{"canonical":"https://sealedbidder.com/opportunities/47pj0025r0059","key":"47PJ0025R0059","url":"https://sealedbidder.com/opportunities/47pj0025r0059","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-01-23T22:00:00Z","first_posted":"2025-05-05","last_posted":"2026-08-12","department":"GENERAL SERVICES ADMINISTRATION","subagency":"PUBLIC BUILDINGS SERVICE","office":"PBS R8 ACQUISITION MANAGEMENT DIVISION","naics":"236220","psc":"Y1AZ","set_aside":null,"place_state":"WA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"53073","place_county_name":"Whatcom County","place_city":"5340805","place_city_name":"Lynden","winner":null,"award_amount":null,"publications":[{"notice_id":"e4475a69dc1f47a3a27540f51b378dd7","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"r","base_type":"r","posted":"2025-05-05","posted_at":"2025-05-05T20:11:33.226Z","due_at":"2025-06-04T20:00:00Z","due_date":"2025-06-04","cancelled":false,"archived":true,"archive_date":"2025-06-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/e4475a69dc1f47a3a27540f51b378dd7/view","enriched":true,"history":[{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T16:49:53.808Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a5abadee65be4fc6b34c950a458ac909","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7"},{"index":1,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-05T20:11:33.226Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7","solicitation_number":"47PJ0025R0059"}]},{"notice_id":"a5abadee65be4fc6b34c950a458ac909","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"r","base_type":"r","posted":"2025-05-19","posted_at":"2025-05-19T16:49:53.808Z","due_at":"2025-06-04T20:00:00Z","due_date":"2025-06-04","cancelled":false,"archived":true,"archive_date":"2025-06-19","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a5abadee65be4fc6b34c950a458ac909/view","enriched":true,"history":[{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T16:49:53.808Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a5abadee65be4fc6b34c950a458ac909","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7"},{"index":1,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-05T20:11:33.226Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7","solicitation_number":"47PJ0025R0059"}]},{"notice_id":"21e3ac60942d44a7ac97f1243e0dc60d","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"p","base_type":"r","posted":"2025-10-23","posted_at":"2025-10-23T19:04:01.059Z","due_at":"2025-11-07T22:00:00Z","due_date":"2025-11-07","cancelled":false,"archived":true,"archive_date":"2025-11-22","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/21e3ac60942d44a7ac97f1243e0dc60d/view","enriched":true,"history":[{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"},{"index":2,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T16:49:53.808Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a5abadee65be4fc6b34c950a458ac909","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7"}]},{"notice_id":"2790aec261674ce2ae874928381f919e","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","base_type":"o","posted":"2025-12-15","posted_at":"2025-12-16T01:52:57.749Z","due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-02-07","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2790aec261674ce2ae874928381f919e/view","enriched":true,"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}]},{"notice_id":"eb85629f6a2f41d1ad07baceb5800435","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","base_type":"o","posted":"2025-12-15","posted_at":"2025-12-16T01:50:40.388Z","due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-02-07","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/eb85629f6a2f41d1ad07baceb5800435/view","enriched":true,"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}]},{"notice_id":"ef33f065ecec4ad29e4798b09166e3af","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","base_type":"p","posted":"2025-12-15","posted_at":"2025-12-15T21:01:21.766Z","due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-02-07","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/ef33f065ecec4ad29e4798b09166e3af/view","enriched":true,"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}]},{"notice_id":"6595a81be1d344689f652fcdb1630c49","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","base_type":"o","posted":"2026-01-09","posted_at":"2026-01-09T19:45:29.861Z","due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-02-07","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/6595a81be1d344689f652fcdb1630c49/view","enriched":true,"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}]},{"notice_id":"4b2237440910436db0b5e685d0b142e4","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","base_type":"o","posted":"2026-08-12","posted_at":"2026-08-12T17:53:26.471Z","due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/4b2237440910436db0b5e685d0b142e4/view","enriched":true,"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}]},{"notice_id":"effb2b5fe6424109b092aefa8e1a4128","title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","solicitation_number":"47PJ0025R0059","notice_type":"o","base_type":"o","posted":"2026-08-12","posted_at":"2026-08-12T17:44:29.429Z","due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","cancelled":false,"archived":true,"archive_date":"2026-08-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/effb2b5fe6424109b092aefa8e1a4128/view","enriched":true,"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}]}],"latest_notice_id":"effb2b5fe6424109b092aefa8e1a4128","first_type":"r","notices":[{"dates":{"posted":"2025-05-05","posted_at":"2025-05-05T20:11:33.226Z","created_at":"2025-05-05T19:42:41.661Z","modified_at":"2025-06-19T04:04:38.514Z","response_deadline":{"raw":"2025-06-04T14:00:00-06:00","utc":"2025-06-04T20:00:00Z","date":"2025-06-04","time":"14:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/e4475a69dc1f47a3a27540f51b378dd7/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-19","archive_type":"auto15"},"history":[{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T16:49:53.808Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a5abadee65be4fc6b34c950a458ac909","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7"},{"index":1,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-05T20:11:33.226Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7","solicitation_number":"47PJ0025R0059"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"e4475a69dc1f47a3a27540f51b378dd7","lineage_id":"e4475a69dc1f47a3a27540f51b378dd7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T23:28:11.245916409Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8b0b68d86eb760866d4577c0238f8acc28eaf67f19de3838d90991222cc89992","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T23:28:11.245916409Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>IMPORTANT NOTICE<br />\nThis is a Sources Sought Notice only.<br />\nThis announcement is issued solely for market research and planning purposes. It does not constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.</p>\n\n<p>PROJECT OVERVIEW<br />\nThe U.S. General Services Administration (GSA), Public Buildings Service (PBS), Region 8, Capital Construction Branch is seeking capable and experienced Design-Build (D-B) firms for the modernization of the Lynden &amp; Sumas Land Ports of Entry (LPOE), located in Washington.</p>\n\n<p>The Government is conducting a market survey to identify qualified large and small businesses with substantial design-build experience on complex, remote projects of similar size, scope, and technical challenges.<br />\n&bull; Estimated Construction Magnitude: Over $400 million<br />\n&bull; NAICS Code: 236220 &ndash; Commercial and Institutional Building Construction<br />\n&bull; Small Business Size Standard: $45 million</p>\n\n<p>PROJECT DESCRIPTION<br />\nThe two (2) ports are briefly described below.</p>\n\n<p>KENNETH G. WARD (LYNDEN) LPOE<br />\nThe Lynden LPOE, occupying approximately 4.7 acres, is located along the US-Canadian border at the northern end of Washington State Route (SR) 539 (aka Guide-Meridian Road). The port, which is approximately 6 miles north of the city of Lynden WA, sits approximately 10 miles to the east of the Peace Arch and Pacific Highway LPOEs (which are in nearby Blaine WA), and sits approximately 10 miles to the west of the Sumas LPOE. The existing port was last modernized in the late 1980s.</p>\n\n<p>The port operates 16 hours a day (08:00-00:00), 365 days a year processing commercial, privately owned vehicles (POVs), buses, and a limited number of pedestrian crossings. The port operates as a permit-only commercial location, limiting commercial traffic to entities that are transporting empty loads or who have prescheduled limited (monetary value) loads with CBP for transit through Lynden.</p>\n\n<p>SUMAS LPOE<br />\nThe Sumas LPOE, which occupies approximately 4.0 acres, is located on WA SR 9 (aka Cherry Street) at the northern end of the city of Sumas WA. The port is surrounded by the US-Canadian border to the north, mixed use commercial and residential properties to the east and south, and a Burlington-Northern &amp; Santa Fe (BNSF) railroad to the immediate west. The port, which was last modernized in the 1980s, sits approximately 10 miles to the east of the Lynden LPOE.