Solicitation, first published as presolicitation
General Services Administration seeks a residential construction contractor for renovation of residential building for Armed Forces Retirement Home in Washington, DC.
47PM0325R0002
Public Buildings Service, PBS R11 Construction Services Divsion Center 3. Residential Remodelers.
Response deadline
March 28, 2025 at 4:00 PM EDT
Closed 608 days ago. Posted July 22, 2025, first published December 19, 2024. Scheduled to archive July 22, 2025.
Get the next one like this from Public Buildings Service by email, the day it is posted.Find my opportunities
This one closed in 2025
4 like it are open now in residential remodelers
- OR WARM SPRINGS QTRS 4 PAINT/FLOORING
Departmental Offices, FWS Contracting Activity
SolicitationSmall businessNAICS 236118Oregon140FF027Q0038Due in 6 daysDec 2 - RENOVATE MILITARY FAMILY HOUSING TOWER 4511, CAMP COURTNEY
Department of the Army, W2SN Endist Japan
SolicitationNAICS 236118Location not publishedW912HV26BA009Closes in 14 daysDec 10 - AFHC Repair Quarters 82 and 86, Camp Zama, Japan
Department of the Army, W2SN Endist Japan
SolicitationNAICS 236118Outside the USW912HV26BA019Closes in 15 daysDec 11
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236118 (residential remodelers), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 70 days from the day the solicitation was posted, January 17, 2025, to the deadline. The deadline moved 2 times: it was first February 21, 2025 and ended as March 28, 2025.
- Before the solicitation
- The agency published a presolicitation on December 19, 2024, 29 days before the solicitation.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
SOLICITATION NOTICE
The General Services Administration (GSA), Public Buildings Service (PBS), National Capital Region (NCR), intends to issue a Request for Proposal (RFP) for a single firm fixed price contract for construction services for renovation of residential building for the Armed Forces Retirement Home (The Sheridan Building) in Washington, DC.
Type of Work
The work to be performed under the terms of this contract includes the following: providing all management, labor, materials, equipment and transportation in support of general construction and renovation of a residential building. The Sheridan Building is a 387,350 Sq Ft, eight floor building built in 1962 on the 272-acre campus of the Armed Forces Retirement Home (AFRH) at 3700 N Capitol Street NW, DC 20011. The campus is listed as a historic district on the National Register of Historic Places. Any construction activities that impact the Sheridan Building area may require historical preservation review. The Sheridan building is the main dormitory building on campus and provides independent and assisted living residences. After the full renovation project, the Sheridan building will contain 491 residential spaces with basement amenities. Resident rooms will consist of kitchenettes, ADA bathrooms, living space, and bedrooms (if applicable). The resident rooms will range in size between roughly 450 – 750 sq. ft. The goal is to provide an inviting residential building that will attract and retain future veteran retirees.
A determination by the Government not to complete this requirement as a set-aside based upon responses to the Sources Sought and other Market Research is solely within the discretion of the Government. The North American Industry Classification System (NAICS) code for this work is 236118, small business size standard is $45.0 million. All responsible firms may submit an offer.
This procurement will require the use of Project Labor Agreements (PLAs), which is mandatory for large scale construction projects (exceeding $35 million).
A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as defined in Subpart 22.5 of the Federal Acquisition Regulation. Pursuant to the FAR, agencies are required to use PLAs in large-scale construction projects unless an exception applies. All PLAs must include:
•Provisions that bind all contractors and subcontractors on the construction project to the agreement;
•Allow all contractors and subcontractors on the construction project to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements;
•Contain language that guarantees against strikes, lockouts, and similar job disruptions;
•Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising during the term of the project labor agreement (i.e. grievance/arbitration procedures),
•Provide other mechanisms for labor-management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health;
•Specify the wages and fringe benefits of all classification or crafts working on the project; and
•Fully conform to all statutes, regulations, Executive Orders, and Presidential Memoranda
•One or more labor organizations involved in the construction work.
The selection process will be conducted in accordance with FAR Part 15 source selection procedures.
Pre-Proposal Conference and Site Visit Information
The Pre-Proposal Meeting and Site Visit will be conducted on WEDNESDAY, JANUARY 29, 2025 AT 10:00 AM EST.
Location: Eagle Gate
140 Rock Creek Church Rd
NW, Washington, DC 20011
Scott Building (Main Entrance)
Lower Level Conference Center/Community Room
Interested offerors are strongly encouraged to attend the Pre-Proposal Conference and Site Visit. Submit an attendee name, company, company designation, and email addresses by emailing the Contract Specialist no later than 2:00 PM EST on FRIDAY, JANUARY 24, 2025 in order to receive the meeting invitation.
RFI: After the site visit, all questions, or Requests for Information (RFI), shall be submitted BY 4:00 PM EST WEDNESDAY, FEBRUARY 05, 2025.
