{"canonical":"https://sealedbidder.com/opportunities/6923g225q000014","key":"6923G225Q000014","url":"https://sealedbidder.com/opportunities/6923g225q000014","title":"PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT","solicitation_number":"6923G225Q000014","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-27T13:00:00Z","first_posted":"2025-08-19","last_posted":"2025-08-19","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"MARITIME ADMINISTRATION","office":"6923G2 DOT MARITIME ADMINISTRATION","naics":"238220","psc":"N045","set_aside":"SBA","place_state":"NY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"36059","place_county_name":"Nassau County","place_city":"3639694","place_city_name":"Kings Point","winner":"R.B. NATIONAL, LTD. CO.","award_amount":null,"publications":[{"notice_id":"b034fd5a006849898deaed5c47494377","title":"PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT","solicitation_number":"6923G225Q000014","notice_type":"k","base_type":"k","posted":"2025-08-19","posted_at":"2025-08-19T20:20:48.193Z","due_at":"2025-08-27T13:00:00Z","due_date":"2025-08-27","cancelled":false,"archived":true,"archive_date":"2025-09-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b034fd5a006849898deaed5c47494377/view","enriched":true,"history":[{"index":3,"title":"PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-19T20:20:48.193Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b034fd5a006849898deaed5c47494377","solicitation_number":"6923G225Q000014"}]}],"latest_notice_id":"b034fd5a006849898deaed5c47494377","first_type":"k","notices":[{"dates":{"posted":"2025-08-19","posted_at":"2025-08-19T20:20:48.193Z","created_at":"2025-08-19T18:49:14.341Z","modified_at":"2025-09-12T03:55:50.803Z","response_deadline":{"raw":"2025-08-27T09:00:00-04:00","utc":"2025-08-27T13:00:00Z","date":"2025-08-27","time":"09:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b034fd5a006849898deaed5c47494377/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT","agency":{"office":{"code":"6923G2","name":"6923G2 DOT MARITIME ADMINISTRATION"},"subtier":{"code":"6938","name":"MARITIME ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"organization_id":"100187910","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-11","archive_type":"auto15"},"history":[{"index":3,"title":"PALMER HALL DUPLEX CONDENSATE TANK REPLACEMENT","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-19T20:20:48.193Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b034fd5a006849898deaed5c47494377","solicitation_number":"6923G225Q000014"}],"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"b034fd5a006849898deaed5c47494377","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"b034fd5a006849898deaed5c47494377","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-03T08:57:32.733894092Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"54b06ac08ed93cca946111bc13edde9ab74fca0bbadcc919b033692fe205e035","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-03T08:57:32.733894092Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>BACKGROUND<br />\nThe United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration&nbsp;<br />\n(MARAD) managed by the United States Department of Transportation.<br />\nThe USMMA is listed on the National Register of Historic Places. Therefore, all work shall be&nbsp;<br />\nconsistent with the Secretary of the Interior&#39;s Standards for the Treatment of Historic Properties&nbsp;<br />\n(36 CFR part 68)<br />\nhttp://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.<br />\nAll work shall meet or exceed the standards provided in the Secretary of the Interior&rsquo;s Standards&nbsp;<br />\nfor Rehabilitation and guidelines for applying the standards published by the National Park&nbsp;<br />\nService, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.<br />\nSCOPE<br />\nThe USMMA seeks a qualified and experienced contractor to provide labor, material, transportation,&nbsp;<br />\ntools, equipment and supervision to perform a replacement of the steam condensate return tank and&nbsp;<br />\npumps inside of the mechanical room of Palmer Hall. The<br />\ncontractor will also replace the existing sump pump with a new two pump system and cover.<br />\n&nbsp;</p>\n\n<p>STATEMENT OF WORK<br />\n3<br />\nDELIVERABLES</p>\n\n<p><br />\nThe Contractor is responsible for the following;<br />\nCondensate return tank<br />\n1. Disconnect prewired unit control panel from duplex condensate tank.