{"canonical":"https://sealedbidder.com/opportunities/697dck25r00074","key":"697DCK25R00074","url":"https://sealedbidder.com/opportunities/697dck25r00074","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-01-31T23:00:00Z","first_posted":"2024-11-22","last_posted":"2025-01-30","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"FEDERAL AVIATION ADMINISTRATION","office":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"236220","psc":"Y1BA","set_aside":null,"place_state":"AK","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"02020","place_county_name":"Anchorage Municipality","place_city":"0203000","place_city_name":"Anchorage","winner":"WALSH FEDERAL LLC","award_amount":null,"publications":[{"notice_id":"c43b7824871c40dbb9b0ba5de9759674","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"p","base_type":"p","posted":"2024-11-22","posted_at":null,"due_at":null,"due_date":null,"cancelled":null,"archived":null,"archive_date":"2024-12-06","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c43b7824871c40dbb9b0ba5de9759674/view","enriched":false,"history":[]},{"notice_id":"38c6295ab21b4dcd9a52f4f5881c4298","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"p","posted":"2024-12-04","posted_at":null,"due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":null,"archived":null,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/38c6295ab21b4dcd9a52f4f5881c4298/view","enriched":false,"history":[]},{"notice_id":"591653bb29b14b38a2645c1bed43ae6c","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"o","posted":"2024-12-05","posted_at":null,"due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":null,"archived":null,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/591653bb29b14b38a2645c1bed43ae6c/view","enriched":false,"history":[]},{"notice_id":"cf47e561dcf1448aba5d2d86269324d2","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"o","posted":"2024-12-20","posted_at":null,"due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":null,"archived":null,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/cf47e561dcf1448aba5d2d86269324d2/view","enriched":false,"history":[]},{"notice_id":"1f7202b0e810485eb80e7525471ee2dc","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"o","posted":"2025-01-14","posted_at":"2025-01-14T20:39:29.046Z","due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":false,"archived":true,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1f7202b0e810485eb80e7525471ee2dc/view","enriched":true,"history":[{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}]},{"notice_id":"1523d3a4682e4cbe85319e7b48f05e17","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"o","posted":"2025-01-15","posted_at":"2025-01-15T19:09:44.844Z","due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":false,"archived":true,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/1523d3a4682e4cbe85319e7b48f05e17/view","enriched":true,"history":[{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}]},{"notice_id":"7d98e20b8190424faab63ba0284e1ba7","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"o","posted":"2025-01-23","posted_at":"2025-01-23T21:15:15.630Z","due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":false,"archived":true,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/7d98e20b8190424faab63ba0284e1ba7/view","enriched":true,"history":[{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}]},{"notice_id":"8ba13af01322472b9a03bc1e3533b5e0","title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","solicitation_number":"697DCK-25-R-00074","notice_type":"o","base_type":"o","posted":"2025-01-30","posted_at":"2025-01-30T21:21:52.239Z","due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","cancelled":false,"archived":true,"archive_date":"2025-02-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8ba13af01322472b9a03bc1e3533b5e0/view","enriched":true,"history":[{"index":14,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T18:40:52.686Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"f6ae0ba648764ddfa0b77a9ecb0b01ae","related_opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0"},{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}]}],"latest_notice_id":"8ba13af01322472b9a03bc1e3533b5e0","first_type":"p","notices":[{"dates":{"posted":"2024-11-22"},"links":{"sam":"https://sam.gov/workspace/contract/opp/c43b7824871c40dbb9b0ba5de9759674/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2024-12-06","archive_type":"auto_custom"},"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"c43b7824871c40dbb9b0ba5de9759674","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"8e91c874f2d37281e19d62bf2fbf75ba70827411bb20f8aba485101baad29643","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"The goverment has requirement for a new Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON). This will be a full and open competition. The govemrent intends to release a competitive RFP within the coming weeks.","origin":"extract"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"name":"Anchorage"},"state":{"code":"AK"},"country":{"code":"USA"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2024-12-04","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/38c6295ab21b4dcd9a52f4f5881c4298/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-15","archive_type":"auto15"},"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"38c6295ab21b4dcd9a52f4f5881c4298","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"1783e0041473f70467b3f80677caaf9ba7ea2885bd372b9e0069cc4a7f92c199","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR. A pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II. All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025. Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025. Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery. Any proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award. To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov. To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR. The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov. Attachment J-5 ANC ATCT TRACON DDH Final Vol 1 Attachment J-5a ANC ATCT TRACON DDH Final Vol 2 Attachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"name":"Anchorage"},"state":{"code":"AK"},"country":{"code":"USA"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2024-12-05","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/591653bb29b14b38a2645c1bed43ae6c/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-15","archive_type":"auto15"},"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"591653bb29b14b38a2645c1bed43ae6c","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"2a441d6c1018d136f7e350a3def621656ba9d8ded20f430f0c4fbff4ae330d3b","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR. The NAICS Code is 236220 Commercial and Institutional Building Construction The ROM is $100M - $200M A pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II. All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025. Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025. Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery. Any proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award. To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov. To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR. The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov. Attachment J-5 ANC ATCT TRACON DDH Final Vol 1 Attachment J-5a ANC ATCT TRACON DDH Final Vol 2 Attachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"name":"Anchorage"},"state":{"code":"AK"},"country":{"code":"USA"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2024-12-20","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/cf47e561dcf1448aba5d2d86269324d2/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2025-02-15","archive_type":"auto15"},"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"cf47e561dcf1448aba5d2d86269324d2","provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T19:12:38.374141Z","row_sha256":"3ca52e42ec8ebfffc2019da8c163f4f1e3403f8915b7ddf85dcb8b23c7aacd8c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-09-16T19:12:38.374141Z","first_seen_at":"2026-09-16T19:12:38.374141Z"},"description":{"text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS). This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR. The NAICS Code is 236220 Commercial and Institutional Building Construction The ROM is $100M - $200M A pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II. All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025. Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025. Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery. Any proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award. To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov. To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR. The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov. Attachment J-5 ANC ATCT TRACON DDH Final Vol 1 Attachment J-5a ANC ATCT TRACON DDH Final Vol 2 Attachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"extract"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"name":"Anchorage"},"state":{"code":"AK"},"country":{"code":"USA"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2025-01-14","posted_at":"2025-01-14T20:39:29.046Z","created_at":"2025-01-14T20:30:12.080Z","modified_at":"2025-02-15T05:04:23.992Z","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1f7202b0e810485eb80e7525471ee2dc/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-15","archive_type":"auto15"},"history":[{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}],"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1f7202b0e810485eb80e7525471ee2dc","lineage_id":"38c6295ab21b4dcd9a52f4f5881c4298","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T03:29:37.015554117Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"72b5c94a1601cd677f3af1142708697ed1eedcd32a5327e3a04a4130d63a64f5","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T03:29:37.015554117Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage</p>\n\n<p>Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).</p>\n\n<p>This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.</p>\n\n<p>The NAICS Code is 236220 Commercial and Institutional Building Construction&nbsp;</p>\n\n<p>The ROM is $100M - $200M</p>\n\n<p>A pre-proposal&nbsp;<strong>Zoom meeting </strong>is scheduled for&nbsp;<strong>January 10, 2025</strong>&nbsp;<strong>at 12:00 ET</strong> for all interested vendors.&nbsp;To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than&nbsp;<strong>January 8, 2025.&nbsp;&nbsp;</strong>A site visit will be held for Offeror(s) down-selected to Phase II.&nbsp;</p>\n\n<p>All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than Jan<strong>uary 17, 2025.</strong></p>\n\n<p>Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on <strong>January 31, 2025.&nbsp;</strong></p>\n\n<p>Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror&rsquo;s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.</p>\n\n<p>Any proposal received after 15:00 PT on <strong>January 31, 2025</strong> will be considered non-responsive and deemed ineligible for award.