{"canonical":"https://sealedbidder.com/opportunities/697dck25r00354","key":"697DCK25R00354","url":"https://sealedbidder.com/opportunities/697dck25r00354","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-08T17:00:00Z","first_posted":"2025-06-26","last_posted":"2025-08-06","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"FEDERAL AVIATION ADMINISTRATION","office":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"236210","psc":"Z2BA","set_aside":"SBA","place_state":"MN","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"27037","place_county_name":"Dakota County","place_city":"2720618","place_city_name":"Farmington","winner":"GUSTAV & RUDY CONTRACTORS, INC.","award_amount":null,"publications":[{"notice_id":"744527ffe4214767be5fcca2224525c6","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"r","posted":"2025-06-26","posted_at":"2025-06-26T14:42:13.616Z","due_at":"2025-07-31T05:00:00Z","due_date":"2025-07-31","cancelled":false,"archived":true,"archive_date":"2025-08-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/744527ffe4214767be5fcca2224525c6/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"419a921317be4189af6976a6afdee1ea","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-07-11","posted_at":"2025-07-11T15:38:40Z","due_at":"2025-07-31T05:00:00Z","due_date":"2025-07-31","cancelled":false,"archived":true,"archive_date":"2025-08-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/419a921317be4189af6976a6afdee1ea/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"1e05bd5a5d044d8bbf357c03a90a7476","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-07-14","posted_at":"2025-07-14T18:46:52.877Z","due_at":"2025-07-31T05:00:00Z","due_date":"2025-07-31","cancelled":false,"archived":true,"archive_date":"2025-08-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1e05bd5a5d044d8bbf357c03a90a7476/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"2d962527d7df4dc486f0d3536edb6355","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-07-16","posted_at":"2025-07-16T15:58:37.563Z","due_at":"2025-07-31T05:00:00Z","due_date":"2025-07-31","cancelled":false,"archived":true,"archive_date":"2025-08-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2d962527d7df4dc486f0d3536edb6355/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"7e83971edac4400d841b744a4fd4e965","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-07-22","posted_at":"2025-07-22T12:35:42.022Z","due_at":"2025-08-08T05:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-08-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7e83971edac4400d841b744a4fd4e965/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"e60ef05f1d5542348e33609390b9ff4f","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-07-29","posted_at":"2025-07-29T19:18:35.180Z","due_at":"2025-08-08T05:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-08-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e60ef05f1d5542348e33609390b9ff4f/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"59873c6f5b624d39bc5ad6483c74afd2","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-07-31","posted_at":"2025-07-31T17:52:23.866Z","due_at":"2025-08-08T17:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-08-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/59873c6f5b624d39bc5ad6483c74afd2/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"4467204164724f38954abc9f879134e9","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-08-05","posted_at":"2025-08-05T17:36:04.002Z","due_at":"2025-08-08T17:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-08-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4467204164724f38954abc9f879134e9/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]},{"notice_id":"451a85078fba4cb2bddf2f16a25d6039","title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","solicitation_number":"697DCK-25-R-00354","notice_type":"o","base_type":"o","posted":"2025-08-06","posted_at":"2025-08-06T20:34:14.053Z","due_at":"2025-08-08T17:00:00Z","due_date":"2025-08-08","cancelled":false,"archived":true,"archive_date":"2025-08-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/451a85078fba4cb2bddf2f16a25d6039/view","enriched":true,"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}]}],"latest_notice_id":"451a85078fba4cb2bddf2f16a25d6039","first_type":"o","notices":[{"dates":{"posted":"2025-06-26","posted_at":"2025-06-26T14:42:13.616Z","created_at":"2025-06-26T14:11:15.938Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-07-31T00:00:00-05:00","utc":"2025-07-31T05:00:00Z","date":"2025-07-31","time":"00:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/744527ffe4214767be5fcca2224525c6/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-15","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"744527ffe4214767be5fcca2224525c6","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-12T00:26:08.495857882Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a69d55f3b834799c6721018bf7d97b5d2c4813b903a06577fffffd9ce95cb8b0","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-12T00:26:08.495857882Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Multiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-07-11","posted_at":"2025-07-11T15:38:40Z","created_at":"2025-07-11T15:31:09.693Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-07-31T00:00:00-05:00","utc":"2025-07-31T05:00:00Z","date":"2025-07-31","time":"00:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/419a921317be4189af6976a6afdee1ea/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-15","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"419a921317be4189af6976a6afdee1ea","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-10T03:05:50.422779467Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3afa4f56adc5c6bda009638b7a9e137595784efa423d016568162587fd32cd05","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-10T03:05:50.422779467Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p></p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-07-14","posted_at":"2025-07-14T18:46:52.877Z","created_at":"2025-07-14T18:42:04.479Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-07-31T00:00:00-05:00","utc":"2025-07-31T05:00:00Z","date":"2025-07-31","time":"00:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1e05bd5a5d044d8bbf357c03a90a7476/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-15","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1e05bd5a5d044d8bbf357c03a90a7476","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-10T02:15:44.037853671Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a6540cb16269c6f84bfea1bd0bd44aa729cd201f92787bc9b6773dd6dcda9ea4","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-10T02:15:44.037853671Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-07-16","posted_at":"2025-07-16T15:58:37.563Z","created_at":"2025-07-16T15:56:40.391Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-07-31T00:00:00-05:00","utc":"2025-07-31T05:00:00Z","date":"2025-07-31","time":"00:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2d962527d7df4dc486f0d3536edb6355/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-15","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2d962527d7df4dc486f0d3536edb6355","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-09T04:02:59.837827660Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f50fdfd494963948c9632e7482ecd37451c217797c90a7c6b14a3ea09fe12ea2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-09T04:02:59.837827660Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-07-22","posted_at":"2025-07-22T12:35:42.022Z","created_at":"2025-07-22T12:28:09.067Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-08-08T00:00:00-05:00","utc":"2025-08-08T05:00:00Z","date":"2025-08-08","time":"00:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7e83971edac4400d841b744a4fd4e965/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-23","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7e83971edac4400d841b744a4fd4e965","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-08T04:20:43.926233363Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"1d21821af92b9828583f8a804720ced58f286e25fe090e110686d9b44703858e","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-08T04:20:43.926233363Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 