<br />\n2. Disconnect steam supply and condensate return lines from condensate tank.<br />\n3. Remove and replace duplex condensate return tank with contractor supplied new unit.<br />\n4. Replace all steam traps on condensate tank.<br />\n5. Replace all isolation valves for condensate tank.<br />\n6. Remove old discharge check valves and replace.<br />\n7. Reconnect and energize prewired unit control panel supplied with new condensate return tank.<br />\n8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor.<br />\n9. Replacement of any pipe insulation and pipe hangers which require removal to complete any&nbsp;<br />\nrepairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal.<br />\n10. Leak checking and ensuring all installed piping and fittings are free from leaks.<br />\nSump Pump<br />\n11. Remove drain piping to access sump pit cover and pump.<br />\n12. Remove existing pump and cover<br />\n13. Install new sump pump with a two-pump system that can handle high temperatures.<br />\n14. Install new cover that works with new system.<br />\n15. Reconnect to all existing branches.<br />\n16. All fittings, pumps, steam traps, and valves to be supplied as new.<br />\n17. Leak test.</p>\n\n<p><br />\nPlease see attached pictures</p>\n\n<p>STATEMENT OF WORK<br />\n5<br />\n1. The contractor shall provide all labor and material, transportation and supervision in the&nbsp;<br />\nperformance of all tasks detailed in this statement of work.<br />\n2. All work is to conform to federal, state and local regulations and codes.<br />\n3. Maintain a work area compliant with safety standards.<br />\n4. Areas worked on shall be cleaned and secured on a daily basis.<br />\n5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the&nbsp;<br />\ncontractor at no cost to the Government.</p>\n\n<p>6. Examine existing conditions prior to any repair activities, site visit will be scheduled to&nbsp;<br />\ninspect the site where services are to be performed.</p>\n\n<p>7. Excess material and debris shall be disposed of in accordance with local and state ordinances.</p>\n\n<p>8. No vehicles shall be driven on the sidewalks or grass.</p>\n\n<p>9. Make every effort to minimize the impact to the daily routine of the Academy.<br />\nCLOSE OUT:<br />\nThe contractor shall provide a signed warranty of any damage, defective material and improper&nbsp;<br />\nworkmanship on any material provided in this contract.<br />\nMaterials and labor to be warranted for one year after installation, and equipment to be warranted&nbsp;<br />\nper manufacturer<br />\nSUBMITTALS<br />\n1. N/A<br />\nGOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR INFORMATION.<br />\nN/A<br />\nCONSIDERATIONS</p>\n\n<p>STATEMENT OF WORK<br />\n6<br />\n&bull; Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or&nbsp;<br />\nproblems that arise).<br />\n&bull; Inform COR of any anticipated disruption in services for construction at least three (3) days in&nbsp;<br />\nadvance</p>\n\n<p>PLACE OF PERFORMANCE</p>\n\n<p>Contractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point,<br />\nN.Y. 11024</p>\n\n<p>PERIOD OF PERFORMANCE</p>\n\n<p>Work is to be completed within 90 calendar days after NTP is approved. Work is to be performed&nbsp;<br />\nduring normal business hours 0700 to 1630, Monday through Friday unless&nbsp;approval is granted by the Contracting Officer.</p>\n\n<p>Appplicable wage determination WD# 2015-4157&nbsp; Rev# 29, dated 7/8/2025</p>\n\n<p>Please see attached SCOPE OF WORK along with pictures&nbsp;</p>","text":"BACKGROUND\n\nThe United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration\n\n(MARAD) managed by the United States Department of Transportation.\n\nThe USMMA is listed on the National Register of Historic Places. Therefore, all work shall be\n\nconsistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties\n\n(36 CFR part 68)\n\nhttp://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.\n\nAll work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards\n\nfor Rehabilitation and guidelines for applying the standards published by the National Park\n\nService, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.\n\nSCOPE\n\nThe USMMA seeks a qualified and experienced contractor to provide labor, material, transportation,\n\ntools, equipment and supervision to perform a replacement of the steam condensate return tank and\n\npumps inside of the mechanical room of Palmer Hall. The\n\ncontractor will also replace the existing sump pump with a new two pump system and cover.