{"canonical":"https://sealedbidder.com/opportunities/6923g225q000011","key":"6923G225Q000011","url":"https://sealedbidder.com/opportunities/6923g225q000011","title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","solicitation_number":"6923G225Q000011","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-06T13:00:00Z","first_posted":"2025-07-22","last_posted":"2025-07-31","department":"TRANSPORTATION, DEPARTMENT OF","subagency":"MARITIME ADMINISTRATION","office":"6923G2 DOT MARITIME ADMINISTRATION","naics":"562910","psc":"F999","set_aside":"SBA","place_state":"NY","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"36059","place_county_name":"Nassau County","place_city":"3639694","place_city_name":"Kings Point","winner":"COASTAL ENVIRONMENTAL TECHNOLOGIES LTD","award_amount":null,"publications":[{"notice_id":"94fc620484d8425da6b7133e17c47436","title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","solicitation_number":"6923G225Q000011","notice_type":"k","base_type":"k","posted":"2025-07-22","posted_at":"2025-07-22T21:26:15.928Z","due_at":"2025-07-29T13:00:00Z","due_date":"2025-07-29","cancelled":false,"archived":true,"archive_date":"2025-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/94fc620484d8425da6b7133e17c47436/view","enriched":true,"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}]},{"notice_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","solicitation_number":"6923G225Q000011","notice_type":"k","base_type":"k","posted":"2025-07-24","posted_at":"2025-07-24T21:08:48.631Z","due_at":"2025-07-31T13:00:00Z","due_date":"2025-07-31","cancelled":false,"archived":true,"archive_date":"2025-08-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/40a49e6cd9b24dd1920fc8d622eaa8eb/view","enriched":true,"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}]},{"notice_id":"20bda56906a74524891c0303f7c3bc05","title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","solicitation_number":"6923G225Q000011","notice_type":"k","base_type":"k","posted":"2025-07-25","posted_at":"2025-07-25T15:28:45.190Z","due_at":"2025-07-31T13:00:00Z","due_date":"2025-07-31","cancelled":false,"archived":true,"archive_date":"2025-08-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/20bda56906a74524891c0303f7c3bc05/view","enriched":true,"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}]},{"notice_id":"b20c9bdfadfe449ba8cfe675b46df978","title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","solicitation_number":"6923G225Q000011","notice_type":"k","base_type":"k","posted":"2025-07-31","posted_at":"2025-07-31T19:42:06.733Z","due_at":"2025-08-06T13:00:00Z","due_date":"2025-08-06","cancelled":false,"archived":true,"archive_date":"2025-08-21","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b20c9bdfadfe449ba8cfe675b46df978/view","enriched":true,"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}]}],"latest_notice_id":"b20c9bdfadfe449ba8cfe675b46df978","first_type":"k","notices":[{"dates":{"posted":"2025-07-22","posted_at":"2025-07-22T21:26:15.928Z","created_at":"2025-07-22T21:14:27.778Z","modified_at":"2025-08-22T03:55:46.984Z","response_deadline":{"raw":"2025-07-29T09:00:00-04:00","utc":"2025-07-29T13:00:00Z","date":"2025-07-29","time":"09:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/94fc620484d8425da6b7133e17c47436/view"},"naics":{"codes":["562910"],"primary":"562910"},"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","agency":{"office":{"code":"6923G2","name":"6923G2 DOT MARITIME ADMINISTRATION"},"subtier":{"code":"6938","name":"MARITIME ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"organization_id":"100187910","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-13","archive_type":"auto15"},"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}],"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"94fc620484d8425da6b7133e17c47436","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"94fc620484d8425da6b7133e17c47436","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-08T04:26:45.780679442Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"b07769a43758bed7c14d02e9a03c2f79e79515792abcddd83d3e39b13a1ab279","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-08T04:26:45.780679442Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.</p>\n\n<p>Statement of Work (SOW)<br />\nWiley Hall 2ⁿᵈ Deck Dean &amp; Reception Offices Lead Paint Abatement / Remediation</p>\n\n<p>1. Description of Services<br />\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and&nbsp;<br />\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),&nbsp;<br />\nequipment and labor necessary to perform lead abatement at Wiley Hall&rsquo;s Dean, Reception Offices,&nbsp;<br />\nDean&rsquo;s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.</p>\n\n<p>2. General Requirements<br />\na. &nbsp;Abatement and disposal shall be in accordance with all federal, state and local laws and&nbsp;<br />\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA&nbsp;<br />\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. &sect; 173), and RCRA.</p>\n\n<p>b. The contractor shall possess and provide current proof of all federal, state and local&nbsp;<br />\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with&nbsp;<br />\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.</p>\n\n<p>c. The contractor shall submit a &ldquo;Occupant Protection Plan&rdquo; to the Contracting Officer&nbsp;<br />\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).<br />\nd. The designated work area(s) must be sealed from neighboring occupied areas of the&nbsp;<br />\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning&nbsp;<br />\nsigns) per federal, state and local laws and regulations throughout the duration of the project&nbsp;<br />\nuntil final clearance has been achieved.</p>\n\n<p>e. All work must be completed using wet methods per federal, state and local laws and regulations.<br />\nf. &nbsp;Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with&nbsp;<br />\nmanufacturer&rsquo;s instructions. The contractor shall use an EPA approved lead encapsulant and provide&nbsp;<br />\nSDS for all products used throughout the project.<br />\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be&nbsp;<br />\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.</p>\n\n<p>h. All work must be completed using HEPA vacuum with a minimum filter requirement capable of&nbsp;<br />\ncapturing particulates of 0.3 microns with 99.97% efficiency and in<br />\nconjunction with all federal, state and local laws and regulations.</p>\n\n<p><br />\ni. &nbsp;Throughout the duration of the abatement/remediation project, the work area(s) must be&nbsp;<br />\ncontained until a formal lead clearance is completed. USMMA&rsquo;s contracted hygienist shall be on-site&nbsp;<br />\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead&nbsp;<br />\nclearance. The clearance levels for dust wipes per the EPA&rsquo;s Hazard Standards and Clearance Levels&nbsp;<br />\nfor Lead in Paint, Dust and Soil requirements are as followed:<br />\na. 10 ug/ft2 &ndash; floors<br />\nb. 100 ug/ft2 &ndash; window sills and troughs</p>\n\n<p>j. &nbsp;All work and clearances must be coordinated with the USMMA&rsquo;s MARAD, COR, Public Safety&nbsp;<br />\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,&nbsp;<br />\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and&nbsp;<br />\nundergo another lead clearance process at no additional cost incurred to the government. If&nbsp;<br />\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>k. The work area must be cordoned off per federal and state laws and regulations with clearly&nbsp;<br />\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the&nbsp;<br />\nabatement project may enter.<br />\nl. &nbsp;Establish a containment area in accordance with federal and state laws and regulations, to&nbsp;<br />\nfully separate the work area from other areas of the building. Maintain and identify emergency&nbsp;<br />\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and&nbsp;<br />\nlocal laws and regulations.</p>\n\n<p>m. The contractor will ensure academy occupants are protected at all times and prevent any&nbsp;<br />\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws&nbsp;<br />\nand regulations.</p>\n\n<p>n. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout&nbsp;<br />\nthe course of the project.</p>\n\n<p>o. The contractor shall be responsible for installation and connection of all temporary utilities&nbsp;<br />\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run&nbsp;<br />\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel&nbsp;<br />\nwill show the contractor where to connect to water and power. The contractor shall provide and&nbsp;<br />\ninstall temporary GFCI panels for electrical service.</p>\n\n<p>p. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant&nbsp;<br />\nequipment to prevent contamination in neighboring areas per federal, state and local laws and&nbsp;<br />\nregulations.<br />\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>r. Provide copies of all federal, state and local notifications.</p>\n\n<p>s. Provide accurate records of abatement completion.</p>\n\n<p>3. Additional Notes<br />\na. Start Date: To be determined (Upon USMMA Contracting Officer&rsquo;s (CO) award of contract).</p>\n\n<p>Completion Date: 4 days after award of contract.</p>\n\n<p>The completion date includes but is not limited to the submittal process, performance of the work,&nbsp;<br />\nfinal air clearance, inspection, waste disposal and waste manifest delivery.<br />\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and&nbsp;<br />\ncontracted IH for approval. The plan must be approved at least two<br />\n(2) business days prior to commencement of work.</p>\n\n<p>c. All work must be scheduled with the COR at least 48 hours prior to commencement.</p>\n\n<p>d. The academy must be immediately notified of any service and/or activity interruptions. Any&nbsp;<br />\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety&nbsp;<br />\nDepartment, and DPW.<br />\ne. &nbsp;A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted&nbsp;<br />\nto identify and mark the proposed area where removal / abatement will take place. The contractor&nbsp;<br />\nwill become familiar with on-sight conditions and restrictions. The square footage identified in&nbsp;<br />\nthe SOW are approximations and will need to be assessed and verified by the contractor during the&nbsp;<br />\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying&nbsp;<br />\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the&nbsp;<br />\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.</p>\n\n<p>f. &nbsp;All work including but not limited to on-site assessment(s) and document review(s), must be&nbsp;<br />\ncompleted between normal business hours of operation (7am &ndash; 4pm), Monday &ndash; Friday, unless&nbsp;<br />\nadditional approval is granted by the CO and COR.</p>\n\n<p>g. Any debris generated during abatement activities will be removed by the contractor daily from&nbsp;<br />\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work&nbsp;<br />\nis completed, suitable for all normal academy activities.</p>\n\n<p>3</p>\n\n<p>h. Contractor must properly dispose of waste in accordance with all RCRA requirements.&nbsp;<br />\nDocumentation of this disposal shall be provided to the COR and Public Safety.</p>\n\n<p>i. &nbsp;The contractor will be required to abate (remove) the paint materials from the indicated areas.&nbsp;<br />\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the&nbsp;<br />\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the&nbsp;<br />\nselected areas and replace with similar material that meet all regulatory and industry standards.</p>\n\n<p>j. Square Footage of removal areas include:<br />\n&bull; &nbsp;Dean&rsquo;s Office (207): ~ 399 SF<br />\n&bull; &nbsp;Reception&rsquo;s Office (206): ~ 378 SF<br />\n&bull; &nbsp;Dean&rsquo;s Bathroom (207A): ~76 SF<br />\n&bull; &nbsp;Hall #4 (208B): ~25 SF</p>\n\n<p>These areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to&nbsp;<br />\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).</p>\n\n<p>k. The contractor shall assume full responsibility and liability for compliance with all applicable&nbsp;<br />\nfederal, state and local regulations related to any and all aspects of the project.</p>\n\n<p>l. &nbsp;The contractor is responsible for ensuring client satisfaction throughout the duration of the&nbsp;<br />\nproject. Any discrepancies, issues and concerns identified by the client originating from the&nbsp;<br />\ncontractor will be addressed, documented and corrected in a timely manner.