Solicitation
Estimating the Cost of a Manufacturing Plant for LFP-Based Lithium-Ion Cells
5-B191-P-00160-00
Department of Energy, Argonne Natl Lab - DOE Contractor. Engineering Services.
Response deadline
May 19, 2025 at 1:00 PM EDT
Closed 555 days ago. Posted May 23, 2025, first published April 29, 2025. Scheduled to archive June 3, 2025.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2025
100 like it are open now in engineering services
- SEAPORT_NMRIL_FMS_LAB_SPPT_1
Department of the Navy, NIWC Pacific
Sources soughtSmall businessNAICS 541330Location not publishedSEAPORT_NMRIL_FMS_LAB_SPPT_REV1Due in 2 daysNov 27 - TSC A-E IDIQ MATOC and Construction Management Services
Departmental Offices, Reclamation Contracting Activity
PresolicitationNAICS 541330Not tied to one place140RR027Q0030Due in 5 daysNov 30 - Keyport Infrastructure Security Support Services (KISSS)
Department of the Navy, Naval Undersea Warfare Center
PresolicitationSmall businessNAICS 541330Location not publishedN0025326R0001Due in 5 daysNov 30
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 541330 (engineering services), means no more than $25.5 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 20 days from the day the solicitation was posted, April 29, 2025, to the deadline. The deadline moved once: it was first May 12, 2025 and ended as May 19, 2025.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The objective of this requirement for a study is to estimate the design and cost of setting up and operating a large- scale plant in the United States to produce LIB using LFP and LFMP cathode active materials. Estimates for three plant sizes should be provided for 5, 25, and 50 GWh per year capacity plants. This work is expected to provide Argonne with a design of the physical and chemical processing steps necessary in the production of cells using LFP and LMFP cathode materials.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Argonne RFP No 5-B191-P-00160-00.zip2.7 MB, April 29, 2025
- Addendum 1 to RFP No 5-B191-P-00160-00.doc241 KB, May 8, 2025
- Addendum 2 and Acknowledgement for 5-B191-P-00160-00.doc250 KB, May 23, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 29, 2025
Solicitation
Due May 12, 2025 at 6:00 PM EDT. SAM.gov, notice e1fb4e3148584afb9904daabef498dd3
3 revisions on SAM
- May 23, 2025: publish, solicitation
- May 8, 2025: publish, solicitation
- April 29, 2025: publish, solicitation
May 8, 2025
Solicitation
Due May 19, 2025 at 1:00 PM EDT. SAM.gov, notice 5f0205581d184b489d538fc224af54ac
3 revisions on SAM
- May 23, 2025: publish, solicitation
- May 8, 2025: publish, solicitation
- April 29, 2025: publish, solicitation
May 23, 2025
Solicitation
Due May 19, 2025 at 1:00 PM EDT. SAM.gov, notice e6dff77b51744c68942e98c334cdff52
3 revisions on SAM
- May 23, 2025: publish, solicitation
- May 8, 2025: publish, solicitation
- April 29, 2025: publish, solicitation
Points of contact
- Jackie Arriagaarriaga@anl.gov630-252-0978
- Parker Hawkphawk@anl.gov630-252-2731