Proposal Due Date
The solicitation closing date will be extended to FRIDAY, MARCH 14, 2025, AT 4:00PM EST..
-----------------------------------------------------------------------------------------------------------------------
System for Award Management (SAM) Registration
All information, amendments and questions concerning this solicitation will be electronically posted at the government point of entry (GPE) website: http://www.sam.gov.
Interested firms must be registered in the System for Award Management (SAM). Firms can register via the Internet site athttps://www.sam.gov, or by contacting the SAM Service Desk at http://www.fsd.gov. Interested firms are required to submit their representations and certifications through the SAM website.
The solicitation and associated information will be available from the SAM site mentioned above. No telephone requests will be accepted. This solicitation is not a sealed bid and there will not be a formal public bid opening. All inquiries must be in writing, preferable via email to the persons specified in the solicitation. All answers will be provided in writing and will be available on the aforementioned SAM posting. Offerors will not be reimbursed for proposal submittal expenses.
-----------------------------------------------------------------------------------------------------------------------
DISCLAIMER: The official solicitation package and technical specifications will be located on the official government web page and the Government is not liable for information furnished by any other source. Amendments, if/when issued, will be posted to the SAM site for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the Offeror’s responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons. The Government is not responsible for any loss of Internet connectivity or for an Offeror’s inability to access the documents posted on the referenced web pages. The Government will not issue paper copies.
***IF ISSSUES DOWNLOADING '8b. AFRH-Sheridan Building..' PLEASE UTILIZE GOOGLE***
Attachments
Files and links listed on SAM.gov. Files we hold a copy of download from here; the rest open SAM's download, which needs no account. Links open the sites the agency named.
- 8b. AFRH-Sheridan Building Drawings Bid Addendum Submission 11-13-24Link to drive.google.com, January 17, 2025
- 8e. C&D-Waste-Monthly-Report - TEMPLATE (1).pdf34 KB, January 17, 2025
- 8e. C&D Waste Mgmt Plan TEMPLATE (1).pdf31 KB, January 17, 2025
- 6. Wage Determination DC20250002 01102025 2025 01 17.pdf82 KB, January 17, 2025
- 7. AFRH-Technical Evaluation Factors-Best Value_ Trade Off 2025 01 17.pdf153 KB, January 17, 2025
- 8f. GSA Affiliated Customer Account (GACA).pdf177 KB, January 17, 2025
- 5. Reps and Certs GC AFRH 2025 01 17.pdf238 KB, January 17, 2025
- 8i. AFRH-033 Sheridan Building Narrative_Revised ExSum for GSA_23-5-02.pdf99 KB, January 17, 2025
- 8h. AFRH Directive 10-7A, AFRH Facilities Management Program, 5March2020.pdf180 KB, January 17, 2025
- 2. Solicitation_GC AFRH 2025 01 17.pdf437 KB, January 17, 2025
- 4. Agreement_GC AFRH 2025 01 17.pdf635 KB, January 17, 2025
- 8k. NCPC Tree Preservation and Replacement Policy.pdf923 KB, January 17, 2025
- 8j. CEQ_Guiding principles for sustainable federal buildings_Dec2020.pdf816 KB, January 17, 2025
- 3. SF1442 AFRH 2024.pdf1.3 MB, January 17, 2025
- 8. SOW Revised Armed Forces Retirement Home 2024 11 13.pdf2.2 MB, January 17, 2025
- 8g. AFRH FACILITIES MANAGEMENT MANUAL_Marc2020.pdf3.6 MB, January 17, 2025
- 8d. AFRH-Sheridan Building Specs Vol 2 Div 21-33 Bid Addendum 11-26-24.pdf9.2 MB, January 17, 2025
- 8a. AFRH Bid Form 2025 01 17.pdf73 KB, January 17, 2025
- 1. Solicitation Package Cover Sheet AFRH 2025 01 17.pdf123 KB, January 17, 2025
- 8c. AFRH-Sheridan Building Specs Vol 1 Specs Div 00-14 Bid Addendum 11-26-24_INCL DIV 1.pdf61.3 MB, January 17, 2025
- Amendment 0001 Solicitation 47PM0325R0002 2025 02 10.pdf3.0 MB, February 10, 2025
