway Aggregate, Method 2 7.5 Miles Full Depth Reclamation, Method 2 4.5 Miles Full Depth Reclamation, Method 2 with Cement 26,000 Tons Asphalt Pavement 380 LF Steel H Piles, In Place 9,800 LF 24” to 48” Culverts 70 Each Inlet (Concrete Box Inlet) 37,000 LF Paved Ditch, Asphalt 80 Each Dry Stacked Headwall ANTICIPATED SCHEDULE: Preshow Onsite Meeting – September 2024 Advertisement – September 2024 Construction – April 2025 through October 2027 ESTIMATED COST RANGE: Between $25,000,000 and $35,000,000
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Jorey Demlcflacquisitions@dot.gov
- Ryan Phillipscflacquisitions@dot.gov