Sources sought
WA NP MORA 11(1), Fryingpan Creek Bridge
690567-25-SS-0010
Federal Highway Administration, 690567 Western Federal Lands Div. Highway, Street, and Bridge Construction.
Response deadline
August 14, 2025 at 5:00 PM EDT
Closed 469 days ago. Posted July 14, 2025. Scheduled to archive August 29, 2025.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2025
36 like it are open now in highway, street, and bridge construction
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Federal Highway Administration, 690567 Western Federal Lands Div
SolicitationNAICS 237310Forks, WA69056727B000002Due in 7 daysDec 3 - AL-WHEELER NWR-WATERMAN GATE
Departmental Offices, FWS Contracting Activity
SolicitationNAICS 237310Ship to the buyer140FF027Q0077Due tomorrowNov 27 - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
Department of the Army, W07V Endist Rock Island
Presolicitation8(a)NAICS 237310MichiganW912EK27BA003Due in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 237310 (highway, street, and bridge construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- What comes next
- No solicitation was published under this number after the sources sought of July 14, 2025. An agency sometimes issues the solicitation under a new number.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
PROJECT: WA NP MORA 11(1), Fryingpan Creek Bridge
This solicitation is a "REQUEST FOR INFORMATION" only for the proposed contract work listed in the requirements section below. This Sources Sought Notice is not a request for formal proposals or quotes. Final plans and specifications are not available at this time. Responses to this Sources Sought must be received by email no later than the date specified in the response section. This intent of this sources sought is for market research to determine contractors with the necessary experience and resources capable of performing this work.
REQUIREMENT:
NAICS Code 237310, Highway, Street, and Bridge Construction apply to this procurement with a size standard of $45 million.
Project Location: 31 Miles North of Packwood, Pierce County, Washington
Estimated Price Range: $10,000,000 and $20,000,000
The purpose of the proposed project is to replace the deteriorated Fryingpan Creek Bridge to ensure the bridge provides a structurally sound, long-term, vehicular bridge crossing over Fryingpan Creek. The Fryingpan Creek Bridge, which is part of the 15-mile Sunrise Road, is vital to park operations, local economies, and visitor use and enjoyment. Sunrise Road serves as the sole vehicular access to the popular Sunrise area (the second busiest area in the park) and is a primary destination for visitors coming from the greater Seattle and Yakima metropolitan areas. Sunrise Road also provides access to the White River Campground and popular park wilderness trails, including the historically significant Wonderland Trail.
The project area is remote, and the construction season is relatively short with typical construction starting in June and ending in October.
The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure.
Project constraints may include:
- Short in-water work window for the work needed
- Threatened fish and bird species in the area creating short work windows.
- This location is at a high elevation so the work window is even shorter than most projects of its kind
- Custom stone work required
- EXTREMELY tight work area
- Needs to keep the road open for the most part
- Material delivery will be a challenge
See Attachment for full requirement.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Sources Sought_WA NP MORA 11(1).pdf84 KB, July 14, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 14, 2025
Sources sought
Due August 14, 2025 at 5:00 PM EDT. SAM.gov, notice 29bfae8806514ff584259eed73440a8b
1 revision on SAM
- July 14, 2025: publish, sources sought
Points of contact
- Contracts G. Officewfl.contracts@dot.gov3606197520