</p>\n\n<p>Note: The contractor is responsible for any subcontractors that may be used throughout this&nbsp;<br />\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.</p>\n\n<p>4</p>\n\n<p>4. Images of Area of Concern<br />\nDean&rsquo;s Office (207): ~ 399 SF<br />\nReception&rsquo;s Office (206): ~ 378 SF Dean&rsquo;s Bathroom (207A): ~76 SF Hall #4 (208B): ~25</p>\n\n<p></p>\n\n<p>PLEASE SEE ATTACHED SITE PICTURES&nbsp;</p>","text":"A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.\n\nStatement of Work (SOW)\n\nWiley Hall 2ⁿᵈ Deck Dean & Reception Offices Lead Paint Abatement / Remediation\n\n1. Description of Services\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and\n\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),\n\nequipment and labor necessary to perform lead abatement at Wiley Hall’s Dean, Reception Offices,\n\nDean’s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.\n\n2. General Requirements\n\na. Abatement and disposal shall be in accordance with all federal, state and local laws and\n\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA\n\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. § 173), and RCRA.\n\nb. The contractor shall possess and provide current proof of all federal, state and local\n\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with\n\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.\n\nc. The contractor shall submit a “Occupant Protection Plan” to the Contracting Officer\n\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).\n\nd. The designated work area(s) must be sealed from neighboring occupied areas of the\n\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning\n\nsigns) per federal, state and local laws and regulations throughout the duration of the project\n\nuntil final clearance has been achieved.\n\ne. All work must be completed using wet methods per federal, state and local laws and regulations.\n\nf. Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with\n\nmanufacturer’s instructions. The contractor shall use an EPA approved lead encapsulant and provide\n\nSDS for all products used throughout the project.\n\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be\n\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.\n\nh. All work must be completed using HEPA vacuum with a minimum filter requirement capable of\n\ncapturing particulates of 0.3 microns with 99.97% efficiency and in\n\nconjunction with all federal, state and local laws and regulations.\n\ni. Throughout the duration of the abatement/remediation project, the work area(s) must be\n\ncontained until a formal lead clearance is completed. USMMA’s contracted hygienist shall be on-site\n\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead\n\nclearance. The clearance levels for dust wipes per the EPA’s Hazard Standards and Clearance Levels\n\nfor Lead in Paint, Dust and Soil requirements are as followed:\n\na. 10 ug/ft2 – floors\n\nb. 100 ug/ft2 – window sills and troughs\n\nj. All work and clearances must be coordinated with the USMMA’s MARAD, COR, Public Safety\n\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,\n\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and\n\nundergo another lead clearance process at no additional cost incurred to the government. If\n\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all\n\nfederal, state and local laws and regulations.\n\nk. The work area must be cordoned off per federal and state laws and regulations with clearly\n\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the\n\nabatement project may enter.\n\nl. Establish a containment area in accordance with federal and state laws and regulations, to\n\nfully separate the work area from other areas of the building. Maintain and identify emergency\n\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and\n\nlocal laws and regulations.\n\nm. The contractor will ensure academy occupants are protected at all times and prevent any\n\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws\n\nand regulations.\n\nn. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout\n\nthe course of the project.\n\no. The contractor shall be responsible for installation and connection of all temporary utilities\n\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run\n\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel\n\nwill show the contractor where to connect to water and power. The contractor shall provide and\n\ninstall temporary GFCI panels for electrical service.\n\np. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant\n\nequipment to prevent contamination in neighboring areas per federal, state and local laws and\n\nregulations.\n\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all\n\nfederal, state and local laws and regulations.\n\nr. Provide copies of all federal, state and local notifications.\n\ns. Provide accurate records of abatement completion.\n\n3. Additional Notes\n\na. Start Date: To be determined (Upon USMMA Contracting Officer’s (CO) award of contract).\n\nCompletion Date: 4 days after award of contract.\n\nThe completion date includes but is not limited to the submittal process, performance of the work,\n\nfinal air clearance, inspection, waste disposal and waste manifest delivery.\n\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and\n\ncontracted IH for approval. The plan must be approved at least two\n\n(2) business days prior to commencement of work.\n\nc. All work must be scheduled with the COR at least 48 hours prior to commencement.\n\nd. The academy must be immediately notified of any service and/or activity interruptions. Any\n\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety\n\nDepartment, and DPW.\n\ne. A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted\n\nto identify and mark the proposed area where removal / abatement will take place. The contractor\n\nwill become familiar with on-sight conditions and restrictions. The square footage identified in\n\nthe SOW are approximations and will need to be assessed and verified by the contractor during the\n\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying\n\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the\n\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.\n\nf. All work including but not limited to on-site assessment(s) and document review(s), must be\n\ncompleted between normal business hours of operation (7am – 4pm), Monday – Friday, unless\n\nadditional approval is granted by the CO and COR.\n\ng. Any debris generated during abatement activities will be removed by the contractor daily from\n\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work\n\nis completed, suitable for all normal academy activities.\n\n3\n\nh. Contractor must properly dispose of waste in accordance with all RCRA requirements.\n\nDocumentation of this disposal shall be provided to the COR and Public Safety.\n\ni. The contractor will be required to abate (remove) the paint materials from the indicated areas.\n\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the\n\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the\n\nselected areas and replace with similar material that meet all regulatory and industry standards.\n\nj. Square Footage of removal areas include:\n\n• Dean’s Office (207): ~ 399 SF\n\n• Reception’s Office (206): ~ 378 SF\n\n• Dean’s Bathroom (207A): ~76 SF\n\n• Hall #4 (208B): ~25 SF\n\nThese areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to\n\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).\n\nk. The contractor shall assume full responsibility and liability for compliance with all applicable\n\nfederal, state and local regulations related to any and all aspects of the project.\n\nl. The contractor is responsible for ensuring client satisfaction throughout the duration of the\n\nproject. Any discrepancies, issues and concerns identified by the client originating from the\n\ncontractor will be addressed, documented and corrected in a timely manner.\n\nNote: The contractor is responsible for any subcontractors that may be used throughout this\n\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.\n\n4\n\n4. Images of Area of Concern\n\nDean’s Office (207): ~ 399 SF\n\nReception’s Office (206): ~ 378 SF Dean’s Bathroom (207A): ~76 SF Hall #4 (208B): ~25\n\nPLEASE SEE ATTACHED SITE PICTURES","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"6923G225Q000011","place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F999"},{"dates":{"posted":"2025-07-24","posted_at":"2025-07-24T21:08:48.631Z","created_at":"2025-07-24T21:02:38.476Z","modified_at":"2025-08-22T03:55:46.984Z","response_deadline":{"raw":"2025-07-31T09:00:00-04:00","utc":"2025-07-31T13:00:00Z","date":"2025-07-31","time":"09:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/40a49e6cd9b24dd1920fc8d622eaa8eb/view"},"naics":{"codes":["562910"],"primary":"562910"},"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","agency":{"office":{"code":"6923G2","name":"6923G2 DOT MARITIME ADMINISTRATION"},"subtier":{"code":"6938","name":"MARITIME ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"organization_id":"100187910","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-15","archive_type":"auto15"},"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}],"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"94fc620484d8425da6b7133e17c47436","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-08T02:21:11.633571648Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f580d33eef4e739ed928529e45685ee3f226c96c5f67f0696e6275909d31ce58","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-08T02:21:11.633571648Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.</p>\n\n<p>Statement of Work (SOW)<br />\nWiley Hall 2ⁿᵈ Deck Dean &amp; Reception Offices Lead Paint Abatement / Remediation</p>\n\n<p>1. Description of Services<br />\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and&nbsp;<br />\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),&nbsp;<br />\nequipment and labor necessary to perform lead abatement at Wiley Hall&rsquo;s Dean, Reception Offices,&nbsp;<br />\nDean&rsquo;s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.</p>\n\n<p>2. General Requirements<br />\na. &nbsp;Abatement and disposal shall be in accordance with all federal, state and local laws and&nbsp;<br />\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA&nbsp;<br />\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. &sect; 173), and RCRA.</p>\n\n<p>b. The contractor shall possess and provide current proof of all federal, state and local&nbsp;<br />\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with&nbsp;<br />\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.</p>\n\n<p>c. The contractor shall submit a &ldquo;Occupant Protection Plan&rdquo; to the Contracting Officer&nbsp;<br />\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).<br />\nd. The designated work area(s) must be sealed from neighboring occupied areas of the&nbsp;<br />\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning&nbsp;<br />\nsigns) per federal, state and local laws and regulations throughout the duration of the project&nbsp;<br />\nuntil final clearance has been achieved.</p>\n\n<p>e. All work must be completed using wet methods per federal, state and local laws and regulations.<br />\nf. &nbsp;Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with&nbsp;<br />\nmanufacturer&rsquo;s instructions. The contractor shall use an EPA approved lead encapsulant and provide&nbsp;<br />\nSDS for all products used throughout the project.<br />\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be&nbsp;<br />\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.</p>\n\n<p>h. All work must be completed using HEPA vacuum with a minimum filter requirement capable of&nbsp;<br />\ncapturing particulates of 0.3 microns with 99.97% efficiency and in<br />\nconjunction with all federal, state and local laws and regulations.</p>\n\n<p><br />\ni. &nbsp;Throughout the duration of the abatement/remediation project, the work area(s) must be&nbsp;<br />\ncontained until a formal lead clearance is completed. USMMA&rsquo;s contracted hygienist shall be on-site&nbsp;<br />\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead&nbsp;<br />\nclearance. The clearance levels for dust wipes per the EPA&rsquo;s Hazard Standards and Clearance Levels&nbsp;<br />\nfor Lead in Paint, Dust and Soil requirements are as followed:<br />\na. 10 ug/ft2 &ndash; floors<br />\nb. 100 ug/ft2 &ndash; window sills and troughs</p>\n\n<p>j. &nbsp;All work and clearances must be coordinated with the USMMA&rsquo;s MARAD, COR, Public Safety&nbsp;<br />\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,&nbsp;<br />\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and&nbsp;<br />\nundergo another lead clearance process at no additional cost incurred to the government. If&nbsp;<br />\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>k. The work area must be cordoned off per federal and state laws and regulations with clearly&nbsp;<br />\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the&nbsp;<br />\nabatement project may enter.