Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,692 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Solicitation, total small business set-aside

6973GH-26-Q-00141 ATCBI-5 Encoder Mod Kits

6973GH-26-Q-00141_ATCBI-5_Encoder_Mod_Kits

Federal Aviation Administration, 6973GH Franchise Acquisition SVCS. Other Electronic Component Manufacturing.

Response deadline

September 11, 2026 at 3:00 PM EDT

Closed 76 days ago. Posted August 26, 2026. Scheduled to archive September 26, 2026.

Get the next one like this from Federal Aviation Administration by email, the day it is posted.Find my opportunities

This one closed in 2026

214 like it are open now in other electronic component manufacturing

All 214 open in other electronic component manufacturing

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
Who may compete
Total small business set-aside. Only small businesses may compete. Small, under NAICS 334419 (other electronic component manufacturing), means no more than 750 employees, counted with affiliates. Open Small business opportunities
Time to respond
Bidders had 16 days from the day the solicitation was posted, August 26, 2026, to the deadline.

Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.

Description

As published on SAM.gov.

1. BACKGROUND

The Federal Aviation Administration (FAA) has identified a requirement to procure conversion kits to support modifications to the Air Traffic Control Beacon Interrogator (ATCBI-5) configuration at Airport Surveillance Radar Model 8 (ASR-8) facilities as part of the Brand-New Air Traffic Control System (BNATCS) implementation under the Radar System Replacement (RSR) Program.

The rotary joints currently installed at ASR-8/ATCBI-5 sites do not provide the number of signal paths required to support integration with the RSR architecture. To achieve compatibility, the existing rotary joints must be converted to the configuration utilized at ASR-8 sites equipped with the Mode Select Beacon System (Mode-S). This conversion requires the installation of a kit developed by AJW-1433, which adds an additional signal path to accommodate the encoders used in the ASR-8 rotary joint.

2. CONTRACTING OFFICER’S REPRESENTATIVE (COR):

The COR formally designated this responsibility by the Contracting Officer to provide direction and Government oversight to the contractor on matters related to this contract. The COR is:

Brandon Brumley

AJW-L910, Radar Technical and Program Support Branch

3. SCOPE OF WORK

The contractor must furnish all labor, facilities, equipment, and materials to fabricate a kit as outlined in each section that follows.

A.         CLIN 001 – One (1) First Article Unit

B.         CLIN 002 – Option to purchase up to thirty (30) Production Units after first article approval

4. REQUIREMENTS

4.1 Design, Construction, and Testing

The contractor shall procure and package the parts listed in Attachment 1 – Parts List into a Kit.

4.2 First Article Unit Delivery

Contractor must deliver one verification unit. Delivery shall occur no later than (NLT) ninety (90) days at receipt of order (ARO).

4.3 Verification Unit Analysis

Upon receipt of first article unit, FAA shall perform visual inspection to determine conformance to Attachment 1 – Parts List. FAA will have 30 days to accept or reject first articles.

4.4 Production Units

Once approval is provided for the first article unit, the contractor shall be considered an approved source of production units. The number of units for production is thirty (30). Delivery of production units shall occur NLT 180 days after notification of First Article Approval.

5. PREPARATION FOR DELIVERY

5.1 Preservation, Packaging, and Packing

Preservation, packaging, and packing shall be IAW Provision 61.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 26, 2026

    Solicitation

    Due September 11, 2026 at 3:00 PM EDT. SAM.gov, notice 3497f0bb0b9f49e7b5f96ec9da41febf

    1 revision on SAM
    • August 26, 2026: publish, solicitation

Points of contact