Solicitation
Fermilab-Replace FFDG-Supplied Process Chiller-380607-DG
380607-DG
Department of Energy, Fermilab - DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
July 1, 2026 at 4:00 PM EDT
Closed 147 days ago. Posted June 2, 2026. Scheduled to archive July 16, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
This one closed in 2026
59 like it are open now in plumbing, heating, and air-conditioning contractors
- Replace Water Tanks FCI Marion Marions, Illinois
Federal Prison System / Bureau of Prisons, Fao
PresolicitationSmall businessNAICS 238220Ship to IL15BGCS26Q00000077Due in 5 daysNov 30 - Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228
Department of Veterans Affairs, 252-Network Contract Office 12
SolicitationSDVOSBNAICS 238220Illinois36C25227Q0059Closes in 8 daysDec 3 - FY27 Danville Mechanical MATOC SEED PROJECT NO: 550-26-106, Replace Air Handling Unit B58 at the VA Illiana Health Care System (VIHCS), Danville IL.
Department of Veterans Affairs, 252-Network Contract Office 12
PresolicitationSDVOSBNAICS 238220Illinois36C25227R0002Closes in 20 daysDec 15
All 59 open in plumbing, heating, and air-conditioning contractors
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238220 (plumbing, heating, and air-conditioning contractors), means no more than $19 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 29 days from the day the solicitation was posted, June 2, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
The Subcontractor shall perform all work as described in the Statement of Work titled for the Replace FFDG-Supplied Process Chiller and Attachment 2- Notes for Project “Replace FFDG-Supplied Process Chiller” All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 16_ DBA WD IL2026008 Mod 1_1.9.26.pdf96 KB, June 2, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 2, 2026
Solicitation
Due July 1, 2026 at 4:00 PM EDT. SAM.gov, notice 12b4840d282548bfb3cf882bd8c9b99c
1 revision on SAM
- June 2, 2026: publish, solicitation
Points of contact
- Dasia Guthriedguthrie@fnal.gov6308402494