04</strong></u></p>\n\n<p>Purpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:</p>\n\n<p>FIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. &nbsp;Requests to attend are due by July 25, 2025 12:00PM Central Time. &nbsp;A real ID is required by all attendees and will be strictly enforced.&nbsp;</p>\n\n<p>**********************************</p>\n\n<p>SECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. &nbsp;Late questions will not be accepted. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>THIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. &nbsp;Late proposals will not be accepted after this time. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>FOURTH: All other terms and conditions remain unchanged and in full effect. &nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 04\n\nPurpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:\n\nFIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. Requests to attend are due by July 25, 2025 12:00PM Central Time. A real ID is required by all attendees and will be strictly enforced.\n\n**********************************\n\nSECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. Late questions will not be accepted.\n\n**********************************\n\nTHIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. Late proposals will not be accepted after this time.\n\n**********************************\n\nFOURTH: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-07-29","posted_at":"2025-07-29T19:18:35.180Z","created_at":"2025-07-29T19:14:41.233Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-08-08T00:00:00-05:00","utc":"2025-08-08T05:00:00Z","date":"2025-08-08","time":"00:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e60ef05f1d5542348e33609390b9ff4f/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-23","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"e60ef05f1d5542348e33609390b9ff4f","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-07T03:28:50.255461867Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"76955e320bb97afbefdc978b4ec04f74f633bc9282b30f2fee5c6d0a8773dec6","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-07T03:28:50.255461867Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 05</strong></u></p>\n\n<p>Purpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.<br />\n<strong>*****************************</strong></p>\n\n<p><strong>SECOND:</strong> Due to photos not allowed at the site, the following photos have been released to&nbsp;all perspective bidders:<br />\n1. Concrete Curb Photos<br />\n2. Epoxy Boiler Room<br />\n3. Exterior Doors<br />\n4. Exterior Stairs and Concrete Work<br />\n5. Tower Lights<br />\n*****************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 04</strong></u></p>\n\n<p>Purpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:</p>\n\n<p>FIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. &nbsp;Requests to attend are due by July 25, 2025 12:00PM Central Time. &nbsp;A real ID is required by all attendees and will be strictly enforced.&nbsp;</p>\n\n<p>**********************************</p>\n\n<p>SECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. &nbsp;Late questions will not be accepted. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>THIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. &nbsp;Late proposals will not be accepted after this time. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>FOURTH: All other terms and conditions remain unchanged and in full effect. &nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 05\n\nPurpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:\n\nFIRST: The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.\n\n*****************************\n\nSECOND: Due to photos not allowed at the site, the following photos have been released to all perspective bidders:\n\n1. Concrete Curb Photos\n\n2. Epoxy Boiler Room\n\n3. Exterior Doors\n\n4. Exterior Stairs and Concrete Work\n\n5. Tower Lights\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 04\n\nPurpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:\n\nFIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. Requests to attend are due by July 25, 2025 12:00PM Central Time. A real ID is required by all attendees and will be strictly enforced.\n\n**********************************\n\nSECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. Late questions will not be accepted.\n\n**********************************\n\nTHIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. Late proposals will not be accepted after this time.\n\n**********************************\n\nFOURTH: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-07-31","posted_at":"2025-07-31T17:52:23.866Z","created_at":"2025-07-31T17:48:10.324Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-08-08T12:00:00-05:00","utc":"2025-08-08T17:00:00Z","date":"2025-08-08","time":"12:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/59873c6f5b624d39bc5ad6483c74afd2/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-23","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"59873c6f5b624d39bc5ad6483c74afd2","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-06T04:06:21.298894455Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"d9f67451406ce5f169ce8a804dd767aade1280d6eba094849c7dd7dfd8dd2570","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-06T04:06:21.298894455Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 06</strong></u></p>\n\n<p>Purpose of amendment 06 is to hereby release the Question and Answer (Q&amp;A) as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The Final Q&amp;A entitled, &quot;J-16_QA for ZMP Multiple Project_Final_7.31.2025&quot; is hereby released.</p>\n\n<p>******************************<br />\n<strong>SECOND: </strong>The proposal due date remains unchanged with a date of August 08, 2025, at Noon&nbsp;Central time.<br />\n<br />\n******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 05</strong></u></p>\n\n<p>Purpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.<br />\n<strong>*****************************</strong></p>\n\n<p><strong>SECOND:</strong> Due to photos not allowed at the site, the following photos have been released to&nbsp;all perspective bidders:<br />\n1. Concrete Curb Photos<br />\n2. Epoxy Boiler Room<br />\n3. Exterior Doors<br />\n4. Exterior Stairs and Concrete Work<br />\n5. Tower Lights<br />\n*****************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 04</strong></u></p>\n\n<p>Purpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:</p>\n\n<p>FIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. &nbsp;Requests to attend are due by July 25, 2025 12:00PM Central Time. &nbsp;A real ID is required by all attendees and will be strictly enforced.