Presolicitation
WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing
69056726R000011
Federal Highway Administration, 690567 Western Federal Lands Div. Highway, Street, and Bridge Construction.
Status
Presolicitation
Posted July 22, 2026. Scheduled to archive July 22, 2028.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one is not taking offers
36 like it are open now in highway, street, and bridge construction
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Federal Highway Administration, 690567 Western Federal Lands Div
SolicitationNAICS 237310Forks, WA69056727B000002Due in 7 daysDec 3 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Presolicitation. Advance notice that a solicitation is coming, usually within a few weeks. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The presolicitation of July 22, 2026 is the earliest notice of the purchase.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT: WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing
LOCATION: This project is in Washington State in/adjacent to Olympic National Park and Stehekin in North Cascades National Park.
WORK: This project consists of pavement preservation and minor guardrail installation. See “Project Description” posted under Attachments for additional details.
LENGTH: BASE SCHEDULE: 60.59 miles and parking areas
OPTION X: 1.92 miles and parking areas
OPTION Y: 12.07 miles and parking areas
OPTION Z: 6.92 miles and parking areas
TENTATIVE COMPLETION DATE: Summer 2028
CONTRACT TYPE: Firm-Fixed-Price Task Order
ESTIMATED PRICE RANGE: Between $10,000,000 and $ 20,000,000 .
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
NOTICE OF SUBCONTRACTING OPPORTUNITY
This project will be solicited to the Western Region Pavement Preservation MATOC. Contractor Information on the IDIQ contractor may be found on our web site at: https://highways.dot.gov/federal-lands/business/construction-contracting-idiq/west-region-pavement-pres
This project is anticipated to be solicited Fall/Winter 2026.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link.
Attachments
Links the agency listed on SAM.gov. They open the sites it named, not files on SAM.gov.
- Link to MATOC informationLink to highways.dot.gov, July 22, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 22, 2026
Presolicitation
SAM.gov, notice 1583f79f6b7a45f6a11df1070c854d98
1 revision on SAM
- July 22, 2026: publish, presolicitation
Points of contact
- Contracts G. Officewfl.contracts@dot.gov3606197520