</p>\n\n<p>To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.</p>\n\n<p>To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.</p>\n\n<p>The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.</p>\n\n<p>Attachment J-5 ANC ATCT TRACON DDH Final Vol 1</p>\n\n<p>Attachment J-5a ANC ATCT TRACON DDH Final Vol 2</p>\n\n<p>Attachment J-5b ANC ATCT TRACON DDH Final Vol 3</p>","text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage\n\nReview all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).\n\nThis SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.\n\nThe NAICS Code is 236220 Commercial and Institutional Building Construction\n\nThe ROM is $100M - $200M\n\nA pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II.\n\nAll questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025.\n\nPhase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025.\n\nOfferor must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.\n\nAny proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award.\n\nTo be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.\n\nTo be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.\n\nThe file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.\n\nAttachment J-5 ANC ATCT TRACON DDH Final Vol 1\n\nAttachment J-5a ANC ATCT TRACON DDH Final Vol 2\n\nAttachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"code":"3000","name":"Anchorage"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2025-01-15","posted_at":"2025-01-15T19:09:44.844Z","created_at":"2025-01-15T19:06:52.186Z","modified_at":"2025-02-15T05:04:23.992Z","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/1523d3a4682e4cbe85319e7b48f05e17/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-15","archive_type":"auto15"},"history":[{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}],"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"1523d3a4682e4cbe85319e7b48f05e17","lineage_id":"38c6295ab21b4dcd9a52f4f5881c4298","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-25T02:46:52.570364524Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"aae489b08e0043738d69df67b37fffcc971763c4241e6b4bcaaba8146d39da8c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-25T02:46:52.570364524Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage</p>\n\n<p>Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).</p>\n\n<p>This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.</p>\n\n<p>The NAICS Code is 236220 Commercial and Institutional Building Construction&nbsp;</p>\n\n<p>The ROM is $100M - $200M</p>\n\n<p>A pre-proposal&nbsp;<strong>Zoom meeting </strong>is scheduled for&nbsp;<strong>January 10, 2025</strong>&nbsp;<strong>at 12:00 ET</strong> for all interested vendors.&nbsp;To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than&nbsp;<strong>January 8, 2025.&nbsp;&nbsp;</strong>A site visit will be held for Offeror(s) down-selected to Phase II.&nbsp;</p>\n\n<p>All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than Jan<strong>uary 17, 2025.</strong></p>\n\n<p>Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on <strong>January 31, 2025.&nbsp;</strong></p>\n\n<p>Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror&rsquo;s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.</p>\n\n<p>Any proposal received after 15:00 PT on <strong>January 31, 2025</strong> will be considered non-responsive and deemed ineligible for award.</p>\n\n<p>To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.</p>\n\n<p>To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.</p>\n\n<p>The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.</p>\n\n<p>Attachment J-5 ANC ATCT TRACON DDH Final Vol 1</p>\n\n<p>Attachment J-5a ANC ATCT TRACON DDH Final Vol 2</p>\n\n<p>Attachment J-5b ANC ATCT TRACON DDH Final Vol 3</p>","text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage\n\nReview all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).\n\nThis SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.\n\nThe NAICS Code is 236220 Commercial and Institutional Building Construction\n\nThe ROM is $100M - $200M\n\nA pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II.\n\nAll questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025.\n\nPhase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025.\n\nOfferor must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.\n\nAny proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award.\n\nTo be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.\n\nTo be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.\n\nThe file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.\n\nAttachment J-5 ANC ATCT TRACON DDH Final Vol 1\n\nAttachment J-5a ANC ATCT TRACON DDH Final Vol 2\n\nAttachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"code":"3000","name":"Anchorage"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2025-01-23","posted_at":"2025-01-23T21:15:15.630Z","created_at":"2025-01-23T21:12:22.660Z","modified_at":"2025-02-15T05:04:23.992Z","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/7d98e20b8190424faab63ba0284e1ba7/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-15","archive_type":"auto15"},"history":[{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}],"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"7d98e20b8190424faab63ba0284e1ba7","lineage_id":"38c6295ab21b4dcd9a52f4f5881c4298","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T10:34:20.675833099Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"7b1f97a77ada520c8b552f126efbba6a0467421c211dd9195866fba5ce85ed96","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T10:34:20.675833099Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage</p>\n\n<p>Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).