</p>\n\n<p>The port operates 24/7/365 processing commercial, POVs, buses, and a significant number of pedestrian crossings. Sumas processes the 2nd most pedestrian crossings, after the Niagara Falls LPOE, along the northern US border. A significant number of these pedestrians make their way to &amp; from Canada, transiting through the Sumas LPOE, to access several storefront shipping locations in the downtown Sumas business district just south of the port to pick up packages shipped to, or within, the US.<br />\nThe Sumas LPOE and project site are in a floodplain that recently (2021) experienced a significant flooding event. Flood- and stormwater management will be a significant aspect of the Sumas project. The project must simultaneously: 1) ensure that the modernized port is adequately protected; 2) ensure that any management and mitigation efforts employed at the port do not introduce adverse impacts to the neighboring community; and 3) ensure that any flood- and stormwater mitigation efforts that the city, county, state, and/or federal government(s) undertake(s) &ndash; separately from the modernization project &ndash; to mitigate flood risk in the larger downtown community do not, in turn, negatively impact the port.</p>\n\n<p>GSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. This provides CBP with several operational advantages, including the ability to divert at least some of Sumas&rsquo; commercial traffic to the modernized Lynden port, on a limited basis, while the Sumas port is modernized after Lynden is brought on-line. It is important to note that the construction of these two ports cannot affect the operational mission of both Lynden and Sumas LPOE&rsquo;s.</p>\n\n<p>The project will seek to accomplish the following goals:<br />\n&bull; Provide best value to partner agencies and taxpayers<br />\n&bull; Develop safe, productive, and attractive workplaces<br />\n&bull; Deliver projects on time and on budget<br />\n&bull; Achieve building performance that is resilient and efficient<br />\n&bull; Leverage the skill of America&rsquo;s most qualified designers and artists<br />\n&bull; Strive for Design, Construction and Operational Excellence<br />\n&bull; Provide stewardship for the next generation of respected landmarks</p>\n\n<p>The DB contractor will be responsible for the complete design and construction of both ports, including&mdash;but not limited to&mdash;the following general scope elements:<br />\n&bull; Demolition and Site Preparation &bull; Removal of outdated port infrastructure, utilities, and impervious surfaces across both sites (approx. 8.7 acres combined). &bull; Site clearing, remediation, and preparation to meet updated floodplain and environmental requirements, particularly at the Sumas site.</p>\n\n<p>&bull; New Construction and Modernization &bull; Design and construction of modernized port facilities totaling approximately 117,000 square feet across both locations. &bull; Construction of new inspection facilities for passenger vehicles, buses, commercial traffic, and pedestrians. &bull; Development of support buildings including: o Main Administration and Inspection Facilities o Secure Commercial and POV Inspection Areas o Utility and Infrastructure Support Buildings o Extensive site improvements including access roads, parking areas, pedestrian pathways, landscaping, and perimeter security systems.</p>\n\n<p>&bull; Flood and Stormwater Management (Sumas-Specific) &bull; Implementation of flood and stormwater mitigation systems to protect the Sumas LPOE, with consideration of community impact and integration with regional flood control efforts.</p>\n\n<p>&bull; Construction Phasing and Operational Continuity &bull; GSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. &bull; Phasing plans must maintain partial operational capability at Sumas, especially for pedestrian and POV processing, throughout the project. Construction of these two ports cannot affect the operational mission of Lynden and Sumas LPOE&rsquo;s.</p>\n\n<p>The DB contractor must coordinate closely with GSA, CBP, and the Construction Manager as Advisor (CMA) to ensure timely delivery, funding compliance, and adherence to all federal and local regulatory requirements.</p>\n\n<p>ANTICIPATED PROCUREMENT SCHEDULE<br />\n&bull; Solicitation Release (Projected): Q4 FY2025<br />\n&bull; Contract Award (Projected): April 2026<br />\n&bull; Substantial Completion (Projected): March 2030 Note: All dates are estimates and subject to change.</p>\n\n<p>CAPABILITY STATEMENT INSTRUCTIONS<br />\nFirms interested in this opportunity should submit a Capabilities Statement (maximum 10 pages) addressing the following:<br />\n1. Company Information<br />\n&bull; Company name, address, DUNS number/UEI, and primary POC (name, phone, email)<br />\n&bull; Business classification under NAICS 236220 (e.g., Large Business, Small Business, SDVOSB, etc.)<br />\n&bull; Years in business, affiliate or parent company details, and any joint venture or teaming partners</p>\n\n<p>2. Expression of Interest<br />\n&bull; A brief statement affirming the intent to propose as a prime contractor for any forthcoming solicitation related to this notice</p>\n\n<p>3. Relevant Project Experience (Up to 2 Projects)<br />\nEach project must demonstrate comparable size, complexity, scope, and delivery method. Include:<br />\n&bull; Project title, owner, and contract/reference number<br />\n&bull; Contract award value and completion year<br />\n&bull; Confirmation of Design-Build delivery method<br />\n&bull; Description of work performed between two (2) or more phased construction sites located 5 miles or more from each other.<br />\n&bull; Description of site planning and construction (utilities, roads, grading, storm drainage, security, etc.)<br />\n&bull; Description of specialized client/user needs (e.g., ports of entry, prisons, hospitals)<br />\n&bull; List of key personnel and technical skillsets relevant to this project<br />\n&bull; Current bonding capacity and evidence of ability to bond &gt;$400M</p>\n\n<p>4. Cost Savings for Phasing Between 2 Construction Sites<br />\nIn addition to your capabilities statement, please include any information about potential cost savings that can be obtained by combining the project phasing between 2 construction sites (5 miles or more apart) as opposed to working each site as independent, separate construction<br />\nprojects and contracts. Savings may include materials, personnel, mobilization, demobilization, administration, and other factors.</p>\n\n<p>EVALUATION &amp; NEXT STEPS<br />\nThis Sources Sought is intended to inform the acquisition strategy and determine whether sufficient interest exists among technically qualified and responsible firms. Responses will assist in determining potential for set-aside decisions under FAR Part 19.</p>\n\n<p>All qualified and interested firms&mdash;regardless of business size&mdash;are strongly encouraged to respond.</p>\n\n<p>SUBMISSION DETAILS<br />\n&bull; Due Date: Wednesday, June 4, 2025</p>\n\n<p></p>\n\n<p><strong>IMPORTANT NOTICE</strong></p>\n\n<p><strong>This is a Sources Sought Notice only.</strong></p>\n\n<p>This announcement is issued solely for market research and planning purposes. It does <strong>not</strong> constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.</p>\n\n<p></p>","text":"IMPORTANT NOTICE\n\nThis is a Sources Sought Notice only.\n\nThis announcement is issued solely for market research and planning purposes. It does not constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.\n\nPROJECT OVERVIEW\n\nThe U.S. General Services Administration (GSA), Public Buildings Service (PBS), Region 8, Capital Construction Branch is seeking capable and experienced Design-Build (D-B) firms for the modernization of the Lynden & Sumas Land Ports of Entry (LPOE), located in Washington.\n\nThe Government is conducting a market survey to identify qualified large and small businesses with substantial design-build experience on complex, remote projects of similar size, scope, and technical challenges.\n\n• Estimated Construction Magnitude: Over $400 million\n\n• NAICS Code: 236220 – Commercial and Institutional Building Construction\n\n• Small Business Size Standard: $45 million\n\nPROJECT DESCRIPTION\n\nThe two (2) ports are briefly described below.\n\nKENNETH G. WARD (LYNDEN) LPOE\n\nThe Lynden LPOE, occupying approximately 4.7 acres, is located along the US-Canadian border at the northern end of Washington State Route (SR) 539 (aka Guide-Meridian Road). The port, which is approximately 6 miles north of the city of Lynden WA, sits approximately 10 miles to the east of the Peace Arch and Pacific Highway LPOEs (which are in nearby Blaine WA), and sits approximately 10 miles to the west of the Sumas LPOE. The existing port was last modernized in the late 1980s.\n\nThe port operates 16 hours a day (08:00-00:00), 365 days a year processing commercial, privately owned vehicles (POVs), buses, and a limited number of pedestrian crossings. The port operates as a permit-only commercial location, limiting commercial traffic to entities that are transporting empty loads or who have prescheduled limited (monetary value) loads with CBP for transit through Lynden.\n\nSUMAS LPOE\n\nThe Sumas LPOE, which occupies approximately 4.0 acres, is located on WA SR 9 (aka Cherry Street) at the northern end of the city of Sumas WA. The port is surrounded by the US-Canadian border to the north, mixed use commercial and residential properties to the east and south, and a Burlington-Northern & Santa Fe (BNSF) railroad to the immediate west. The port, which was last modernized in the 1980s, sits approximately 10 miles to the east of the Lynden LPOE.