<br />\nl. &nbsp;Establish a containment area in accordance with federal and state laws and regulations, to&nbsp;<br />\nfully separate the work area from other areas of the building. Maintain and identify emergency&nbsp;<br />\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and&nbsp;<br />\nlocal laws and regulations.</p>\n\n<p>m. The contractor will ensure academy occupants are protected at all times and prevent any&nbsp;<br />\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws&nbsp;<br />\nand regulations.</p>\n\n<p>n. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout&nbsp;<br />\nthe course of the project.</p>\n\n<p>o. The contractor shall be responsible for installation and connection of all temporary utilities&nbsp;<br />\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run&nbsp;<br />\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel&nbsp;<br />\nwill show the contractor where to connect to water and power. The contractor shall provide and&nbsp;<br />\ninstall temporary GFCI panels for electrical service.</p>\n\n<p>p. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant&nbsp;<br />\nequipment to prevent contamination in neighboring areas per federal, state and local laws and&nbsp;<br />\nregulations.<br />\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>r. Provide copies of all federal, state and local notifications.</p>\n\n<p>s. Provide accurate records of abatement completion.</p>\n\n<p>3. Additional Notes<br />\na. Start Date: To be determined (Upon USMMA Contracting Officer&rsquo;s (CO) award of contract).</p>\n\n<p>Completion Date: 4 days after award of contract.</p>\n\n<p>The completion date includes but is not limited to the submittal process, performance of the work,&nbsp;<br />\nfinal air clearance, inspection, waste disposal and waste manifest delivery.<br />\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and&nbsp;<br />\ncontracted IH for approval. The plan must be approved at least two<br />\n(2) business days prior to commencement of work.</p>\n\n<p>c. All work must be scheduled with the COR at least 48 hours prior to commencement.</p>\n\n<p>d. The academy must be immediately notified of any service and/or activity interruptions. Any&nbsp;<br />\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety&nbsp;<br />\nDepartment, and DPW.<br />\ne. &nbsp;A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted&nbsp;<br />\nto identify and mark the proposed area where removal / abatement will take place. The contractor&nbsp;<br />\nwill become familiar with on-sight conditions and restrictions. The square footage identified in&nbsp;<br />\nthe SOW are approximations and will need to be assessed and verified by the contractor during the&nbsp;<br />\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying&nbsp;<br />\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the&nbsp;<br />\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.</p>\n\n<p>f. &nbsp;All work including but not limited to on-site assessment(s) and document review(s), must be&nbsp;<br />\ncompleted between normal business hours of operation (7am &ndash; 4pm), Monday &ndash; Friday, unless&nbsp;<br />\nadditional approval is granted by the CO and COR.</p>\n\n<p>g. Any debris generated during abatement activities will be removed by the contractor daily from&nbsp;<br />\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work&nbsp;<br />\nis completed, suitable for all normal academy activities.</p>\n\n<p>3</p>\n\n<p>h. Contractor must properly dispose of waste in accordance with all RCRA requirements.&nbsp;<br />\nDocumentation of this disposal shall be provided to the COR and Public Safety.</p>\n\n<p>i. &nbsp;The contractor will be required to abate (remove) the paint materials from the indicated areas.&nbsp;<br />\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the&nbsp;<br />\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the&nbsp;<br />\nselected areas and replace with similar material that meet all regulatory and industry standards.</p>\n\n<p>j. Square Footage of removal areas include:<br />\n&bull; &nbsp;Dean&rsquo;s Office (207): ~ 399 SF<br />\n&bull; &nbsp;Reception&rsquo;s Office (206): ~ 378 SF<br />\n&bull; &nbsp;Dean&rsquo;s Bathroom (207A): ~76 SF<br />\n&bull; &nbsp;Hall #4 (208B): ~25 SF</p>\n\n<p>These areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to&nbsp;<br />\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).</p>\n\n<p>k. The contractor shall assume full responsibility and liability for compliance with all applicable&nbsp;<br />\nfederal, state and local regulations related to any and all aspects of the project.</p>\n\n<p>l. &nbsp;The contractor is responsible for ensuring client satisfaction throughout the duration of the&nbsp;<br />\nproject. Any discrepancies, issues and concerns identified by the client originating from the&nbsp;<br />\ncontractor will be addressed, documented and corrected in a timely manner.</p>\n\n<p>Note: The contractor is responsible for any subcontractors that may be used throughout this&nbsp;<br />\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.</p>\n\n<p>4</p>\n\n<p>4. Images of Area of Concern<br />\nDean&rsquo;s Office (207): ~ 399 SF<br />\nReception&rsquo;s Office (206): ~ 378 SF Dean&rsquo;s Bathroom (207A): ~76 SF Hall #4 (208B): ~25</p>\n\n<p></p>\n\n<p>PLEASE SEE ATTACHED SITE PICTURES&nbsp;</p>","text":"A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.\n\nStatement of Work (SOW)\n\nWiley Hall 2ⁿᵈ Deck Dean & Reception Offices Lead Paint Abatement / Remediation\n\n1. Description of Services\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and\n\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),\n\nequipment and labor necessary to perform lead abatement at Wiley Hall’s Dean, Reception Offices,\n\nDean’s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.\n\n2. General Requirements\n\na. Abatement and disposal shall be in accordance with all federal, state and local laws and\n\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA\n\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. § 173), and RCRA.\n\nb. The contractor shall possess and provide current proof of all federal, state and local\n\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with\n\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.\n\nc. The contractor shall submit a “Occupant Protection Plan” to the Contracting Officer\n\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).\n\nd. The designated work area(s) must be sealed from neighboring occupied areas of the\n\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning\n\nsigns) per federal, state and local laws and regulations throughout the duration of the project\n\nuntil final clearance has been achieved.\n\ne. All work must be completed using wet methods per federal, state and local laws and regulations.\n\nf. Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with\n\nmanufacturer’s instructions. The contractor shall use an EPA approved lead encapsulant and provide\n\nSDS for all products used throughout the project.\n\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be\n\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.\n\nh. All work must be completed using HEPA vacuum with a minimum filter requirement capable of\n\ncapturing particulates of 0.3 microns with 99.97% efficiency and in\n\nconjunction with all federal, state and local laws and regulations.\n\ni. Throughout the duration of the abatement/remediation project, the work area(s) must be\n\ncontained until a formal lead clearance is completed. USMMA’s contracted hygienist shall be on-site\n\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead\n\nclearance. The clearance levels for dust wipes per the EPA’s Hazard Standards and Clearance Levels\n\nfor Lead in Paint, Dust and Soil requirements are as followed:\n\na. 10 ug/ft2 – floors\n\nb. 100 ug/ft2 – window sills and troughs\n\nj. All work and clearances must be coordinated with the USMMA’s MARAD, COR, Public Safety\n\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,\n\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and\n\nundergo another lead clearance process at no additional cost incurred to the government. If\n\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all\n\nfederal, state and local laws and regulations.\n\nk. The work area must be cordoned off per federal and state laws and regulations with clearly\n\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the\n\nabatement project may enter.\n\nl. Establish a containment area in accordance with federal and state laws and regulations, to\n\nfully separate the work area from other areas of the building. Maintain and identify emergency\n\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and\n\nlocal laws and regulations.\n\nm. The contractor will ensure academy occupants are protected at all times and prevent any\n\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws\n\nand regulations.\n\nn. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout\n\nthe course of the project.\n\no. The contractor shall be responsible for installation and connection of all temporary utilities\n\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run\n\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel\n\nwill show the contractor where to connect to water and power. The contractor shall provide and\n\ninstall temporary GFCI panels for electrical service.\n\np. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant\n\nequipment to prevent contamination in neighboring areas per federal, state and local laws and\n\nregulations.\n\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all\n\nfederal, state and local laws and regulations.\n\nr. Provide copies of all federal, state and local notifications.\n\ns. Provide accurate records of abatement completion.\n\n3. Additional Notes\n\na. Start Date: To be determined (Upon USMMA Contracting Officer’s (CO) award of contract).\n\nCompletion Date: 4 days after award of contract.\n\nThe completion date includes but is not limited to the submittal process, performance of the work,\n\nfinal air clearance, inspection, waste disposal and waste manifest delivery.\n\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and\n\ncontracted IH for approval. The plan must be approved at least two\n\n(2) business days prior to commencement of work.\n\nc. All work must be scheduled with the COR at least 48 hours prior to commencement.\n\nd. The academy must be immediately notified of any service and/or activity interruptions. Any\n\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety\n\nDepartment, and DPW.\n\ne. A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted\n\nto identify and mark the proposed area where removal / abatement will take place. The contractor\n\nwill become familiar with on-sight conditions and restrictions. The square footage identified in\n\nthe SOW are approximations and will need to be assessed and verified by the contractor during the\n\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying\n\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the\n\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.\n\nf. All work including but not limited to on-site assessment(s) and document review(s), must be\n\ncompleted between normal business hours of operation (7am – 4pm), Monday – Friday, unless\n\nadditional approval is granted by the CO and COR.\n\ng. Any debris generated during abatement activities will be removed by the contractor daily from\n\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work\n\nis completed, suitable for all normal academy activities.\n\n3\n\nh. Contractor must properly dispose of waste in accordance with all RCRA requirements.\n\nDocumentation of this disposal shall be provided to the COR and Public Safety.\n\ni. The contractor will be required to abate (remove) the paint materials from the indicated areas.\n\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the\n\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the\n\nselected areas and replace with similar material that meet all regulatory and industry standards.