&nbsp;</p>\n\n<p>**********************************</p>\n\n<p>SECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. &nbsp;Late questions will not be accepted. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>THIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. &nbsp;Late proposals will not be accepted after this time. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>FOURTH: All other terms and conditions remain unchanged and in full effect. &nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 06\n\nPurpose of amendment 06 is to hereby release the Question and Answer (Q&A) as described in the following:\n\nFIRST: The Final Q&A entitled, \"J-16_QA for ZMP Multiple Project_Final_7.31.2025\" is hereby released.\n\n******************************\n\nSECOND: The proposal due date remains unchanged with a date of August 08, 2025, at Noon Central time.\n\n******************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 05\n\nPurpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:\n\nFIRST: The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.\n\n*****************************\n\nSECOND: Due to photos not allowed at the site, the following photos have been released to all perspective bidders:\n\n1. Concrete Curb Photos\n\n2. Epoxy Boiler Room\n\n3. Exterior Doors\n\n4. Exterior Stairs and Concrete Work\n\n5. Tower Lights\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 04\n\nPurpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:\n\nFIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. Requests to attend are due by July 25, 2025 12:00PM Central Time. A real ID is required by all attendees and will be strictly enforced.\n\n**********************************\n\nSECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. Late questions will not be accepted.\n\n**********************************\n\nTHIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. Late proposals will not be accepted after this time.\n\n**********************************\n\nFOURTH: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-08-05","posted_at":"2025-08-05T17:36:04.002Z","created_at":"2025-08-05T17:34:39.197Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-08-08T12:00:00-05:00","utc":"2025-08-08T17:00:00Z","date":"2025-08-08","time":"12:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4467204164724f38954abc9f879134e9/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-23","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4467204164724f38954abc9f879134e9","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-06T01:31:17.789164288Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a89c03d38ba55071356275dff41b79facf584ac97f11400ba58ca585b6ca445f","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-06T01:31:17.789164288Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 06</strong></u></p>\n\n<p>Purpose of amendment 06 is to hereby release the Question and Answer (Q&amp;A) as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The Final Q&amp;A entitled, &quot;J-16_QA for ZMP Multiple Project_Final_7.31.2025&quot; is hereby released.</p>\n\n<p>******************************<br />\n<strong>SECOND: </strong>The proposal due date remains unchanged with a date of August 08, 2025, at Noon&nbsp;Central time.<br />\n<br />\n******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 05</strong></u></p>\n\n<p>Purpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.<br />\n<strong>*****************************</strong></p>\n\n<p><strong>SECOND:</strong> Due to photos not allowed at the site, the following photos have been released to&nbsp;all perspective bidders:<br />\n1. Concrete Curb Photos<br />\n2. Epoxy Boiler Room<br />\n3. Exterior Doors<br />\n4. Exterior Stairs and Concrete Work<br />\n5. Tower Lights<br />\n*****************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 04</strong></u></p>\n\n<p>Purpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:</p>\n\n<p>FIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. &nbsp;Requests to attend are due by July 25, 2025 12:00PM Central Time. &nbsp;A real ID is required by all attendees and will be strictly enforced.&nbsp;</p>\n\n<p>**********************************</p>\n\n<p>SECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. &nbsp;Late questions will not be accepted. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>THIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. &nbsp;Late proposals will not be accepted after this time. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>FOURTH: All other terms and conditions remain unchanged and in full effect. &nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 06\n\nPurpose of amendment 06 is to hereby release the Question and Answer (Q&A) as described in the following:\n\nFIRST: The Final Q&A entitled, \"J-16_QA for ZMP Multiple Project_Final_7.31.2025\" is hereby released.\n\n******************************\n\nSECOND: The proposal due date remains unchanged with a date of August 08, 2025, at Noon Central time.\n\n******************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 05\n\nPurpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:\n\nFIRST: The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.\n\n*****************************\n\nSECOND: Due to photos not allowed at the site, the following photos have been released to all perspective bidders:\n\n1. Concrete Curb Photos\n\n2. Epoxy Boiler Room\n\n3. Exterior Doors\n\n4. Exterior Stairs and Concrete Work\n\n5. Tower Lights\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 04\n\nPurpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:\n\nFIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. Requests to attend are due by July 25, 2025 12:00PM Central Time. A real ID is required by all attendees and will be strictly enforced.\n\n**********************************\n\nSECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. Late questions will not be accepted.\n\n**********************************\n\nTHIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. Late proposals will not be accepted after this time.