{"canonical":"https://sealedbidder.com/opportunities/36c26325q0538","key":"36C26325Q0538","url":"https://sealedbidder.com/opportunities/36c26325q0538","title":"J041--Minneapolis VAMC Chiller Maintenance Sources Sought","solicitation_number":"36C26325Q0538","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-03-14T22:00:00Z","first_posted":"2025-03-06","last_posted":"2025-03-06","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"NETWORK CONTRACT OFFICE 23 (36C263)","naics":"561210","psc":"J041","set_aside":null,"place_state":"MN","place_scope":"site","site":"Minneapolis VA Medical Center","place_state_source":null,"place_evidence":null,"place_county":"27053","place_county_name":"Hennepin County","place_city":"2743000","place_city_name":"Minneapolis","winner":null,"award_amount":null,"publications":[{"notice_id":"f9c6116b1044478dacb32647035c22f7","title":"J041--Minneapolis VAMC Chiller Maintenance Sources Sought","solicitation_number":"36C26325Q0538","notice_type":"r","base_type":"r","posted":"2025-03-06","posted_at":"2025-03-06T20:57:17.381Z","due_at":"2025-03-14T22:00:00Z","due_date":"2025-03-14","cancelled":false,"archived":true,"archive_date":"2025-03-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f9c6116b1044478dacb32647035c22f7/view","enriched":true,"history":[{"index":3,"title":"J041--Minneapolis VAMC Chiller Maintenance Sources Sought","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T20:57:17.381Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f9c6116b1044478dacb32647035c22f7","solicitation_number":"36C26325Q0538"}]}],"latest_notice_id":"f9c6116b1044478dacb32647035c22f7","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-03-06","posted_at":"2025-03-06T20:57:17.381Z","created_at":"2025-03-06T20:57:15.196Z","modified_at":"2025-03-15T04:04:32.667Z","response_deadline":{"raw":"2025-03-14T17:00:00-05:00","utc":"2025-03-14T22:00:00Z","date":"2025-03-14","time":"17:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f9c6116b1044478dacb32647035c22f7/view"},"naics":{"codes":["561210"],"primary":"561210"},"title":"J041--Minneapolis VAMC Chiller Maintenance Sources Sought","agency":{"office":{"code":"36C263","name":"NETWORK CONTRACT OFFICE 23 (36C263)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"55101","city":"Saint Paul","state":"MN","country":"USA"},"organization_id":"100183219","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-03-14","archive_type":"auto_custom"},"history":[{"index":3,"title":"J041--Minneapolis VAMC Chiller Maintenance Sources Sought","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-03-06T20:57:17.381Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f9c6116b1044478dacb32647035c22f7","solicitation_number":"36C26325Q0538"}],"contacts":[{"name":"Jeffrey Brown","role":"primary","email":"Jeffrey.Brown8@va.gov","phone":"651-293-3009","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"f9c6116b1044478dacb32647035c22f7","lineage_id":"f9c6116b1044478dacb32647035c22f7","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-21T02:48:56.547642545Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c7fd44f11132e58a61c637b947dcd4ef4432d7e67d9bb8c2f15681282e790f41","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-21T02:48:56.547642545Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"The Minneapolis VAMC requires chiller maintenance and inspection services in accordance with the draft Statement of Work (SOW) below. \nThis is a sources sought/proof of capability solicitation looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement.\nIf you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a description of proof of capability to: Jeffrey.Brown8@va.gov on or before March 14th, 2025. Only emailed responses will be considered.\nAdditionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy. \n1.\nIdentify your organization's socio-economic category.\n2.\nState whether any of the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.).\n3.\nState if subcontracting is contemplated for this requirement and what percentage of the work will be subcontracted and for what tasks.\nÂ \n*If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses.*\n*If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.*\n\n\n\n\n\n\n\nSTATEMENT OF WORK\n\nMinneapolis Veteran Affairs Health Care System\nChiller Maintenance\n\n\nIntroduction:\n\nThe MVAHCS Chillers and associated equipment require preventative, scheduled maintenance, repairs and emergency service repairs. Requesting a Base year plus four option years (5 years total).