Solicitation
Resurface SATF Asphalt Traction Test Pad
693JJ924R000026
National Highway Traffic Safety Administration, 693JJ9 NHTSA Office of Acquistion. Highway, Street, and Bridge Construction.
Response deadline
July 15, 2024 at 4:00 PM EDT
Closed 864 days ago. Posted June 27, 2024, first published June 14, 2024. Scheduled to archive October 15, 2024.
Get the next one like this from National Highway Traffic Safety Administration by email, the day it is posted.Find my opportunities
This one closed in 2024
36 like it are open now in highway, street, and bridge construction
- Road Paving IAH (Houston Bush) Airport
Federal Aviation Administration, 697DCK Regional Acquisitions SVCS
SolicitationSmall businessNAICS 237310Texas697DCK-27-R-00033Closes in 49 daysJan 14, 2027 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 31 days from the day the solicitation was posted, June 14, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Provide responses to solicitation Q&A
This amendment is issued to provide responses to questions received to the Solicitation.
End of amendment
Solicitation for project entitled 'Resurface San Angelo Test Facility (SATF)
Asphalt Traction Test Surface' Response Date:
July 15, 2024 Point of Contract:
Thomas J. Bub, Contract Specialist Solicitation Number:
693JJ924R000026 I. BACKGROUND: The National Highway Traffic Safety Administration (NHTSA) is charged with the responsibility of reducing the personal and property losses resulting from motor vehicle crashes. Many sources of information are needed to permit researchers to adequately measure the characteristics of the highway safety environment. NHTSA data are essential to reducing the human and economic cost of motor vehicle crashes.
NHTSA’s various data systems are the only source of real-world crash data for conducting basic research, identifying problem areas, developing effective countermeasures, identifying program and rulemaking needs, developing and evaluating programs, rules, and standards, evaluating new technologies, and providing information to accurately assess and allocate grants for reducing crashes.
The National Highway Traffic Safety Administration (NHTSA) has a need to resurface the asphalt test surface portion of the Traction Grading Test Track used to perform testing in accordance with the Uniform Tire Quality Grading System (UTQGS) at the Office of Vehicle Safety Compliance’s (OVSC’s) San Angelo Test Facility (SATF) located on the grounds of Goodfellow Air Force Base (GAFB) in San Angelo, Texas (TX).
The asphalt test surface was last resurfaced in September 2013. The test surface is used by OVSC to perform traction testing for enforcement of the UTQG consumer information program. The test surface is also used by outside entities to perform traction testing.
Objective: The objective of this contract is to replace the asphalt UTQG traction test surface located at the SATF located on GAFB in San Angelo, TX with a durable surface that meets the tire test surfaces specified in 49 C.F.R. § 575.104. This may include, but is not limited to, identifying a suitable replacement asphalt mix with test strips, removing the existing surface, placing a new asphalt surface, and re-painting the required lines.
General Requirements: The Contractor shall identify a suitable asphalt mix design through the placement and evaluation of a test strip, removing the existing test surface (if required), replacing the test surface, and ensuring smooth transitions to and from the test surface, to include painting of the completed test surface. The Contractor shall be familiar with work requirements for GAFB and certain requirements and approvals that must be met and/or obtained prior to the start of work by the contractor.
Solicitation Information: The Government contemplates that a Cost Plus Fixed-Fee type Contract with a period of performance not to exceed twenty-four (24) months will be awarded from this solicitation.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Thomas J. Bubthomas.bub@dot.gov
- Vincent Lynchvincent.lynch@dot.gov