\n\n**********************************\n\nFOURTH: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"},{"dates":{"posted":"2025-08-06","posted_at":"2025-08-06T20:34:14.053Z","created_at":"2025-08-06T20:30:33.738Z","modified_at":"2025-08-24T04:57:02.873Z","response_deadline":{"raw":"2025-08-08T12:00:00-05:00","utc":"2025-08-08T17:00:00Z","date":"2025-08-08","time":"12:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/451a85078fba4cb2bddf2f16a25d6039/view"},"naics":{"codes":["236210"],"primary":"236210"},"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-23","archive_type":"auto15"},"history":[{"index":13,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T20:34:14.053Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"451a85078fba4cb2bddf2f16a25d6039","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":11,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-05T17:36:04.002Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4467204164724f38954abc9f879134e9","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":10,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T17:52:23.866Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"59873c6f5b624d39bc5ad6483c74afd2","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":9,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-29T19:18:35.180Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"e60ef05f1d5542348e33609390b9ff4f","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":8,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T12:35:42.022Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7e83971edac4400d841b744a4fd4e965","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":7,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-16T15:58:37.563Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2d962527d7df4dc486f0d3536edb6355","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":6,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-14T18:46:52.877Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1e05bd5a5d044d8bbf357c03a90a7476","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":5,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-11T15:38:40Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"419a921317be4189af6976a6afdee1ea","solicitation_number":"697DCK-25-R-00354","parent_opportunity_id":"744527ffe4214767be5fcca2224525c6","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":4,"title":"Solicitation for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-26T14:42:13.616Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"744527ffe4214767be5fcca2224525c6","solicitation_number":"697DCK-25-R-00354","related_opportunity_id":"888f75e2c4684122b0253d092c1bcb40"},{"index":3,"title":"Sources Sought for multiple projects located at Air Route Traffic Control Center in Minneapolis, MN","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-20T11:36:03.079Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"888f75e2c4684122b0253d092c1bcb40","solicitation_number":"697DCK-25-M-JHKC1"}],"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"451a85078fba4cb2bddf2f16a25d6039","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"744527ffe4214767be5fcca2224525c6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-05T03:40:30.758720969Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"79460840d9874a5aa43fc8494d20bef669ad949789e14d71b37dd209c61953ed","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-05T03:40:30.758720969Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p><u><strong>Amendment 07</strong></u></p>\n\n<p>The purpose of Amendment 07 is to hereby release the following two (2) Questions &amp; Answers:</p>\n\n<p><strong>FIRST: &nbsp;</strong>The following questions were posed ahead of the proposal due date set for this Friday August 8th, 2025. &nbsp;</p>\n\n<p>Question posed: Going through the documents to submit our bid &ndash; under the insurance schedule &ndash; Wondering if it is a performance bond and a payment bond?&nbsp;</p>\n\n<p>Answer: Performance and Payment bonds are not required.</p>\n\n<p>Question posed: Is material safety data sheet needed prior to bidding or only if we are awarded the bid? If it is needed at the time of bid submittal is it( MSDS) needed for the concrete?&nbsp;</p>\n\n<p>Answer: The MSDS sheet would be a submittal after award.</p>\n\n<p>*******************************</p>\n\n<p><strong>SECOND:</strong> &nbsp;All other terms and conditions remain unchanged and in full effect.&nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 06</strong></u></p>\n\n<p>Purpose of amendment 06 is to hereby release the Question and Answer (Q&amp;A) as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The Final Q&amp;A entitled, &quot;J-16_QA for ZMP Multiple Project_Final_7.31.2025&quot; is hereby released.</p>\n\n<p>******************************<br />\n<strong>SECOND: </strong>The proposal due date remains unchanged with a date of August 08, 2025, at Noon&nbsp;Central time.<br />\n<br />\n******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 05</strong></u></p>\n\n<p>Purpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.<br />\n<strong>*****************************</strong></p>\n\n<p><strong>SECOND:</strong> Due to photos not allowed at the site, the following photos have been released to&nbsp;all perspective bidders:<br />\n1. Concrete Curb Photos<br />\n2. Epoxy Boiler Room<br />\n3. Exterior Doors<br />\n4. Exterior Stairs and Concrete Work<br />\n5. Tower Lights<br />\n*****************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 04</strong></u></p>\n\n<p>Purpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:</p>\n\n<p>FIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. &nbsp;Requests to attend are due by July 25, 2025 12:00PM Central Time. &nbsp;A real ID is required by all attendees and will be strictly enforced.&nbsp;</p>\n\n<p>**********************************</p>\n\n<p>SECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. &nbsp;Late questions will not be accepted. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>THIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. &nbsp;Late proposals will not be accepted after this time. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>FOURTH: All other terms and conditions remain unchanged and in full effect. &nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","text":"Amendment 07\n\nThe purpose of Amendment 07 is to hereby release the following two (2) Questions & Answers:\n\nFIRST: The following questions were posed ahead of the proposal due date set for this Friday August 8th, 2025.\n\nQuestion posed: Going through the documents to submit our bid – under the insurance schedule – Wondering if it is a performance bond and a payment bond?\n\nAnswer: Performance and Payment bonds are not required.\n\nQuestion posed: Is material safety data sheet needed prior to bidding or only if we are awarded the bid? If it is needed at the time of bid submittal is it( MSDS) needed for the concrete?\n\nAnswer: The MSDS sheet would be a submittal after award.\n\n*******************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 06\n\nPurpose of amendment 06 is to hereby release the Question and Answer (Q&A) as described in the following:\n\nFIRST: The Final Q&A entitled, \"J-16_QA for ZMP Multiple Project_Final_7.31.2025\" is hereby released.\n\n******************************\n\nSECOND: The proposal due date remains unchanged with a date of August 08, 2025, at Noon Central time.\n\n******************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 05\n\nPurpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:\n\nFIRST: The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.\n\n*****************************\n\nSECOND: Due to photos not allowed at the site, the following photos have been released to all perspective bidders:\n\n1. Concrete Curb Photos\n\n2. Epoxy Boiler Room\n\n3. Exterior Doors\n\n4. Exterior Stairs and Concrete Work\n\n5. Tower Lights\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 04\n\nPurpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:\n\nFIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. Requests to attend are due by July 25, 2025 12:00PM Central Time. A real ID is required by all attendees and will be strictly enforced.