\n\nObjectives:\n\nEstablish a chiller preventative maintenance contract with a reputable company that has a minimum of 5 years  experience performing all aspects of chiller maintenance on the makes and models listed below:\n\nEquipment\nBrand\nSize\nModel\nSerial\nLocation\nChiller 1\nYork\n1100 ton\nYKNQNRK1-CZGS    \nSMWM-774210\n69\nChiller 2\nYork\n1100 ton\nYKNQNRK1-CZG\nSMWM-753090 \n69\nChiller3\nYork\n1100 ton\nYKNQNRK1-CZG     \nSMWM-481550   \n69\nChiller 4\nYork\n1100 ton\nYKNQNRK2-CZG\nSMWM-700880   \n69\nChiller 5\nMcQuay\n290 ton\nWMC290DSC-ER10 \nSTNU081000119\nBJ101-70\nChiller 6\nMcQuay\n290 ton\nWMC290DSC-ER10\nSTNU0810001000\nBJ101-70\nChiller 7\nTrane\n500 ton\nCVHE0500\nL99C01119M\nA104-49\nChiller 8\nTrane\n70 ton\nRTAE 300F\nU17B07263\n70\nchiller 9\nTrane\n70 ton\nRTAE 300F\nU17B07264\n70\nChiller 10\nYork\n60 ton\nYCAL0060EB17X\nRCNM007937\n9\nChiller 11\nMcQuay\n50 ton\nAGZ050CHHNN\nSTNU090800034\nMRI 70\nChiller 12\nDimplex\n15 ton\nHW02-7500\n29643\nMRI 70\nChiller 13\nDimplex\nUNK\nW02-10000-2P-NF-L-M4\nW000055-001\nMRI 70\nChiller 14\nArtic\n30 ton\nTMACRPV0300D4-DS1\nA001040421\n49-CH-001\n\n \n\nStatement of Work:\n\nContractor will provide all labor, tools, equipment and preventative maintenance materials (parts/supplies) to preform Preventative Maintenance, Seasonal Maintenance and Periodic Services on the equipment listed above as per manufacture s service manual, technical bulletins and other documentation. Provide service parts and labor for end of season preventative maintenance services. All repair parts will meet manufacture s Specifications. Service to include maintaining York Variable Speed drive including replaced with OEM York Inhibitor annually.\n\n\nPreventative Maintenance Program includes:\n\nSeasonal Start Up\nSeasonal Shut down / End of season preventative maintenance.\nOil Analysis.\nOil and filter changes.\nVibration Analysis on Circulating Pumps (Annually).\nVibration Analysis on Cooling towers (Annually).\nCalibrate differential pressure sensors (Annually).\nCalibrate Flow Sensors (Annually).\nCondenser Tube Brushing- (Chillers 1, 2, 3, 4, 5, 6 and 7 - Annually) \nEvaporator Tube Brushing (every 3 years) Due FY 28\nEddy current testing (every 3 years) Due FY 28 chiller (Seasonal shut down).\n\n(see appendix A for details)\n\nSeasonal startup and shut down dates vary year to year depending on the weather conditions in Minneapolis, Minnesota. Typically, startup is in May and shut down is done in September. Exact dates will be coordinated with contractor each season in advance.\n\nProvide a service report to the Energy Plant Supervisor and the HVAC Shop Supervisor for each service completed. Provide any recommendations for necessary repairs or enhancements to maintain capacity, reliability, and efficiency. The written reports shall be submitted to the VAHCS Energy Center and HVAC Shop Supervisor within 10 calendar days after service is complete.\n\nContractor must be able to properly troubleshoot and diagnose all aspects of chiller system failures.\n\nTechnician s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the chiller system failure and that they have verified the chiller system has been properly diagnosed and concur with the technician s assessment.\n\nThe VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert s points that contradict the Contractor s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert s opinion.\n\nWorking hours:\n\nAnticipated hours of work will be Monday through Friday from 7:00 am   5:00 pm. Emergency repairs may be required after hours, weekends and/or federal holidays. \n\nObserved Federal Holidays:\n\nNew Year s Day  Martin Luther King Birthday\nWashington s Birthday Memorial Day\nJuneteenth   Independence Day  \nLabor Day   Columbus Day\nVeteran s Day   Thanksgiving Day\nChristmas Day \n\n\nSafety:\n\nContractor is responsible for maintaining a safe working environment for their employees as well as the MVAHACS Staff. Work areas will be kept cleaned throughout the day and all trash and demolished materials properly disposed of daily.\n\nAppropriate Personnel Protective Equipment (PPE) will be worn while performing work on the VA Campus. Contact COR for additional requirements. This may include PPE mandated by the facility.\n\n\nSecurity:\n\nContractor s personnel will utilize a temporary vendor s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.\n\nThe Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Contractors employees must complete web-based Rules of Behavior training.