\n\nThe port operates 24/7/365 processing commercial, POVs, buses, and a significant number of pedestrian crossings. Sumas processes the 2nd most pedestrian crossings, after the Niagara Falls LPOE, along the northern US border. A significant number of these pedestrians make their way to & from Canada, transiting through the Sumas LPOE, to access several storefront shipping locations in the downtown Sumas business district just south of the port to pick up packages shipped to, or within, the US.\n\nThe Sumas LPOE and project site are in a floodplain that recently (2021) experienced a significant flooding event. Flood- and stormwater management will be a significant aspect of the Sumas project. The project must simultaneously: 1) ensure that the modernized port is adequately protected; 2) ensure that any management and mitigation efforts employed at the port do not introduce adverse impacts to the neighboring community; and 3) ensure that any flood- and stormwater mitigation efforts that the city, county, state, and/or federal government(s) undertake(s) – separately from the modernization project – to mitigate flood risk in the larger downtown community do not, in turn, negatively impact the port.\n\nGSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. This provides CBP with several operational advantages, including the ability to divert at least some of Sumas’ commercial traffic to the modernized Lynden port, on a limited basis, while the Sumas port is modernized after Lynden is brought on-line. It is important to note that the construction of these two ports cannot affect the operational mission of both Lynden and Sumas LPOE’s.\n\nThe project will seek to accomplish the following goals:\n\n• Provide best value to partner agencies and taxpayers\n\n• Develop safe, productive, and attractive workplaces\n\n• Deliver projects on time and on budget\n\n• Achieve building performance that is resilient and efficient\n\n• Leverage the skill of America’s most qualified designers and artists\n\n• Strive for Design, Construction and Operational Excellence\n\n• Provide stewardship for the next generation of respected landmarks\n\nThe DB contractor will be responsible for the complete design and construction of both ports, including—but not limited to—the following general scope elements:\n\n• Demolition and Site Preparation • Removal of outdated port infrastructure, utilities, and impervious surfaces across both sites (approx. 8.7 acres combined). • Site clearing, remediation, and preparation to meet updated floodplain and environmental requirements, particularly at the Sumas site.\n\n• New Construction and Modernization • Design and construction of modernized port facilities totaling approximately 117,000 square feet across both locations. • Construction of new inspection facilities for passenger vehicles, buses, commercial traffic, and pedestrians. • Development of support buildings including: o Main Administration and Inspection Facilities o Secure Commercial and POV Inspection Areas o Utility and Infrastructure Support Buildings o Extensive site improvements including access roads, parking areas, pedestrian pathways, landscaping, and perimeter security systems.\n\n• Flood and Stormwater Management (Sumas-Specific) • Implementation of flood and stormwater mitigation systems to protect the Sumas LPOE, with consideration of community impact and integration with regional flood control efforts.\n\n• Construction Phasing and Operational Continuity • GSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. • Phasing plans must maintain partial operational capability at Sumas, especially for pedestrian and POV processing, throughout the project. Construction of these two ports cannot affect the operational mission of Lynden and Sumas LPOE’s.\n\nThe DB contractor must coordinate closely with GSA, CBP, and the Construction Manager as Advisor (CMA) to ensure timely delivery, funding compliance, and adherence to all federal and local regulatory requirements.\n\nANTICIPATED PROCUREMENT SCHEDULE\n\n• Solicitation Release (Projected): Q4 FY2025\n\n• Contract Award (Projected): April 2026\n\n• Substantial Completion (Projected): March 2030 Note: All dates are estimates and subject to change.\n\nCAPABILITY STATEMENT INSTRUCTIONS\n\nFirms interested in this opportunity should submit a Capabilities Statement (maximum 10 pages) addressing the following:\n\n1. Company Information\n\n• Company name, address, DUNS number/UEI, and primary POC (name, phone, email)\n\n• Business classification under NAICS 236220 (e.g., Large Business, Small Business, SDVOSB, etc.)\n\n• Years in business, affiliate or parent company details, and any joint venture or teaming partners\n\n2. Expression of Interest\n\n• A brief statement affirming the intent to propose as a prime contractor for any forthcoming solicitation related to this notice\n\n3. Relevant Project Experience (Up to 2 Projects)\n\nEach project must demonstrate comparable size, complexity, scope, and delivery method. Include:\n\n• Project title, owner, and contract/reference number\n\n• Contract award value and completion year\n\n• Confirmation of Design-Build delivery method\n\n• Description of work performed between two (2) or more phased construction sites located 5 miles or more from each other.\n\n• Description of site planning and construction (utilities, roads, grading, storm drainage, security, etc.)\n\n• Description of specialized client/user needs (e.g., ports of entry, prisons, hospitals)\n\n• List of key personnel and technical skillsets relevant to this project\n\n• Current bonding capacity and evidence of ability to bond >$400M\n\n4. Cost Savings for Phasing Between 2 Construction Sites\n\nIn addition to your capabilities statement, please include any information about potential cost savings that can be obtained by combining the project phasing between 2 construction sites (5 miles or more apart) as opposed to working each site as independent, separate construction\n\nprojects and contracts. Savings may include materials, personnel, mobilization, demobilization, administration, and other factors.\n\nEVALUATION & NEXT STEPS\n\nThis Sources Sought is intended to inform the acquisition strategy and determine whether sufficient interest exists among technically qualified and responsible firms. Responses will assist in determining potential for set-aside decisions under FAR Part 19.\n\nAll qualified and interested firms—regardless of business size—are strongly encouraged to respond.\n\nSUBMISSION DETAILS\n\n• Due Date: Wednesday, June 4, 2025\n\nIMPORTANT NOTICE\n\nThis is a Sources Sought Notice only.\n\nThis announcement is issued solely for market research and planning purposes. It does not constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2025-05-19","posted_at":"2025-05-19T16:49:53.808Z","created_at":"2025-05-19T16:36:59.167Z","modified_at":"2025-06-19T04:04:38.514Z","response_deadline":{"raw":"2025-06-04T14:00:00-06:00","utc":"2025-06-04T20:00:00Z","date":"2025-06-04","time":"14:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a5abadee65be4fc6b34c950a458ac909/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-06-19","archive_type":"auto15"},"history":[{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T16:49:53.808Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a5abadee65be4fc6b34c950a458ac909","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7"},{"index":1,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-05T20:11:33.226Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7","solicitation_number":"47PJ0025R0059"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"a5abadee65be4fc6b34c950a458ac909","lineage_id":"e4475a69dc1f47a3a27540f51b378dd7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T01:13:38.422449544Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"a77818e6be6c016d085a6ea94b7c6829025ede28fdb08bf12ab2b4595e9983a3","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T01:13:38.422449544Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"<p>IMPORTANT NOTICE<br />\nThis is a Sources Sought Notice only.<br />\nThis announcement is issued solely for market research and planning purposes. It does not constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.</p>\n\n<p>PROJECT OVERVIEW<br />\nThe U.S. General Services Administration (GSA), Public Buildings Service (PBS), Region 8, Capital Construction Branch is seeking capable and experienced Design-Build (D-B) firms for the modernization of the Lynden &amp; Sumas Land Ports of Entry (LPOE), located in Washington.</p>\n\n<p>The Government is conducting a market survey to identify qualified large and small businesses with substantial design-build experience on complex, remote projects of similar size, scope, and technical challenges.<br />\n&bull; Estimated Construction Magnitude: Over $400 million<br />\n&bull; NAICS Code: 236220 &ndash; Commercial and Institutional Building Construction<br />\n&bull; Small Business Size Standard: $45 million</p>\n\n<p>PROJECT DESCRIPTION<br />\nThe two (2) ports are briefly described below.</p>\n\n<p>KENNETH G. WARD (LYNDEN) LPOE<br />\nThe Lynden LPOE, occupying approximately 4.7 acres, is located along the US-Canadian border at the northern end of Washington State Route (SR) 539 (aka Guide-Meridian Road). The port, which is approximately 6 miles north of the city of Lynden WA, sits approximately 10 miles to the east of the Peace Arch and Pacific Highway LPOEs (which are in nearby Blaine WA), and sits approximately 10 miles to the west of the Sumas LPOE. The existing port was last modernized in the late 1980s.