\n\n**********************************\n\nSECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. Late questions will not be accepted.\n\n**********************************\n\nTHIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. Late proposals will not be accepted after this time.\n\n**********************************\n\nFOURTH: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00354","place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Z2BA"}],"due_at":"2025-08-08T17:00:00Z","due_date":"2025-08-08","closes_at":"2025-08-08T17:00:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","state":"MN","county":"27037","county_name":"Dakota County","city":"2720618","city_name":"Farmington","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"VK3PRM8JV282","amount":null,"linked_awards":9,"cancelled":false,"archived":true,"updated_at":"2026-11-05T04:14:16.450617Z","principal_notice_id":"451a85078fba4cb2bddf2f16a25d6039","description":{"text":"Amendment 07\n\nThe purpose of Amendment 07 is to hereby release the following two (2) Questions & Answers:\n\nFIRST: The following questions were posed ahead of the proposal due date set for this Friday August 8th, 2025.\n\nQuestion posed: Going through the documents to submit our bid – under the insurance schedule – Wondering if it is a performance bond and a payment bond?\n\nAnswer: Performance and Payment bonds are not required.\n\nQuestion posed: Is material safety data sheet needed prior to bidding or only if we are awarded the bid? If it is needed at the time of bid submittal is it( MSDS) needed for the concrete?\n\nAnswer: The MSDS sheet would be a submittal after award.\n\n*******************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 06\n\nPurpose of amendment 06 is to hereby release the Question and Answer (Q&A) as described in the following:\n\nFIRST: The Final Q&A entitled, \"J-16_QA for ZMP Multiple Project_Final_7.31.2025\" is hereby released.\n\n******************************\n\nSECOND: The proposal due date remains unchanged with a date of August 08, 2025, at Noon Central time.\n\n******************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 05\n\nPurpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:\n\nFIRST: The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.\n\n*****************************\n\nSECOND: Due to photos not allowed at the site, the following photos have been released to all perspective bidders:\n\n1. Concrete Curb Photos\n\n2. Epoxy Boiler Room\n\n3. Exterior Doors\n\n4. Exterior Stairs and Concrete Work\n\n5. Tower Lights\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 04\n\nPurpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:\n\nFIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. Requests to attend are due by July 25, 2025 12:00PM Central Time. A real ID is required by all attendees and will be strictly enforced.\n\n**********************************\n\nSECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. Late questions will not be accepted.\n\n**********************************\n\nTHIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. Late proposals will not be accepted after this time.\n\n**********************************\n\nFOURTH: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 03\n\nFIRST: The official question and answers (Q&A) are hereby updated and released to include three additional questions.\n\n****************************\n\nSECOND: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 02\n\nPurpose of amendment 02 is release the official Question and Answer (Q&A) and additional attachment as described below:\n\nFIRST: The official Q&A is hereby released for this solicitation as attachment J-16.\n\n*******************************\n\nSECOND: Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.\n\n*******************************\n\nTHIRD: All other terms and conditions remainunchanged and in full effect.\n\n*****************************************************************************************\n\nAmendment 01:\n\nPurpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:\n\nFIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:\n\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.\n\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n3. 00005 Remove and replace HU-380 Humidifier\n\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers\n\n5. 00008 Remove and replace power panels\n\n6. 00009 Remove and replace two (2) boiler vent stacks\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n*****************************\n\nSECOND: Due to FIRST above, the following attachments are no longer applicable:\n\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications\n\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings\n\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts\n\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications\n\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings\n\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts\n\n7. J-5, ZMP Humidifier HU-380 remove and replace\n\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications\n\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings\n\n10. J-6c, ZMP AHU 12 13 EOSH Impacts\n\n11. J-8a, ZMP Replace Electrical Panels specifications\n\n12. J-8b, ZMP Replace Electrical Panels drawings\n\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts\n\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work\n\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification\n\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1\n\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2\n\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts\n\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.\n\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring\n\n*****************************\n\nTHIRD: All other terms and conditions remain unchanged and in full effect.\n\n*****************************************************************************************\n\nMultiple projects located at Air Route Traffic Control Center in Minneapolis, MN\n\n512 Division Street, Farmington, MN 55024\n\nATTENTION: This overall project will consist of multiple projects at the same facility. Contractors can bid on all, one, or some of the line items found within the solicitation. Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).\n\nThe Projects are defined by the Contract Documents and consist of the following:\n\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.\n\n2. Remove and replace Epoxy Floor in the Boiler Room.\n\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.\n\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.\n\n5. Remove and replace HU-380 Humidifier.\n\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.\n\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.\n\n8. Remove and replace power panels.\n\n9. Remove and replace two (2) boiler vent stacks.\n\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall\n\n9b. Bid Option 2: Dishwasher Room Ceiling Repair\n\n9c. Bid Option 3: Replacement of Hot Water Heater Flue\n\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.