Skip to content

SealedBidder is a private company, not a government agency.

Sign upDashboard
  • 8,681 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell SealedBidder what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and SealedBidder tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans

Special notice

CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads

Federal Highway Administration, Federal Highway Administration. Highway, Street, and Bridge Construction.

Response deadline

August 7, 2025 at 4:00 PM EDT

Closed 476 days ago. Posted July 23, 2025, first published July 23, 2025. Scheduled to archive September 30, 2025.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed in 2025

36 like it are open now in highway, street, and bridge construction

All 36 open in highway, street, and bridge construction

Reading this notice

Worked out from the publications and the award on this page.

Kind of notice
Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation. Glossary

Description

As published on SAM.gov.

CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

SPECIAL NOTICE TO PROSPECTIVE OFFERORS regarding CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Road project, Sources Sought Notice 6982AF-25-SS-0025.  Interested businesses must submit responses to the below questions by e-mail to CFLAcquisitions@dot.gov (Attn:  Jorey Deml) for receipt by close of business (2 p.m. local Denver time) on August 7, 2025: 

  1. Will your firm bid this project if it uses a Project Labor Agreement?
  2. If so, how much will your bid increase in terms of percent (estimated), due to the use of a Project Labor Agreement?

PROJECT NUMBER:  CA NP MOJA 11(2) 10(2)

PROJECT NAME:  Kelso-Cima and Kelbaker Roads

PROJECT DESCRIPTION: 

The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road.

SCOPE OF THE WORK: 

The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment.

The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection,

The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations.  Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work.  Prior experience on projects of similar magnitude is required.

Principle work items include:

110,000 tons of asphalt concrete pavement,

133,000 tons of roadway aggregate,

81,000 tons of aggregate surface course,

110,000 cubic yards of roadway excavation,

49 miles of full depth reclamation, method 2, 6-inch depth,

17,000 linear feet of concrete barrier (low water crossings),

44 miles of fence, tortoise barrier,

2,400 linear feet of tortoise crossing structure, and

12,000 cubic yards of rip rap

ANTICIPATED SCHEDULE: 

Advertisement – Fall 2025

Construction – Early 2026, duration 24 to 30 months

ESTIMATED COST RANGE: 

Between $80,000,000 and $120,000,000

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 23, 2025

    Special notice

    Due August 7, 2025 at 4:00 PM EDT. SAM.gov, notice 236acbdf41fe4653b246882a358b4f1b

    2 revisions on SAM
    • July 23, 2025: publish, special notice
    • July 23, 2025: publish, special notice
  2. July 23, 2025

    Special notice

    Due August 7, 2025 at 4:00 PM EDT. SAM.gov, notice 4263b8e9e7f84c6e9077d6bc03410a1a

    2 revisions on SAM
    • July 23, 2025: publish, special notice
    • July 23, 2025: publish, special notice

Points of contact