- Amendment 0002 Solicitation 47PM0325R0002 2025 02 18.pdf11.5 MB, February 18, 2025
- Amendment 0003 AFRH_Bid Form_TTH ALTERNATIVE_250213.pdf57 KB, March 4, 2025
- Amendment 0003 RFI Responses 1-149 2025 03 04.pdf129 KB, March 4, 2025
- Past Performance Questionnaire.pdf208 KB, March 4, 2025
- Amendment 0003 Solicitation_GC AFRH 2025 03 04.pdf425 KB, March 4, 2025
- AFRH-Sheridan Pre-Bid Addendum 2-12-25.pdf129 KB, March 4, 2025
- AEWLA22050. Geotechnical Report. 10142022.pdf5.8 MB, March 4, 2025
- A406 - CLINICAL AREAS- NURSE STATIONS - FIRST FLOOR.pdf504 KB, March 4, 2025
- A405 - CLINICAL AREAS-NURSE STATIONS - FIRST FLOOR.pdf500 KB, March 4, 2025
- A517 - EXTERIOR PLAN DETAILS.pdf539 KB, March 4, 2025
- A412 - ENLARGED RESIDENT ROOM SHOWERS.pdf552 KB, March 4, 2025
- A427 - SPA ROOMS AND LAUNDRY ROOMS.pdf588 KB, March 4, 2025
- S401 - STRUCTURAL ROOF FRAMING PARTIAL PLANS.pdf363 KB, March 4, 2025
- S521 - STRUCTURAL ANNEX FRAMING DETAILS.pdf350 KB, March 4, 2025
- A570 - EXTERIOR EXPANSION JOINT DIAGRAMS.pdf643 KB, March 4, 2025
- H603 - HVAC DETAILS.pdf438 KB, March 4, 2025
- H702 - HVAC SCHEDULES.pdf420 KB, March 4, 2025
- A407 - NORTH SERVERY.pdf605 KB, March 4, 2025
- S542 - STRUCTURAL BALCONY ENCLOSURE DETAILS.pdf388 KB, March 4, 2025
- A409 - ENLARGED TOILET ROOM PLANS AND ELEVATIONS.pdf590 KB, March 4, 2025
- AI402 - FIRST FLOOR ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS.pdf500 KB, March 4, 2025
- AI406 - FIRST FLOOR TOILET ROOM FINISH PLANS AND ELEVATIONS.pdf468 KB, March 4, 2025
- A560 - TYPICAL ROOF DETAILS.pdf732 KB, March 4, 2025
- AD100B - BASEMENT DEMOLITION PLAN B.pdf539 KB, March 4, 2025
- AD100A - BASEMENT DEMOLITION PLAN A.pdf558 KB, March 4, 2025
- H804 - CONTROL DIAGRAMS.pdf491 KB, March 4, 2025
- HD103 - CHILLER PLANT DEMO PLAN.pdf485 KB, March 4, 2025
- AD100 - OVERALL BASEMENT DEMOLITION PLAN.pdf555 KB, March 4, 2025
- AI403 - SERVERY FINISH PLAN AND ELEVATIONS.pdf559 KB, March 4, 2025
- AI408 - TYPICAL NORTH- SOUTH ELEVATOR LOBBY FINISH PLANS (FLOORS 2-7).pdf567 KB, March 4, 2025
- AI405 - FIRST FLOOR ENLARGED CORRIDOR PLANS AND ELEVATIONS.pdf567 KB, March 4, 2025
- AD101 - OVERALL FIRST FLOOR DEMOLITION PLAN.pdf588 KB, March 4, 2025
- A503 - EXTERIOR WALL SECTION DETAILS.pdf694 KB, March 4, 2025
- A516 - EXTERIOR PLAN DETAILS.pdf705 KB, March 4, 2025
- A102B - SECOND FLOOR PLAN B.pdf747 KB, March 4, 2025
- A504 - EXTERIOR WALL SECTION DETAILS.pdf864 KB, March 4, 2025
- AS-101 - FIRST FLOOR SIGNAGE PLAN.pdf888 KB, March 4, 2025
- A102 - OVERALL SECOND FLOOR PLAN.pdf1.0 MB, March 4, 2025
- AS-102 - TYPICAL FLOOR SIGNAGE PLAN (FLOORS 2-7).pdf895 KB, March 4, 2025
- G001 - COVER SHEET.pdf1.2 MB, March 4, 2025
- A112B - SECOND FLOOR REFLECTED CEILING PLAN B.pdf1.4 MB, March 4, 2025
- AI407 - TYPICAL ELEVATOR LOBBY FINISH PLANS AND ELEVATIONS (FLOORS 2-7).pdf1.3 MB, March 4, 2025
- A602 - DOOR SCHEDULE TYPES DETAILS.pdf493 KB, March 4, 2025
- A601 - DOOR SCHEDULE TYPES DETAILS.pdf552 KB, March 4, 2025
- S552 - STRUCTURAL TRASH CHUTE GENERATOR ENCLSOURE BALCONY ENCLOSURE DETAILS.pdf392 KB, March 4, 2025
- A408 - SOUTH SERVERY.pdf711 KB, March 4, 2025
- AI401 - ENTRANCE LOBBY FINISH PLAN AND ELEVATIONS.pdf740 KB, March 4, 2025
- 000110 Table of Contents.pdf66 KB, March 4, 2025
- 079500 - Exterior Expansion Control.pdf72 KB, March 4, 2025
- 072713 - Modified Bituminous Sheet Air Barriers.pdf190 KB, March 4, 2025
- 081416 - Flush Wood Doors.pdf112 KB, March 4, 2025
- 084113 - Aluminum-Framed Entrances and Storefronts.pdf274 KB, March 4, 2025
- 087100 - Door Hardware.pdf455 KB, March 4, 2025
- 087113 - Automatic Door Operator.pdf102 KB, March 4, 2025
- 088700 - Window Film.pdf101 KB, March 4, 2025
- 088000 - Glazing.pdf270 KB, March 4, 2025
- 089119 - Fixed Louvers.pdf61 KB, March 4, 2025
- 101423.16 - Panel Signage.pdf60 KB, March 4, 2025
- 095000 - Wood Panel Ceiling.pdf80 KB, March 4, 2025
- 232123 FL - Hydronic Pumps.pdf75 KB, March 4, 2025
- 235700 FL - Heat Exchangers for HVAC.pdf90 KB, March 4, 2025
