Solicitation
Department Of Energy - National Nuclear Security Administration Joint Cyber Facility Construction Solicitation
47PB5427R0003
Public Buildings Service, PBS Capital Projects - Zone 7 Branch. Commercial and Institutional Building Construction.
Offers due
December 7, 2026 at 1:00 PM EST
11 days from now. Posted November 2, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Similar, open now
- High Temp Hot Water Distribution System and Heat Plant Suite of Repairs to the US Air Force Academy COLORADO
Department of the Army, W071 Endist Omaha
Sources soughtNAICS 236220ColoradoW9128F27SM003Closes in 18 daysDec 14 - Byron White Courthouse Rug Replacement
Public Buildings Service, PBS Project Delivery Zones 5-7 - Rocky Mountain Branch
Combined synopsis and solicitationSmall businessNAICS 236220Denver, CO47PD5127Q9970Closes in 19 daysDec 15 - Y1DA | 521-24-102 | Renovate Wards 2K and 2B for Optometry/Ophthalmology Clinical Use
Department of Veterans Affairs, 247-Network Contract Office 7
SolicitationSDVOSBNAICS 236220Alabama36C24726R0134Due todayNov 26
All 183 open in commercial and institutional building construction
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. To compete, read the solicitation and its attachments, send questions to the contact named on the notice in writing, and submit the offer the way the solicitation says before the deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders have 35 days from the day the solicitation was posted, November 2, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Project Title: Department Of Energy - National Nuclear Security Administration Joint Cyber Facility
Project Location: Building 810, Denver Federal Center, Lakewood, Colorado 80225
NAICS: 236220, Commercial & Institutional Building Construction
Estimated Price Range: Between $10 and $20 million
1. Project Summary: The U.S. General Services Administration (GSA), intends to procure construction services for a design-bid-build project for the development of a Joint Cyber Facility (JCF) for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) at the Denver Federal Center in Lakewood, Colorado.
This requirement for a new turnkey JCF consists of approximately 23,688 square feet of combined office and support space, including approximately 16,000 square feet of finished office workspace and 7,688 square feet of existing mechanical and electrical rooms supporting the space. The project includes integration of existing equipment from a prior data center installation. The finished space includes a reception area, offices, conference rooms, hoteling cubicles, pantry, server room, and a large video conferencing room.
Construction and tenant build-out will occur within an occupied facility, necessitating careful coordination with active surrounding tenants. Work includes, demolition, architectural, mechanical, electrical, plumbing, fire protection, telecommunications, audio visual system infrastructure, security infrastructure, equipment, and coordinating installation of system furniture components, all of which must strictly adhere to accreditation requirements and standards.
2. Solicitation Documents and Access Requirements
NOTICE: Project-related documents, including drawings, specifications, and other supporting technical information, are available. To receive a copy of the scope of work documents, offerors must first complete the provided CUI Information Request Form (Request for Controlled Unclassified Information (CUI)) and any required Business License Form and submit the completed/signed forms to the Contracting Officer at jamie.potter@gsa.gov.
After submitting the required forms, offerors must request access to the controlled documents through SAM.gov. Access will be granted through SAM.gov to offerors that have submitted properly completed forms and requested access to the controlled documents.
3. Pre-Proposal Conference / Site Visit
Date: Thursday, November 12, 2026
Location: Building 810 Lobby, Denver Federal Center, Lakewood, Colorado
RSVP Deadline: Tuesday, November 10, 2026, at 11:00 a.m. (Mountain Time)
RSVP Registration Link: https://forms.gle/SL5GCKVBnby2Bb7j6
Interested offerors planning to attend the site visit must RSVP using the registration link provided above no later than the specified deadline.
4. Questions and Clarifications
All questions regarding the solicitation shall be submitted in writing via email to the Contracting Officer no later than Thursday, November 19, 2026, at 11:00 a.m. Mountain Time.
Questions received after the deadline may not be considered. The Government anticipates issuing responses to timely submitted questions through a solicitation amendment.
5. Proposal Submission
Proposal Due Date: Monday, December 7, 2026
Proposal Due Time: 11:00 a.m. Mountain Time
Offerors shall submit proposals in accordance with the instructions and requirements identified in the solicitation documents.
6. Additional Information
The solicitation and its associated documents establish the complete requirements, terms, conditions, evaluation criteria, and proposal submission instructions for this procurement.
Offerors are responsible for monitoring SAM.gov for solicitation amendments and other official updates.
Attachments
Files and links listed on SAM.gov. Files we hold a copy of download from here; the rest open SAM's download, which needs no account. Links open the sites the agency named.