\n\nSTATEMENT OF WORK\n\n3\n\nDELIVERABLES\n\nThe Contractor is responsible for the following;\n\nCondensate return tank\n\n1. Disconnect prewired unit control panel from duplex condensate tank.\n\n2. Disconnect steam supply and condensate return lines from condensate tank.\n\n3. Remove and replace duplex condensate return tank with contractor supplied new unit.\n\n4. Replace all steam traps on condensate tank.\n\n5. Replace all isolation valves for condensate tank.\n\n6. Remove old discharge check valves and replace.\n\n7. Reconnect and energize prewired unit control panel supplied with new condensate return tank.\n\n8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor.\n\n9. Replacement of any pipe insulation and pipe hangers which require removal to complete any\n\nrepairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal.\n\n10. Leak checking and ensuring all installed piping and fittings are free from leaks.\n\nSump Pump\n\n11. Remove drain piping to access sump pit cover and pump.\n\n12. Remove existing pump and cover\n\n13. Install new sump pump with a two-pump system that can handle high temperatures.\n\n14. Install new cover that works with new system.\n\n15. Reconnect to all existing branches.\n\n16. All fittings, pumps, steam traps, and valves to be supplied as new.\n\n17. Leak test.\n\nPlease see attached pictures\n\nSTATEMENT OF WORK\n\n5\n\n1. The contractor shall provide all labor and material, transportation and supervision in the\n\nperformance of all tasks detailed in this statement of work.\n\n2. All work is to conform to federal, state and local regulations and codes.\n\n3. Maintain a work area compliant with safety standards.\n\n4. Areas worked on shall be cleaned and secured on a daily basis.\n\n5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the\n\ncontractor at no cost to the Government.\n\n6. Examine existing conditions prior to any repair activities, site visit will be scheduled to\n\ninspect the site where services are to be performed.\n\n7. Excess material and debris shall be disposed of in accordance with local and state ordinances.\n\n8. No vehicles shall be driven on the sidewalks or grass.\n\n9. Make every effort to minimize the impact to the daily routine of the Academy.\n\nCLOSE OUT:\n\nThe contractor shall provide a signed warranty of any damage, defective material and improper\n\nworkmanship on any material provided in this contract.\n\nMaterials and labor to be warranted for one year after installation, and equipment to be warranted\n\nper manufacturer\n\nSUBMITTALS\n\n1. N/A\n\nGOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR INFORMATION.\n\nN/A\n\nCONSIDERATIONS\n\nSTATEMENT OF WORK\n\n6\n\n• Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or\n\nproblems that arise).\n\n• Inform COR of any anticipated disruption in services for construction at least three (3) days in\n\nadvance\n\nPLACE OF PERFORMANCE\n\nContractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point,\n\nN.Y. 11024\n\nPERIOD OF PERFORMANCE\n\nWork is to be completed within 90 calendar days after NTP is approved. Work is to be performed\n\nduring normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer.\n\nAppplicable wage determination WD# 2015-4157 Rev# 29, dated 7/8/2025\n\nPlease see attached SCOPE OF WORK along with pictures","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"6923G225Q000014","place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"N045"}],"due_at":"2025-08-27T13:00:00Z","due_date":"2025-08-27","closes_at":"2025-08-27T13:00:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6938","sub_name":"MARITIME ADMINISTRATION","office_key":"o-6923G2","office_name":"6923G2 DOT MARITIME ADMINISTRATION","state":"NY","county":"36059","county_name":"Nassau County","city":"3639694","city_name":"Kings Point","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"DLDGEGTESEL9","amount":null,"linked_awards":2,"cancelled":false,"archived":true,"updated_at":"2026-11-03T09:25:06.657956Z","principal_notice_id":"b034fd5a006849898deaed5c47494377","description":{"text":"BACKGROUND\n\nThe United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration\n\n(MARAD) managed by the United States Department of Transportation.\n\nThe USMMA is listed on the National Register of Historic Places. Therefore, all work shall be\n\nconsistent with the Secretary of the Interior's Standards for the Treatment of Historic Properties\n\n(36 CFR part 68)\n\nhttp://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.