\n\nj. Square Footage of removal areas include:\n\n• Dean’s Office (207): ~ 399 SF\n\n• Reception’s Office (206): ~ 378 SF\n\n• Dean’s Bathroom (207A): ~76 SF\n\n• Hall #4 (208B): ~25 SF\n\nThese areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to\n\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).\n\nk. The contractor shall assume full responsibility and liability for compliance with all applicable\n\nfederal, state and local regulations related to any and all aspects of the project.\n\nl. The contractor is responsible for ensuring client satisfaction throughout the duration of the\n\nproject. Any discrepancies, issues and concerns identified by the client originating from the\n\ncontractor will be addressed, documented and corrected in a timely manner.\n\nNote: The contractor is responsible for any subcontractors that may be used throughout this\n\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.\n\n4\n\n4. Images of Area of Concern\n\nDean’s Office (207): ~ 399 SF\n\nReception’s Office (206): ~ 378 SF Dean’s Bathroom (207A): ~76 SF Hall #4 (208B): ~25\n\nPLEASE SEE ATTACHED SITE PICTURES","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"6923G225Q000011","place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F999"},{"dates":{"posted":"2025-07-25","posted_at":"2025-07-25T15:28:45.190Z","created_at":"2025-07-25T15:26:37.360Z","modified_at":"2025-08-22T03:55:46.984Z","response_deadline":{"raw":"2025-07-31T09:00:00-04:00","utc":"2025-07-31T13:00:00Z","date":"2025-07-31","time":"09:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/20bda56906a74524891c0303f7c3bc05/view"},"naics":{"codes":["562910"],"primary":"562910"},"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","agency":{"office":{"code":"6923G2","name":"6923G2 DOT MARITIME ADMINISTRATION"},"subtier":{"code":"6938","name":"MARITIME ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"organization_id":"100187910","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-15","archive_type":"auto15"},"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}],"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"20bda56906a74524891c0303f7c3bc05","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"94fc620484d8425da6b7133e17c47436","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-08T01:12:25.882677933Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4fd1fb9490bb24fd27974301686e389e2a20a210d77ab3e15818cb0a0855b9db","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-08T01:12:25.882677933Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.</p>\n\n<p>Statement of Work (SOW)<br />\nWiley Hall 2ⁿᵈ Deck Dean &amp; Reception Offices Lead Paint Abatement / Remediation</p>\n\n<p>1. Description of Services<br />\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and&nbsp;<br />\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),&nbsp;<br />\nequipment and labor necessary to perform lead abatement at Wiley Hall&rsquo;s Dean, Reception Offices,&nbsp;<br />\nDean&rsquo;s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.</p>\n\n<p>2. General Requirements<br />\na. &nbsp;Abatement and disposal shall be in accordance with all federal, state and local laws and&nbsp;<br />\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA&nbsp;<br />\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. &sect; 173), and RCRA.</p>\n\n<p>b. The contractor shall possess and provide current proof of all federal, state and local&nbsp;<br />\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with&nbsp;<br />\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.</p>\n\n<p>c. The contractor shall submit a &ldquo;Occupant Protection Plan&rdquo; to the Contracting Officer&nbsp;<br />\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).<br />\nd. The designated work area(s) must be sealed from neighboring occupied areas of the&nbsp;<br />\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning&nbsp;<br />\nsigns) per federal, state and local laws and regulations throughout the duration of the project&nbsp;<br />\nuntil final clearance has been achieved.</p>\n\n<p>e. All work must be completed using wet methods per federal, state and local laws and regulations.<br />\nf. &nbsp;Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with&nbsp;<br />\nmanufacturer&rsquo;s instructions. The contractor shall use an EPA approved lead encapsulant and provide&nbsp;<br />\nSDS for all products used throughout the project.<br />\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be&nbsp;<br />\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.</p>\n\n<p>h. All work must be completed using HEPA vacuum with a minimum filter requirement capable of&nbsp;<br />\ncapturing particulates of 0.3 microns with 99.97% efficiency and in<br />\nconjunction with all federal, state and local laws and regulations.</p>\n\n<p><br />\ni. &nbsp;Throughout the duration of the abatement/remediation project, the work area(s) must be&nbsp;<br />\ncontained until a formal lead clearance is completed. USMMA&rsquo;s contracted hygienist shall be on-site&nbsp;<br />\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead&nbsp;<br />\nclearance. The clearance levels for dust wipes per the EPA&rsquo;s Hazard Standards and Clearance Levels&nbsp;<br />\nfor Lead in Paint, Dust and Soil requirements are as followed:<br />\na. 10 ug/ft2 &ndash; floors<br />\nb. 100 ug/ft2 &ndash; window sills and troughs</p>\n\n<p>j. &nbsp;All work and clearances must be coordinated with the USMMA&rsquo;s MARAD, COR, Public Safety&nbsp;<br />\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,&nbsp;<br />\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and&nbsp;<br />\nundergo another lead clearance process at no additional cost incurred to the government. If&nbsp;<br />\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>k. The work area must be cordoned off per federal and state laws and regulations with clearly&nbsp;<br />\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the&nbsp;<br />\nabatement project may enter.<br />\nl. &nbsp;Establish a containment area in accordance with federal and state laws and regulations, to&nbsp;<br />\nfully separate the work area from other areas of the building. Maintain and identify emergency&nbsp;<br />\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and&nbsp;<br />\nlocal laws and regulations.</p>\n\n<p>m. The contractor will ensure academy occupants are protected at all times and prevent any&nbsp;<br />\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws&nbsp;<br />\nand regulations.</p>\n\n<p>n. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout&nbsp;<br />\nthe course of the project.</p>\n\n<p>o. The contractor shall be responsible for installation and connection of all temporary utilities&nbsp;<br />\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run&nbsp;<br />\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel&nbsp;<br />\nwill show the contractor where to connect to water and power. The contractor shall provide and&nbsp;<br />\ninstall temporary GFCI panels for electrical service.</p>\n\n<p>p. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant&nbsp;<br />\nequipment to prevent contamination in neighboring areas per federal, state and local laws and&nbsp;<br />\nregulations.<br />\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>r. Provide copies of all federal, state and local notifications.</p>\n\n<p>s. Provide accurate records of abatement completion.</p>\n\n<p>3. Additional Notes<br />\na. Start Date: To be determined (Upon USMMA Contracting Officer&rsquo;s (CO) award of contract).</p>\n\n<p>Completion Date: 4 days after award of contract.</p>\n\n<p>The completion date includes but is not limited to the submittal process, performance of the work,&nbsp;<br />\nfinal air clearance, inspection, waste disposal and waste manifest delivery.<br />\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and&nbsp;<br />\ncontracted IH for approval. The plan must be approved at least two<br />\n(2) business days prior to commencement of work.</p>\n\n<p>c. All work must be scheduled with the COR at least 48 hours prior to commencement.</p>\n\n<p>d. The academy must be immediately notified of any service and/or activity interruptions. Any&nbsp;<br />\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety&nbsp;<br />\nDepartment, and DPW.<br />\ne. &nbsp;A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted&nbsp;<br />\nto identify and mark the proposed area where removal / abatement will take place. The contractor&nbsp;<br />\nwill become familiar with on-sight conditions and restrictions. The square footage identified in&nbsp;<br />\nthe SOW are approximations and will need to be assessed and verified by the contractor during the&nbsp;<br />\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying&nbsp;<br />\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the&nbsp;<br />\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.</p>\n\n<p>f. &nbsp;All work including but not limited to on-site assessment(s) and document review(s), must be&nbsp;<br />\ncompleted between normal business hours of operation (7am &ndash; 4pm), Monday &ndash; Friday, unless&nbsp;<br />\nadditional approval is granted by the CO and COR.</p>\n\n<p>g. Any debris generated during abatement activities will be removed by the contractor daily from&nbsp;<br />\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work&nbsp;<br />\nis completed, suitable for all normal academy activities.</p>\n\n<p>3</p>\n\n<p>h. Contractor must properly dispose of waste in accordance with all RCRA requirements.&nbsp;<br />\nDocumentation of this disposal shall be provided to the COR and Public Safety.</p>\n\n<p>i. &nbsp;The contractor will be required to abate (remove) the paint materials from the indicated areas.&nbsp;<br />\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the&nbsp;<br />\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the&nbsp;<br />\nselected areas and replace with similar material that meet all regulatory and industry standards.</p>\n\n<p>j. Square Footage of removal areas include:<br />\n&bull; &nbsp;Dean&rsquo;s Office (207): ~ 399 SF<br />\n&bull; &nbsp;Reception&rsquo;s Office (206): ~ 378 SF<br />\n&bull; &nbsp;Dean&rsquo;s Bathroom (207A): ~76 SF<br />\n&bull; &nbsp;Hall #4 (208B): ~25 SF</p>\n\n<p>These areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to&nbsp;<br />\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).</p>\n\n<p>k. The contractor shall assume full responsibility and liability for compliance with all applicable&nbsp;<br />\nfederal, state and local regulations related to any and all aspects of the project.</p>\n\n<p>l. &nbsp;The contractor is responsible for ensuring client satisfaction throughout the duration of the&nbsp;<br />\nproject. Any discrepancies, issues and concerns identified by the client originating from the&nbsp;<br />\ncontractor will be addressed, documented and corrected in a timely manner.</p>\n\n<p>Note: The contractor is responsible for any subcontractors that may be used throughout this&nbsp;<br />\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.</p>\n\n<p>4</p>\n\n<p>4. Images of Area of Concern<br />\nDean&rsquo;s Office (207): ~ 399 SF<br />\nReception&rsquo;s Office (206): ~ 378 SF Dean&rsquo;s Bathroom (207A): ~76 SF Hall #4 (208B): ~25</p>\n\n<p></p>\n\n<p>PLEASE SEE ATTACHED SITE PICTURES&nbsp;</p>","text":"A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.\n\nStatement of Work (SOW)\n\nWiley Hall 2ⁿᵈ Deck Dean & Reception Offices Lead Paint Abatement / Remediation\n\n1. Description of Services\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and\n\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),\n\nequipment and labor necessary to perform lead abatement at Wiley Hall’s Dean, Reception Offices,\n\nDean’s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.\n\n2. General Requirements\n\na. Abatement and disposal shall be in accordance with all federal, state and local laws and\n\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA\n\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. § 173), and RCRA.\n\nb. The contractor shall possess and provide current proof of all federal, state and local\n\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with\n\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.\n\nc. The contractor shall submit a “Occupant Protection Plan” to the Contracting Officer\n\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).\n\nd. The designated work area(s) must be sealed from neighboring occupied areas of the\n\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning\n\nsigns) per federal, state and local laws and regulations throughout the duration of the project\n\nuntil final clearance has been achieved.