</p>\n\n<p>This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.</p>\n\n<p>The NAICS Code is 236220 Commercial and Institutional Building Construction&nbsp;</p>\n\n<p>The ROM is $100M - $200M</p>\n\n<p>A pre-proposal&nbsp;<strong>Zoom meeting </strong>is scheduled for&nbsp;<strong>January 10, 2025</strong>&nbsp;<strong>at 12:00 ET</strong> for all interested vendors.&nbsp;To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than&nbsp;<strong>January 8, 2025.&nbsp;&nbsp;</strong>A site visit will be held for Offeror(s) down-selected to Phase II.&nbsp;</p>\n\n<p>All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than Jan<strong>uary 17, 2025.</strong></p>\n\n<p>Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on <strong>January 31, 2025.&nbsp;</strong></p>\n\n<p>Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror&rsquo;s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.</p>\n\n<p>Any proposal received after 15:00 PT on <strong>January 31, 2025</strong> will be considered non-responsive and deemed ineligible for award.</p>\n\n<p>To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.</p>\n\n<p>To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.</p>\n\n<p>The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.</p>\n\n<p>Attachment J-5 ANC ATCT TRACON DDH Final Vol 1</p>\n\n<p>Attachment J-5a ANC ATCT TRACON DDH Final Vol 2</p>\n\n<p>Attachment J-5b ANC ATCT TRACON DDH Final Vol 3</p>","text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage\n\nReview all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).\n\nThis SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.\n\nThe NAICS Code is 236220 Commercial and Institutional Building Construction\n\nThe ROM is $100M - $200M\n\nA pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II.\n\nAll questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025.\n\nPhase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025.\n\nOfferor must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.\n\nAny proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award.\n\nTo be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.\n\nTo be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.\n\nThe file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.\n\nAttachment J-5 ANC ATCT TRACON DDH Final Vol 1\n\nAttachment J-5a ANC ATCT TRACON DDH Final Vol 2\n\nAttachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"code":"3000","name":"Anchorage"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BA"},{"dates":{"posted":"2025-01-30","posted_at":"2025-01-30T21:21:52.239Z","created_at":"2025-01-30T21:19:35.231Z","modified_at":"2025-02-15T05:04:23.992Z","response_deadline":{"raw":"2025-01-31T15:00:00-08:00","utc":"2025-01-31T23:00:00Z","date":"2025-01-31","time":"15:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-28800}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8ba13af01322472b9a03bc1e3533b5e0/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","agency":{"office":{"code":"697DCK","name":"697DCK REGIONAL ACQUISITIONS SVCS"},"subtier":{"code":"6920","name":"FEDERAL AVIATION ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"organization_id":"500000015","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-02-15","archive_type":"auto15"},"history":[{"index":14,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-29T18:40:52.686Z","notice_type":{"code":"s","label":"Special Notice"},"request_type":"submit","opportunity_id":"f6ae0ba648764ddfa0b77a9ecb0b01ae","related_opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0"},{"index":11,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-30T21:21:52.239Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"8ba13af01322472b9a03bc1e3533b5e0","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":9,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-23T21:15:15.630Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"7d98e20b8190424faab63ba0284e1ba7","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":8,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-15T19:09:44.844Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1523d3a4682e4cbe85319e7b48f05e17","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":7,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-14T20:39:29.046Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"1f7202b0e810485eb80e7525471ee2dc","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":6,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-20T20:40:21.027Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"cf47e561dcf1448aba5d2d86269324d2","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":4,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-11-22T21:36:34.541Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"c43b7824871c40dbb9b0ba5de9759674","solicitation_number":"697DCK-25-R-00074"},{"index":3,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-05T12:00:08.377Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"591653bb29b14b38a2645c1bed43ae6c","solicitation_number":"697DCK-25-R-00074","parent_opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"},{"index":2,"title":"Anchorage Airport Traffic Control Tower (ANC ATCT) and Anchorage Terminal Radar Approach Control/Base Building (A11 TRACON)","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2024-12-04T21:30:25.989Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"38c6295ab21b4dcd9a52f4f5881c4298","solicitation_number":"697DCK-25-R-00074","related_opportunity_id":"c43b7824871c40dbb9b0ba5de9759674"}],"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"8ba13af01322472b9a03bc1e3533b5e0","lineage_id":"38c6295ab21b4dcd9a52f4f5881c4298","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T02:57:13.768424460Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a5d4fd5c39779931b9d2130e682ce4e225cc649e6cfd54f22bef4fb27de0e226","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T02:57:13.768424460Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage</p>\n\n<p>Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).