- 107113 - Exterior Sun Control Devices.pdf79 KB, March 4, 2025
- 236416 FL - Centrifugal Water Chillers- Addendum 3.pdf119 KB, March 4, 2025
- Amendment 0003 Technical Evaluation Factors-Best Value_ Trade Off 2025 03 04.pdf152 KB, March 4, 2025
- Amendment 0003 Solicitation 47PM0325R0002 2025 03 04.pdf569 KB, March 4, 2025
- H103 - CHILLER PLANT.pdf487 KB, March 5, 2025
- Amendment 0004 Solicitation 47PM0325R0002 2025 03 13.pdf567 KB, March 13, 2025
- Amendment 0005 RFI Responses 150 - 336 2025 03 18.pdf152 KB, March 18, 2025
- Amendment 0005 Solicitation 47PM0325R0002 2025 03 18 (2).pdf568 KB, March 18, 2025
- Amendment 0006 Solicitation 47PM0325R0002 2025 03 25.pdf22.2 MB, March 25, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 19, 2024
Presolicitation, originally sources sought
SAM.gov, notice d56e03fbaa1743c7baca3d239a35914e
January 17, 2025
Solicitation
Due February 21, 2025 at 4:00 PM EST. SAM.gov, notice 547347ebe7464496a9c2f2324d6d1c16
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
February 10, 2025
Solicitation
Due February 21, 2025 at 4:00 PM EST. SAM.gov, notice bbfec6029ed042e292004d32e76e9031
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
February 18, 2025
Solicitation
Due February 21, 2025 at 4:00 PM EST. SAM.gov, notice 05063bec7b594349ad204223adcca60f
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
February 21, 2025
Solicitation
Due March 14, 2025 at 4:00 PM EDT. SAM.gov, notice 15de3c25d60549dbbd344a2d030771aa
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
March 4, 2025
Solicitation
Due March 14, 2025 at 4:00 PM EDT. SAM.gov, notice 0f3eb3f750594cac88aa6779f176828c
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
March 4, 2025
Solicitation
Due March 14, 2025 at 4:00 PM EDT. SAM.gov, notice 58d5bea7c99943b39721ee897fa7aad7
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
March 5, 2025
Solicitation
Due March 14, 2025 at 4:00 PM EDT. SAM.gov, notice e4ba013c46004631b46b6f5899e11b00
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
March 13, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice f6e50bfce4a34feb81730658355aa1c6
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
March 18, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice 828bae2c181c49e6b1b20c34096fce16
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
March 25, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice c4088106fa4a408a8972171e5eb8384d
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
July 17, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice 1d6a8a21dd0a4bd595db55f19562e89d
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
July 17, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice 8ef7515a4fd548a7845fce056b796a2e
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
July 17, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice f1953bc50e6a464ab085ecc044733678
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
July 22, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice 22572e2bf55e461bb17aa62328c0b434
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
July 22, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice a18f9bb0ce204667bc04a61cd88e38cb
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
July 22, 2025
Solicitation
Due March 28, 2025 at 4:00 PM EDT. SAM.gov, notice b6c1b32f112a4cb7b35ef98300702a56
16 revisions on SAM
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 22, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- July 17, 2025: publish, solicitation
- March 25, 2025: publish, solicitation
- March 18, 2025: publish, solicitation
- March 13, 2025: publish, solicitation
- March 5, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- March 4, 2025: publish, solicitation
- February 21, 2025: publish, solicitation
- February 18, 2025: publish, solicitation
- February 10, 2025: publish, solicitation
- January 17, 2025: publish, solicitation
Points of contact
- Harvelle Fullerharvelle.fuller@gsa.gov2026990759
- Elwora "Liza" Ahmedelwora.ahmed@gsa.gov2022559273