\n\nAll employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.\n\nContractor will submit all required security badging documents for each employee that will be on site to perform work. Signatures on documents must be wet signatures. The following documents must be completed .and returned within 5 business days from the award date of contract:\n\nOF 306- Must be Typed. Handwritten document will not be accepted.\nSelf Certification\nVA 10-2417\nEmployee Fingerprint Resource Form\n\nContractors are required to check in with the Energy Center Supervisor, HVAC Supervisor or the designated representative upon arrival at facility to obtain instructions, work orders and project location information.\n\n\n\nParking/Storage:\n\nParking is available by Bldg 69 (Energy Center) and at the main hospital in parking lots 11, 43A and 43B for vehicles (automobiles and Pickup trucks). Larger vehicles, equipment, job site trailers or storage containers must utilize parking lot 43A only. Contractor s contact information (name and phone number) is required to be displayed on all vehicles, equipment, trailers or containers that are stored overnight at the MVAHCS. Dropping off tools and materials at the loading dock is permitted but no parking is allowed in the loading dock area. Unattended vehicles in unauthorized parking areas will be ticketed by MVAHCS Police.\n\nAppendix A\n\nThe contractor shall use each manufacturer s specifications and guidelines, as a final determination to keep the chiller system operating as designed. The following list emphasizes the required tasks required to keep the chillers in good operating condition.\n\n\nSeasonal Start up: \n\nReview manufacturer's recommendations for startup. \nStart condenser, evaporator and cooling towers.\nStart chiller and monitor for proper operation and performance.\nLeak-test chiller for refrigerant system leaks with an electronic leak detector.\nCheck for any Oil leaks.\nLog all operating conditions after unit stabilizes.\nReview Owners logs and log all operating conditions.\nReview operating procedures and owners log with chiller operator.\nRetrieve oil samples after startup and send to test lab analysis.\nCheck refrigerant levels (Annually)\nCheck oil levels (Annually).\nCalibrate Flow sensors (25 ea - Flow sensors).\nCalibrate Differential Sensors (35 ea- Differential pressure sensors).\nPerform Vibration Analysis for Pumps and motor assemblies (45 ea - Pumps).\nPerform Vibration Analysis for Cooling Tower motor and gear boxes (8 ea)\nCheck oil sump heater and purge pump oil heater where applicable.\nAll electric wiring integral to each chiller.\nAll refrigerant piping associated with the chiller systems.\nInsulation on the refrigerant piping and equipment, to be re-installed up to Industry standards.\nCheck and test all operating and safety controls.\nInspect and test all pressure and temperature controls, thermometers, and manual valves located on the equipment.\nCalibration of three Refrigerant Leak Detection Systems in Chiller Mechanical Rooms \n\n\n\nSeasonal Shut down / End of season preventative maintenance:\n\nPerform Spectro-chemical oil Analysis.\nRefrigerant analysis.\nOil and filter change per manufactures service manual for each chiller.\nTube Brushing. Brushing and Cleaning of all condensers and tubes, which include both bell ends being removed. Brushing and cleaning Service only applies to chillers 1, 2, 3, 4, 5, 6 and 7.\nEvaporator Tube Brushing every 3 years Due FY 28\nEddy current testing every 3 years. Due Feb 2028.\nInspect main starter and control panel.\nLeak test chiller for refrigerant and oil systems leaks using an electronic leak detector.\nTest electrical wiring insulation using the Megohmmeter method for compressor motor and oil pump motor.\nClean and tighten all electrical terminals.\nTest oil for acidity.\nCheck oil sump heater operation.\nService York Variable Speed drive including OEM York Inhibitor annually.\n\n\n\nVibration Analysis:\n\nParameters tested:   Results:\nMeasure horizontal deflections Report\nMeasure vertical deflections Trends\nMeasure axial deflections  Recommendations\nEstablish baseline\nVibration analysis shall be performed annually.\n\n\nProvide detailed vibration analysis reports. Reports shall include information about the condition of pumps or cooling towers and solutions to repair each item.\n\nSpectrochemical oil analysis:\n\nParameters tested:  Results:\nMetals    Diagnosis\nMoisture   Trends\nAcid Number   Recommendations\n1-oil analysis shall be performed annually. \n\nProvide detailed report for each sample.