Sources sought
The Federal Aviation Administration (FAA) intends to establish a Qualified Vendors List (QVL) for Cab Glass repair and/or replacement in various US locations.
697DCK-26-R-ALJH1
Federal Aviation Administration, 697DCK Regional Acquisitions SVCS. Glass and Glazing Contractors.
Response deadline
March 27, 2026 at 1:00 PM EDT
Closed 244 days ago. Posted March 11, 2026. Scheduled to archive April 11, 2026.
Get the next one like this from Federal Aviation Administration by email, the day it is posted.Find my opportunities
This one closed in 2026
1 like it is open now in glass and glazing contractors
- Replace Visitor Center Windows, Lava Beds N.M.
Departmental Offices, National Park Service Contracting Activity
SolicitationSmall businessNAICS 238150California140PP027Q0056Closes in 15 daysDec 11
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238150 (glass and glazing contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of March 11, 2026. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
DESCRIPTION
The Federal Aviation Administration (FAA) intends to establish a Qualified Vendors List (QVL) for Cab Glass repair and/or replacement for Air Traffic Control Towers (ATCT) in various locations throughout the United States.
The purpose of this pre-solicitation is to solicit statements of interest and capabilities from contractors having experience in this type of work.
In order to assist with aquisition strategy development and to gain a better understanding of the commerical marketplace, the FAA requests the following information for interested vedors:
A. Name of company (The resultant Prime contractor that may ultimately be awarded the subsequent contract).
B. Address
C. Point of Contact Name, e-mail address and telephone number
D. UEI Number
F. Relevent experience on projects of similar scope withing the last five years. Provide specific contract numbers, contact names, and email information to support claimed capabilities.
G. Number of years in business.
H. Which region of the country would you be able to support.
SUMMARY OF WORK
A. Project Location: The projects are located at FAA Air Traffic Control Towers (ATCT) in three different regions, Eastern, Central, and Western.
B. Project Scope: This project requires the repair and/or removal and replacement of insulated glass units located in the cab of the Air Traffic Control Tower.
C. Work must include all labor, materials and equipment to complete the following:
- Perform and gather accurate measurements for the required replacement Insulated Glass Unit (IGUs).
- Contractor is advised of the potential presence of lead in the paint on the existing frame and structure
- Remove the existing damaged glass and properly dispose of them.
- Provide and install properly sized replacement IGUs in accordance with the drawings and specifications.
D. The typical types of glazing installed in FAA ATCT facilities usually consist of one of the following types of annealed glass, but is not limited to:
- Monolithic Glass
- Insulated Glass Unit (IGU)
- Laminated Insulated Glass Unit
- Laminated Glass Unit
E. The FAA also has a limited number of facilities that require the following application:
- Electromagnetic Interference(EMI) / Radio Frequency Interference (RFI) Reduction Glass
F. Provide a warranty in accordance with specification 08 88 58.
G. Clean new IGU in accordance with manufacturer's instructions.
H. Clean project site and restore to original condition.
CONTRACTOR PERSONNEL REQUIREMENTS
A. The Project Manager must have a minimum of ten (10) years of experience in the glass industry and with coordinating subcontractors and suppliers on complex projects.
B. The Project Superintendent must have a minimum of ten (10) years of experience in the glass industry and with coordinating subcontractors and suppliers on complex projects and in overseeing and implementing safety programs and protocols. The Project Superintendent must have completed the 30-hour OSHA General Industry Safety Class. Proof of current qualifications must be provided.
C. Crane operators must meet the requirements in USACE EM 385-1-1, Section 16 and Appendix G. In addition, for mobile cranes with Original Equipment Manufacturer (OEM) rated capacitates of 50,000 pounds or greater, crane operators must be designated as qualified by a source that qualifies crane operators (i.e., union, a government agency, or and organization that tests and qualifies crane operators). Proof of current qualifications must be provided.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 11, 2026
Sources sought
Due March 27, 2026 at 1:00 PM EDT. SAM.gov, notice bcc25824e416498ca6b93ea939a8ab40
2 revisions on SAM
- June 15, 2026: publish, solicitation
- March 11, 2026: publish, sources sought
Points of contact
- Ms. Joni Haynesjoni.l.haynes@faa.gov
- Angela Laymanangela.layman@faa.gov