# Estimating the Manufacturing Advantage of Dry-Coating of Cathodes in a Lithium-Ion Cell Plant

Canonical: https://sealedbidder.com/opportunities/5b191p0016200

- Solicitation number: 5-B191-P-00162-00
- Notice type: Solicitation
- Status: Closed. Deadline was June 27, 2025 at 4:00 PM EDT
- Department: Department of Energy
- Contracting office: Argonne Natl Lab - DOE Contractor (899031)
- NAICS: 541330 Engineering Services
- Product or service code: R425 Engineering and Technical Services
- Small business size standard: $25.5 million in average annual receipts (13 CFR 121.201, NAICS 541330)
- Who can bid, by location: Location not published. The notice publishes no state, city or site; its documents may.
- First posted: April 29, 2025
- Last posted: June 13, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/99efd8f9406341a6bdb0fbfee17f1ec9/view

## Reading this notice

- Kind of notice: Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline.
- Who may compete: SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 59 days from the day the solicitation was posted, April 29, 2025, to the deadline. The deadline moved 3 times: it was first May 12, 2025 and ended as June 27, 2025.

## Description

This requirement is for a study to estimate the change in design and cost of a LIB cell plant that uses dry coating of the cathode electrode with respect to the more common wet coated electrodes used today. The data and analysis will be used for three plant sizes rated for 5, 25, and 50 GWh per year capacity plants.This work is expected to provide the Laboratory with a quantitative estimate of the advantages and challenges of using dry coated NMC811 cathode layers over the more common wet coating process.

## Attachments

- [Argonne RFP No 5-B191-P-00162-00.zip](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/69d62d2ce0e245dea046a1663f821112/download)
- [Addendum-1-to-RFP-No-5-B191-P-00162-00.doc](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ce522a7990124aa6b0b28ea6770eb760/download)
- [Addendum-2-to-RFP-No-5-B191-P-00162-00.doc](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/d74a477888ac4534804b43cbbb72e47a/download)

## Open now in the same industry

98 open in NAICS 541330.

- SEAPORT_NMRIL_FMS_LAB_SPPT_1 (SEAPORT_NMRIL_FMS_LAB_SPPT_REV1), due November 27, 2026 at 3:00 PM EST. https://sealedbidder.com/opportunities/seaportnmrilfmslabspptrev1
- TSC A-E IDIQ MATOC and Construction Management Services (140RR027Q0030), due November 30, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/140rr027q0030
- Keyport Infrastructure Security Support Services (KISSS) (N0025326R0001), due November 30, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/n0025326r0001

## Publications

- April 29, 2025: Solicitation, due May 12, 2025 at 6:00 PM EDT. Notice 52804a2237a84c5ba55fd66688c4b987. https://sam.gov/workspace/contract/opp/52804a2237a84c5ba55fd66688c4b987/view
- May 8, 2025: Solicitation, due May 13, 2025 at 6:00 PM EDT. Notice e01f0620d36746deb928084d5f182226. https://sam.gov/workspace/contract/opp/e01f0620d36746deb928084d5f182226/view
- May 21, 2025: Solicitation, due June 4, 2025 at 4:00 PM EDT. Notice c84ff5839af34e39ae399b37f6d4573c. https://sam.gov/workspace/contract/opp/c84ff5839af34e39ae399b37f6d4573c/view
- June 13, 2025: Solicitation, due June 27, 2025 at 4:00 PM EDT. Notice 99efd8f9406341a6bdb0fbfee17f1ec9. https://sam.gov/workspace/contract/opp/99efd8f9406341a6bdb0fbfee17f1ec9/view

## Points of contact

- Jackie Arriaga, arriaga@anl.gov, 630-252-0978
- Parker Hawk, phawk@anl.gov, 630-252-2731

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/5b191p0016200.