</p>\n\n<p>The port operates 16 hours a day (08:00-00:00), 365 days a year processing commercial, privately owned vehicles (POVs), buses, and a limited number of pedestrian crossings. The port operates as a permit-only commercial location, limiting commercial traffic to entities that are transporting empty loads or who have prescheduled limited (monetary value) loads with CBP for transit through Lynden.</p>\n\n<p>SUMAS LPOE<br />\nThe Sumas LPOE, which occupies approximately 4.0 acres, is located on WA SR 9 (aka Cherry Street) at the northern end of the city of Sumas WA. The port is surrounded by the US-Canadian border to the north, mixed use commercial and residential properties to the east and south, and a Burlington-Northern &amp; Santa Fe (BNSF) railroad to the immediate west. The port, which was last modernized in the 1980s, sits approximately 10 miles to the east of the Lynden LPOE.</p>\n\n<p>The port operates 24/7/365 processing commercial, POVs, buses, and a significant number of pedestrian crossings. Sumas processes the 2nd most pedestrian crossings, after the Niagara Falls LPOE, along the northern US border. A significant number of these pedestrians make their way to &amp; from Canada, transiting through the Sumas LPOE, to access several storefront shipping locations in the downtown Sumas business district just south of the port to pick up packages shipped to, or within, the US.<br />\nThe Sumas LPOE and project site are in a floodplain that recently (2021) experienced a significant flooding event. Flood- and stormwater management will be a significant aspect of the Sumas project. The project must simultaneously: 1) ensure that the modernized port is adequately protected; 2) ensure that any management and mitigation efforts employed at the port do not introduce adverse impacts to the neighboring community; and 3) ensure that any flood- and stormwater mitigation efforts that the city, county, state, and/or federal government(s) undertake(s) &ndash; separately from the modernization project &ndash; to mitigate flood risk in the larger downtown community do not, in turn, negatively impact the port.</p>\n\n<p>GSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. This provides CBP with several operational advantages, including the ability to divert at least some of Sumas&rsquo; commercial traffic to the modernized Lynden port, on a limited basis, while the Sumas port is modernized after Lynden is brought on-line. It is important to note that the construction of these two ports cannot affect the operational mission of both Lynden and Sumas LPOE&rsquo;s.</p>\n\n<p>The project will seek to accomplish the following goals:<br />\n&bull; Provide best value to partner agencies and taxpayers<br />\n&bull; Develop safe, productive, and attractive workplaces<br />\n&bull; Deliver projects on time and on budget<br />\n&bull; Achieve building performance that is resilient and efficient<br />\n&bull; Leverage the skill of America&rsquo;s most qualified designers and artists<br />\n&bull; Strive for Design, Construction and Operational Excellence<br />\n&bull; Provide stewardship for the next generation of respected landmarks</p>\n\n<p>The DB contractor will be responsible for the complete design and construction of both ports, including&mdash;but not limited to&mdash;the following general scope elements:<br />\n&bull; Demolition and Site Preparation &bull; Removal of outdated port infrastructure, utilities, and impervious surfaces across both sites (approx. 8.7 acres combined). &bull; Site clearing, remediation, and preparation to meet updated floodplain and environmental requirements, particularly at the Sumas site.</p>\n\n<p>&bull; New Construction and Modernization &bull; Design and construction of modernized port facilities totaling approximately 117,000 square feet across both locations. &bull; Construction of new inspection facilities for passenger vehicles, buses, commercial traffic, and pedestrians. &bull; Development of support buildings including: o Main Administration and Inspection Facilities o Secure Commercial and POV Inspection Areas o Utility and Infrastructure Support Buildings o Extensive site improvements including access roads, parking areas, pedestrian pathways, landscaping, and perimeter security systems.</p>\n\n<p>&bull; Flood and Stormwater Management (Sumas-Specific) &bull; Implementation of flood and stormwater mitigation systems to protect the Sumas LPOE, with consideration of community impact and integration with regional flood control efforts.</p>\n\n<p>&bull; Construction Phasing and Operational Continuity &bull; GSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. &bull; Phasing plans must maintain partial operational capability at Sumas, especially for pedestrian and POV processing, throughout the project. Construction of these two ports cannot affect the operational mission of Lynden and Sumas LPOE&rsquo;s.</p>\n\n<p>The DB contractor must coordinate closely with GSA, CBP, and the Construction Manager as Advisor (CMA) to ensure timely delivery, funding compliance, and adherence to all federal and local regulatory requirements.</p>\n\n<p>ANTICIPATED PROCUREMENT SCHEDULE<br />\n&bull; Solicitation Release (Projected): Q4 FY2025<br />\n&bull; Contract Award (Projected): April 2026<br />\n&bull; Substantial Completion (Projected): March 2030 Note: All dates are estimates and subject to change.</p>\n\n<p>CAPABILITY STATEMENT INSTRUCTIONS<br />\nFirms interested in this opportunity should submit a Capabilities Statement (maximum 10 pages) addressing the following:<br />\n<strong>1. Company Information</strong><br />\n&bull; Company name, address, DUNS number/UEI, and primary POC (name, phone, email)<br />\n&bull; Business classification under NAICS 236220 (e.g., Large Business, Small Business, SDVOSB, etc.)<br />\n&bull; Years in business, affiliate or parent company details, and any joint venture or teaming partners</p>\n\n<p><strong>2. Expression of Interest</strong><br />\n&bull; A brief statement affirming the intent to propose as a prime contractor for any forthcoming solicitation related to this notice</p>\n\n<p><strong>3. Relevant Project Experience (Up to 2 Projects)</strong><br />\nEach project must demonstrate comparable size, complexity, scope, and delivery method. Include:<br />\n&bull; Project title, owner, and contract/reference number<br />\n&bull; Contract award value and completion year<br />\n&bull; Confirmation of Design-Build delivery method<br />\n&bull; Description of work performed between two (2) or more phased construction sites located 5 miles or more from each other.<br />\n&bull; Description of site planning and construction (utilities, roads, grading, storm drainage, security, etc.)<br />\n&bull; Description of specialized client/user needs (e.g., ports of entry, prisons, hospitals)<br />\n&bull; List of key personnel and technical skillsets relevant to this project<br />\n&bull; Current bonding capacity and evidence of ability to bond &gt;$400M</p>\n\n<p><strong>4. Cost Savings for Phasing Between 2 Construction Sites</strong><br />\nIn addition to your capabilities statement, please include any information about potential cost savings that can be obtained by combining the project phasing between 2 construction sites (5 miles or more apart) as opposed to working each site as independent, separate construction<br />\nprojects and contracts. Savings may include materials, personnel, mobilization, demobilization, administration, and other factors.</p>\n\n<p><strong>5. Project Labor Agreement (PLA) Survey</strong></p>\n\n<p>Please also fill out the attached PLA survey.&nbsp;&nbsp;The Government intends to use the responses to the attached survey for one year as a determination on whether or not to incorporate a PLA for general construction projects in the state of Washington.</p>\n\n<p></p>\n\n<p>EVALUATION &amp; NEXT STEPS<br />\nThis Sources Sought is intended to inform the acquisition strategy and determine whether sufficient interest exists among technically qualified and responsible firms. Responses will assist in determining potential for set-aside decisions under FAR Part 19.</p>\n\n<p>All qualified and interested firms&mdash;regardless of business size&mdash;are strongly encouraged to respond.</p>\n\n<p>SUBMISSION DETAILS<br />\n&bull; Due Date: Wednesday, June 4, 2025</p>\n\n<p></p>\n\n<p><strong>IMPORTANT NOTICE</strong></p>\n\n<p><strong>This is a Sources Sought Notice only.</strong></p>\n\n<p>This announcement is issued solely for market research and planning purposes. It does <strong>not</strong> constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.</p>\n\n<p></p>","text":"IMPORTANT NOTICE\n\nThis is a Sources Sought Notice only.\n\nThis announcement is issued solely for market research and planning purposes. It does not constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.\n\nPROJECT OVERVIEW\n\nThe U.S. General Services Administration (GSA), Public Buildings Service (PBS), Region 8, Capital Construction Branch is seeking capable and experienced Design-Build (D-B) firms for the modernization of the Lynden & Sumas Land Ports of Entry (LPOE), located in Washington.\n\nThe Government is conducting a market survey to identify qualified large and small businesses with substantial design-build experience on complex, remote projects of similar size, scope, and technical challenges.\n\n• Estimated Construction Magnitude: Over $400 million\n\n• NAICS Code: 236220 – Commercial and Institutional Building Construction\n\n• Small Business Size Standard: $45 million\n\nPROJECT DESCRIPTION\n\nThe two (2) ports are briefly described below.