\n\nAll work shall meet or exceed the standards provided in the Secretary of the Interior’s Standards\n\nfor Rehabilitation and guidelines for applying the standards published by the National Park\n\nService, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.\n\nSCOPE\n\nThe USMMA seeks a qualified and experienced contractor to provide labor, material, transportation,\n\ntools, equipment and supervision to perform a replacement of the steam condensate return tank and\n\npumps inside of the mechanical room of Palmer Hall. The\n\ncontractor will also replace the existing sump pump with a new two pump system and cover.\n\nSTATEMENT OF WORK\n\n3\n\nDELIVERABLES\n\nThe Contractor is responsible for the following;\n\nCondensate return tank\n\n1. Disconnect prewired unit control panel from duplex condensate tank.\n\n2. Disconnect steam supply and condensate return lines from condensate tank.\n\n3. Remove and replace duplex condensate return tank with contractor supplied new unit.\n\n4. Replace all steam traps on condensate tank.\n\n5. Replace all isolation valves for condensate tank.\n\n6. Remove old discharge check valves and replace.\n\n7. Reconnect and energize prewired unit control panel supplied with new condensate return tank.\n\n8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor.\n\n9. Replacement of any pipe insulation and pipe hangers which require removal to complete any\n\nrepairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal.\n\n10. Leak checking and ensuring all installed piping and fittings are free from leaks.\n\nSump Pump\n\n11. Remove drain piping to access sump pit cover and pump.\n\n12. Remove existing pump and cover\n\n13. Install new sump pump with a two-pump system that can handle high temperatures.\n\n14. Install new cover that works with new system.\n\n15. Reconnect to all existing branches.\n\n16. All fittings, pumps, steam traps, and valves to be supplied as new.\n\n17. Leak test.\n\nPlease see attached pictures\n\nSTATEMENT OF WORK\n\n5\n\n1. The contractor shall provide all labor and material, transportation and supervision in the\n\nperformance of all tasks detailed in this statement of work.\n\n2. All work is to conform to federal, state and local regulations and codes.\n\n3. Maintain a work area compliant with safety standards.\n\n4. Areas worked on shall be cleaned and secured on a daily basis.\n\n5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the\n\ncontractor at no cost to the Government.\n\n6. Examine existing conditions prior to any repair activities, site visit will be scheduled to\n\ninspect the site where services are to be performed.\n\n7. Excess material and debris shall be disposed of in accordance with local and state ordinances.\n\n8. No vehicles shall be driven on the sidewalks or grass.\n\n9. Make every effort to minimize the impact to the daily routine of the Academy.\n\nCLOSE OUT:\n\nThe contractor shall provide a signed warranty of any damage, defective material and improper\n\nworkmanship on any material provided in this contract.\n\nMaterials and labor to be warranted for one year after installation, and equipment to be warranted\n\nper manufacturer\n\nSUBMITTALS\n\n1. N/A\n\nGOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR INFORMATION.\n\nN/A\n\nCONSIDERATIONS\n\nSTATEMENT OF WORK\n\n6\n\n• Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or\n\nproblems that arise).\n\n• Inform COR of any anticipated disruption in services for construction at least three (3) days in\n\nadvance\n\nPLACE OF PERFORMANCE\n\nContractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point,\n\nN.Y. 11024\n\nPERIOD OF PERFORMANCE\n\nWork is to be completed within 90 calendar days after NTP is approved. Work is to be performed\n\nduring normal business hours 0700 to 1630, Monday through Friday unless approval is granted by the Contracting Officer.\n\nAppplicable wage determination WD# 2015-4157 Rev# 29, dated 7/8/2025\n\nPlease see attached SCOPE OF WORK along with pictures","html":"<p>BACKGROUND<br />\nThe United States Merchant Martine Academy (USMMA) is an agency of the Maritime Administration&nbsp;<br />\n(MARAD) managed by the United States Department of Transportation.<br />\nThe USMMA is listed on the National Register of Historic Places. Therefore, all work shall be&nbsp;<br />\nconsistent with the Secretary of the Interior&#39;s Standards for the Treatment of Historic Properties&nbsp;<br />\n(36 CFR part 68)<br />\nhttp://www.nps.gov/tps/standards/four-treatments/treatment-guidelines.pdf.