{"canonical":"https://sealedbidder.com/opportunities/6982af24b000009","key":"6982AF24B000009","url":"https://sealedbidder.com/opportunities/6982af24b000009","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2024-06-20T20:00:00Z","first_posted":"2024-04-29","last_posted":"2024-07-02","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"FEDERAL HIGHWAY ADMINISTRATION","office":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","place_state":"CO","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"08019","place_county_name":"Clear Creek County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"9ed788c9c85749e6af7588cf6a547171","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"p","base_type":"r","posted":"2024-04-29","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-05-27","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/9ed788c9c85749e6af7588cf6a547171/view","enriched":false,"history":[]},{"notice_id":"457fefa893a6477789ebbca64e01cf9f","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","base_type":"p","posted":"2024-05-20","posted_at":null,"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","cancelled":null,"archived":null,"archive_date":"2024-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/457fefa893a6477789ebbca64e01cf9f/view","enriched":false,"history":[]},{"notice_id":"98ab4030b72b4be98075dc76ca32ee24","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","base_type":"o","posted":"2024-06-05","posted_at":null,"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","cancelled":null,"archived":null,"archive_date":"2024-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/98ab4030b72b4be98075dc76ca32ee24/view","enriched":false,"history":[]},{"notice_id":"74abbd008b0a4fa3a913c969d30f08ad","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","base_type":"o","posted":"2024-06-12","posted_at":null,"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","cancelled":null,"archived":null,"archive_date":"2024-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/74abbd008b0a4fa3a913c969d30f08ad/view","enriched":false,"history":[]},{"notice_id":"a2a637fc9ead4999a2acc125aa2cf9ac","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","base_type":"o","posted":"2024-06-17","posted_at":null,"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","cancelled":null,"archived":null,"archive_date":"2024-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a2a637fc9ead4999a2acc125aa2cf9ac/view","enriched":false,"history":[]},{"notice_id":"7ee98486af744e728e9aea97a9b9095c","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","base_type":"o","posted":"2024-06-20","posted_at":null,"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","cancelled":null,"archived":null,"archive_date":"2024-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7ee98486af744e728e9aea97a9b9095c/view","enriched":false,"history":[]},{"notice_id":"929a3f3f59f8494983dd1d564877a820","title":"CO FLAP SH 5(1) Mount Blue Sky Highway","solicitation_number":"6982AF24B000009","notice_type":"o","base_type":"o","posted":"2024-07-02","posted_at":null,"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","cancelled":null,"archived":null,"archive_date":"2024-07-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/929a3f3f59f8494983dd1d564877a820/view","enriched":false,"history":[]}],"latest_notice_id":"929a3f3f59f8494983dd1d564877a820","first_type":"p","notices":[{"dates":{"posted":"2024-04-29"},"links":{"sam":"https://sam.gov/workspace/contract/opp/9ed788c9c85749e6af7588cf6a547171/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-05-27","archive_type":"auto_custom"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"9ed788c9c85749e6af7588cf6a547171","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"e6ac60769c33a7392c29ed39c4b1814a64d90cc26de3c8328084e1d4138c1dd8","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: Advertise: May 2024 It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-05-20","response_deadline":{"raw":"2024-06-20T14:00:00-06:00","utc":"2024-06-20T20:00:00Z","date":"2024-06-20","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/457fefa893a6477789ebbca64e01cf9f/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-05","archive_type":"auto15"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"457fefa893a6477789ebbca64e01cf9f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"83f4c0a5379b10dfe35ed18abe79ba811935174d347f01dc4b4fb2ed39ee877d","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-06-05","response_deadline":{"raw":"2024-06-20T14:00:00-06:00","utc":"2024-06-20T20:00:00Z","date":"2024-06-20","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/98ab4030b72b4be98075dc76ca32ee24/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-05","archive_type":"auto15"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"98ab4030b72b4be98075dc76ca32ee24","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"3b9efee88da91fa9676d4c111c0768585f453c55aa134fa68f85b2435cafc6eb","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-06-12","response_deadline":{"raw":"2024-06-20T14:00:00-06:00","utc":