\n\nKENNETH G. WARD (LYNDEN) LPOE\n\nThe Lynden LPOE, occupying approximately 4.7 acres, is located along the US-Canadian border at the northern end of Washington State Route (SR) 539 (aka Guide-Meridian Road). The port, which is approximately 6 miles north of the city of Lynden WA, sits approximately 10 miles to the east of the Peace Arch and Pacific Highway LPOEs (which are in nearby Blaine WA), and sits approximately 10 miles to the west of the Sumas LPOE. The existing port was last modernized in the late 1980s.\n\nThe port operates 16 hours a day (08:00-00:00), 365 days a year processing commercial, privately owned vehicles (POVs), buses, and a limited number of pedestrian crossings. The port operates as a permit-only commercial location, limiting commercial traffic to entities that are transporting empty loads or who have prescheduled limited (monetary value) loads with CBP for transit through Lynden.\n\nSUMAS LPOE\n\nThe Sumas LPOE, which occupies approximately 4.0 acres, is located on WA SR 9 (aka Cherry Street) at the northern end of the city of Sumas WA. The port is surrounded by the US-Canadian border to the north, mixed use commercial and residential properties to the east and south, and a Burlington-Northern & Santa Fe (BNSF) railroad to the immediate west. The port, which was last modernized in the 1980s, sits approximately 10 miles to the east of the Lynden LPOE.\n\nThe port operates 24/7/365 processing commercial, POVs, buses, and a significant number of pedestrian crossings. Sumas processes the 2nd most pedestrian crossings, after the Niagara Falls LPOE, along the northern US border. A significant number of these pedestrians make their way to & from Canada, transiting through the Sumas LPOE, to access several storefront shipping locations in the downtown Sumas business district just south of the port to pick up packages shipped to, or within, the US.\n\nThe Sumas LPOE and project site are in a floodplain that recently (2021) experienced a significant flooding event. Flood- and stormwater management will be a significant aspect of the Sumas project. The project must simultaneously: 1) ensure that the modernized port is adequately protected; 2) ensure that any management and mitigation efforts employed at the port do not introduce adverse impacts to the neighboring community; and 3) ensure that any flood- and stormwater mitigation efforts that the city, county, state, and/or federal government(s) undertake(s) – separately from the modernization project – to mitigate flood risk in the larger downtown community do not, in turn, negatively impact the port.\n\nGSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. This provides CBP with several operational advantages, including the ability to divert at least some of Sumas’ commercial traffic to the modernized Lynden port, on a limited basis, while the Sumas port is modernized after Lynden is brought on-line. It is important to note that the construction of these two ports cannot affect the operational mission of both Lynden and Sumas LPOE’s.\n\nThe project will seek to accomplish the following goals:\n\n• Provide best value to partner agencies and taxpayers\n\n• Develop safe, productive, and attractive workplaces\n\n• Deliver projects on time and on budget\n\n• Achieve building performance that is resilient and efficient\n\n• Leverage the skill of America’s most qualified designers and artists\n\n• Strive for Design, Construction and Operational Excellence\n\n• Provide stewardship for the next generation of respected landmarks\n\nThe DB contractor will be responsible for the complete design and construction of both ports, including—but not limited to—the following general scope elements:\n\n• Demolition and Site Preparation • Removal of outdated port infrastructure, utilities, and impervious surfaces across both sites (approx. 8.7 acres combined). • Site clearing, remediation, and preparation to meet updated floodplain and environmental requirements, particularly at the Sumas site.\n\n• New Construction and Modernization • Design and construction of modernized port facilities totaling approximately 117,000 square feet across both locations. • Construction of new inspection facilities for passenger vehicles, buses, commercial traffic, and pedestrians. • Development of support buildings including: o Main Administration and Inspection Facilities o Secure Commercial and POV Inspection Areas o Utility and Infrastructure Support Buildings o Extensive site improvements including access roads, parking areas, pedestrian pathways, landscaping, and perimeter security systems.\n\n• Flood and Stormwater Management (Sumas-Specific) • Implementation of flood and stormwater mitigation systems to protect the Sumas LPOE, with consideration of community impact and integration with regional flood control efforts.\n\n• Construction Phasing and Operational Continuity • GSA and U.S. Customs and Border Patrol (CBP) currently expect that the D-B will employ sequential and concurrent construction phasing when modernizing the two ports. The current expectation is that Lynden will start its construction modernization first and then Sumas will follow approximately midway through construction. • Phasing plans must maintain partial operational capability at Sumas, especially for pedestrian and POV processing, throughout the project. Construction of these two ports cannot affect the operational mission of Lynden and Sumas LPOE’s.\n\nThe DB contractor must coordinate closely with GSA, CBP, and the Construction Manager as Advisor (CMA) to ensure timely delivery, funding compliance, and adherence to all federal and local regulatory requirements.\n\nANTICIPATED PROCUREMENT SCHEDULE\n\n• Solicitation Release (Projected): Q4 FY2025\n\n• Contract Award (Projected): April 2026\n\n• Substantial Completion (Projected): March 2030 Note: All dates are estimates and subject to change.\n\nCAPABILITY STATEMENT INSTRUCTIONS\n\nFirms interested in this opportunity should submit a Capabilities Statement (maximum 10 pages) addressing the following:\n\n1. Company Information\n\n• Company name, address, DUNS number/UEI, and primary POC (name, phone, email)\n\n• Business classification under NAICS 236220 (e.g., Large Business, Small Business, SDVOSB, etc.)\n\n• Years in business, affiliate or parent company details, and any joint venture or teaming partners\n\n2. Expression of Interest\n\n• A brief statement affirming the intent to propose as a prime contractor for any forthcoming solicitation related to this notice\n\n3. Relevant Project Experience (Up to 2 Projects)\n\nEach project must demonstrate comparable size, complexity, scope, and delivery method. Include:\n\n• Project title, owner, and contract/reference number\n\n• Contract award value and completion year\n\n• Confirmation of Design-Build delivery method\n\n• Description of work performed between two (2) or more phased construction sites located 5 miles or more from each other.\n\n• Description of site planning and construction (utilities, roads, grading, storm drainage, security, etc.)\n\n• Description of specialized client/user needs (e.g., ports of entry, prisons, hospitals)\n\n• List of key personnel and technical skillsets relevant to this project\n\n• Current bonding capacity and evidence of ability to bond >$400M\n\n4. Cost Savings for Phasing Between 2 Construction Sites\n\nIn addition to your capabilities statement, please include any information about potential cost savings that can be obtained by combining the project phasing between 2 construction sites (5 miles or more apart) as opposed to working each site as independent, separate construction\n\nprojects and contracts. Savings may include materials, personnel, mobilization, demobilization, administration, and other factors.\n\n5. Project Labor Agreement (PLA) Survey\n\nPlease also fill out the attached PLA survey. The Government intends to use the responses to the attached survey for one year as a determination on whether or not to incorporate a PLA for general construction projects in the state of Washington.\n\nEVALUATION & NEXT STEPS\n\nThis Sources Sought is intended to inform the acquisition strategy and determine whether sufficient interest exists among technically qualified and responsible firms. Responses will assist in determining potential for set-aside decisions under FAR Part 19.\n\nAll qualified and interested firms—regardless of business size—are strongly encouraged to respond.\n\nSUBMISSION DETAILS\n\n• Due Date: Wednesday, June 4, 2025\n\nIMPORTANT NOTICE\n\nThis is a Sources Sought Notice only.\n\nThis announcement is issued solely for market research and planning purposes. It does not constitute a solicitation, request for proposals, or offer. No contract will be awarded from this notice. The Government will not reimburse respondents for any costs associated with submission of information in response to this notice.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2025-10-23","posted_at":"2025-10-23T19:04:01.059Z","created_at":"2025-10-23T18:51:35.131Z","modified_at":"2025-11-22T05:04:31.487Z","response_deadline":{"raw":"2025-11-07T15:00:00-07:00","utc":"2025-11-07T22:00:00Z","date":"2025-11-07","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/21e3ac60942d44a7ac97f1243e0dc60d/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-22","archive_type":"auto15"},"history":[{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"},{"index":2,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-19T16:49:53.808Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"a5abadee65be4fc6b34c950a458ac909","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"e4475a69dc1f47a3a27540f51b378dd7"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"21e3ac60942d44a7ac97f1243e0dc60d","lineage_id":"e4475a69dc1f47a3a27540f51b378dd7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-25T01:38:27.099292874Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"2f6e39d1da67a60f3371e90c08121711ad67795cc329c6e5a483360b57df8485","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-25T01:38:27.099292874Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Solicitation No. 47PJ0025R0059</p>\n\n<p></p>\n\n<p>The General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.