\n\nRequests to attend site visit are due: Noon Central Time on July 08, 2025\n\nSite Visit is being held on: July 09, 2025 @ 9AM Central Time\n\nQuestions are due by: July 14, 2025 at Noon Central Time\n\nProposals are due by: July 31, 2025 at Noon Central time","html":"<p><u><strong>Amendment 07</strong></u></p>\n\n<p>The purpose of Amendment 07 is to hereby release the following two (2) Questions &amp; Answers:</p>\n\n<p><strong>FIRST: &nbsp;</strong>The following questions were posed ahead of the proposal due date set for this Friday August 8th, 2025. &nbsp;</p>\n\n<p>Question posed: Going through the documents to submit our bid &ndash; under the insurance schedule &ndash; Wondering if it is a performance bond and a payment bond?&nbsp;</p>\n\n<p>Answer: Performance and Payment bonds are not required.</p>\n\n<p>Question posed: Is material safety data sheet needed prior to bidding or only if we are awarded the bid? If it is needed at the time of bid submittal is it( MSDS) needed for the concrete?&nbsp;</p>\n\n<p>Answer: The MSDS sheet would be a submittal after award.</p>\n\n<p>*******************************</p>\n\n<p><strong>SECOND:</strong> &nbsp;All other terms and conditions remain unchanged and in full effect.&nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 06</strong></u></p>\n\n<p>Purpose of amendment 06 is to hereby release the Question and Answer (Q&amp;A) as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The Final Q&amp;A entitled, &quot;J-16_QA for ZMP Multiple Project_Final_7.31.2025&quot; is hereby released.</p>\n\n<p>******************************<br />\n<strong>SECOND: </strong>The proposal due date remains unchanged with a date of August 08, 2025, at Noon&nbsp;Central time.<br />\n<br />\n******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 05</strong></u></p>\n\n<p>Purpose of amendment 05 is to release the second site visit sign-in sheet and photos of the site as described in the following:<br />\n<br />\n<strong>FIRST: </strong>The second site visit was held on Monday, July 28th and the sign-in sheet (Sign-in Roster_28 July 2025) is hereby release for all perspective bidders.<br />\n<strong>*****************************</strong></p>\n\n<p><strong>SECOND:</strong> Due to photos not allowed at the site, the following photos have been released to&nbsp;all perspective bidders:<br />\n1. Concrete Curb Photos<br />\n2. Epoxy Boiler Room<br />\n3. Exterior Doors<br />\n4. Exterior Stairs and Concrete Work<br />\n5. Tower Lights<br />\n*****************************<br />\n<strong>THIRD:</strong> All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 04</strong></u></p>\n\n<p>Purpose of this modification is to offer an additional site visit and update the milestone dates as described in the following:</p>\n\n<p>FIRST: A second site visit is being offered on July 28, 2025, at 9:00AM Central Time. &nbsp;Requests to attend are due by July 25, 2025 12:00PM Central Time. &nbsp;A real ID is required by all attendees and will be strictly enforced.&nbsp;</p>\n\n<p>**********************************</p>\n\n<p>SECOND: Due to FIRST above, additional questions will be accepted and will be due on July 30th, 2025 at 12:00PM Central Time. &nbsp;Late questions will not be accepted. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>THIRD: Due to FIRST and SECOND above, proposals will be due on August 8th, 2025 at 12:00PM Central Time. &nbsp;Late proposals will not be accepted after this time. &nbsp;</p>\n\n<p>**********************************</p>\n\n<p>FOURTH: All other terms and conditions remain unchanged and in full effect. &nbsp;</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 03</strong></u></p>\n\n<p>FIRST: The official question and answers (Q&amp;A) are hereby updated and released to include three additional questions.<br />\n****************************<br />\nSECOND: All other terms and conditions remain unchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><u><strong>Amendment 02</strong></u></p>\n\n<p>Purpose of amendment 02 is release the official Question and Answer (Q&amp;A) and additional attachment as described below:<br />\n<br />\n<strong>FIRST:</strong> The official Q&amp;A is hereby released for this solicitation as attachment J-16.<br />\n*******************************<br />\n<strong>SECOND:</strong> Due to FIRST above, attachment J-17, Excerpt_ZMP_RCLR_ID01922_Tower Assessment Report_2024_DNC is hereby included in this opportunity.</p>\n\n<p>*******************************<br />\n<strong>THIRD:</strong> All other terms and conditions remainunchanged and in full effect.</p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Amendment 01:&nbsp;</u></strong></p>\n\n<p>Purpose of Amendment 01 is to remove 6 of the 10 projects from this solicitation moving forward:<br />\n<br />\n<strong>FIRST: The following projects are no longer apart of this solicitation and zero proposals will be received for them:</strong><br />\n1. 00001 Replace two (2) Chilled Water Flow Control Valves and one (1) Condenser Water Flow Control Valve.<br />\n2. 00004 Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n3. 00005 Remove and replace HU-380 Humidifier<br />\n4. 00006 Remove and replace AHU-12 and AHU-13Humidifiers<br />\n5. 00008 Remove and replace power panels<br />\n6. 00009 Remove and replace two (2) boiler vent stacks<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue</p>\n\n<p>*****************************<br />\n<strong>SECOND: Due to FIRST above, the following attachments are no longer applicable:</strong><br />\n1. J-1a, ZMP Chilled Water Valve Replacement Specifications<br />\n2. J-1b, ZMP Chilled Water Valve Replacement Drawings<br />\n3. J-1c, ZMP Chilled Water Valve Replacement EOSH Impacts<br />\n4. J-4a, ZMP PSB Gas Unit Heater Replacement Specifications<br />\n5. J-4b, ZMP PSB Gas Unit Heater Replacement Drawings<br />\n6. J-4c, ZMP PSB Gas Unit Heater Replacement EOSH Impacts<br />\n7. J-5, ZMP Humidifier HU-380 remove and replace<br />\n8. J-6a, ZMP AHU-12 and AHU-13 Humidifiers remove and replace specifications<br />\n9. J-6b, ZMP AHU-12 and AHU-13 Humidifiers remove and replace drawings<br />\n10. J-6c, ZMP AHU 12 13 EOSH Impacts<br />\n11. J-8a, ZMP Replace Electrical Panels specifications<br />\n12. J-8b, ZMP Replace Electrical Panels drawings<br />\n13. J-8c, ZMP Various Power Panel Replace EOSH Impacts<br />\n14. J-9a, ZMP Replace 2 Boiler Vent Stacks Scope of Work<br />\n15. J-9b, ZMP Replace 2 Boiler Vent Stacks specification<br />\n16. J-9c, ZMP Replace 2 Boiler Vent Stacks Drawing 1<br />\n17. J-9d, ZMP Replace 2 Boiler Vent Stacks Drawing 2<br />\n18. J-9e, ZMP Replace 2 Boiler Vent Stacks EOSH Impacts<br />\n19. J-11, FAA Std 019 Lightning and Surge Protection, etc.<br />\n20. J-12, FAA-C-1217H Chg 2 Electrical Work Premises Wiring</p>\n\n<p>*****************************<br />\n<strong>THIRD: All other terms and conditions remain unchanged and in full effect.</strong></p>\n\n<p>*****************************************************************************************</p>\n\n<p><strong><u>Multiple projects located at Air Route Traffic Control Center&nbsp;</u></strong><strong><u>in Minneapolis, MN</u><br />\n512 Division Street,&nbsp;Farmington, MN 55024</strong></p>\n\n<p><u><strong>ATTENTION:</strong> </u>This overall project will consist of multiple projects at the same facility.&nbsp; Contractors can bid on all, one, or some of the line items found within the solicitation.&nbsp; Award or multiple awards will be made based on Lowest Priced Technically Acceptable (LPTA).