Presolicitation, total small business set-aside
KS FLAP MIA 253(1) Hillsdale Lake Access
6982AF24B000007
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Status
Presolicitation
Posted February 21, 2024. Scheduled to archive April 21, 2024.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one is not taking offers
36 like it are open now in highway, street, and bridge construction
- AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30 - NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237310Not tied to one place140PP027R0017Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- Total small business set-aside. Only small businesses may compete. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. Open Small business opportunities
- What comes next
- No solicitation was published under this number after the presolicitation of February 21, 2024. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: KS FLAP MIA 253(1)
PROJECT NAME:
Hillsdale Lake Access PROJECT DESCRIPTION: The project scope includes the widening, rehabilitation, and asphalt overlay of 253rd Street and Orleans Road to improve safety and pavement conditions as well as to better public access to the reservoir area. The project includes grading, drainage improvements, placement of roadway aggregate base, hot asphalt overlay, signing, striping, and other safety-related features necessary to meet current design practices. Improvements will begin at W 253rd Street at the intersection of Harmony Road and proceeds west and north for approximately 0.75 miles and ends at the paved portion of Orleans Road.
PRINCIPAL WORK ITEMS: Roadway aggregate, Method 2, 450 TON Roadway Reconditioning, 1 MILE Asphalt Concrete Pavement, Type 1, 2,800 TON Prime Coat, Method 1, 9,500 SQ YD Asphalt Pavement Milling, 2inch depth, 1,500 SQ YD Cleaning Culvert in Place, 4 EACH Guardrail Systems MGS, Type 2, Class A Wood Posts, 125 LNFT Terminal Section, Type MGS Tangent, 4 EACH Placing Conserved Topsoil, 3 inch depth, 4,600 SQ YD Pavement Markings, Type D, Solid, 15,000 LNFT Clearing and Grubbing, 2.05 ACRE ANTICIPATED SCHEDULE:
Advertise:
March 2024 Construction:
May 2024 – October 2024 ESTIMATED COST RANGE: The anticipated cost range is between $700,000 and $2,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
February 21, 2024
Presolicitation, originally sources sought
SAM.gov, notice c47fb5affa984522872f69611ce2375a
Points of contact
- Stephanie NavarroCFLContracts@dot.gov
- Ryan PhillipsCFLContracts@dot.gov