Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Sources sought

CO FLAP LAR 10(1) Horsetooth Res and Carter Lake

6982AF24SS0012

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

June 30, 2024 at 4:00 PM EDT

Closed 879 days ago. Posted June 20, 2024, first published June 6, 2024. Scheduled to archive July 15, 2024.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed in 2024

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
Who may compete
SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
What comes next
No solicitation was published under this number after the sources sought of June 6, 2024. An agency sometimes issues the solicitation under a new number.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Leslie Karsten) for receipt by close of business (2 p.m. local Denver time) on June 30, 2024:

(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;

(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;

(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $20 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the CO FLAP LAR 10(1) Horsetooth Res and Carter Lake project in which you performed roadway excavation, placement of rip rap, placement of aggregate base, full depth reclamation, asphalt concrete pavement, minor concrete pavement, installation of culverts, manholes, concrete curb, concrete sidewalk, and permanent and temporary traffic control.

DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT NUMBER: CO FLAP LAR 10(1)

PROJECT NAME:

Horsetooth Res and Carter Lake PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually.

SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots.

The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping.

Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.

PRINCIPAL WORK ITEMS: 26,000 cubic yards of roadway excavation 23,000 cubic yards of waste 120 cubic yards of rip rap 26,000 tons of aggregate base 23,000 square yards of full depth reclamation 20,000 tons asphalt concrete pavement 1300 square yards minor concrete pavement 1,100 linear feet of pipe culverts (24” to 42”) with end sections 7 each manholes 4,000 linear feet curb concrete 600 square yards sidewalk concrete 23,000 square yards placing topsoil and seeding (hydraulic method) 75 each sign system 28 miles pavement markings 1 lump sum temporary traffic control ANTICIPATED SCHEDULE: Advertisement – September 2024 Award – November 2024 Construction – April 2025 through November 2026 The estimated price range of the project work is between: $10 million and $20 million.

MISCELLANEOUS: The project is in a mountainous and high recreation use area where access to the reservoir amenities must be maintained during construction. Limitations for closures will require strategic phasing and traffic control management. The work is occurring in a cultural and natural resource sensitive area. Environmental and weather constraints may affect the construction schedule operations.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 6, 2024

    Sources sought

    Due June 30, 2024 at 4:00 PM EDT. SAM.gov, notice 8b234676ed9d485d9c5a2a274b51e61c

  2. June 20, 2024

    Sources sought

    Due June 30, 2024 at 4:00 PM EDT. SAM.gov, notice 33ffff03876e4355b2eab15a0248e5cd

Points of contact