# Correct FCA Deficiencies Construction

Canonical: https://sealedbidder.com/opportunities/36c77026r0006

- Solicitation number: 36C77026R0006
- Notice type: Award notice (first published as presolicitation)
- Status: Awarded to Capex Construction LLC for $6,170,241.00
- Department: Department of Veterans Affairs
- Contracting office: National Cmop Office (36C770)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1EZ Construction Of Other Industrial Buildings
- Set-aside: Service-disabled veteran-owned small business set-aside
- Small business size standard: $45 million in average annual receipts (13 CFR 121.201, NAICS 236220)
- Place of performance: Tucson, Arizona
- County: Pima County (FIPS 04019). https://sealedbidder.com/counties/pima-county-az-04019
- City: Tucson. https://sealedbidder.com/cities/tucson-az-0477000
- First posted: February 12, 2026
- Last posted: October 26, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/5fce01e4c3d94fdab7610310e1617c38/view

## Reading this notice

- Kind of notice: Award notice. Who won, when, and for how much.
- Who may compete: Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 236220 (commercial and institutional building construction), means no more than $45 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 114 days from the day the solicitation was posted, May 12, 2026, to the deadline. The deadline moved 5 times: it was first February 27, 2026 and ended as September 3, 2026.
- Before the solicitation: The agency published a presolicitation on February 12, 2026, 89 days before the solicitation.
- How it ended: Awarded to Capex Construction LLC on September 25, 2026, 22 days after offers were due. The contracting office reported 3 offers (full and open competition after exclusion of sources).

## Description

The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled &ldquo;762-24-101 FCA Drawings&rdquo; and &ldquo;762-24-101 FCA Specifications&rdquo;.  The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product..

## Attachments

- [36C77026R0006_1.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/91c8e9196c66445c8ec829050159c02b/download)
- [36C77026R0006_2.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/a4d1e5f28177498caa801733e8d66c6e/download)
- [Attachment 1 - Past Performance 36C77026R0006.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/6dbd77ef92fb40df92b86f6db13c0730/download)

## Award on USAspending

- Recipient: Capex Construction LLC (UEI VJWLNDEBBDM5)
- Contract: 36C77026C0005, definitive contract
- Obligated: $6,170,241.00
- Competition: Full and Open Competition After Exclusion of Sources, 3 offers received
- Link: solicitation number 36C77026R0006 equals the FPDS solicitation identifier; same awarding office 36C770 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C77026C0005_3600_-NONE-_-NONE-/


## Open now in the same industry

193 open in NAICS 236220.

- Yuma Proving Ground Job Order Contract (JOC) (W5168W27RA022), due November 30, 2026 at 2:00 PM EST. https://sealedbidder.com/opportunities/w5168w27ra022
- iHouse Apartment Construction (75H70126R00026), due December 1, 2026 at 5:00 PM EST. https://sealedbidder.com/opportunities/75h70126r00026
- ATS 3 Replacement (47PD5527Q0026), due December 15, 2026 at 6:00 PM EST. https://sealedbidder.com/opportunities/47pd5527q0026

## Publications

- February 12, 2026: Presolicitation, due February 27, 2026 at 3:30 PM EST. Notice f761bb31a94145a0a8e958ddc97874cb. https://sam.gov/workspace/contract/opp/f761bb31a94145a0a8e958ddc97874cb/view
- May 12, 2026: Solicitation, due June 10, 2026 at 3:30 PM EDT. Notice 0b244c7cbcee41f79f1a02437931adba. https://sam.gov/workspace/contract/opp/0b244c7cbcee41f79f1a02437931adba/view
- May 12, 2026: Solicitation, due June 10, 2026 at 3:30 PM EDT. Notice f7443f7309b2475bb0f4e12320583f64. https://sam.gov/workspace/contract/opp/f7443f7309b2475bb0f4e12320583f64/view
- May 15, 2026: Solicitation, due June 10, 2026 at 3:30 PM EDT. Notice 239b4c325f924aa18ac5eec12ffdc70c. https://sam.gov/workspace/contract/opp/239b4c325f924aa18ac5eec12ffdc70c/view
- May 15, 2026: Presolicitation, due February 27, 2026 at 3:30 PM EST. Notice 583f40192ac543708a9b7d43316ecbd4. https://sam.gov/workspace/contract/opp/583f40192ac543708a9b7d43316ecbd4/view
- June 4, 2026: Solicitation, due July 16, 2026 at 3:30 PM EDT. Notice e2b28b7a7f0f4b34b4b0cb1c558a4389. https://sam.gov/workspace/contract/opp/e2b28b7a7f0f4b34b4b0cb1c558a4389/view
- June 9, 2026: Solicitation, due July 16, 2026 at 3:30 PM EDT. Notice 0eb6279f9542441d9549af0a3cac85e0. https://sam.gov/workspace/contract/opp/0eb6279f9542441d9549af0a3cac85e0/view
- June 9, 2026: Solicitation, due July 16, 2026 at 3:30 PM EDT. Notice fcc5dc70fc244a8aba60d45b631d642b. https://sam.gov/workspace/contract/opp/fcc5dc70fc244a8aba60d45b631d642b/view
- July 9, 2026: Solicitation, due August 16, 2026 at 3:30 PM EDT. Notice c20d142f70374c36b691cc783dd8bfda. https://sam.gov/workspace/contract/opp/c20d142f70374c36b691cc783dd8bfda/view
- July 9, 2026: Solicitation, due August 16, 2026 at 3:30 PM EDT. Notice d73716bcaea84e1899a4f351da2cfc6e. https://sam.gov/workspace/contract/opp/d73716bcaea84e1899a4f351da2cfc6e/view
- July 9, 2026: Solicitation, due August 16, 2026 at 3:30 PM EDT. Notice f3fcf34ef1f046b3a3d3f5ee1fbd567f. https://sam.gov/workspace/contract/opp/f3fcf34ef1f046b3a3d3f5ee1fbd567f/view
- August 31, 2026: Solicitation, due September 3, 2026 at 3:30 PM EDT. Notice feb2faad295949ca81b7fdfa18bed050. https://sam.gov/workspace/contract/opp/feb2faad295949ca81b7fdfa18bed050/view
- October 26, 2026: Award notice. Notice 5fce01e4c3d94fdab7610310e1617c38. https://sam.gov/workspace/contract/opp/5fce01e4c3d94fdab7610310e1617c38/view

## Points of contact

- Billie Jo Cherico (Contractor), Contract Specialist, Billie.Cherico@va.gov, (913)758-9930
- Christy Pendlay, Christy.Pendlay@va.gov, 9136840152

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c77026r0006.