\n\nRefrigerant analysis:\n\nParameters tested:  Results:\nHigh boiling residue  Diagnosis\nAcid Number   Trends\nMoisture Content  Recommendations\nRefrigerant analysis shall be performed annually.\n\nProvide a detailed report for each sample.\n\n\nEddy current testing shall be performed in Fiscal Year 2028 (Every 3 calendar years). Analyses are to be performed on both evaporator and condenser tubes. Both end bells shall be removed during the process of the Eddy Current Testing and the evaporator/ condenser cleaning procedure.\n\nParameters tested:  Results:\nCorrosion   Verbal report\nSupport wear   Written report\nFreeze bulge   Charts/diagrams\nSplit fins   Recommendations\nLeakers   Pitting\n\n\nEND","text":"The Minneapolis VAMC requires chiller maintenance and inspection services in accordance with the draft Statement of Work (SOW) below.\nThis is a sources sought/proof of capability solicitation looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement.\nIf you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a description of proof of capability to: Jeffrey.Brown8@va.gov on or before March 14th, 2025. Only emailed responses will be considered.\nAdditionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy.\n1.\nIdentify your organization's socio-economic category.\n2.\nState whether any of the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.).\n3.\nState if subcontracting is contemplated for this requirement and what percentage of the work will be subcontracted and for what tasks.\nÂ\n*If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses.*\n*If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.*\n\nSTATEMENT OF WORK\n\nMinneapolis Veteran Affairs Health Care System\nChiller Maintenance\n\nIntroduction:\n\nThe MVAHCS Chillers and associated equipment require preventative, scheduled maintenance, repairs and emergency service repairs. Requesting a Base year plus four option years (5 years total).\n\nObjectives:\n\nEstablish a chiller preventative maintenance contract with a reputable company that has a minimum of 5 years experience performing all aspects of chiller maintenance on the makes and models listed below:\n\nEquipment\nBrand\nSize\nModel\nSerial\nLocation\nChiller 1\nYork\n1100 ton\nYKNQNRK1-CZGS\nSMWM-774210\n69\nChiller 2\nYork\n1100 ton\nYKNQNRK1-CZG\nSMWM-753090\n69\nChiller3\nYork\n1100 ton\nYKNQNRK1-CZG\nSMWM-481550\n69\nChiller 4\nYork\n1100 ton\nYKNQNRK2-CZG\nSMWM-700880\n69\nChiller 5\nMcQuay\n290 ton\nWMC290DSC-ER10\nSTNU081000119\nBJ101-70\nChiller 6\nMcQuay\n290 ton\nWMC290DSC-ER10\nSTNU0810001000\nBJ101-70\nChiller 7\nTrane\n500 ton\nCVHE0500\nL99C01119M\nA104-49\nChiller 8\nTrane\n70 ton\nRTAE 300F\nU17B07263\n70\nchiller 9\nTrane\n70 ton\nRTAE 300F\nU17B07264\n70\nChiller 10\nYork\n60 ton\nYCAL0060EB17X\nRCNM007937\n9\nChiller 11\nMcQuay\n50 ton\nAGZ050CHHNN\nSTNU090800034\nMRI 70\nChiller 12\nDimplex\n15 ton\nHW02-7500\n29643\nMRI 70\nChiller 13\nDimplex\nUNK\nW02-10000-2P-NF-L-M4\nW000055-001\nMRI 70\nChiller 14\nArtic\n30 ton\nTMACRPV0300D4-DS1\nA001040421\n49-CH-001\n\nStatement of Work:\n\nContractor will provide all labor, tools, equipment and preventative maintenance materials (parts/supplies) to preform Preventative Maintenance, Seasonal Maintenance and Periodic Services on the equipment listed above as per manufacture s service manual, technical bulletins and other documentation. Provide service parts and labor for end of season preventative maintenance services. All repair parts will meet manufacture s Specifications. Service to include maintaining York Variable Speed drive including replaced with OEM York Inhibitor annually.\n\nPreventative Maintenance Program includes:\n\nSeasonal Start Up\nSeasonal Shut down / End of season preventative maintenance.\nOil Analysis.\nOil and filter changes.\nVibration Analysis on Circulating Pumps (Annually).\nVibration Analysis on Cooling towers (Annually).\nCalibrate differential pressure sensors (Annually).\nCalibrate Flow Sensors (Annually).\nCondenser Tube Brushing- (Chillers 1, 2, 3, 4, 5, 6 and 7 - Annually)\nEvaporator Tube Brushing (every 3 years) Due FY 28\nEddy current testing (every 3 years) Due FY 28 chiller (Seasonal shut down).\n\n(see appendix A for details)\n\nSeasonal startup and shut down dates vary year to year depending on the weather conditions in Minneapolis, Minnesota. Typically, startup is in May and shut down is done in September. Exact dates will be coordinated with contractor each season in advance.