<br />\nAll work shall meet or exceed the standards provided in the Secretary of the Interior&rsquo;s Standards&nbsp;<br />\nfor Rehabilitation and guidelines for applying the standards published by the National Park&nbsp;<br />\nService, U.S. Department of the Interior 36 CFR 67.7 - Standards for rehabilitation.<br />\nSCOPE<br />\nThe USMMA seeks a qualified and experienced contractor to provide labor, material, transportation,&nbsp;<br />\ntools, equipment and supervision to perform a replacement of the steam condensate return tank and&nbsp;<br />\npumps inside of the mechanical room of Palmer Hall. The<br />\ncontractor will also replace the existing sump pump with a new two pump system and cover.<br />\n&nbsp;</p>\n\n<p>STATEMENT OF WORK<br />\n3<br />\nDELIVERABLES</p>\n\n<p><br />\nThe Contractor is responsible for the following;<br />\nCondensate return tank<br />\n1. Disconnect prewired unit control panel from duplex condensate tank.<br />\n2. Disconnect steam supply and condensate return lines from condensate tank.<br />\n3. Remove and replace duplex condensate return tank with contractor supplied new unit.<br />\n4. Replace all steam traps on condensate tank.<br />\n5. Replace all isolation valves for condensate tank.<br />\n6. Remove old discharge check valves and replace.<br />\n7. Reconnect and energize prewired unit control panel supplied with new condensate return tank.<br />\n8. All fittings, pumps, steam traps, and valves to be supplied as new from contractor.<br />\n9. Replacement of any pipe insulation and pipe hangers which require removal to complete any&nbsp;<br />\nrepairs. All insulation shall be replaced with fiberglass pipe wrap or approved equal.<br />\n10. Leak checking and ensuring all installed piping and fittings are free from leaks.<br />\nSump Pump<br />\n11. Remove drain piping to access sump pit cover and pump.<br />\n12. Remove existing pump and cover<br />\n13. Install new sump pump with a two-pump system that can handle high temperatures.<br />\n14. Install new cover that works with new system.<br />\n15. Reconnect to all existing branches.<br />\n16. All fittings, pumps, steam traps, and valves to be supplied as new.<br />\n17. Leak test.</p>\n\n<p><br />\nPlease see attached pictures</p>\n\n<p>STATEMENT OF WORK<br />\n5<br />\n1. The contractor shall provide all labor and material, transportation and supervision in the&nbsp;<br />\nperformance of all tasks detailed in this statement of work.<br />\n2. All work is to conform to federal, state and local regulations and codes.<br />\n3. Maintain a work area compliant with safety standards.<br />\n4. Areas worked on shall be cleaned and secured on a daily basis.<br />\n5. Any damage to existing facilities or appurtenances shall be repaired or replaced in kind, by the&nbsp;<br />\ncontractor at no cost to the Government.</p>\n\n<p>6. Examine existing conditions prior to any repair activities, site visit will be scheduled to&nbsp;<br />\ninspect the site where services are to be performed.</p>\n\n<p>7. Excess material and debris shall be disposed of in accordance with local and state ordinances.</p>\n\n<p>8. No vehicles shall be driven on the sidewalks or grass.</p>\n\n<p>9. Make every effort to minimize the impact to the daily routine of the Academy.<br />\nCLOSE OUT:<br />\nThe contractor shall provide a signed warranty of any damage, defective material and improper&nbsp;<br />\nworkmanship on any material provided in this contract.<br />\nMaterials and labor to be warranted for one year after installation, and equipment to be warranted&nbsp;<br />\nper manufacturer<br />\nSUBMITTALS<br />\n1. N/A<br />\nGOVERNMENT FURNISHED PROPERTY, MATERIAL, EQUIPMENT OR INFORMATION.<br />\nN/A<br />\nCONSIDERATIONS</p>\n\n<p>STATEMENT OF WORK<br />\n6<br />\n&bull; Maintain communication with the COR (and immediately inform the COR of any unforeseen issues or&nbsp;<br />\nproblems that arise).<br />\n&bull; Inform COR of any anticipated disruption in services for construction at least three (3) days in&nbsp;<br />\nadvance</p>\n\n<p>PLACE OF PERFORMANCE</p>\n\n<p>Contractor will perform the task at located at the USMMA, 300 Steamboat Road, Kings Point,<br />\nN.Y. 11024</p>\n\n<p>PERIOD OF PERFORMANCE</p>\n\n<p>Work is to be completed within 90 calendar days after NTP is approved. Work is to be performed&nbsp;<br />\nduring normal business hours 0700 to 1630, Monday through Friday unless&nbsp;approval is granted by the Contracting Officer.