\n\ne. All work must be completed using wet methods per federal, state and local laws and regulations.\n\nf. Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with\n\nmanufacturer’s instructions. The contractor shall use an EPA approved lead encapsulant and provide\n\nSDS for all products used throughout the project.\n\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be\n\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.\n\nh. All work must be completed using HEPA vacuum with a minimum filter requirement capable of\n\ncapturing particulates of 0.3 microns with 99.97% efficiency and in\n\nconjunction with all federal, state and local laws and regulations.\n\ni. Throughout the duration of the abatement/remediation project, the work area(s) must be\n\ncontained until a formal lead clearance is completed. USMMA’s contracted hygienist shall be on-site\n\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead\n\nclearance. The clearance levels for dust wipes per the EPA’s Hazard Standards and Clearance Levels\n\nfor Lead in Paint, Dust and Soil requirements are as followed:\n\na. 10 ug/ft2 – floors\n\nb. 100 ug/ft2 – window sills and troughs\n\nj. All work and clearances must be coordinated with the USMMA’s MARAD, COR, Public Safety\n\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,\n\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and\n\nundergo another lead clearance process at no additional cost incurred to the government. If\n\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all\n\nfederal, state and local laws and regulations.\n\nk. The work area must be cordoned off per federal and state laws and regulations with clearly\n\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the\n\nabatement project may enter.\n\nl. Establish a containment area in accordance with federal and state laws and regulations, to\n\nfully separate the work area from other areas of the building. Maintain and identify emergency\n\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and\n\nlocal laws and regulations.\n\nm. The contractor will ensure academy occupants are protected at all times and prevent any\n\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws\n\nand regulations.\n\nn. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout\n\nthe course of the project.\n\no. The contractor shall be responsible for installation and connection of all temporary utilities\n\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run\n\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel\n\nwill show the contractor where to connect to water and power. The contractor shall provide and\n\ninstall temporary GFCI panels for electrical service.\n\np. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant\n\nequipment to prevent contamination in neighboring areas per federal, state and local laws and\n\nregulations.\n\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all\n\nfederal, state and local laws and regulations.\n\nr. Provide copies of all federal, state and local notifications.\n\ns. Provide accurate records of abatement completion.\n\n3. Additional Notes\n\na. Start Date: To be determined (Upon USMMA Contracting Officer’s (CO) award of contract).\n\nCompletion Date: 4 days after award of contract.\n\nThe completion date includes but is not limited to the submittal process, performance of the work,\n\nfinal air clearance, inspection, waste disposal and waste manifest delivery.\n\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and\n\ncontracted IH for approval. The plan must be approved at least two\n\n(2) business days prior to commencement of work.\n\nc. All work must be scheduled with the COR at least 48 hours prior to commencement.\n\nd. The academy must be immediately notified of any service and/or activity interruptions. Any\n\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety\n\nDepartment, and DPW.\n\ne. A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted\n\nto identify and mark the proposed area where removal / abatement will take place. The contractor\n\nwill become familiar with on-sight conditions and restrictions. The square footage identified in\n\nthe SOW are approximations and will need to be assessed and verified by the contractor during the\n\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying\n\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the\n\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.\n\nf. All work including but not limited to on-site assessment(s) and document review(s), must be\n\ncompleted between normal business hours of operation (7am – 4pm), Monday – Friday, unless\n\nadditional approval is granted by the CO and COR.\n\ng. Any debris generated during abatement activities will be removed by the contractor daily from\n\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work\n\nis completed, suitable for all normal academy activities.\n\n3\n\nh. Contractor must properly dispose of waste in accordance with all RCRA requirements.\n\nDocumentation of this disposal shall be provided to the COR and Public Safety.\n\ni. The contractor will be required to abate (remove) the paint materials from the indicated areas.\n\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the\n\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the\n\nselected areas and replace with similar material that meet all regulatory and industry standards.\n\nj. Square Footage of removal areas include:\n\n• Dean’s Office (207): ~ 399 SF\n\n• Reception’s Office (206): ~ 378 SF\n\n• Dean’s Bathroom (207A): ~76 SF\n\n• Hall #4 (208B): ~25 SF\n\nThese areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to\n\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).\n\nk. The contractor shall assume full responsibility and liability for compliance with all applicable\n\nfederal, state and local regulations related to any and all aspects of the project.\n\nl. The contractor is responsible for ensuring client satisfaction throughout the duration of the\n\nproject. Any discrepancies, issues and concerns identified by the client originating from the\n\ncontractor will be addressed, documented and corrected in a timely manner.\n\nNote: The contractor is responsible for any subcontractors that may be used throughout this\n\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.\n\n4\n\n4. Images of Area of Concern\n\nDean’s Office (207): ~ 399 SF\n\nReception’s Office (206): ~ 378 SF Dean’s Bathroom (207A): ~76 SF Hall #4 (208B): ~25\n\nPLEASE SEE ATTACHED SITE PICTURES","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"6923G225Q000011","place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F999"},{"dates":{"posted":"2025-07-31","posted_at":"2025-07-31T19:42:06.733Z","created_at":"2025-07-31T18:49:28.600Z","modified_at":"2025-08-22T03:55:46.984Z","response_deadline":{"raw":"2025-08-06T09:00:00-04:00","utc":"2025-08-06T13:00:00Z","date":"2025-08-06","time":"09:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b20c9bdfadfe449ba8cfe675b46df978/view"},"naics":{"codes":["562910"],"primary":"562910"},"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","agency":{"office":{"code":"6923G2","name":"6923G2 DOT MARITIME ADMINISTRATION"},"subtier":{"code":"6938","name":"MARITIME ADMINISTRATION"},"department":{"code":"069","name":"TRANSPORTATION, DEPARTMENT OF"},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"organization_id":"100187910","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-21","archive_type":"auto15"},"history":[{"index":5,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-31T19:42:06.733Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"b20c9bdfadfe449ba8cfe675b46df978","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":3,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-25T15:28:45.190Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"20bda56906a74524891c0303f7c3bc05","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":2,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-24T21:08:48.631Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"modify","opportunity_id":"40a49e6cd9b24dd1920fc8d622eaa8eb","solicitation_number":"6923G225Q000011","parent_opportunity_id":"94fc620484d8425da6b7133e17c47436"},{"index":1,"title":"Wiley Hall Dean's office, Reception office, Deans bathroom and hallway corridor","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-22T21:26:15.928Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"94fc620484d8425da6b7133e17c47436","solicitation_number":"6923G225Q000011"}],"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"b20c9bdfadfe449ba8cfe675b46df978","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"94fc620484d8425da6b7133e17c47436","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-06T04:21:51.486628158Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3dbab67d5c47525ff81e0712b99602a0d96a8dbd6b86871910ee33f7b40bbb67","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-06T04:21:51.486628158Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>The purpose of this modification is to respond request for information as well as extend<br />\nthe date and time of offer due as follows:</p>\n\n<p>a. &nbsp;Offers submission due date is hereby extended to August 6th, 2025 @0900.</p>\n\n<p>b. &nbsp;Response to request for information posted on attachment&nbsp;</p>\n\n<p>A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.</p>\n\n<p>Statement of Work (SOW)<br />\nWiley Hall 2ⁿᵈ Deck Dean &amp; Reception Offices Lead Paint Abatement / Remediation</p>\n\n<p>1. Description of Services<br />\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and&nbsp;<br />\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),&nbsp;<br />\nequipment and labor necessary to perform lead abatement at Wiley Hall&rsquo;s Dean, Reception Offices,&nbsp;<br />\nDean&rsquo;s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.</p>\n\n<p>2. General Requirements<br />\na. &nbsp;Abatement and disposal shall be in accordance with all federal, state and local laws and&nbsp;<br />\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA&nbsp;<br />\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. &sect; 173), and RCRA.</p>\n\n<p>b. The contractor shall possess and provide current proof of all federal, state and local&nbsp;<br />\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with&nbsp;<br />\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.</p>\n\n<p>c. The contractor shall submit a &ldquo;Occupant Protection Plan&rdquo; to the Contracting Officer&nbsp;<br />\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).<br />\nd. The designated work area(s) must be sealed from neighboring occupied areas of the&nbsp;<br />\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning&nbsp;<br />\nsigns) per federal, state and local laws and regulations throughout the duration of the project&nbsp;<br />\nuntil final clearance has been achieved.</p>\n\n<p>e. All work must be completed using wet methods per federal, state and local laws and regulations.<br />\nf. &nbsp;Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with&nbsp;<br />\nmanufacturer&rsquo;s instructions. The contractor shall use an EPA approved lead encapsulant and provide&nbsp;<br />\nSDS for all products used throughout the project.<br />\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be&nbsp;<br />\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.</p>\n\n<p>h. All work must be completed using HEPA vacuum with a minimum filter requirement capable of&nbsp;<br />\ncapturing particulates of 0.3 microns with 99.97% efficiency and in<br />\nconjunction with all federal, state and local laws and regulations.</p>\n\n<p><br />\ni. &nbsp;Throughout the duration of the abatement/remediation project, the work area(s) must be&nbsp;<br />\ncontained until a formal lead clearance is completed. USMMA&rsquo;s contracted hygienist shall be on-site&nbsp;<br />\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead&nbsp;<br />\nclearance. The clearance levels for dust wipes per the EPA&rsquo;s Hazard Standards and Clearance Levels&nbsp;<br />\nfor Lead in Paint, Dust and Soil requirements are as followed:<br />\na. 10 ug/ft2 &ndash; floors<br />\nb. 100 ug/ft2 &ndash; window sills and troughs</p>\n\n<p>j. &nbsp;All work and clearances must be coordinated with the USMMA&rsquo;s MARAD, COR, Public Safety&nbsp;<br />\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,&nbsp;<br />\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and&nbsp;<br />\nundergo another lead clearance process at no additional cost incurred to the government. If&nbsp;<br />\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>k. The work area must be cordoned off per federal and state laws and regulations with clearly&nbsp;<br />\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the&nbsp;<br />\nabatement project may enter.