Sources sought
NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge
6982AF24SS0010
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
May 31, 2024 at 4:00 PM EDT
Closed 909 days ago. Posted May 17, 2024. Scheduled to archive June 15, 2024.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- NM FLAP SR35(1) Grant County Bridges
Federal Highway Administration, 6982AF Central Federal Lands Divisi
PresolicitationNAICS 237310Mimbres, NM6982AF26B000010Due in 5 daysDec 1 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of May 17, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Jon Holsopple) for receipt by close of business (2 p.m. local Denver time) on May 31, 2024:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the NM ERFO FS SNTFE 2022-1(1) El Porvenir Bridge project in which you performed prefabricated steel bridge construction, structural concrete, drilled shafts, and embankment construction. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ Project Details: NM ERFO FS SNTFE 2022-1(1)
El Porvenir Bridge PROJECT DESCRIPTION: The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM. The project is considered 4R and located in Mountainous terrain.
SCOPE OF THE WORK: The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route. Embankment work will be required for the realignment of the aggregate surfaced road.
PRINCIPAL WORK ITEMS:
Prefabricated Steel Bridge:
LPSM Structural Concrete:
84 CUYD Drilled Shafts, 24 Inch Diameter:
103 LNFT Embankment Construction: 2,000 CUYD The anticipated advertisement date is August 2024 with an award date of September 2024. Physical construction activities at the site are anticipated to occur between June and December 2025. The estimated price range of the project work is between $2,000,000 and $5,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 17, 2024
Sources sought
Due May 31, 2024 at 4:00 PM EDT. SAM.gov, notice 1b2c65f07b2e463aa4fdc03b913a0d9d
Points of contact
- Jon HolsoppleCFLContracts@dot.gov
- Leslie KarstenCFLcontracts@dot.gov