</p>\n\n<p>Appplicable wage determination WD# 2015-4157&nbsp; Rev# 29, dated 7/8/2025</p>\n\n<p>Please see attached SCOPE OF WORK along with pictures&nbsp;</p>","origin":"detail"},"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"naics_codes":["238220"],"award":null,"attachments":[{"resource_id":"754e7254fee24e60bdae2a91a9afee7c","name":"WAGE DETERMINATION NO. 2015-4157 Rev No. 29 dtd 7.08.25.pdf","kind":"file","mime_type":".pdf","size_bytes":523281,"posted_at":"2025-08-19T20:20:48.193Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/754e7254fee24e60bdae2a91a9afee7c/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_6923G225P000154_6938_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_6923G225P000154_6938_-NONE-_-NONE-/","piid":"6923G225P000154","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"DLDGEGTESEL9","recipient_name":"R.B. NATIONAL, LTD. CO.","recipient_uei":"DLDGEGTESEL9","recipient_cage":"9GH74","recipient_city":"BRAZORIA","recipient_state":"TX","sub_name":"Maritime Administration","office_name":"6923G2 DOT MARITIME ADMINISTRATION","office_key":"o-6923G2","first_action_date":"2025-09-08","last_action_date":"2025-09-09","actions":2,"obligated":"0","current_total_value":"0","potential_total_value":"0","naics":"238220","psc":"N045","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":9,"description":"DUPLEX CONDENSATE TANK REPLACEMENT AND HIGH HEAT SUMP PUMP INSTALL","method":"solicitation","confidence":"high","evidence":["solicitation number 6923G225Q000014 equals the FPDS solicitation identifier","same awarding office 6923G2"],"opportunity_key":null,"opportunity_title":null},{"award_key":"CONT_AWD_6923G225P000172_6938_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_6923G225P000172_6938_-NONE-_-NONE-/","piid":"6923G225P000172","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"ZJ1CQPM452X3","recipient_name":"ARABIC INTERPRETERS LLC","recipient_uei":"ZJ1CQPM452X3","recipient_cage":"9YQF6","recipient_city":"ARLINGTON","recipient_state":"TX","sub_name":"Maritime Administration","office_name":"6923G2 DOT MARITIME ADMINISTRATION","office_key":"o-6923G2","first_action_date":"2025-09-18","last_action_date":"2025-09-18","actions":1,"obligated":"42948.67","current_total_value":"42948.67","potential_total_value":"42948.67","naics":"238220","psc":"N041","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":12,"description":"PALMER DUPLEX CONDENSATE RETURN TANK REPLACEMENT AND HIGH HEAT DUEL SUMP PUMP INSTALL.","method":"solicitation","confidence":"high","evidence":["solicitation number 6923G225Q000014 equals the FPDS solicitation identifier","same awarding office 6923G2"],"opportunity_key":null,"opportunity_title":null}],"related":[],"similar_open":[{"key":"36C24227R0008","latest_notice_id":"a4209158195e4eaaa69a73f455b90ed4","title":"Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC","solicitation_number":"36C24227R0008","notice_type":"o","first_type":"p","first_posted":"2026-10-14","last_posted":"2026-11-20","notices":6,"due_at":"2026-12-02T15:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"238220","psc":"Z1DA","set_aside":"SBA","state":"NY","county":"36065","county_name":"Oneida County","city":"3663418","city_name":"Rome","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"70ZL14Q0000006","latest_notice_id":"f1d0674e9de64955b0c327a1e89bd8f6","title":"REMOVE AND REPLACE 13 PROPANE REGULATORS, USCG STA FIRE ISLAND HOUSING, BABYLON, NY 11702-4602","solicitation_number":"70ZL14Q0000006","notice_type":"k","first_type":"k","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":2,"due_at":"2026-12-07T22:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-070","dept_name":"HOMELAND SECURITY, DEPARTMENT OF","sub_key":"s-7008","sub_name":"US COAST GUARD","office_key":"o-70ZL14","office_name":"BASE BOSTON","naics":"238220","psc":"Z1FA","set_aside":"SBA","state":"NY","county":"36103","county_name":"Suffolk County","city":"3603408","city_name":"Babylon","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C26227Q0149","latest_notice_id":"99fd06e3089e4005bf945b21581e7d70","title":"J065--BRINE MAINTENANCE SVC - Base +4 OY ($0.00) [605] | POP: 01/01/2027 - 12/31/2031","solicitation_number":"36C26227Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"238220","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"}],"similar_open_total":59,"indexable":false}