<br />\nl. &nbsp;Establish a containment area in accordance with federal and state laws and regulations, to&nbsp;<br />\nfully separate the work area from other areas of the building. Maintain and identify emergency&nbsp;<br />\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and&nbsp;<br />\nlocal laws and regulations.</p>\n\n<p>m. The contractor will ensure academy occupants are protected at all times and prevent any&nbsp;<br />\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws&nbsp;<br />\nand regulations.</p>\n\n<p>n. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout&nbsp;<br />\nthe course of the project.</p>\n\n<p>o. The contractor shall be responsible for installation and connection of all temporary utilities&nbsp;<br />\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run&nbsp;<br />\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel&nbsp;<br />\nwill show the contractor where to connect to water and power. The contractor shall provide and&nbsp;<br />\ninstall temporary GFCI panels for electrical service.</p>\n\n<p>p. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant&nbsp;<br />\nequipment to prevent contamination in neighboring areas per federal, state and local laws and&nbsp;<br />\nregulations.<br />\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>r. Provide copies of all federal, state and local notifications.</p>\n\n<p>s. Provide accurate records of abatement completion.</p>\n\n<p>3. Additional Notes<br />\na. Start Date: To be determined (Upon USMMA Contracting Officer&rsquo;s (CO) award of contract).</p>\n\n<p>Completion Date: 4 days after award of contract.</p>\n\n<p>The completion date includes but is not limited to the submittal process, performance of the work,&nbsp;<br />\nfinal air clearance, inspection, waste disposal and waste manifest delivery.<br />\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and&nbsp;<br />\ncontracted IH for approval. The plan must be approved at least two<br />\n(2) business days prior to commencement of work.</p>\n\n<p>c. All work must be scheduled with the COR at least 48 hours prior to commencement.</p>\n\n<p>d. The academy must be immediately notified of any service and/or activity interruptions. Any&nbsp;<br />\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety&nbsp;<br />\nDepartment, and DPW.<br />\ne. &nbsp;A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted&nbsp;<br />\nto identify and mark the proposed area where removal / abatement will take place. The contractor&nbsp;<br />\nwill become familiar with on-sight conditions and restrictions. The square footage identified in&nbsp;<br />\nthe SOW are approximations and will need to be assessed and verified by the contractor during the&nbsp;<br />\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying&nbsp;<br />\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the&nbsp;<br />\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.</p>\n\n<p>f. &nbsp;All work including but not limited to on-site assessment(s) and document review(s), must be&nbsp;<br />\ncompleted between normal business hours of operation (7am &ndash; 4pm), Monday &ndash; Friday, unless&nbsp;<br />\nadditional approval is granted by the CO and COR.</p>\n\n<p>g. Any debris generated during abatement activities will be removed by the contractor daily from&nbsp;<br />\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work&nbsp;<br />\nis completed, suitable for all normal academy activities.</p>\n\n<p>3</p>\n\n<p>h. Contractor must properly dispose of waste in accordance with all RCRA requirements.&nbsp;<br />\nDocumentation of this disposal shall be provided to the COR and Public Safety.</p>\n\n<p>i. &nbsp;The contractor will be required to abate (remove) the paint materials from the indicated areas.&nbsp;<br />\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the&nbsp;<br />\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the&nbsp;<br />\nselected areas and replace with similar material that meet all regulatory and industry standards.</p>\n\n<p>j. Square Footage of removal areas include:<br />\n&bull; &nbsp;Dean&rsquo;s Office (207): ~ 399 SF<br />\n&bull; &nbsp;Reception&rsquo;s Office (206): ~ 378 SF<br />\n&bull; &nbsp;Dean&rsquo;s Bathroom (207A): ~76 SF<br />\n&bull; &nbsp;Hall #4 (208B): ~25 SF</p>\n\n<p>These areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to&nbsp;<br />\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).</p>\n\n<p>k. The contractor shall assume full responsibility and liability for compliance with all applicable&nbsp;<br />\nfederal, state and local regulations related to any and all aspects of the project.</p>\n\n<p>l. &nbsp;The contractor is responsible for ensuring client satisfaction throughout the duration of the&nbsp;<br />\nproject. Any discrepancies, issues and concerns identified by the client originating from the&nbsp;<br />\ncontractor will be addressed, documented and corrected in a timely manner.</p>\n\n<p>Note: The contractor is responsible for any subcontractors that may be used throughout this&nbsp;<br />\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.</p>\n\n<p>4</p>\n\n<p>4. Images of Area of Concern<br />\nDean&rsquo;s Office (207): ~ 399 SF<br />\nReception&rsquo;s Office (206): ~ 378 SF Dean&rsquo;s Bathroom (207A): ~76 SF Hall #4 (208B): ~25</p>\n\n<p></p>\n\n<p>PLEASE SEE ATTACHED SITE PICTURES&nbsp;</p>","text":"The purpose of this modification is to respond request for information as well as extend\n\nthe date and time of offer due as follows:\n\na. Offers submission due date is hereby extended to August 6th, 2025 @0900.\n\nb. Response to request for information posted on attachment\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.\n\nStatement of Work (SOW)\n\nWiley Hall 2ⁿᵈ Deck Dean & Reception Offices Lead Paint Abatement / Remediation\n\n1. Description of Services\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and\n\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),\n\nequipment and labor necessary to perform lead abatement at Wiley Hall’s Dean, Reception Offices,\n\nDean’s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.\n\n2. General Requirements\n\na. Abatement and disposal shall be in accordance with all federal, state and local laws and\n\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA\n\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. § 173), and RCRA.\n\nb. The contractor shall possess and provide current proof of all federal, state and local\n\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with\n\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.\n\nc. The contractor shall submit a “Occupant Protection Plan” to the Contracting Officer\n\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).\n\nd. The designated work area(s) must be sealed from neighboring occupied areas of the\n\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning\n\nsigns) per federal, state and local laws and regulations throughout the duration of the project\n\nuntil final clearance has been achieved.\n\ne. All work must be completed using wet methods per federal, state and local laws and regulations.\n\nf. Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with\n\nmanufacturer’s instructions. The contractor shall use an EPA approved lead encapsulant and provide\n\nSDS for all products used throughout the project.\n\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be\n\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.\n\nh. All work must be completed using HEPA vacuum with a minimum filter requirement capable of\n\ncapturing particulates of 0.3 microns with 99.97% efficiency and in\n\nconjunction with all federal, state and local laws and regulations.\n\ni. Throughout the duration of the abatement/remediation project, the work area(s) must be\n\ncontained until a formal lead clearance is completed. USMMA’s contracted hygienist shall be on-site\n\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead\n\nclearance. The clearance levels for dust wipes per the EPA’s Hazard Standards and Clearance Levels\n\nfor Lead in Paint, Dust and Soil requirements are as followed:\n\na. 10 ug/ft2 – floors\n\nb. 100 ug/ft2 – window sills and troughs\n\nj. All work and clearances must be coordinated with the USMMA’s MARAD, COR, Public Safety\n\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,\n\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and\n\nundergo another lead clearance process at no additional cost incurred to the government. If\n\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all\n\nfederal, state and local laws and regulations.\n\nk. The work area must be cordoned off per federal and state laws and regulations with clearly\n\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the\n\nabatement project may enter.\n\nl. Establish a containment area in accordance with federal and state laws and regulations, to\n\nfully separate the work area from other areas of the building. Maintain and identify emergency\n\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and\n\nlocal laws and regulations.\n\nm. The contractor will ensure academy occupants are protected at all times and prevent any\n\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws\n\nand regulations.\n\nn. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout\n\nthe course of the project.\n\no. The contractor shall be responsible for installation and connection of all temporary utilities\n\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run\n\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel\n\nwill show the contractor where to connect to water and power. The contractor shall provide and\n\ninstall temporary GFCI panels for electrical service.\n\np. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant\n\nequipment to prevent contamination in neighboring areas per federal, state and local laws and\n\nregulations.\n\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all\n\nfederal, state and local laws and regulations.\n\nr. Provide copies of all federal, state and local notifications.\n\ns. Provide accurate records of abatement completion.\n\n3. Additional Notes\n\na. Start Date: To be determined (Upon USMMA Contracting Officer’s (CO) award of contract).\n\nCompletion Date: 4 days after award of contract.\n\nThe completion date includes but is not limited to the submittal process, performance of the work,\n\nfinal air clearance, inspection, waste disposal and waste manifest delivery.\n\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and\n\ncontracted IH for approval. The plan must be approved at least two\n\n(2) business days prior to commencement of work.\n\nc. All work must be scheduled with the COR at least 48 hours prior to commencement.\n\nd. The academy must be immediately notified of any service and/or activity interruptions. Any\n\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety\n\nDepartment, and DPW.\n\ne. A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted\n\nto identify and mark the proposed area where removal / abatement will take place. The contractor\n\nwill become familiar with on-sight conditions and restrictions. The square footage identified in\n\nthe SOW are approximations and will need to be assessed and verified by the contractor during the\n\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying\n\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the\n\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.\n\nf. All work including but not limited to on-site assessment(s) and document review(s), must be\n\ncompleted between normal business hours of operation (7am – 4pm), Monday – Friday, unless\n\nadditional approval is granted by the CO and COR.\n\ng. Any debris generated during abatement activities will be removed by the contractor daily from\n\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work\n\nis completed, suitable for all normal academy activities.\n\n3\n\nh. Contractor must properly dispose of waste in accordance with all RCRA requirements.\n\nDocumentation of this disposal shall be provided to the COR and Public Safety.\n\ni. The contractor will be required to abate (remove) the paint materials from the indicated areas.\n\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the\n\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the\n\nselected areas and replace with similar material that meet all regulatory and industry standards.