- Pre-Proposal Conference / Site VisitLink to forms.gle, November 2, 2026
- Department Of Energy - National Nuclear Security Administration Joint Cyber Facility, Past Performance Questionnaire Google Form [GC]Link to forms.gle, November 2, 2026
- 06.4_9_FPS_Escort-After-Hours-Form_20260430.pdf330 KB, November 2, 2026
- 06.4_8_BAS Graphic Guideline Rev A.pdf143 KB, November 2, 2026
- 06.4_7_2022-0017-Niagara-Information-and-Conformation-Statement-NICS.pdf840 KB, November 2, 2026
- 06.4_6_GSA Data Normalization for Building Automation Systems_v25.pdf1.6 MB, November 2, 2026
- 06.4_5_NDA_Document_Security.pdf107 KB, November 2, 2026
- 06.4_4_CD_Waste_Management_Plan__Reporting_Template.xlsx358 KB, November 2, 2026
- 06.4_3_DOE NNSA JCF_Security ROCAL_YYYYMMDD.xlsx27 KB, November 2, 2026
- 06.4_2_ CDX Implementation Guide_V2025.1.pdf5.8 MB, November 2, 2026
- 06.4_1_GSA BIM, CDX & COBie Standard_v2025.1.pdf4.2 MB, November 2, 2026
- 06.3_4_Site Logistics Plan_20261028.pdf4.4 MB, November 2, 2026
- 06.3_3_FFE Responsibility Matrix_20261027.pdf471 KB, November 2, 2026
- 06.3_2_Owners Project Requirements_20261027.pdf278 KB, November 2, 2026
- 06.3_1_Commissioning Plan_20261023.pdf2.4 MB, November 2, 2026
- 06.2_5_Conference Rooms_GDIT AV Design_Rev 7_20261023.pdf2.1 MB, November 2, 2026
- 06.2_4_Watch Floor_Planar Video Wall Design_20260806.pdf1.0 MB, November 2, 2026
- 06.2_3a_Watch Floor Furniture Power Whip_PowerLinc Brochure 2024-LR.pdf947 KB, November 2, 2026
- 06.2_3_Watch Floor Furniture Design_Rev D_20260617.pdf4.7 MB, November 2, 2026
- 06.2_2_ICS-705-1_Construction Security Plan (CSP)_20261026.pdf184 KB, November 2, 2026
- 06.2_1_ICD-ICS-705_v1.5.1_20210726.pdf1.8 MB, November 2, 2026
- 06.1_12_DOE NNSA JCF_COBie Spreadsheet_IA & CMTA_20261023.xlsx1.5 MB, November 2, 2026
- 06.1_11_DOE NNSA JCF_BIM Execution Plan BEP & COBIE Integrated Design Process IDP_20.xlsx47 KB, November 2, 2026
- 06.1_10_DOE NNSA JCF_Final Existing Conditions Survey_Hazardous Materials Survey_260723.pdf73.8 MB, November 2, 2026
- 06.1_9_APPENDIX E - Mechanical Calculations_CD-100 IFC_20261023.pdf318 KB, November 2, 2026
- 06.1_8_DOE NNSA JCF_APPENDIX D - FP Calculations_CD-100 IFC_20261023.pdf1.6 MB, November 2, 2026
- 06.1_7_DOE NNSA JCF_APPENDIX C - ARCH-03GSAA-IA_LIGHTING CALCULATION REPORT_20261023.pdf804 KB, November 2, 2026
- 06.1_6_DOE NNSA JCF_APPENDIX B - Graphics_Signage_CD-100 IFC.pdf9.1 MB, November 2, 2026
- 06.1_5_DOE NNSA JCF_APPENDIX A - BUILDING 810 SOUTHWATCH.pdf1.6 MB, November 2, 2026
- 06.1_4_DOE NNSA JCF_Project Manual Volume 2_20261023.pdf9.1 MB, November 2, 2026
- 06.1_3_DOE NNSA JCF_Project Manual Volume 1_20261023.pdf11.8 MB, November 2, 2026
- 06.1_2_DOE NNSA JCF_CD-100% IFC Combined Set_20261023_.pdf104.8 MB, November 2, 2026
- 06.1_1_DOE NNSA JCF_Narrative Memo_20261023.pdf2.2 MB, November 2, 2026
- Wage Determination Davis-Bacon Act WD CO20260023.pdf40 KB, November 2, 2026
- 07_Price Proposal Form.xlsx117 KB, November 2, 2026
- 06_Department Of Energy - National Nuclear Security Administration Joint Cyber Facility SOW_20261029.pdf623 KB, November 2, 2026
- 05_Sample Proprietary Information Agreement.docx8 KB, November 2, 2026
- 04_CUI Building Information Request Form.pdf91 KB, November 2, 2026
- 03_Draft Agreement.docx55 KB, November 2, 2026
- 02_47PB5427R0003.pdf1.3 MB, November 2, 2026
- 01_Solicitation Department Of Energy - National Nuclear Security Administration Joint Cyber Facility.pdf619 KB, November 2, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 2, 2026
Solicitation, originally presolicitation
Due December 7, 2026 at 1:00 PM EST. SAM.gov, notice e87be19f02de482e99c7ad4ca3402fa8
2 revisions on SAM
- November 2, 2026: publish, solicitation
- August 6, 2026: publish, presolicitation
Points of contact
- Jamie (James) Potterjamie.potter@gsa.gov3035889153