Sources sought
Site Visit - Removal of Old Fluid Cell
82247
Department of the Air Force, FA8571 Maint Contracting AFSC Pzim.
Offers due
December 10, 2026 at 4:00 PM EST
14 days from now. Posted October 20, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- RANGER Crew XP 1000 NorthStar Edition Premium Blue Labyrinth Robins AFBCombined synopsis and solicitationSmall businessNAICS 336999Ship to Warner Robins, GARobins Air Force BaseFA857127Q0026Due in 4 daysNov 30
- 2027 POLARIS RANGER CREW XP 1000 NORTHSTAR EDITION WITH TURN SIGNALS/HORN - Stealth Gray Robins AFB GACombined synopsis and solicitationSmall businessNAICS 336999Ship to Warner Robins, GARobins Air Force BaseFA857127Q0028Due in 4 daysNov 30
- L7WE01 Hybrid Laser TrimmerSolicitationSmall businessNAICS 333517Ship to Warner Robins, GAFA857127Q0025_Hybrid_Laser_TrimmerDue in 4 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Sources sought. Market research. The agency wants to know who could do the work before it decides how to compete it. A business that could do the work answers with a short capability statement. Answering does not commit it to bid, and the answers decide whether the purchase is set aside for small businesses. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. What a set-aside is
- What comes next
- No solicitation has been published under this number yet. The sources sought of October 20, 2026 is the earliest notice of the purchase.
Description
As published on SAM.gov.
The Contractor shall provide to the Maintenance Support Group (MXSG) all the tools, parts, materials, equipment, labor, and transportation necessary to decommission, remove, and dispose of one (1) Quintus ABB QFC 1.6 x 4-1400 fluid cell press. The equipment is located in building 140 at Robins Air Force Base (AFB), Georgia. Decommissioning services shall include dismantling, rigging, relocating the components to a designated on-base cutting site, reduction of major components to recyclable sizes, and hauling all resulting scrap and debris off Robins AFB.
Upper Filler Piece: 64,000 lbs; Pressure Plate: 32,000 lbs; Lower Filler Piece: 86,000 lbs; Unwound Main Cylinder: 148,000 lbs; Plating attached to Lower Filler: 7,000 lbs (see Performance Work Statement for full details)
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Draft PWS - Site Visit.pdf215 KB, October 20, 2026
- Site Visit Notice - Removal of Old Fluid Cell.pdf93 KB, October 20, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 20, 2026
Sources sought
Due December 10, 2026 at 4:00 PM EST. SAM.gov, notice 63453acb5fc248c3a22c1d9ebd47eb4a
1 revision on SAM
- October 20, 2026: publish, sources sought
Points of contact
- Thomas Curtisthomas.curtis.10@us.af.mil
- Traci Chancetraci.chance@us.af.mil4789268853