\n\nj. Square Footage of removal areas include:\n\n• Dean’s Office (207): ~ 399 SF\n\n• Reception’s Office (206): ~ 378 SF\n\n• Dean’s Bathroom (207A): ~76 SF\n\n• Hall #4 (208B): ~25 SF\n\nThese areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to\n\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).\n\nk. The contractor shall assume full responsibility and liability for compliance with all applicable\n\nfederal, state and local regulations related to any and all aspects of the project.\n\nl. The contractor is responsible for ensuring client satisfaction throughout the duration of the\n\nproject. Any discrepancies, issues and concerns identified by the client originating from the\n\ncontractor will be addressed, documented and corrected in a timely manner.\n\nNote: The contractor is responsible for any subcontractors that may be used throughout this\n\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.\n\n4\n\n4. Images of Area of Concern\n\nDean’s Office (207): ~ 399 SF\n\nReception’s Office (206): ~ 378 SF Dean’s Bathroom (207A): ~76 SF Hall #4 (208B): ~25\n\nPLEASE SEE ATTACHED SITE PICTURES","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"6923G225Q000011","place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"F999"}],"due_at":"2025-08-06T13:00:00Z","due_date":"2025-08-06","closes_at":"2025-08-06T13:00:00Z","awardable":false,"dept_key":"d-069","dept_name":"TRANSPORTATION, DEPARTMENT OF","sub_key":"s-6938","sub_name":"MARITIME ADMINISTRATION","office_key":"o-6923G2","office_name":"6923G2 DOT MARITIME ADMINISTRATION","state":"NY","county":"36059","county_name":"Nassau County","city":"3639694","city_name":"Kings Point","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"PF82SXJ1J5C5","amount":null,"linked_awards":4,"cancelled":false,"archived":true,"updated_at":"2026-11-06T04:28:41.894858Z","principal_notice_id":"b20c9bdfadfe449ba8cfe675b46df978","description":{"text":"The purpose of this modification is to respond request for information as well as extend\n\nthe date and time of offer due as follows:\n\na. Offers submission due date is hereby extended to August 6th, 2025 @0900.\n\nb. Response to request for information posted on attachment\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.\n\nStatement of Work (SOW)\n\nWiley Hall 2ⁿᵈ Deck Dean & Reception Offices Lead Paint Abatement / Remediation\n\n1. Description of Services\n\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and\n\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),\n\nequipment and labor necessary to perform lead abatement at Wiley Hall’s Dean, Reception Offices,\n\nDean’s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.\n\n2. General Requirements\n\na. Abatement and disposal shall be in accordance with all federal, state and local laws and\n\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA\n\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. § 173), and RCRA.\n\nb. The contractor shall possess and provide current proof of all federal, state and local\n\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with\n\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.\n\nc. The contractor shall submit a “Occupant Protection Plan” to the Contracting Officer\n\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).\n\nd. The designated work area(s) must be sealed from neighboring occupied areas of the\n\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning\n\nsigns) per federal, state and local laws and regulations throughout the duration of the project\n\nuntil final clearance has been achieved.\n\ne. All work must be completed using wet methods per federal, state and local laws and regulations.\n\nf. Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with\n\nmanufacturer’s instructions. The contractor shall use an EPA approved lead encapsulant and provide\n\nSDS for all products used throughout the project.\n\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be\n\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.\n\nh. All work must be completed using HEPA vacuum with a minimum filter requirement capable of\n\ncapturing particulates of 0.3 microns with 99.97% efficiency and in\n\nconjunction with all federal, state and local laws and regulations.\n\ni. Throughout the duration of the abatement/remediation project, the work area(s) must be\n\ncontained until a formal lead clearance is completed. USMMA’s contracted hygienist shall be on-site\n\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead\n\nclearance. The clearance levels for dust wipes per the EPA’s Hazard Standards and Clearance Levels\n\nfor Lead in Paint, Dust and Soil requirements are as followed:\n\na. 10 ug/ft2 – floors\n\nb. 100 ug/ft2 – window sills and troughs\n\nj. All work and clearances must be coordinated with the USMMA’s MARAD, COR, Public Safety\n\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,\n\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and\n\nundergo another lead clearance process at no additional cost incurred to the government. If\n\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all\n\nfederal, state and local laws and regulations.\n\nk. The work area must be cordoned off per federal and state laws and regulations with clearly\n\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the\n\nabatement project may enter.\n\nl. Establish a containment area in accordance with federal and state laws and regulations, to\n\nfully separate the work area from other areas of the building. Maintain and identify emergency\n\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and\n\nlocal laws and regulations.\n\nm. The contractor will ensure academy occupants are protected at all times and prevent any\n\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws\n\nand regulations.\n\nn. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout\n\nthe course of the project.\n\no. The contractor shall be responsible for installation and connection of all temporary utilities\n\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run\n\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel\n\nwill show the contractor where to connect to water and power. The contractor shall provide and\n\ninstall temporary GFCI panels for electrical service.\n\np. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant\n\nequipment to prevent contamination in neighboring areas per federal, state and local laws and\n\nregulations.\n\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all\n\nfederal, state and local laws and regulations.\n\nr. Provide copies of all federal, state and local notifications.\n\ns. Provide accurate records of abatement completion.\n\n3. Additional Notes\n\na. Start Date: To be determined (Upon USMMA Contracting Officer’s (CO) award of contract).\n\nCompletion Date: 4 days after award of contract.\n\nThe completion date includes but is not limited to the submittal process, performance of the work,\n\nfinal air clearance, inspection, waste disposal and waste manifest delivery.\n\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and\n\ncontracted IH for approval. The plan must be approved at least two\n\n(2) business days prior to commencement of work.\n\nc. All work must be scheduled with the COR at least 48 hours prior to commencement.\n\nd. The academy must be immediately notified of any service and/or activity interruptions. Any\n\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety\n\nDepartment, and DPW.\n\ne. A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted\n\nto identify and mark the proposed area where removal / abatement will take place. The contractor\n\nwill become familiar with on-sight conditions and restrictions. The square footage identified in\n\nthe SOW are approximations and will need to be assessed and verified by the contractor during the\n\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying\n\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the\n\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.\n\nf. All work including but not limited to on-site assessment(s) and document review(s), must be\n\ncompleted between normal business hours of operation (7am – 4pm), Monday – Friday, unless\n\nadditional approval is granted by the CO and COR.\n\ng. Any debris generated during abatement activities will be removed by the contractor daily from\n\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work\n\nis completed, suitable for all normal academy activities.\n\n3\n\nh. Contractor must properly dispose of waste in accordance with all RCRA requirements.\n\nDocumentation of this disposal shall be provided to the COR and Public Safety.\n\ni. The contractor will be required to abate (remove) the paint materials from the indicated areas.\n\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the\n\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the\n\nselected areas and replace with similar material that meet all regulatory and industry standards.\n\nj. Square Footage of removal areas include:\n\n• Dean’s Office (207): ~ 399 SF\n\n• Reception’s Office (206): ~ 378 SF\n\n• Dean’s Bathroom (207A): ~76 SF\n\n• Hall #4 (208B): ~25 SF\n\nThese areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to\n\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).\n\nk. The contractor shall assume full responsibility and liability for compliance with all applicable\n\nfederal, state and local regulations related to any and all aspects of the project.\n\nl. The contractor is responsible for ensuring client satisfaction throughout the duration of the\n\nproject. Any discrepancies, issues and concerns identified by the client originating from the\n\ncontractor will be addressed, documented and corrected in a timely manner.\n\nNote: The contractor is responsible for any subcontractors that may be used throughout this\n\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.\n\n4\n\n4. Images of Area of Concern\n\nDean’s Office (207): ~ 399 SF\n\nReception’s Office (206): ~ 378 SF Dean’s Bathroom (207A): ~76 SF Hall #4 (208B): ~25\n\nPLEASE SEE ATTACHED SITE PICTURES","html":"<p>The purpose of this modification is to respond request for information as well as extend<br />\nthe date and time of offer due as follows:</p>\n\n<p>a. &nbsp;Offers submission due date is hereby extended to August 6th, 2025 @0900.</p>\n\n<p>b. &nbsp;Response to request for information posted on attachment&nbsp;</p>\n\n<p>A contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and licensed lead abatement specialist to provide all management, tools, supplies, notification(s), equipment and labor necessary to perform lead abatement at Wiley Halls Dean, Reception Offices, Deans Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations. See SOW for additional details.</p>\n\n<p>Statement of Work (SOW)<br />\nWiley Hall 2ⁿᵈ Deck Dean &amp; Reception Offices Lead Paint Abatement / Remediation</p>\n\n<p>1. Description of Services<br />\nA contractor shall provide a New York and/or Environmental Protection Agency (EPA) qualified and&nbsp;<br />\nlicensed lead abatement specialist to provide all management, tools, supplies, notification(s),&nbsp;<br />\nequipment and labor necessary to perform lead abatement at Wiley Hall&rsquo;s Dean, Reception Offices,&nbsp;<br />\nDean&rsquo;s Bathroom and Hall #4 in accordance with all federal, state and local laws and regulations.</p>\n\n<p>2. General Requirements<br />\na. &nbsp;Abatement and disposal shall be in accordance with all federal, state and local laws and&nbsp;<br />\nregulations including but not limited to requirements established by 40 CFR Part 745, EPA&nbsp;<br />\n(Renovation, Repair, and Painting (RRP) Rule), D.O.T. (49 C.F.R. &sect; 173), and RCRA.</p>\n\n<p>b. The contractor shall possess and provide current proof of all federal, state and local&nbsp;<br />\ntrainings, license(s) and certification(s) including but not limited to the RRP, be registered with&nbsp;<br />\nthe EPA and be licensed as a lead abatement contractor through either New York and/or EPA.</p>\n\n<p>c. The contractor shall submit a &ldquo;Occupant Protection Plan&rdquo; to the Contracting Officer&nbsp;<br />\nRepresentative (COR), Public Safety Department, and Department of Public Works (DPW).<br />\nd. The designated work area(s) must be sealed from neighboring occupied areas of the&nbsp;<br />\nQuarter/academy with the appropriate barriers (i.e., plastic) and hazard notifications (warning&nbsp;<br />\nsigns) per federal, state and local laws and regulations throughout the duration of the project&nbsp;<br />\nuntil final clearance has been achieved.