Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,711 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $99 a month. See your matches before you pay.
See plans

Award notice, first published as solicitation

UT FLAP 73(2) La Sal Mountain Loop Road

6982AF23B000027

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Awarded

Kilgore Companies, LLC

$20,631,490.73 obligated so far on USAspending

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one was awarded in 2023

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Award notice. Who won, when, and for how much. Glossary
How it ended
Awarded to Kilgore Companies, LLC on February 6, 2024, 49 days after offers were due. The contracting office reported 5 offers (full and open competition).

Description

As published on SAM.gov with the solicitation of January 8, 2024.

PROJECT NUMBER: UT FLAP 73(2)

PROJECT NAME:

La Sal Mountain Loop Road PROJECT DESCRIPTION: The UT FLAP 73(2), La Sal Mountain Loop Road Project is located approximately 8 miles southeast of Moab, UT in Eastern Utah. The project crosses through Utah State School and Institutional Trust Lands (SITLA), Bureau of Land Management (BLM), private, and United States Forest Service (USFS) lands, providing access to the Manti – La Sal National Forest and Bureau of Land Management lands.

The route is categorized as a major rural collector in mountainous terrain and is maintained by San Juan County. This project rehabilitates and reconstructs the existing road with minor superelevation correction, profile adjustments, curve widening, ditch reconstruction, culvert replacements, asphalt surfacing, erosion control, signing, and pavement markings. The existing pavement is in poor condition with significant rutting, cracking, and potholing apparent along the route.

To complete the proposed widening and realignment, rock and soil cuts and fills are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. The project consists of two segments, broken into Schedule A and Option X. Segment 1 (Option X) – Segment 1 goes from the intersection of Old Airport Road 11+62 to 147+00 at the intersection of Pack Creek Cutoff.

Rehabilitation and widening consists of pulverizing the existing pavement, widening the road to 30 feet from the beginning to 45+00 and 26 feet for the remainder of the road, placing aggregate base and asphalt concrete pavement, and drainage improvements. Segment 2 (Schedule A) – Segment 2 goes from 147+00 at the intersection of Pack Creek Cutoff, and goes to 650+91, the boundary with the previous project UT PFH 46-1(2) and UT FLAP 73(1).

Rehabilitation consists of pulverizing the existing pavement, placing new aggregate base leveling, asphalt concrete pavement, and drainage improvements to narrow the roadway width to 26 feet. Five locations will be reconstructed requiring raising or lowering profile, placing aggregate base, asphalt concrete pavement, and drainage improvements to widen the roadway width to 26 feet.

PRINCIPAL WORK ITEMS (Schedule A):

20401-0000 Roadway Excavation:

75,000 CUYD 30101-0000 Aggregate Base:

55,000 TON 30401-5500 Full Depth Reclamation: 9.45 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL:

31,000 TON 60201-1000 Culverts:

4000 LNFT 63501-1000 Temporary Traffic Control:

LPSM PRINCIPAL WORK ITEMS (Option X):

20401-0000 Roadway Excavation:

16,000 CUYD 30101-0000 Aggregate Base:

25,000 TON 30401-5500 Full Depth Reclamation: 2.56 Miles 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL:

9,600 TON 63501-1000 Temporary Traffic Control:

LPSM ESTIMATED COST RANGE: Total estimated cost between $20,000,000 and $30,000,000 This is a full and open competition.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
KN9MADJQ8H69
CAGE
6DYA6
Vendor location
West Valley City, UT
Contract
6982AF24C000009, definitive contract
Obligated
$20,631,490.73
Actions
2 between February 6, 2024 and October 14, 2026
Competition
Full and Open Competition, 5 offers received
Set-aside reported
No Set Aside Used.
Described as
Ut Flap 73(2) La Sal Mountain Loop Road Roadway Rehabilitation and Reconstruction
Match
award number 6982AF24C000009 equals the contract number; same awarding office 6982AF (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 8, 2024

    Solicitation

    Due December 19, 2023 at 4:00 PM EST. SAM.gov, notice c3d8a408ab214834b6a2ef0392b5f65a

  2. February 6, 2024

    Award notice, originally solicitation

    Awarded to KILGORE COMPANIES, LLC West Valley City for $21,995,114. SAM.gov, notice 3eba36416b97499595d9cd09aa4d0e96

Points of contact