Solicitation, first published as presolicitation
TX FLAP FM 709(1) – Access to Navarro Mills Lake
6982AF23B000037
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Awarded
Mckenzie Construction & Site Development LLC
$7,228,943.61 obligated so far on USAspending
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one was awarded in 2024
36 like it are open now in highway, street, and bridge construction
- Road Paving IAH (Houston Bush) Airport
Federal Aviation Administration, 697DCK Regional Acquisitions SVCS
SolicitationSmall businessNAICS 237310Texas697DCK-27-R-00033Closes in 49 daysJan 14, 2027 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 34 days from the day the solicitation was posted, September 26, 2024, to the deadline. The deadline moved once: it was first September 19, 2024 and ended as October 30, 2024.
- Before the solicitation
- The agency published a presolicitation on September 4, 2024, 22 days before the solicitation.
- How it ended
- Awarded to Mckenzie Construction & Site Development LLC on November 18, 2024, 19 days after offers were due. The contracting office reported 4 offers (full and open competition).
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT NUMBER: TX FLAP FM 709(1)
PROJECT NAME:
Navarro Mills Lake Road PROJECT DESCRIPTION: The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction. The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP).
In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety.
PRINCIPAL WORK ITEMS: 7,820 Embankment Construction 29,000 tons of Aggregate base 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement) 7000 Tons of Asphalt Concrete Pavement 4000 hours of temporary traffic control, flagger 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel. 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert 390 linear feet, 30-inch pipe culvert (concrete) 660 linear feet, 24-inch pipe culvert (concrete) 210 linear feet, 54-inch pipe culvert (concrete)
ANTICIPATED SCHEDULE:
Advertise:
September 2024 Award:
Fall 2024 Construction: November 2024 –August 2025 ESTIMATED COST RANGE: The anticipated cost range is between $5,000,000 and $10,000,000.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- UEI
- V5NWWR9UUJR8
- CAGE
- 5S3L0
- Vendor location
- Washington, DC
- Contract
- 6982AF25C000006, definitive contract
- Obligated
- $7,228,943.61
- Actions
- 11 between November 18, 2024 and November 2, 2026
- Competition
- Full and Open Competition, 4 offers received
- Set-aside reported
- No Set Aside Used.
- Described as
- TX Flap FM709(1) Access to Navarro Mills Lake Construction
- Match
- solicitation number 6982AF23B000037 equals the FPDS solicitation identifier; same awarding office 6982AF (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 4, 2024
Presolicitation, originally sources sought
Due September 19, 2024 at 4:00 PM EDT. SAM.gov, notice d89070957e8e4d7dab94a9ed50ad0b24
September 26, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice 64e14802fc5d4bb0a924ee6fb9bb2b36
September 26, 2024
Solicitation, originally presolicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice 88b3bd7499214a38a2c0d99d7faeb477
October 8, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice 1fb9753efa104410b3c475be57b5285f
October 10, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice 69e222e7cebf4918abcc622e583811b0
October 11, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice bb3c23bf3daa4f899cf29cdd494215ce
October 25, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice 33000b68cfad4e3e87b972eeca6f6e41
October 30, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice 93b362587e124406a681fc4b37af7c55
November 18, 2024
Award notice, originally solicitation
Awarded to MCKENZIE CONSTRUCTION & SITE DEVELOPMENT LLC Washington for $6,742,627. SAM.gov, notice 064863d7170e4844ad1015d3ee18c0e5
November 18, 2024
Solicitation
Due October 30, 2024 at 4:00 PM EDT. SAM.gov, notice b81e377d44d0423980eec96ab415a63b
Points of contact
- Stephanie NavarroCFLAcquisitions@dot.gov