</p>\n\n<p>This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.</p>\n\n<p>The NAICS Code is 236220 Commercial and Institutional Building Construction&nbsp;</p>\n\n<p>The ROM is $100M - $200M</p>\n\n<p>A pre-proposal&nbsp;<strong>Zoom meeting </strong>is scheduled for&nbsp;<strong>January 10, 2025</strong>&nbsp;<strong>at 12:00 ET</strong> for all interested vendors.&nbsp;To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than&nbsp;<strong>January 8, 2025.&nbsp;&nbsp;</strong>A site visit will be held for Offeror(s) down-selected to Phase II.&nbsp;</p>\n\n<p>All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than Jan<strong>uary 17, 2025.</strong></p>\n\n<p>Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on <strong>January 31, 2025.&nbsp;</strong></p>\n\n<p>Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror&rsquo;s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.</p>\n\n<p>Any proposal received after 15:00 PT on <strong>January 31, 2025</strong> will be considered non-responsive and deemed ineligible for award.</p>\n\n<p>To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.</p>\n\n<p>To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.</p>\n\n<p>The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.</p>\n\n<p>Attachment J-5 ANC ATCT TRACON DDH Final Vol 1</p>\n\n<p>Attachment J-5a ANC ATCT TRACON DDH Final Vol 2</p>\n\n<p>Attachment J-5b ANC ATCT TRACON DDH Final Vol 3</p>","text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage\n\nReview all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).\n\nThis SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.\n\nThe NAICS Code is 236220 Commercial and Institutional Building Construction\n\nThe ROM is $100M - $200M\n\nA pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II.\n\nAll questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025.\n\nPhase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025.\n\nOfferor must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.\n\nAny proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award.\n\nTo be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.\n\nTo be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.\n\nThe file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.\n\nAttachment J-5 ANC ATCT TRACON DDH Final Vol 1\n\nAttachment J-5a ANC ATCT TRACON DDH Final Vol 2\n\nAttachment J-5b ANC ATCT TRACON DDH Final Vol 3","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"697DCK-25-R-00074","place_of_performance":{"city":{"code":"3000","name":"Anchorage"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1BA"}],"due_at":"2025-01-31T23:00:00Z","due_date":"2025-01-31","closes_at":"2025-01-31T23:00:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","state":"AK","county":"02020","county_name":"Anchorage Municipality","city":"0203000","city_name":"Anchorage","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"DMFWBVTL9324","amount":null,"linked_awards":16,"cancelled":false,"archived":true,"updated_at":"2026-11-24T03:44:56.691144Z","principal_notice_id":"8ba13af01322472b9a03bc1e3533b5e0","description":{"text":"The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage\n\nReview all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).\n\nThis SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.\n\nThe NAICS Code is 236220 Commercial and Institutional Building Construction\n\nThe ROM is $100M - $200M\n\nA pre-proposal Zoom meeting is scheduled for January 10, 2025 at 12:00 ET for all interested vendors. To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than January 8, 2025. A site visit will be held for Offeror(s) down-selected to Phase II.\n\nAll questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than January 17, 2025.\n\nPhase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on January 31, 2025.\n\nOfferor must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror’s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.\n\nAny proposal received after 15:00 PT on January 31, 2025 will be considered non-responsive and deemed ineligible for award.\n\nTo be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.\n\nTo be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.\n\nThe file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.\n\nAttachment J-5 ANC ATCT TRACON DDH Final Vol 1\n\nAttachment J-5a ANC ATCT TRACON DDH Final Vol 2\n\nAttachment J-5b ANC ATCT TRACON DDH Final Vol 3","html":"<p>The Federal Aviation Administration (FAA) has a requirement to build a new Airport Traffic Control Tower Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) (A11) facility at the Ted Stevens International Airport (ANC) in Anchorage</p>\n\n<p>Review all attachments pertaining to this solicitation prior to submitting a proposal. Please note the FAR references cited in SAM are not applicable to the FAA as the FAA has its own policies and guidance referenced in the Acquisition Management System (AMS).