&nbsp;</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia.&nbsp;The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.&nbsp;</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988.&nbsp;The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p></p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3).&nbsp; For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p></p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals).&nbsp; Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals.&nbsp; Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p></p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p></p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and include the Phase 2 evaluation factors, developed in accordance with 15.304.&nbsp; Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p></p>\n\n<p>Stipend:&nbsp; In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p></p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p></p>\n\n<p>This procurement will be open to large business firms.&nbsp; The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.&nbsp;</p>\n\n<p></p>\n\n<p>The RFQ will be issued electronically in November/December 2025 at: http://www.SAM.gov/.&nbsp;</p>\n\n<p></p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov &nbsp;</p>","text":"Solicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and include the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nThe RFQ will be issued electronically in November/December 2025 at: http://www.SAM.gov/.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2025-12-15","posted_at":"2025-12-16T01:52:57.749Z","created_at":"2025-12-16T01:52:29.370Z","modified_at":"2026-08-12T17:55:19.044Z","response_deadline":{"raw":"2026-01-23T15:00:00-07:00","utc":"2026-01-23T22:00:00Z","date":"2026-01-23","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2790aec261674ce2ae874928381f919e/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-07","archive_type":"auto15"},"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"2790aec261674ce2ae874928381f919e","lineage_id":"ef33f065ecec4ad29e4798b09166e3af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T01:42:18.090922213Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"3e1b3a1e5d9410ea1a35f4a5a3c2302ce174e42666cf1dbb45370a7f8df92a0b","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T01:42:18.090922213Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","text":"Solicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2025-12-15","posted_at":"2025-12-16T01:50:40.388Z","created_at":"2025-12-16T01:45:15.348Z","modified_at":"2026-08-12T17:55:19.044Z","response_deadline":{"raw":"2026-01-23T15:00:00-07:00","utc":"2026-01-23T22:00:00Z","date":"2026-01-23","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/eb85629f6a2f41d1ad07baceb5800435/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-07","archive_type":"auto15"},"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"eb85629f6a2f41d1ad07baceb5800435","lineage_id":"ef33f065ecec4ad29e4798b09166e3af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T02:23:01.919473571Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"6f29944ce8e5a88157fa9b6d541443d8942ca8c08f9a213ef99f3b42d96c885b","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T02:23:01.919473571Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","text":"Solicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2025-12-15","posted_at":"2025-12-15T21:01:21.766Z","created_at":"2025-12-15T20:05:56.485Z","modified_at":"2026-08-12T17:55:19.044Z","response_deadline":{"raw":"2026-01-23T15:00:00-07:00","utc":"2026-01-23T22:00:00Z","date":"2026-01-23","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/ef33f065ecec4ad29e4798b09166e3af/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-07","archive_type":"auto15"},"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"ef33f065ecec4ad29e4798b09166e3af","lineage_id":"ef33f065ecec4ad29e4798b09166e3af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-19T02:24:02.926691826Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"e17c24e017e162cba928b343261256255fb5507eb2bf88cdcdb054e60ac7f08f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-19T02:24:02.926691826Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","text":"Solicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2026-01-09","posted_at":"2026-01-09T19:45:29.861Z","created_at":"2026-01-09T19:23:57.970Z","modified_at":"2026-08-12T17:55:19.044Z","response_deadline":{"raw":"2026-01-23T15:00:00-07:00","utc":"2026-01-23T22:00:00Z","date":"2026-01-23","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/6595a81be1d344689f652fcdb1630c49/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-02-07","archive_type":"auto15"},"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"6595a81be1d344689f652fcdb1630c49","lineage_id":"ef33f065ecec4ad29e4798b09166e3af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-17T00:14:17.988484043Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"f3a380e1a430ed76a432e205f690c1785afa118f6a2bbb6e6d719b9b3d1787bd","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-17T00:14:17.988484043Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"<p>Amendment 0001 - issued on January 09, 2026</p>\n\n<p>Amendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:</p>\n\n<p>-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.</p>\n\n<p>-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.</p>\n\n<p>-The Solicitation &ndash; Phase 1, revision dated January 09, 2026.&nbsp;&nbsp;</p>\n\n<p></p>\n\n<p>-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------</p>\n\n<p></p>\n\n<p></p>\n\n<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","text":"Amendment 0001 - issued on January 09, 2026\n\nAmendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:\n\n-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.\n\n-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.\n\n-The Solicitation – Phase 1, revision dated January 09, 2026.\n\n-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\n\nSolicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2026-08-12","posted_at":"2026-08-12T17:53:26.471Z","created_at":"2026-08-12T17:44:45.443Z","modified_at":"2026-08-12T17:55:19.044Z","response_deadline":{"raw":"2026-01-23T15:00:00-07:00","utc":"2026-01-23T22:00:00Z","date":"2026-01-23","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/4b2237440910436db0b5e685d0b142e4/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-13","archive_type":"auto_custom"},"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"4b2237440910436db0b5e685d0b142e4","lineage_id":"ef33f065ecec4ad29e4798b09166e3af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-25T01:28:14.568898482Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"7689cd4a09f062a65eeee3b43d728f2ab6a94c66c938303f23700bf0cc1680c7","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-25T01:28:14.568898482Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p></p>\n\n<p>Amendment 0002 - issued on August 10, 2026</p>\n\n<p>***This amendment is being issued to cancel the solicitaiton.***</p>\n\n<p></p>\n\n<p>-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------</p>\n\n<p></p>\n\n<p>Amendment 0001 - issued on January 09, 2026</p>\n\n<p>Amendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:</p>\n\n<p>-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.</p>\n\n<p>-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.</p>\n\n<p>-The Solicitation &ndash; Phase 1, revision dated January 09, 2026.&nbsp;&nbsp;</p>\n\n<p></p>\n\n<p>-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------</p>\n\n<p></p>\n\n<p></p>\n\n<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","text":"Amendment 0002 - issued on August 10, 2026\n\n***This amendment is being issued to cancel the solicitaiton.***\n\n-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\n\nAmendment 0001 - issued on January 09, 2026\n\nAmendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:\n\n-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.\n\n-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.\n\n-The Solicitation – Phase 1, revision dated January 09, 2026.