Solicitation
28-ID Diffractometer
4-B138-Q-00213-00
Department of Energy, Argonne Natl Lab - DOE Contractor. Analytical Laboratory Instrument Manufacturing.
Response deadline
March 15, 2024 at 6:00 PM EDT
Closed 985 days ago. Posted March 1, 2024, first published March 1, 2024. Scheduled to archive March 15, 2024.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2024
59 like it are open now in analytical laboratory instrument manufacturing
- Olfactory Detection Port with Olfactory Data Interpreter Software
Usda, Departmental Administration, Ocp Service and Supply Div
Sources soughtNAICS 334516Ship to IL1179170Due in 7 daysDec 2 - ARBITRARY WAVEFORM GENERATOR
Department of the Navy, NSWC Crane
Combined synopsis and solicitationNAICS 334516Ship to Crane, INN0016427Q0014Due todayNov 25 - Brand Name or Equal Teledyne Instruments Liquid Sy
Department of Energy, National Energy Technology Laboratory
SolicitationSmall businessNAICS 334516Ship to the buyer89243327QEX000002Due todayNov 25
All 59 open in analytical laboratory instrument manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 334516 (analytical laboratory instrument manufacturing), means no more than 1,000 employees, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 14 days from the day the solicitation was posted, March 1, 2024, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Advanced Photon Source Upgrade Project (APS-U) is planning a storage-ring upgrade that will reduce the electron-beam emittance by a factor of ~75. This ultra-low emittance is achieved by replacing the present storage ring lattice with a multi-bend achromat (MBA) lattice. The MBA lattice will increase the x-ray coherent fraction by two orders of magnitude and decrease the horizontal source size by a factor of ~20.
In addition, the APS-U is planning to build eight new featured beamlines and make optics upgrades to many others. One of the feature beamlines built as part of the APS-U with be dedicated to Coherent High Energy X-ray (CHEX) studies at sector 28ID of the APS. The CHEX beamline will operate with a combination of integrated and shared instruments. Three shared instruments will be installed on each branch line for use with multiple systems.
The maximize the systems and scattering geometries that these shared instruments can accommodate requires a large Eulerian cradle that can be used with any of them. The large cradle would be swapped with the hexapod present in the typical diffractometer configuration. We will be conducting a Pre-Award meeting on Tuesday, March 5th at 9:00 am CST. If you'd like to attend, please let me know and I'l send you a link to join the meeting.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Kendra Spencerkcspencer@anl.gov6302526829