</p>\n\n<p>This SIR/RFP is being posted in accordance with Federal Aviation Administration (FAA) Acquisition Management Policy, Section 3.2.1.3.11 Public Announcements. All interested vendors are advised that the FAA will not pay for any information or any administrative costs incurred that are associated with any response received from industry in response to this SIR.</p>\n\n<p>The NAICS Code is 236220 Commercial and Institutional Building Construction&nbsp;</p>\n\n<p>The ROM is $100M - $200M</p>\n\n<p>A pre-proposal&nbsp;<strong>Zoom meeting </strong>is scheduled for&nbsp;<strong>January 10, 2025</strong>&nbsp;<strong>at 12:00 ET</strong> for all interested vendors.&nbsp;To attend please submit your request to Katie Fogle at katherine.fogle@faa.gov no later than&nbsp;<strong>January 8, 2025.&nbsp;&nbsp;</strong>A site visit will be held for Offeror(s) down-selected to Phase II.&nbsp;</p>\n\n<p>All questions must be submitted in writing to the Contracting Officer, Katie Fogle at katherine.fogle@faa.gov, no later than Jan<strong>uary 17, 2025.</strong></p>\n\n<p>Phase I Proposals must be received in the inbox of Katie Fogle at Katherine.fogle@faa.gov no later than 15:00 PT on <strong>January 31, 2025.&nbsp;</strong></p>\n\n<p>Offeror must request receipt for submission if so desired. All Amendments issued, if any, must be signed and submitted with the Offeror&rsquo;s submission. Offerors are cautioned that proposals may take significant time to process electronically before reaching the inbox. Delays in transmission will not excuse a late delivery.</p>\n\n<p>Any proposal received after 15:00 PT on <strong>January 31, 2025</strong> will be considered non-responsive and deemed ineligible for award.</p>\n\n<p>To be considered for award of this requirement, the offeror must have a current/valid registration in the System for Award Management (SAM) database website: www.sam.gov.</p>\n\n<p>To be eligible for award, Offerors must submit a proposal that is in accordance with Section L and Section M of this SIR.</p>\n\n<p>The file sizes for the following attachments are too large to upload. To receive the attachments below please email your request to Katie Fogle at katherine.fogle@faa.gov.</p>\n\n<p>Attachment J-5 ANC ATCT TRACON DDH Final Vol 1</p>\n\n<p>Attachment J-5a ANC ATCT TRACON DDH Final Vol 2</p>\n\n<p>Attachment J-5b ANC ATCT TRACON DDH Final Vol 3</p>","origin":"detail"},"contacts":[{"name":"Katherine Fogle","role":"primary","email":"katherine.fogle@faa.gov"}],"place_of_performance":{"city":{"code":"3000","name":"Anchorage"},"state":{"code":"AK","name":"Alaska"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"76177","city":"FORT WORTH","state":"TX","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[{"resource_id":"3306d2c908a1403a9dfd612491ae47e2","name":"Attachment J-3a ANC ATCT and TRACON Final Specs Vol 2.pdf","kind":"file","mime_type":".pdf","size_bytes":6289528,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3306d2c908a1403a9dfd612491ae47e2/download","mirrored":false},{"resource_id":"e56d8021fe504b839829002f055416c8","name":"Attachment J-3 ANC ATCT TRACON Final Spec Vol 1.pdf","kind":"file","mime_type":".pdf","size_bytes":29661730,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e56d8021fe504b839829002f055416c8/download","mirrored":false},{"resource_id":"85a0a80d8ddd40f88953cb128d2673a9","name":"Attachment J-3c ANC ATCT TRACON Final Spec Vol 4.pdf","kind":"file","mime_type":".pdf","size_bytes":5060205,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/85a0a80d8ddd40f88953cb128d2673a9/download","mirrored":false},{"resource_id":"8ebaaa40b3cf43aa9868f31f014c611c","name":"Attachment J-3b ANC ATCT TRACON Final Spec Vol 3.pdf","kind":"file","mime_type":".pdf","size_bytes":6474064,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8ebaaa40b3cf43aa9868f31f014c611c/download","mirrored":false},{"resource_id":"8baf045ea6e24c819964fa62d67dfc64","name":"Attachment J-4 ANC ATCT TRACON BOD Final.pdf","kind":"file","mime_type":".pdf","size_bytes":10178667,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8baf045ea6e24c819964fa62d67dfc64/download","mirrored":false},{"resource_id":"70c35c16ecc7485ab197582c6d94047f","name":"Attachment J-7 Price Proposal.xlsx","kind":"file","mime_type":".xlsx","size_bytes":35701,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/70c35c16ecc7485ab197582c6d94047f/download","mirrored":false},{"resource_id":"c782f307c8524e26828063a96f606df0","name":"PAST PERFORMANCE QUESTIONNAIRE.pdf","kind":"file","mime_type":".pdf","size_bytes":130066,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c782f307c8524e26828063a96f606df0/download","mirrored":false},{"resource_id":"8aedca8902e34e9cb47dbb8ea36f8c5f","name":"Attachment J-6 Wage Determination.pdf","kind":"file","mime_type":".pdf","size_bytes":89910,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8aedca8902e34e9cb47dbb8ea36f8c5f/download","mirrored":false},{"resource_id":"e4909aaeda2f4855a36acd0d2fb9c756","name":"Attachment J-2 ANC ATCT TRACON Drawings Vol 1.pdf","kind":"file","mime_type":".pdf","size_bytes":83494670,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e4909aaeda2f4855a36acd0d2fb9c756/download","mirrored":false},{"resource_id":"c0bb8cdf9fdb46d4b66e29916f6023ef","name":"Attachment J-2a ANC ATCT TRACON Drawings Vol 2.pdf","kind":"file","mime_type":".pdf","size_bytes":108921092,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c0bb8cdf9fdb46d4b66e29916f6023ef/download","mirrored":false},{"resource_id":"4c28b116b5904d9aa8466b081c351262","name":"Attachment J-2b ANC ATCT TRACON Drawings Vol 