</p>\n\n<p>e. All work must be completed using wet methods per federal, state and local laws and regulations.<br />\nf. &nbsp;Apply a lead encapsulation paint or primer, over all surfaces to be painted, in accordance with&nbsp;<br />\nmanufacturer&rsquo;s instructions. The contractor shall use an EPA approved lead encapsulant and provide&nbsp;<br />\nSDS for all products used throughout the project.<br />\ng. Given the sensitive nature of these areas (occupied resident), USMMA is requiring all work to be&nbsp;<br />\ndone in a negative pressure enclosure to minimize impact to building occupants and operations.</p>\n\n<p>h. All work must be completed using HEPA vacuum with a minimum filter requirement capable of&nbsp;<br />\ncapturing particulates of 0.3 microns with 99.97% efficiency and in<br />\nconjunction with all federal, state and local laws and regulations.</p>\n\n<p><br />\ni. &nbsp;Throughout the duration of the abatement/remediation project, the work area(s) must be&nbsp;<br />\ncontained until a formal lead clearance is completed. USMMA&rsquo;s contracted hygienist shall be on-site&nbsp;<br />\nto conduct oversight of the lead abatement process, perform air monitoring, and the final lead&nbsp;<br />\nclearance. The clearance levels for dust wipes per the EPA&rsquo;s Hazard Standards and Clearance Levels&nbsp;<br />\nfor Lead in Paint, Dust and Soil requirements are as followed:<br />\na. 10 ug/ft2 &ndash; floors<br />\nb. 100 ug/ft2 &ndash; window sills and troughs</p>\n\n<p>j. &nbsp;All work and clearances must be coordinated with the USMMA&rsquo;s MARAD, COR, Public Safety&nbsp;<br />\nDepartment, DPW and contracted IH. If clearance levels are not achieved in accordance with federal,&nbsp;<br />\nstate and local laws and regulations, the contractor shall perform an environmental re-cleaning and&nbsp;<br />\nundergo another lead clearance process at no additional cost incurred to the government. If&nbsp;<br />\nrequired, this process will be repeated until acceptable levels are achieved in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>k. The work area must be cordoned off per federal and state laws and regulations with clearly&nbsp;<br />\nvisible barriers (i.e., caution tape) where only authorized and trained individuals related to the&nbsp;<br />\nabatement project may enter.<br />\nl. &nbsp;Establish a containment area in accordance with federal and state laws and regulations, to&nbsp;<br />\nfully separate the work area from other areas of the building. Maintain and identify emergency&nbsp;<br />\nexit(s) from the work area or establish alternate exit(s) compliant with all federal, state and&nbsp;<br />\nlocal laws and regulations.</p>\n\n<p>m. The contractor will ensure academy occupants are protected at all times and prevent any&nbsp;<br />\npotential lead and/or lead dust contamination in accordance with all federal, state and local laws&nbsp;<br />\nand regulations.</p>\n\n<p>n. All electrical equipment shall be run through Ground Fault Interrupt Circuit (GFCI) throughout&nbsp;<br />\nthe course of the project.</p>\n\n<p>o. The contractor shall be responsible for installation and connection of all temporary utilities&nbsp;<br />\nrequired to complete the abatement. The contractor shall ensure all electrical equipment run&nbsp;<br />\nthrough Ground Fault Interrupt Circuit (GFCI) throughout the duration of the project. DPW personnel&nbsp;<br />\nwill show the contractor where to connect to water and power. The contractor shall provide and&nbsp;<br />\ninstall temporary GFCI panels for electrical service.</p>\n\n<p>p. The contractor shall secure infrastructure equipment (i.e., HVAC system) and all other relevant&nbsp;<br />\nequipment to prevent contamination in neighboring areas per federal, state and local laws and&nbsp;<br />\nregulations.<br />\nq. Provide accurate and complete waste manifest(s) for lead disposal in accordance with all&nbsp;<br />\nfederal, state and local laws and regulations.</p>\n\n<p>r. Provide copies of all federal, state and local notifications.</p>\n\n<p>s. Provide accurate records of abatement completion.</p>\n\n<p>3. Additional Notes<br />\na. Start Date: To be determined (Upon USMMA Contracting Officer&rsquo;s (CO) award of contract).</p>\n\n<p>Completion Date: 4 days after award of contract.</p>\n\n<p>The completion date includes but is not limited to the submittal process, performance of the work,&nbsp;<br />\nfinal air clearance, inspection, waste disposal and waste manifest delivery.<br />\nb. A full work plan must be prepared in advance and submitted to the COR, Public Safety, DPW, and&nbsp;<br />\ncontracted IH for approval. The plan must be approved at least two<br />\n(2) business days prior to commencement of work.</p>\n\n<p>c. All work must be scheduled with the COR at least 48 hours prior to commencement.</p>\n\n<p>d. The academy must be immediately notified of any service and/or activity interruptions. Any&nbsp;<br />\npotential unforeseen interruptions or issues must be immediately related to the COR, Public Safety&nbsp;<br />\nDepartment, and DPW.<br />\ne. &nbsp;A pre-bid onsite walkthrough with the DPW, COR, and Public Safety Department will be conducted&nbsp;<br />\nto identify and mark the proposed area where removal / abatement will take place. The contractor&nbsp;<br />\nwill become familiar with on-sight conditions and restrictions. The square footage identified in&nbsp;<br />\nthe SOW are approximations and will need to be assessed and verified by the contractor during the&nbsp;<br />\nwalkthrough and incorporated into the bid submission. The contractor is responsible for verifying&nbsp;<br />\nquantities and locations where all work is to be performed. Failure to do so shall not relieve the&nbsp;<br />\ncontractor of its obligation to furnish all labor and materials necessary to perform the work.</p>\n\n<p>f. &nbsp;All work including but not limited to on-site assessment(s) and document review(s), must be&nbsp;<br />\ncompleted between normal business hours of operation (7am &ndash; 4pm), Monday &ndash; Friday, unless&nbsp;<br />\nadditional approval is granted by the CO and COR.</p>\n\n<p>g. Any debris generated during abatement activities will be removed by the contractor daily from&nbsp;<br />\nthe affected area(s) and academy premises. Area(s) will be left neat and clean daily and after work&nbsp;<br />\nis completed, suitable for all normal academy activities.</p>\n\n<p>3</p>\n\n<p>h. Contractor must properly dispose of waste in accordance with all RCRA requirements.&nbsp;<br />\nDocumentation of this disposal shall be provided to the COR and Public Safety.</p>\n\n<p>i. &nbsp;The contractor will be required to abate (remove) the paint materials from the indicated areas.&nbsp;<br />\nIf the paint cannot be removed while still leaving a clean, smooth and paintable surface, the&nbsp;<br />\ncontractor will be required to remove building material (i.e. wood pieces) in its entirety for the&nbsp;<br />\nselected areas and replace with similar material that meet all regulatory and industry standards.</p>\n\n<p>j. Square Footage of removal areas include:<br />\n&bull; &nbsp;Dean&rsquo;s Office (207): ~ 399 SF<br />\n&bull; &nbsp;Reception&rsquo;s Office (206): ~ 378 SF<br />\n&bull; &nbsp;Dean&rsquo;s Bathroom (207A): ~76 SF<br />\n&bull; &nbsp;Hall #4 (208B): ~25 SF</p>\n\n<p>These areas will be outlined at the time of the on-site walkthrough. Abatement shall occur to&nbsp;<br />\ninclude removal of the selected areas and outlining materials (i.e., paint or marker).</p>\n\n<p>k. The contractor shall assume full responsibility and liability for compliance with all applicable&nbsp;<br />\nfederal, state and local regulations related to any and all aspects of the project.</p>\n\n<p>l. &nbsp;The contractor is responsible for ensuring client satisfaction throughout the duration of the&nbsp;<br />\nproject. Any discrepancies, issues and concerns identified by the client originating from the&nbsp;<br />\ncontractor will be addressed, documented and corrected in a timely manner.</p>\n\n<p>Note: The contractor is responsible for any subcontractors that may be used throughout this&nbsp;<br />\nproject. Subcontractors are required to adhere to all the requirements set forth within this SOW.</p>\n\n<p>4</p>\n\n<p>4. Images of Area of Concern<br />\nDean&rsquo;s Office (207): ~ 399 SF<br />\nReception&rsquo;s Office (206): ~ 378 SF Dean&rsquo;s Bathroom (207A): ~76 SF Hall #4 (208B): ~25</p>\n\n<p></p>\n\n<p>PLEASE SEE ATTACHED SITE PICTURES&nbsp;</p>","origin":"detail"},"contacts":[{"fax":"5167735131","name":"CARMEN I. FELIZ","role":"primary","email":"FELIZC@USMMA.EDU","phone":"5167266149"},{"name":"Amit S. Narine","role":"secondary","email":"NarineA@usmma.edu","phone":"5167266032"}],"place_of_performance":{"zip":"11024","city":{"code":"39694","name":"Kings Point"},"state":{"code":"NY","name":"New York"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"11024","city":"KINGS POINT","state":"NY","country":"USA"},"naics_codes":["562910"],"award":null,"attachments":[{"resource_id":"43aefbe829fc47ceb23a7e0e3bb3c7eb","name":"FBO NOTICE SF 1449 6923G225Q000011 WILEY HALL LEAD ABATEMENT.pdf","kind":"file","mime_type":".pdf","size_bytes":4529021,"posted_at":"2025-07-22T21:26:15.928Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/43aefbe829fc47ceb23a7e0e3bb3c7eb/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_6923G225P000147_6938_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_6923G225P000147_6938_-NONE-_-NONE-/","piid":"6923G225P000147","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"PF82SXJ1J5C5","recipient_name":"COASTAL ENVIRONMENTAL TECHNOLOGIES LTD","recipient_uei":"PF82SXJ1J5C5","recipient_cage":"1PSL7","recipient_city":"BRENTWOOD","recipient_state":"NY","sub_name":"Maritime Administration","office_name":"6923G2 DOT MARITIME ADMINISTRATION","office_key":"o-6923G2","first_action_date":"2025-08-12","last_action_date":"2025-09-30","actions":3,"obligated":"37532.00","current_total_value":"37532.00","potential_total_value":"37532.00","naics":"562910","psc":"F999","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SMALL BUSINESS SET ASIDE - TOTAL","offers_received":8,"description":"A CONTRACTOR SHALL PROVIDE A NEW YORK AND/OR ENVIRONMENTAL PROTECTION AGENCY (EPA) QUALIFIED AND LICENSED LEAD ABATEMENT SPECIALIST TO PROVIDE ALL MANAGEMENT, TOOLS, SUPPLIES, NOTIFICATION(S), EQUIPMENT AND LABOR NECESSARY TO PERFORM LEAD ABATEMENT A","method":"solicitation","confidence":"high","evidence":["solicitation number 6923G225Q000011 equals the FPDS solicitation identifier","same awarding office 6923G2"],"opportunity_key":null,"opportunity_title":null}],"related":[],"similar_open":[{"key":"36C24227R0010","latest_notice_id":"c95dcd81879b4a90b11678c8a80b3462","title":"F108--620-26-206 Asbestos Abatement","solicitation_number":"36C24227R0010","notice_type":"o","first_type":"p","first_posted":"2026-10-23","last_posted":"2026-11-19","notices":8,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C242","office_name":"242-NETWORK CONTRACT OFFICE 02 (36C242)","naics":"562910","psc":"F108","set_aside":"SDVOSBC","state":"NY","county":"36119","county_name":"Westchester County","city":"3648208","city_name":"Montrose","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"SSNALMS2027","latest_notice_id":"e04c751a3ed145f0aec582a481028eb3","title":"Sources Sought Notice: Asbestos and Lead Management Services","solicitation_number":"SSN-ALMS-2027","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-18","notices":3,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-075","dept_name":"HEALTH AND HUMAN SERVICES, DEPARTMENT OF","sub_key":"s-7529","sub_name":"NATIONAL INSTITUTES OF HEALTH","office_key":"o-75N990","office_name":"NIH A E CONSTRUCTION","naics":"562910","psc":null,"set_aside":"SBA","state":"MD","county":"24031","county_name":"Montgomery County","city":"2407125","city_name":"Bethesda","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"W9123826X1CUS","latest_notice_id":"7f4c8306bbb845e981719d270fcea54a","title":"Remedial Investigation (RI) and Optional Feasibility Study (FS) for Per- and Polyfluoroalkyl Substances (PFAS)","solicitation_number":"W9123826X1CUS","notice_type":"r","first_type":"r","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":3,"due_at":"2026-11-30T18:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91238","office_name":"W075 ENDIST SACRAMENTO","naics":"562910","psc":"B510","set_aside":null,"state":"CA","county":"06053","county_name":"Monterey County","city":"0648872","city_name":"Monterey","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"}],"similar_open_total":14,"indexable":false}