Justification
High Pressure Gas Storage Area Concrete Repair
4200947706
National Aeronautics and Space Administration, NASA Kennedy Space Center. Industrial Building Construction.
Status
Justification
Posted November 3, 2026. Scheduled to archive December 3, 2026.
Get the next one like this from National Aeronautics and Space Administration by email, the day it is posted.Find my opportunities
This one is not taking offers
6 like it are open now in industrial building construction
- IE181 - WHS Greenhouse Construction
Bureau of Indian Affairs, Indian Education Acquisition Office
SolicitationIndian small businessNAICS 236210Fort Wingate, NM140A2327Q0297Due in 5 daysNov 30 - Multiple Award Construction Contract (MACC)
Department of the Air Force, FA7060 11TH Contracting SQ PK
Sources soughtNAICS 236210District of ColumbiaFA706027RXXX2Due in 5 daysNov 30 - Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Department of the Air Force, FA8137 AFSC Pzioc
Closes in 8 daysDec 3
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Justification. Why an agency limited competition or awarded without it, citing the FAR authority. Glossary
Description
As published on SAM.gov.
Concrete spalling repair work at Space Launch Complex (LC) LC-39B. To ensure proper access to complete the work, approximately 20 high pressure gas (HPG) battery vessels will have to be removed. After the concrete spalling repair work is completed, the HPG battery vessels will have to be reinstalled. Associated testing, commissioning, and documentation are also required. These batteries provide extra gas storage capacity at LC-39B, supporting NASA’s Space Launch System (SLS) and NASA’s mission.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Fair Opportunity Exception - Pad B Battery - Concrete Spalling Final.pdf349 KB, November 3, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
November 3, 2026
Justification
SAM.gov, notice 742776a90d9b426d82671d1fd2f977f0
1 revision on SAM
- November 3, 2026: publish, justification
Points of contact
- Timothy Freelandtimothy.freeland-1@nasa.gov3218671095