3.pdf","kind":"file","mime_type":".pdf","size_bytes":50599555,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4c28b116b5904d9aa8466b081c351262/download","mirrored":false},{"resource_id":"1d705d467e134c4ea4002ef5dcc82c7c","name":"Attachment J-2d ANC ATCT TRACON Drawings Vol 5.pdf","kind":"file","mime_type":".pdf","size_bytes":53572427,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/1d705d467e134c4ea4002ef5dcc82c7c/download","mirrored":false},{"resource_id":"9dcad7c7fe2a4ff697d1220f0dfa6410","name":"697DCK-25-R-00074_Final.pdf","kind":"file","mime_type":".pdf","size_bytes":457058,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/9dcad7c7fe2a4ff697d1220f0dfa6410/download","mirrored":false},{"resource_id":"8df51a0377ef463da74ca6feb767e5cf","name":"Attachment J-1 ANC ATCT TRACON Statement of Work.pdf","kind":"file","mime_type":".pdf","size_bytes":249031,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/8df51a0377ef463da74ca6feb767e5cf/download","mirrored":false},{"resource_id":"a0d34cd6ef424dafb5a75cecd01abbd2","name":"Attachment J-2c ANC ATCT TRACON Drawings Vol 4.pdf","kind":"file","mime_type":".pdf","size_bytes":38301986,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a0d34cd6ef424dafb5a75cecd01abbd2/download","mirrored":false},{"resource_id":"ffcd82bf372442efb9a870dc9a115730","name":"Attachment J-2e ANC ATCT TRACON Drawings Vol 6.pdf","kind":"file","mime_type":".pdf","size_bytes":116773684,"posted_at":"2024-12-04T21:30:25.989Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ffcd82bf372442efb9a870dc9a115730/download","mirrored":false},{"resource_id":"6fb38678b21f413d9ee63826b2608fa9","name":"697DCK-25-R-00074 Amend 0001.pdf","kind":"file","mime_type":".pdf","size_bytes":184689,"posted_at":"2024-12-20T20:40:21.027Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6fb38678b21f413d9ee63826b2608fa9/download","mirrored":false},{"resource_id":"b233654278634e76bed955cd7c11959a","name":"FINANICAL CAPABILITY FORM.pdf","kind":"file","mime_type":".pdf","size_bytes":148437,"posted_at":"2025-01-15T19:09:44.844Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b233654278634e76bed955cd7c11959a/download","mirrored":false},{"resource_id":"416c6557b7a849639fcf0813dd2eee79","name":"697DCK-25-R-00074 Amend 0002.pdf","kind":"file","mime_type":".pdf","size_bytes":204557,"posted_at":"2025-01-23T21:15:15.630Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/416c6557b7a849639fcf0813dd2eee79/download","mirrored":false},{"resource_id":"3530b882d343466cad5e4b2c4b04d04c","name":"22 11 23.13_domestic-water_packaged_booster_pumps_Rev 1_Amend 0003.pdf","kind":"file","mime_type":".pdf","size_bytes":50074,"posted_at":"2025-01-23T21:15:15.630Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/3530b882d343466cad5e4b2c4b04d04c/download","mirrored":false},{"resource_id":"980145d905cb40c38990fafc92c9e415","name":"01 31 00_Project_Management_and_Coordination_Rev 1_Amend 0003.pdf","kind":"file","mime_type":".pdf","size_bytes":116251,"posted_at":"2025-01-23T21:15:15.630Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/980145d905cb40c38990fafc92c9e415/download","mirrored":false},{"resource_id":"2a09992879b84349af0bb00eafc841cd","name":"01 40 00_Contractor_Quality_Control_Rev 1_Amend 0003.pdf","kind":"file","mime_type":".pdf","size_bytes":136371,"posted_at":"2025-01-23T21:15:15.630Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/2a09992879b84349af0bb00eafc841cd/download","mirrored":false},{"resource_id":"f650983b56d6410a92ce1df4ccbd9eb5","name":"697DCK-25-R-00074 Amend 0003.pdf","kind":"file","mime_type":".pdf","size_bytes":221620,"posted_at":"2025-01-23T21:15:15.630Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f650983b56d6410a92ce1df4ccbd9eb5/download","mirrored":false},{"resource_id":"adc60b68c90e47dabc4aca1e9b7e106e","name":"Zoom Meeting Attendence.pdf","kind":"file","mime_type":".pdf","size_bytes":146717,"posted_at":"2025-01-23T21:15:15.630Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/adc60b68c90e47dabc4aca1e9b7e106e/download","mirrored":false},{"resource_id":"e9ff399d4ae7459ebba71bb3c767387f","name":"QUESTIONS and RESPONES Jan 30 2025.pdf","kind":"file","mime_type":".pdf","size_bytes":148043,"posted_at":"2025-01-30T21:21:52.239Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e9ff399d4ae7459ebba71bb3c767387f/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_697DCK25P00116_6920_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_697DCK25P00116_6920_-NONE-_-NONE-/","piid":"697DCK25P00116","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"DMFWBVTL9324","recipient_name":"WALSH FEDERAL LLC","recipient_uei":"DMFWBVTL9324","recipient_cage":"6PDH6","recipient_city":"CHICAGO","recipient_state":"IL","sub_name":"Federal Aviation Administration","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","office_key":"o-697DCK","first_action_date":"2025-09-18","last_action_date":"2025-09-18","actions":1,"obligated":"150000.00","current_total_value":"150000.00","potential_total_value":"150000.00","naics":"236220","psc":"Y1BA","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":2,"description":"STIPEND FOR ATCT AND TRACON (A11) FACILITY AT THE TED STEVENS INTERNATIONAL AIRPORT (ANC) IN ANCHORAGE","method":"solicitation","confidence":"high","evidence":["solicitation number 697DCK25R00074 equals the FPDS solicitation identifier","same awarding office 697DCK"],"opportunity_key":null,"opportunity_title":null},{"award_key":"CONT_AWD_697DCK25P00120_6920_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_697DCK25P00120_6920_-NONE-_-NONE-/","piid":"697DCK25P00120","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"R8HDMU14YAB9","recipient_name":"FLINTCO-UNIT-HPM