"2024-06-20T20:00:00Z","date":"2024-06-20","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/74abbd008b0a4fa3a913c969d30f08ad/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-05","archive_type":"auto15"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"74abbd008b0a4fa3a913c969d30f08ad","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"42c355bdd26fb5c9f900d98d0ddda3804f8af3fc24002ef4dd15b913f56f1df3","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-06-17","response_deadline":{"raw":"2024-06-20T14:00:00-06:00","utc":"2024-06-20T20:00:00Z","date":"2024-06-20","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a2a637fc9ead4999a2acc125aa2cf9ac/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-05","archive_type":"auto15"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"a2a637fc9ead4999a2acc125aa2cf9ac","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"dd2be7a809d099fd206686ab588d5f7175d5a8c44a7ff5d88a8b630a510df5e6","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-06-20","response_deadline":{"raw":"2024-06-20T14:00:00-06:00","utc":"2024-06-20T20:00:00Z","date":"2024-06-20","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7ee98486af744e728e9aea97a9b9095c/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-05","archive_type":"auto15"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7ee98486af744e728e9aea97a9b9095c","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"d07c348fbf8df52e2adc10ecac4dc81dd8672e74b377b315b2f8cf141c692959","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"},{"dates":{"posted":"2024-07-02","response_deadline":{"raw":"2024-06-20T14:00:00-06:00","utc":"2024-06-20T20:00:00Z","date":"2024-06-20","time":"14:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/929a3f3f59f8494983dd1d564877a820/view"},"naics":{"codes":["237310"],"primary":"237310"},"title":"CO FLAP SH 5(1) Mount Blue Sky Highway","agency":{"office":{"code":"6982AF","name":"6982AF CENTRAL FEDERAL LANDS DIVISI"},"subtier":{"code":"6925","name":"FEDERAL HIGHWAY ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-07-05","archive_type":"auto15"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"929a3f3f59f8494983dd1d564877a820","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2024_archived_opportunities.csv","etag":"\"d582488fe153a9f11bf629913d176ffc-137\"","fetched_at":"2026-09-16T19:07:39.720164Z","row_sha256":"8f1af52675275efae9b5803f0c6384cd12094681b49611aee577d99d63c86753","last_modified":"2026-09-13T14:47:40Z"},"updated_at":"2026-09-16T19:07:39.720164Z","first_seen_at":"2026-09-16T19:07:39.720164Z"},"description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"6982AF24B000009","place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"product_service_code":"Y1LB"}],"due_at":"2024-06-20T20:00:00Z","due_date":"2024-06-20","closes_at":"2024-06-20T20:00:00Z","awardable":true,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","state":"CO","county":"08019","county_name":"Clear Creek County","city":null,"city_name":null,"country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-24T03:25:58.922164Z","principal_notice_id":"929a3f3f59f8494983dd1d564877a820","description":{"text":"PROJECT NUMBER and NAME: CO FLAP SH5(1), Mount Blue Sky Highway PROJECT DESCRIPTION: The Mount Blue Sky Highway Project proposes to reconstruct 0.7 miles of Colorado State Highway (SH) 5 in Clear Creek County, Colorado. The project is located approximately 50 miles southwest of Denver in the Arapaho and Roosevelt National Forest. SH 5 is designated a Scenic Byway and provides access to the top of Mount Blue Sky which is the highest paved road in the United States. The project area is adjacent to Summit Lake Park located at 13,000 feet above sea level. The area receives on average 292 inches of snowfall per year with temperatures ranging from 65 to -40 degrees Fahrenheit. The project traverses between United States Forest Service and Denver Mountain Parks Lands. The project area is distressed with major subgrade failures. The roadway was originally constructed across a wetland complex causing disruption to both surface and subsurface water flow which has led to degradation of the underlying permafrost. The Permafrost degradation and on-going solifluction have caused major damage to the roadway including settlement, subgrade failure, and cracking. The project scope includes roadway reconstruction with a pavement section supported upon an air convection embankment (ACE) to improve subsurface drainage, minimize permafrost degradation, and stabilize the roadway. The ACE will be constructed to an approximate maximum depth of 4’ to 5’ and will consist of rock ranging from 4” to 12” in diameter. Additional salient project features include removal and replacement of culverts, installation of an aquatic organism passage culvert, vegetation salvage and placement, sub excavation, aggregate subgrade, and asphalt paving. PRINCIPAL WORK ITEMS: 20,000 cubic yards of embankment construction including rock embankment 2,000 tons of aggregate base 2,000 tons of asphalt concrete pavement 200 linear feet of metal pipe culverts 4000 square yards of salvaging/placing conserved topsoil 5 miles pavement markings, type b ANTICIPATED SCHEDULE: It is anticipated construction will start approximately July 2024 and finish approximately October 2025. ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.","html":null,"origin":"extract"},"contacts":[{"name":"Stephanie Navarro","role":"primary","email":"CFLAcquisitions@dot.gov"},{"name":"Jorey Deml","role":"secondary","email":"CFLAcquisitions@dot.gov"}],"place_of_performance":{"zip":"80439","city":{"name":"Evergreen"},"state":{"code":"CO"},"country":{"code":"USA"}},"office_address":{"zip":"80228","city":"LAKEWOOD","state":"CO","country":"USA"},"naics_codes":["237310"],"award":null,"attachments":[],"awards":[],"related":[{"key":"6982AF26B000010","latest_notice_id":"50a05d9353314c6db46437054358709d","title":"NM FLAP SR35(1) Grant County Bridges","solicitation_number":"6982AF26B000010","notice_type":"p","first_type":"p","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"NM","county":"35017","county_name":"Grant County","city":"3548830","city_name":"Mimbres","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"6982AF27B000011","latest_notice_id":"e2d68a7d10a64d84a49617e66fbbf058","title":"ND OMAD 2025(1) Minuteman Missile Access Road","solicitation_number":"6982AF27B000011","notice_type":"o","first_type":"p","first_posted":"2026-10-01","last_posted":"2026-11-18","notices":6,"due_at":"2026-12-02T20:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"ND","county":"38101","county_name":"Ward County","city":"3853380","city_name":"Minot","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"6982AF27B000010","latest_notice_id":"02bedff6e87f42b78adcfbe03b6c535b","title":"CO OMAD 300(71) Minuteman Missile Access","solicitation_number":"6982AF27B000010","notice_type":"o","first_type":"p","first_posted":"2026-10-01","last_posted":"2026-11-18","notices":6,"due_at":"2026-12-02T21:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"WY","county":"56021","county_name":"Laramie County","city":"5613900","city_name":"Cheyenne","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"6982AF27B000005","latest_notice_id":"9d5ecc3e275a4fe883a84d83c25e8f92","title":"UT NP ARCH 100(2) Bridges on Delicate Arch Road","solicitation_number":"6982AF27B000005","notice_type":"o","first_type":"p","first_posted":"2026-09-08","last_posted":"2026-11-25","notices":8,"due_at":"2026-12-03T21:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"UT","county":"49019","county_name":"Grand County","city":"4950700","city_name":"Moab","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"6982AF27B000008","latest_notice_id":"40abc20233e54857b8a6f6f348978081","title":"HI FLAP CR562(1) Kilauea Point","solicitation_number":"6982AF27B000008","notice_type":"o","first_type":"p","first_posted":"2026-10-15","last_posted":"2026-11-17","notices":2,"due_at":"2026-12-17T21:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6925","sub_name":"FEDERAL HIGHWAY ADMINISTRATION","office_key":"o-6982AF","office_name":"6982AF CENTRAL FEDERAL LANDS DIVISI","naics":"237310","psc":"Y1LB","set_aside":null,"state":"HI","county":"15007","county_name":"Kauai County","city":"1536650","city_name":"Kilauea","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"1240LT27Q0004","latest_notice_id":"b6cd2f6e173941a7b4e6b22948e1d29a","title":"GAOA Brainard Lake Recreation Area Deferred Maintenance","solicitation_number":"1240LT27Q0004","notice_type":"k","first_type":"k","first_posted":"2026-10-27","last_posted":"2026-10-28","notices":3,"due_at":"2026-12-17T22:00:00Z","due_date":"2026-12-17","closes_at":"2026-12-17T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-123187","office_name":"USDA FOREST SERVICE","naics":"237310","psc":"Z1PA","set_aside":"SBA","state":"CO","county":"08013","county_name":"Boulder County","city":"0882735","city_name":"Ward","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"1240LT27Q0019","latest_notice_id":"c6ad68e9951042da84a8d664bba7eadf","title":"Administrative Parking Lot Repairs","solicitation_number":"1240LT27Q0019","notice_type":"o","first_type":"o","first_posted":"2026-10-21","last_posted":"2026-11-23","notices":5,"due_at":"2026-12-18T19:00:00Z","due_date":"2026-12-18","closes_at":"2026-12-18T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-1240LT","office_name":"USDA-FS, CSA INTERMOUNTAIN 8","naics":"237310","psc":"Y1LB","set_aside":"SBA","state":"CO","county":"08069","county_name":"Larimer County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"140FF027Q0077","latest_notice_id":"9702a20ddec44a6e9922c43ac0ad75d3","title":"56--AL-WHEELER NWR-WATERMAN GATE","solicitation_number":"140FF027Q0077","notice_type":"o","first_type":"o","first_posted":"2026-11-13","last_posted":"2026-11-16","notices":2,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1406","sub_name":"DEPARTMENTAL OFFICES","office_key":"o-140FF0","office_name":"FWS CONTRACTING ACTIVITY","naics":"237310","psc":"5630","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 5630)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"}],"similar_open_total":36,"indexable":false}