\n\n-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\n\nSolicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"},{"dates":{"posted":"2026-08-12","posted_at":"2026-08-12T17:44:29.429Z","created_at":"2026-08-12T17:44:29.429Z","modified_at":"2026-08-12T17:55:19.044Z","response_deadline":{"raw":"2026-01-23T15:00:00-07:00","utc":"2026-01-23T22:00:00Z","date":"2026-01-23","time":"15:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/effb2b5fe6424109b092aefa8e1a4128/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","agency":{"office":{"code":"47PJ00","name":"PBS R8 ACQUISITION MANAGEMENT DIVISION"},"subtier":{"code":"4740","name":"PUBLIC BUILDINGS SERVICE"},"department":{"code":"047","name":"GENERAL SERVICES ADMINISTRATION"},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"organization_id":"100176880","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-13","archive_type":"auto_custom"},"history":[{"index":11,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":true,"posted_at":"2026-08-12T17:55:19.044Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"2e57895762a645fd947e183a1971cbcc","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":10,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:53:26.471Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"4b2237440910436db0b5e685d0b142e4","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":9,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-08-12T17:44:29.429Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"effb2b5fe6424109b092aefa8e1a4128","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":8,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-01-09T19:45:29.861Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"6595a81be1d344689f652fcdb1630c49","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":6,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:52:57.749Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"2790aec261674ce2ae874928381f919e","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":5,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-16T01:50:40.388Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"eb85629f6a2f41d1ad07baceb5800435","solicitation_number":"47PJ0025R0059","parent_opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":4,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-15T21:01:21.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"ef33f065ecec4ad29e4798b09166e3af","solicitation_number":"47PJ0025R0059","related_opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d"},{"index":3,"title":"Design-Build Services for Modernization of the Lynden & Sumas Land Ports of Entry","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-23T19:04:01.059Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"21e3ac60942d44a7ac97f1243e0dc60d","solicitation_number":"47PJ0025R0059","related_opportunity_id":"a5abadee65be4fc6b34c950a458ac909"}],"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"effb2b5fe6424109b092aefa8e1a4128","lineage_id":"ef33f065ecec4ad29e4798b09166e3af","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-09-25T01:50:10.428925340Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T00:55:27.040971Z","row_sha256":"e254b23a417a913f517941735d768b956686f59709f4658c8c2a2d9ff3db4d2b","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-25T01:50:10.428925340Z","first_seen_at":"2026-09-16T00:55:27.040971Z"},"description":{"html":"<p>Amendment 0001 - issued on January 09, 2026</p>\n\n<p>Amendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:</p>\n\n<p>-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.</p>\n\n<p>-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.</p>\n\n<p>-The Solicitation &ndash; Phase 1, revision dated January 09, 2026.&nbsp;&nbsp;</p>\n\n<p></p>\n\n<p>-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------</p>\n\n<p></p>\n\n<p></p>\n\n<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","text":"Amendment 0001 - issued on January 09, 2026\n\nAmendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:\n\n-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.\n\n-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.\n\n-The Solicitation – Phase 1, revision dated January 09, 2026.\n\n-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\n\nSolicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"47PJ0025R0059","place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1AZ"}],"due_at":"2026-01-23T22:00:00Z","due_date":"2026-01-23","closes_at":"2026-01-23T22:00:00Z","awardable":true,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PJ00","office_name":"PBS R8 ACQUISITION MANAGEMENT DIVISION","state":"WA","county":"53073","county_name":"Whatcom County","city":"5340805","city_name":"Lynden","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-09-25T02:40:32.644453Z","principal_notice_id":"effb2b5fe6424109b092aefa8e1a4128","description":{"text":"Amendment 0001 - issued on January 09, 2026\n\nAmendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:\n\n-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.\n\n-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.\n\n-The Solicitation – Phase 1, revision dated January 09, 2026.\n\n-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------\n\nSolicitation No. 47PJ0025R0059\n\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden & Sumas Land Ports Of Entry (LPOE’s) located in Washington State.\n\nThe Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP. The port’s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.\n\nThe Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4. It will also provide a dedicated pedestrian corridor and outbound inspection processing. The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.\n\nGSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.\n\nThe purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the “short-listed” Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 “short-list” on SAM.gov.\n\nMaximum Number of “Short-Listed” Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.\n\nPhase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.\n\nStipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nAt the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.\n\nThis procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.\n\nContracting Officer:\n\nShannon Sweeney\n\nEmail: Shannon.Sweeney@gsa.gov\n\nPhase 1 – Request for Qualifications\n\nThe Phase 1 Solicitation documents are comprised of the following:\n\n• (1) The Solicitation – Phase 1\n\n• (2) Standard Form (SF) 1442 – Solicitation Offer and Award\n\n• (3) Draft of the Agreement\n\n• (4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.\n\n• (5) Solicitation Attachment 01 - Offeror Representations and Certifications Form\n\n• (6) Solicitation Attachment 02 - Past Performance Questionnaire for Architect-Engineer\n\n• (7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor\n\n• (8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)\n\n• (9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices\n\n• (10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative\n\n• (11) Solicitation Attachment 07 - PBS Core Building Standards\n\nAll questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response. Any responses provided by GSA will be posted on the Governmentwide Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026. Multiple amendments providing responses to questions may be provided for questions that are submitted early. Offerors are encouraged to submit questions early.\n\nSubmission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026\n\nSubmission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.\n\nOfferors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.\n\nIn consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend. Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating. For the avoidance of doubt, no stipend is paid during Phase 1.\n\nA project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement. Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.\n\nDraft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 – Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.","html":"<p>Amendment 0001 - issued on January 09, 2026</p>\n\n<p>Amendment 0001 is being issued to accomplish the following; 1) post the interested parties list and 2) respond to questions asked by offerors during Phase 1 of the solicitation. into the Solicitation. The following revised documents are provided under the cover of this Amendment and are hereby incorporated into the Solicitation:</p>\n\n<p>-Solicitation Attachment 02: The Past Performance Questionnaire for Architect-Engineer Phase 1, revision dated January 09, 2026.</p>\n\n<p>-Solicitation Attachment 03: The Past Performance Questionnaire for the General Contractor Phase 1, revision dated January 09, 2026.</p>\n\n<p>-The Solicitation &ndash; Phase 1, revision dated January 09, 2026.&nbsp;&nbsp;</p>\n\n<p></p>\n\n<p>-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------</p>\n\n<p></p>\n\n<p></p>\n\n<p>Solicitation No. 47PJ0025R0059</p>\n\n<p><br />\nThe General Services Administration (GSA) intends to issue a Request for Qualifications (RFQ) for a Design-Build (DB) contract for new construction services to replace the existing Lynden &amp; Sumas Land Ports Of Entry (LPOE&rsquo;s) located in Washington State.</p>\n\n<p>The Kenneth G. Ward (Lynden) Land Port of Entry is a limited-service port operating 16 hours daily serving personal vehicles, buses, and limited (permit only) commercial truck traffic between Lynden, WA and Aldergrove, British Columbia. The existing port was last modernized in 1986 and is no longer able to meet the operational needs of US CBP.&nbsp; The port&rsquo;s limited commercial capability results in unbalanced demand and escalating wait times at other commercial ports in the surrounding area. The modernization project will: expand, separate, and relocate Privately Owned Vehicles (POV) and Commercial vehicles.</p>\n\n<p>The Sumas Land Port of Entry serves personal vehicles, buses, pedestrians and commercial traffic between Sumas, WA and British Columbia. It has the 2nd most pedestrian crossings along the Northern Border and was last modernized in 1988. The Sumas LPOE is no longer able to meet the operational needs of the US CBP. GSA will expand and modernize POV and commercial screening operations. The modernization project will: increase POV lanes from 5 to 6 and commercial lanes from 2 to 4.