</p>\n\n<p></p>\n\n<p><u><strong>The Projects are defined by the Contract Documents and consist of the following:</strong></u><br />\n1. Replace Two (2) Chilled Water Flow Control Valves and One (1) Condenser Water Flow Control Valve.<br />\n2. Remove and replace Epoxy Floor in the Boiler Room.<br />\n3. Remove and replace four (4) exterior doors in Power Service Building and Maintenance Garage.<br />\n4. Demolish existing gas heaters and replace with ten (10) new gas unit heaters.<br />\n5. Remove and replace HU-380 Humidifier.<br />\n6. Remove and replace AHU-12 and AHU-13 Humidifiers.<br />\n7. Remove existing red-light and white strobe lights and replace with new dual LED lighting system.<br />\n8. Remove and replace power panels.<br />\n9. Remove and replace two (2) boiler vent stacks.<br />\n9a. Bid Option 1: Removal and Reinstallation of Dish Washing Room Wall<br />\n9b. Bid Option 2: Dishwasher Room Ceiling Repair<br />\n9c. Bid Option 3: Replacement of Hot Water Heater Flue<br />\n10. Resurface Exterior Concrete Floor and Adjust Concrete Curb.</p>\n\n<p><strong>Requests to attend site visit are due:</strong> Noon Central Time on July 08, 2025</p>\n\n<p><strong>Site Visit is being held on:</strong> July 09, 2025 @ 9AM Central Time</p>\n\n<p><strong>Questions are due by:</strong> July 14, 2025 at Noon Central Time</p>\n\n<p><strong>Proposals are due by:</strong> July 31, 2025 at Noon Central time</p>","origin":"detail"},"contacts":[{"name":"Ms. Joni Haynes","role":"primary","email":"joni.l.haynes@faa.gov"},{"name":"Karen Czerwiec","role":"secondary","email":"karen.v-ctr.czerwiec@faa.gov"}],"place_of_performance":{"city":{"code":"20618","name":"Farmington"},"state":{"code":"MN","name":"Minnesota"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"naics_codes":["236210"],"award":null,"attachments":[{"resource_id":"0a5c1f1bc19f4fd7a9a04db5e477f2d0","name":"697DCK-25-R-00354_Final.pdf","kind":"file","mime_type":".pdf","size_bytes":479712,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0a5c1f1bc19f4fd7a9a04db5e477f2d0/download","mirrored":false},{"resource_id":"c0fc67c1980a49ab98c171e34b22d2ce","name":"J-1a_Chilled Water Valve Replacement Project Spec.pdf","kind":"file","mime_type":".pdf","size_bytes":1155605,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c0fc67c1980a49ab98c171e34b22d2ce/download","mirrored":false},{"resource_id":"577c59d92f2944d7b78672cdd1d22f14","name":"J-1b_Chilled Water Valve Replacement Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":439927,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/577c59d92f2944d7b78672cdd1d22f14/download","mirrored":false},{"resource_id":"acf6f953032a4db58ad72e1cef04429a","name":"J-1c_EOSH Impacts Chilled Water Valve Replace.pdf","kind":"file","mime_type":".pdf","size_bytes":2599597,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/acf6f953032a4db58ad72e1cef04429a/download","mirrored":false},{"resource_id":"f633f18953984c9b9f6c994bc9ad4484","name":"J-2_Scope of Work_Epoxy Floor.pdf","kind":"file","mime_type":".pdf","size_bytes":1393152,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f633f18953984c9b9f6c994bc9ad4484/download","mirrored":false},{"resource_id":"68062f70051d4d88b32abfff83ef36d2","name":"J-3_Scope of Work_Exterior Doors.pdf","kind":"file","mime_type":".pdf","size_bytes":376615,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/68062f70051d4d88b32abfff83ef36d2/download","mirrored":false},{"resource_id":"c5dda6f963504f53848264b7d9ffeba1","name":"J-4a_ZMP-04202024 GAS UNIT HEATER REPLACEMENT SPECS.pdf","kind":"file","mime_type":".pdf","size_bytes":1753752,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c5dda6f963504f53848264b7d9ffeba1/download","mirrored":false},{"resource_id":"bef8759c0264483994cbce384763a823","name":"J-4b_ZMP Gas Unit Heater Replacement Drawings (3).pdf","kind":"file","mime_type":".pdf","size_bytes":370753,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bef8759c0264483994cbce384763a823/download","mirrored":false},{"resource_id":"bdaae9e646be4cbaa8cd7e98a3be8b4c","name":"J-4c_ZMP Gas Unit Heater EOSH Impacts.pdf","kind":"file","mime_type":".pdf","size_bytes":153987,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bdaae9e646be4cbaa8cd7e98a3be8b4c/download","mirrored":false},{"resource_id":"37fb5b0926324a71b731987d94e60ac4","name":"J-5_Scope of Work_380 Steam Humidifier.pdf","kind":"file","mime_type":".pdf","size_bytes":446158,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/37fb5b0926324a71b731987d94e60ac4/download","mirrored":false},{"resource_id":"c3f59f39b12a49b088a26bdb2300f966","name":"J-6a_ZMP AHU 12 and 13 Humidifier Replacement Spec.pdf","kind":"file","mime_type":".pdf","size_bytes":1449452,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c3f59f39b12a49b088a26bdb2300f966/download","mirrored":false},{"resource_id":"fcfbdd79276b4f4da723f51b3e4102d2","name":"J-6b ZMP AHU 12 and 13 Humidifier Replacement Drawings.pdf","kind":"file","mime_type":".pdf","size_bytes":1210160,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fcfbdd79276b4f4da723f51b3e4102d2/download","mirrored":false},{"resource_id":"6531c102c4454ffb91eed29bab7edf51","name":"J-6c ZMP AHU 13 and 13 Humidifier Replace EOSH Impacts.pdf","kind":"file","mime_type":".pdf","size_bytes":208653,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6531c102c4454ffb91eed29bab7edf51/download","mirrored":false},{"resource_id":"5e79193a3bbf4c758295b43e5e4c850e","name":"J-7_ZMP NASET Obstruction Lights SOW.pdf","kind":"file","mime_type":".pdf","size_bytes":157224,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/5e79193a3bbf4c758295b43e5e4c850e/download","mirrored":false},{"resource_id":"f07257424dd34012b7bdd41d85101f70","name":"J-8a_ZMP Panel Replace Specs.pdf","kind":"file","mime_type":".pdf","size_bytes":718520,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f07257424dd34012b7bdd41d85101f70/download","mirrored":false},{"resource_id":"82f9113e95b74de1bc9e02ed96568064","name":"J-8b_ZMP Panel Replace Drawings Binder1.pdf","kind":"file","mime_type":".pdf","size_bytes":9484523,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/82f9113e95b74de1bc9e02ed96568064/download","mirrored":false},{"resource_id":"dd7bb13125be4ce38e529fc6223080ee","name":"J-8c_ZMP Power Panel EOSH Impacts.pdf","kind":"file","mime_type":".pdf","size_bytes":2653178,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dd7bb13125be4ce38e529fc6223080ee/download","mirrored":false},{"resource_id":"70d152904c5145b5a73a880585d11028","name":"J-9a_ZMP Boiler Scope of Work.pdf","kind":"file","mime_type":".pdf","size_bytes":118127,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/70d152904c5145b5a73a880585d11028/download","mirrored":false},{"resource_id":"ebedd59d3e79433bb1beba88ec953396","name":"J-9b_ZMP Boiler Vent Stack Replacement Specifications.pdf","kind":"file","mime_type":".pdf","size_bytes":506979,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ebedd59d3e79433bb1beba88ec953396/download","mirrored":false},{"resource_id":"c0f6dcfe3b8b42d7b91d293916ab435a","name":"J-9c_ZMP Boiler Drawing zmp-1203733-m001 Rev A.pdf","kind":"file","mime_type":".pdf","size_bytes":586847,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c0f6dcfe3b8b42d7b91d293916ab435a/download","mirrored":false},{"resource_id":"0b760d70e48b46e48ee647b2cb0ec5f9","name":"J-9d_ZMP Boiler Drawing zmp-msp-e-5896-a02r Bid