JV","recipient_uei":"R8HDMU14YAB9","recipient_cage":"0QKT1","recipient_city":"ENGLEWOOD","recipient_state":"CO","sub_name":"Federal Aviation Administration","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","office_key":"o-697DCK","first_action_date":"2025-09-18","last_action_date":"2025-09-18","actions":1,"obligated":"150000.00","current_total_value":"150000.00","potential_total_value":"150000.00","naics":"236220","psc":"Y1BA","extent_competed":"FULL AND OPEN COMPETITION","set_aside":"NO SET ASIDE USED.","offers_received":2,"description":"STIPEND FOR ATCT AND TRACON (A11) FACILITY AT THE TED STEVENS INTERNATIONAL AIRPORT (ANC) IN ANCHORAGE","method":"solicitation","confidence":"high","evidence":["solicitation number 697DCK25R00074 equals the FPDS solicitation identifier","same awarding office 697DCK"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"20261120PCONLINE","latest_notice_id":"03aa60d897cb4cbcb826c0d61a5cb1a6","title":"Federal Aviation Administration - United States Postal Service (USPS)-authorized, web-based, Software-as-a-Service (SaaS) PC Postage Online Solution","solicitation_number":"20261120_PC_ONLINE","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":null,"psc":"R604","set_aside":null,"state":"DC","county":"11001","county_name":"District of Columbia","city":"1150000","city_name":"Washington","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"697DCK27R00039","latest_notice_id":"59cefa73472a4390b8ef0cd5199d6855","title":"Market Survey for Helicopter Services for the FAA between Juneau and other Sites in Alaska","solicitation_number":"697DCK-27-R-00039","notice_type":"p","first_type":"p","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-12-01T00:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"481211","psc":"1730","set_aside":null,"state":"AK","county":"02110","county_name":"Juneau City and Borough","city":"0236400","city_name":"Juneau","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"697DCK27R00038","latest_notice_id":"907fa7b41fea4549a49a3624212beaf7","title":"Market Survey for Janitorial Services at FAA Facilities in King Salmon, Alaska","solicitation_number":"697DCK-27-R-00038","notice_type":"p","first_type":"p","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-12-01T00:00:00Z","due_date":"2026-11-30","closes_at":"2026-12-01T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"561720","psc":"S201","set_aside":null,"state":"AK","county":"02060","county_name":"Bristol Bay Borough","city":"0239630","city_name":"King Salmon","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"697DCK27R00022A","latest_notice_id":"555bbe8d6aa64108bca5569444c05dad","title":"Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA","solicitation_number":"697DCK-27-R-00022A","notice_type":"o","first_type":"o","first_posted":"2026-10-26","last_posted":"2026-11-23","notices":7,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"541330","psc":"C215","set_aside":"SBA","state":"CA","county":"06079","county_name":"San Luis Obispo County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"697DCK27R00028","latest_notice_id":"31630ee4df644dd4b56d4786e41c7662","title":"697DCK-27-R-00028: SEA Elevator Maintenance Services","solicitation_number":"697DCK-27-R-00028","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-17","notices":4,"due_at":"2026-12-11T22:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6920","sub_name":"FEDERAL AVIATION ADMINISTRATION","office_key":"o-697DCK","office_name":"697DCK REGIONAL ACQUISITIONS SVCS","naics":"238290","psc":"Z1BA","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open":[{"key":"W911KB27RWP01","latest_notice_id":"3c237827a28d40e49a4b753e571f5751","title":"ACC003 Weapons Generation Complex and Northern Flightline","solicitation_number":"W911KB27RWP01","notice_type":"o","first_type":"o","first_posted":"2026-11-10","last_posted":"2026-11-23","notices":3,"due_at":"2026-11-30T23:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"236220","psc":"Y1EA","set_aside":null,"state":"AK","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"site","state_evidence":"RECAPITALIZATION FTR PROGRAM AT JOINT BASE ELMENDORF-RICHARDSON","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"W911KB27RWP02","latest_notice_id":"5e06b207e59d4411ab6b80978e9b444b","title":"ACC004 Flight Simulator","solicitation_number":"W911KB27RWP02","notice_type":"o","first_type":"s","first_posted":"2026-09-14","last_posted":"2026-11-24","notices":3,"due_at":"2026-12-09T23:00:00Z","due_date":"2026-12-09","closes_at":"2026-12-09T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W911KB","office_name":"W2SN ENDIST ALASKA","naics":"236220","psc":"Y1BG","set_aside":null,"state":"AK","county":"02050","county_name":"Bethel Census Area","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"70Z08725RRMACC003","latest_notice_id":"c325264751504faeaa0bae4c95438def","title":"USCG REGIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT (RMACC III)","solicitation_number":"70Z08725RRMACC003","notice_type":"r","first_type":"r","first_posted":"2024-10-10","last_posted":"2026-01-08","notices":30,"due_at":"2026-12-31T22:00:00Z","due_date":"2026-12-31","closes_at":"2026-12-31T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70Z087","office_name":"CEU JUNEAU(00087)","naics":"236220","psc":"Z2AZ","set_aside":null,"state":"AK","county":"02110","county_name":"Juneau City and Borough","city":"0236400","city_name":"Juneau","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-09-24T03:25:58.922164Z"}],"similar_open_total":194,"indexable":false}