&nbsp; It will also provide a dedicated pedestrian corridor and outbound inspection processing.&nbsp; The Sumas LPOE is located in a floodplain that experienced a significant flooding event in 2021. Flood- and stormwater management will be a significant aspect of the Sumas project.</p>\n\n<p>GSA intends to award a firm-fixed price design-build contract pursuant to the Federal Acquisition Regulation (FAR) two-phase design-build selection procedures (FAR Subpart 36.3). For this contract award process, GSA will issue two Solicitations in sequence: Phase 1 and Phase 2, respectively.</p>\n\n<p>The purpose of Phase 1 (the Request for Qualifications) is to select the most highly qualified Offerors from Phase 1 to participate in Phase 2 (the Request for Proposals). Once Phase 1 is complete, the Contracting Officer will invite the &ldquo;short-listed&rdquo; Offerors to submit Phase 2 proposals. Potential Offerors are hereby placed on notice that GSA will publicly announce the names of the Phase 1 &ldquo;short-list&rdquo; on SAM.gov.</p>\n\n<p>Maximum Number of &ldquo;Short-Listed&rdquo; Offerors: The Contracting Officer will select a maximum of three (3) of the most highly rated Offerors to proceed to Phase 2.</p>\n\n<p>Phase 2 of the solicitation is prepared in accordance with FAR Part 15 and includes the Phase 2 evaluation factors, developed in accordance with 15.304. Phase 2 solicitations require submission of technical and price proposals, which are evaluated separately, in accordance with Part 15.</p>\n\n<p><br />\n&nbsp;</p>\n\n<p>Stipend: In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend to Offerors not selected for award of the resulting contract. Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for a stipend. For the avoidance of doubt, no stipend is paid during Phase 1.</p>\n\n<p>At the conclusion of Phase 2, GSA intends to award a contract to a single Offeror for all design and all construction services.</p>\n\n<p>This procurement will be open to large business firms. The firm shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal.</p>\n\n<p><strong><u>Contracting Officer:</u></strong></p>\n\n<p>Shannon Sweeney</p>\n\n<p>Email: Shannon.Sweeney@gsa.gov</p>\n\n<p></p>\n\n<p>Phase 1 &ndash; Request for Qualifications</p>\n\n<p>The Phase 1 Solicitation documents are comprised of the following:</p>\n\n<ul>\n\t<li>(1) The Solicitation &ndash; Phase 1</li>\n\t<li>(2) Standard Form (SF) 1442 &ndash; Solicitation Offer and Award&nbsp;</li>\n\t<li>(3) Draft of the Agreement&nbsp;</li>\n\t<li>(4) Draft of the Scope of Work, Specifications, Drawing Exhibits and other Attachments to the Agreement.</li>\n\t<li>(5) Solicitation Attachment 01 - Offeror Representations and Certifications Form&nbsp;</li>\n\t<li>(6) Solicitation Attachment 02 - Past Performance Questionnaire for&nbsp; &nbsp; Architect-Engineer</li>\n\t<li>(7) Solicitation Attachment 03 - Past Performance Questionnaire for General contractor</li>\n\t<li>(8) Solicitation Attachment 04 - Request for Controlled Unclassified Information (CUI)&nbsp;&nbsp;</li>\n\t<li>(9) Solicitation Attachment 05 - Program Development Study (PDS) Appendices</li>\n\t<li>(10) Solicitation Attachment 06 - Program Development Study (PDS) Narrative</li>\n\t<li>(11) Solicitation Attachment 07 - PBS Core Building Standards</li>\n</ul>\n\n<p></p>\n\n<p>All questions related to solicitation 47PJ0025R0059 shall be submitted in writing via email, to the Contracting Officer, no later than 3:00 PM Mountain Time, January 2. Questions received after this cutoff may not receive a response.&nbsp; Any responses provided by GSA will be posted on the Governmentwide<em> </em>Point of Entry (GPE) as an Amendment to the Solicitation no later than January 9, 2026.&nbsp; Multiple amendments providing responses to questions may be provided for questions that are submitted early.&nbsp; Offerors are encouraged to submit questions early.</p>\n\n<p>Submission Due Date/Time: 3:00 PM Mountain Time, January 23, 2026</p>\n\n<p>Submission Requirements: Interested Offerors shall thoroughly review the solicitation documents for all submission requirements.</p>\n\n<p>Offerors shall provide an executed Proprietary Information Agreement in accordance with Section II.D. Other Information to be Submitted with Proposals.&nbsp;</p>\n\n<p>In consideration for the preparation of a Phase 2 technical proposal, GSA will pay a stipend only to the Phase 2 Offerors submitting complete acceptable Phase 2 offers that are not selected for award of the resulting contract.&nbsp; Offerors that submit incomplete or unacceptable Phase 2 proposals will not be eligible for the stipend.&nbsp; Proposals will be considered complete and acceptable when offerors have addressed each of the Phase 1 factors, with each factor receiving at least a marginal rating.&nbsp; For the avoidance of doubt, no stipend is paid during Phase 1.&nbsp;&nbsp;</p>\n\n<p>A project labor agreement (PLA) will be required under Phase 2 in accordance with FAR 52.222-34, Project Labor Agreement.&nbsp; Prior to contract award, the contractor must enter into a PLA and maintain the PLA throughout the life of the contract.</p>\n\n<p>Draft Scope of Work documents are available. To receive a copy of the draft scope of work documents, offerors must first complete the provided CUI Information Request Form (Solicitation Attachment 04 &ndash; Request for Controlled Unclassified Information (CUI)) and return the completed/signed document to the Contracting Officer at shannon.sweeney@gsa.gov. Documents will be distributed to Offerors who return properly completed forms.</p>\n\n<p></p>","origin":"detail"},"contacts":[{"name":"Shannon Sweeney","role":"primary","email":"shannon.sweeney@gsa.gov"},{"name":"Tammy Quinn","role":"secondary","email":"tammy.quinn@gsa.gov"}],"place_of_performance":{"zip":"98264","city":{"code":"40805","name":"Lynden"},"state":{"code":"WA","name":"Washington"},"country":{"code":"USA","name":"UNITED STATES"}},"office_address":{"zip":"80225","city":"LAKEWOOD","state":"CO","country":"USA"},"naics_codes":["236220"],"award":null,"attachments":[{"resource_id":"4277b85586a64290a2b83e225f2db1d1","name":"PLA Survey.docx","kind":"file","mime_type":".docx","size_bytes":39707,"posted_at":"2025-05-19T16:49:53.808Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4277b85586a64290a2b83e225f2db1d1/download","mirrored":false},{"resource_id":"da3d2dd89db24a57bd4d22228152c97a","name":"Soliciation Attachment 04 - Request for Controlled Unclassified Information (CUI).pdf","kind":"file","mime_type":".pdf","size_bytes":100199,"posted_at":"2025-12-15T21:01:21.766Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/da3d2dd89db24a57bd4d22228152c97a/download","mirrored":false}],"awards":[],"related":[{"key":"47PJ0025R0054","latest_notice_id":"83ba99883b714099953f81f85a2c6d9a","title":"GSA Leasing Support Services Max (GLS Max)","solicitation_number":"47PJ0025R0054","notice_type":"p","first_type":"p","first_posted":"2025-04-16","last_posted":"2025-09-04","notices":12,"due_at":"2026-12-31T21:00:00Z","due_date":"2026-12-31","closes_at":"2026-12-31T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PJ00","office_name":"PBS R8 ACQUISITION MANAGEMENT DIVISION","naics":"531210","psc":"R402","set_aside":null,"state":"CO","county":"08031","county_name":"Denver County","city":"0820000","city_name":"Denver","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-01T02:14:55.543552Z"}],"similar_open":[{"key":"W912DW27RA011","latest_notice_id":"6b9f6a0ddd3b49e9ac62b28b95e89f26","title":"$300M Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for Facilities Sustainment, Restoration, and Modernization (FSRM) Program at Joint Base Lewis-McChord (JBLM)","solicitation_number":"W912DW27RA011","notice_type":"r","first_type":"r","first_posted":"2026-08-26","last_posted":"2026-11-17","notices":4,"due_at":"2026-12-01T22:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1JZ","set_aside":null,"state":"WA","county":"53053","county_name":"Pierce County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Joint Base Lewis-McChord","site_key":"joint-base-lewis-mcchord-wa","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"LPOELYNDENSS","latest_notice_id":"f89c1ac4317e4219a2edec4c398a69b5","title":"Design-Build Modernization of the LPOE in Lynden, Washington Sources Sought","solicitation_number":"LPOE_LYNDEN_SS","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-12-03T21:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PB53","office_name":"PBS CAPITAL PROJECTS - ZONES 5 & 6 BRANCH","naics":"236220","psc":null,"set_aside":null,"state":"WA","county":"53073","county_name":"Whatcom County","city":"5340805","city_name":"Lynden","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"W912DW27RA014","latest_notice_id":"365a0af20ef74105bf6b4bcde03def94","title":"JOINT BASE LEWIS MCCHORD MULTI DOMAIN TASK FORCE BUILDINGS 3223-3224, WASHINGTON","solicitation_number":"W912DW27RA014","notice_type":"o","first_type":"p","first_posted":"2026-09-16","last_posted":"2026-11-06","notices":6,"due_at":"2026-12-11T19:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912DW","office_name":"W071 ENDIST SEATTLE","naics":"236220","psc":"Y1AZ","set_aside":"SBA","state":"WA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Joint Base Lewis-McChord","site_key":"joint-base-lewis-mcchord-wa","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-07T04:54:53.607561Z"}],"similar_open_total":193,"indexable":false}