Option.pdf","kind":"file","mime_type":".pdf","size_bytes":5549030,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0b760d70e48b46e48ee647b2cb0ec5f9/download","mirrored":false},{"resource_id":"84eb7fa0ad61495494fd88241a3a8eab","name":"J-9e_ZMP Boiler EOSH Impacts.pdf","kind":"file","mime_type":".pdf","size_bytes":2520455,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/84eb7fa0ad61495494fd88241a3a8eab/download","mirrored":false},{"resource_id":"9b68c46ac6cd4190be3f0eccc00956fd","name":"J-10_Scope of Work_Exterior Concrete Work.pdf","kind":"file","mime_type":".pdf","size_bytes":1164602,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9b68c46ac6cd4190be3f0eccc00956fd/download","mirrored":false},{"resource_id":"2d923ff3fa7d4195af12a9170d027018","name":"J-11 FAA-STD-019G.pdf","kind":"file","mime_type":".pdf","size_bytes":6793575,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2d923ff3fa7d4195af12a9170d027018/download","mirrored":false},{"resource_id":"a2eb04ad0d9449fcb52768749281f63c","name":"J-12 FAA-C-1217H Chg 2.pdf","kind":"file","mime_type":".pdf","size_bytes":725001,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a2eb04ad0d9449fcb52768749281f63c/download","mirrored":false},{"resource_id":"4f8afe1e0a35499fac34af10f633a2af","name":"J-13_Hazardous Energy Standard Procedure.pdf","kind":"file","mime_type":".pdf","size_bytes":71917,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4f8afe1e0a35499fac34af10f633a2af/download","mirrored":false},{"resource_id":"1c5e4400f7c94058b7ccec2ab6a517f3","name":"J-14_DOL WD MN20250053 5 2 25.pdf","kind":"file","mime_type":".pdf","size_bytes":404934,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1c5e4400f7c94058b7ccec2ab6a517f3/download","mirrored":false},{"resource_id":"9d75f0a9d13443dc819a7fa3be7a9e23","name":"J-15 Price proposal spreadsheet r.xlsx","kind":"file","mime_type":".xlsx","size_bytes":14908,"posted_at":"2025-06-26T14:42:13.616Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9d75f0a9d13443dc819a7fa3be7a9e23/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_697DCK25C00279_6920_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_697DCK25C00279_6920_-NONE-_-NONE-/","piid":"697DCK25C00279","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"VK3PRM8JV282","recipient_name":"GUSTAV & RUDY CONTRACTORS, INC.","recipient_uei":"VK3PRM8JV282","recipient_cage":"932L6","recipient_city":"HAMEL","recipient_state":"MN","sub_name":"Federal Aviation Administration","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","office_key":"o-697DCK","first_action_date":"2025-09-15","last_action_date":"2026-01-26","actions":3,"obligated":"156286.62","current_total_value":"156286.62","potential_total_value":"156286.62","naics":"236220","psc":"Z1AZ","extent_competed":"COMPETED UNDER SAP","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":5,"description":"ZMP PROJECTS","method":"solicitation","confidence":"high","evidence":["solicitation number 697DCK25R00354 equals the FPDS solicitation identifier","same awarding office 697DCK"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"20261120PCONLINE","latest_notice_id":"03aa60d897cb4cbcb826c0d61a5cb1a6","title":"Federal Aviation Administration - United States Postal Service (USPS)-authorized, web-based, Software-as-a-Service (SaaS) PC Postage Online Solution","solicitation_number":"20261120_PC_ONLINE","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":null,"psc":"R604","set_aside":null,"state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"697DCK27R00039","latest_notice_id":"59cefa73472a4390b8ef0cd5199d6855","title":"Market Survey for Helicopter Services for the FAA between Juneau and other Sites in Alaska","solicitation_number":"697DCK-27-R-00039","notice_type":"p","first_type":"p","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-12-01T00:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"481211","psc":"1730","set_aside":null,"state":"AK","county":"02110","county_name":"Juneau City and Borough","city":"0236400","city_name":"Juneau","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"697DCK27R00038","latest_notice_id":"907fa7b41fea4549a49a3624212beaf7","title":"Market Survey for Janitorial Services at FAA Facilities in King Salmon, Alaska","solicitation_number":"697DCK-27-R-00038","notice_type":"p","first_type":"p","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-12-01T00:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"561720","psc":"S201","set_aside":null,"state":"AK","county":"02060","county_name":"Bristol Bay Borough","city":"0239630","city_name":"King Salmon","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"697DCK27R00022A","latest_notice_id":"555bbe8d6aa64108bca5569444c05dad","title":"Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA","solicitation_number":"697DCK-27-R-00022A","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-11-23","notices":7,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"541330","psc":"C215","set_aside":"SBA","state":"CA","county":"06079","county_name":"San Luis Obispo County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"697DCK27R00028","latest_notice_id":"31630ee4df644dd4b56d4786e41c7662","title":"697DCK-27-R-00028: SEA Elevator Maintenance Services","solicitation_number":"697DCK-27-R-00028","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-17","notices":4,"due_at":"2026-12-11T22:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"238290","psc":"Z1BA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"140A2327Q0297","latest_notice_id":"e23146304c404a24ad420d6821b45e75","title":"Y--IE181 - WHS Greenhouse Construction","solicitation_number":"140A2327Q0297","notice_type":"o","first_type":"o","first_posted":"2026-10-20","last_posted":"2026-11-18","notices":2,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-014","dept_name":"INTERIOR, DEPARTMENT OF THE","sub_key":"s-1450","sub_name":"BUREAU OF INDIAN AFFAIRS","office_key":"o-140A23","office_name":"INDIAN EDUCATION ACQUISITION OFFICE","naics":"236210","psc":"Y1CA","set_aside":"ISBEE","state":"NM","county":"35031","county_name":"McKinley County","city":"3527410","city_name":"Fort Wingate","country":null,"place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"FA706027RXXX2","latest_notice_id":"a5758e59cd7b4be4a87845edec87f359","title":"Multiple Award Construction Contract (MACC)","solicitation_number":"FA706027RXXX2","notice_type":"r","first_type":"r","first_posted":"2026-11-05","last_posted":"2026-11-05","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA7060","office_name":"FA7060 11TH CONTRACTING SQ PK","naics":"236210","psc":"Z2JZ","set_aside":null,"state":"DC","county":"11001","county_name":"District of Columbia","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-06T04:46:59.158685Z"},{"key":"FA813726R0040","latest_notice_id":"49cbd90b4ddd456fb05b7337b27520f9","title":"Tinker AFB 2026 Multiple Award Construction Contract (MACC)","solicitation_number":"FA8137-26-R-0040","notice_type":"o","first_type":"o","first_posted":"2026-06-12","last_posted":"2026-11-20","notices":16,"due_at":"2026-12-03T19:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8137","office_name":"FA8137 AFSC PZIOC","naics":"236210","psc":"Z2JZ","set_aside":"SBP","state":"OK","county":"40109","county_name":"Oklahoma County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Tinker Air Force Base","site_key":"tinker-air-force-base-ok","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":6,"indexable":false}