Solicitation
USCG Station Rockland Window sealant
37000PR260000068Rocklandwindaows
US Coast Guard, Base Boston. Other Building Equipment Contractors.
Response deadline
September 1, 2026 at 12:00 AM EDT
Closed 87 days ago. Posted August 28, 2026. Scheduled to archive September 16, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed in 2026
17 like it are open now in other building equipment contractors
- JLM Roll Up Door Replacement
Department of Veterans Affairs, 256-Network Contract Office 16
Combined synopsis and solicitationSDVOSBNAICS 238290North Little Rock, AR36C25627Q0092Due in 3 daysNov 30 - Replace Elevators at FDC Miami
Federal Prison System / Bureau of Prisons, Fao
PresolicitationSmall businessNAICS 238290Miami, FL15BBNF26Q31000001Due in 6 daysDec 3 - 537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical Center
Department of Veterans Affairs, 252-Network Contract Office 12
Due in 7 daysDec 4
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Solicitation. A formal request for proposals, quotes or bids. Offers are due by the response deadline. Glossary
- Who may compete
- SAM.gov lists no set-aside on this notice, so it is not reserved for small businesses. Small, under NAICS 238290 (other building equipment contractors), means no more than $22 million in average annual receipts, counted with affiliates. What a set-aside is
- Time to respond
- Bidders had 4 days from the day the solicitation was posted, August 28, 2026, to the deadline.
Size standard from 13 CFR 121.201. The solicitation itself is what binds: check the code and standard it states.
Description
As published on SAM.gov.
Inspect all windows/awnings and surrounding for drafts, leaks, or visible damage and submit a report to the CG. The pre report will include using a water wand to verify where the water intrusion is coming from. After, the contractor will remove any old, cracked sealant and clean the surfaces thoroughly. Apply new, high quality, weather resistant, sealant around the entire window frame, ensuring a continuous and smooth bead. Check and adjust the window sashes, jambs, sill, flashing and locks to ensure a tight seal. Also, apply new, high quality, weather resistant, sealant around the awning to make sure no water intrusion occurs without taking the awning off. Reinstall or replace any worn weather stripping. Finally, conduct a post inspection insuring no leaks remain (water wand), confirming all parts are weather-tight. Replace all window interior trim pieces that were damaged with the same materials.
In accordance with the attached Statement Of Work (SOW).
quoters must provide proof of insurance
all wages and benefits must be in compliance with the SCA/Davis Bacon Act for the Disiplane of work, Place of Preformance, and Period of Preformance.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- DEI_FAR_Clause.docx16 KB, August 28, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 28, 2026
Solicitation
Due September 1, 2026 at 12:00 AM EDT. SAM.gov, notice 4bfd4912209042e48b663473497f9d73
1 revision on SAM
- August 28, 2026: publish, solicitation
Points of contact
- Matthew Johnstonmatthew.h.johnston@uscg.mil
- Jeff CenterJeffery.A.Center2@uscg.mil12068150512