\n\nProvide a service report to the Energy Plant Supervisor and the HVAC Shop Supervisor for each service completed. Provide any recommendations for necessary repairs or enhancements to maintain capacity, reliability, and efficiency. The written reports shall be submitted to the VAHCS Energy Center and HVAC Shop Supervisor within 10 calendar days after service is complete.\n\nContractor must be able to properly troubleshoot and diagnose all aspects of chiller system failures.\n\nTechnician s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the chiller system failure and that they have verified the chiller system has been properly diagnosed and concur with the technician s assessment.\n\nThe VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert s points that contradict the Contractor s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert s opinion.\n\nWorking hours:\n\nAnticipated hours of work will be Monday through Friday from 7:00 am 5:00 pm. Emergency repairs may be required after hours, weekends and/or federal holidays.\n\nObserved Federal Holidays:\n\nNew Year s Day Martin Luther King Birthday\nWashington s Birthday Memorial Day\nJuneteenth Independence Day\nLabor Day Columbus Day\nVeteran s Day Thanksgiving Day\nChristmas Day\n\nSafety:\n\nContractor is responsible for maintaining a safe working environment for their employees as well as the MVAHACS Staff. Work areas will be kept cleaned throughout the day and all trash and demolished materials properly disposed of daily.\n\nAppropriate Personnel Protective Equipment (PPE) will be worn while performing work on the VA Campus. Contact COR for additional requirements. This may include PPE mandated by the facility.\n\nSecurity:\n\nContractor s personnel will utilize a temporary vendor s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.\n\nThe Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Contractors employees must complete web-based Rules of Behavior training.\n\nAll employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.\n\nContractor will submit all required security badging documents for each employee that will be on site to perform work. Signatures on documents must be wet signatures. The following documents must be completed .and returned within 5 business days from the award date of contract:\n\nOF 306- Must be Typed. Handwritten document will not be accepted.\nSelf Certification\nVA 10-2417\nEmployee Fingerprint Resource Form\n\nContractors are required to check in with the Energy Center Supervisor, HVAC Supervisor or the designated representative upon arrival at facility to obtain instructions, work orders and project location information.\n\nParking/Storage:\n\nParking is available by Bldg 69 (Energy Center) and at the main hospital in parking lots 11, 43A and 43B for vehicles (automobiles and Pickup trucks). Larger vehicles, equipment, job site trailers or storage containers must utilize parking lot 43A only. Contractor s contact information (name and phone number) is required to be displayed on all vehicles, equipment, trailers or containers that are stored overnight at the MVAHCS. Dropping off tools and materials at the loading dock is permitted but no parking is allowed in the loading dock area. Unattended vehicles in unauthorized parking areas will be ticketed by MVAHCS Police.\n\nAppendix A\n\nThe contractor shall use each manufacturer s specifications and guidelines, as a final determination to keep the chiller system operating as designed. The following list emphasizes the required tasks required to keep the chillers in good operating condition.\n\nSeasonal Start up:\n\nReview manufacturer's recommendations for startup.\nStart condenser, evaporator and cooling towers.\nStart chiller and monitor for proper operation and performance.\nLeak-test chiller for refrigerant system leaks with an electronic leak detector.\nCheck for any Oil leaks.\nLog all operating conditions after unit stabilizes.\nReview Owners logs and log all operating conditions.\nReview operating procedures and owners log with chiller operator.\nRetrieve oil samples after startup and send to test lab analysis.\nCheck refrigerant levels (Annually)\nCheck oil levels (Annually).\nCalibrate Flow sensors (25 ea - Flow sensors).\nCalibrate Differential Sensors (35 ea- Differential pressure sensors).\nPerform Vibration Analysis for Pumps and motor assemblies (45 ea - Pumps).\nPerform Vibration Analysis for Cooling Tower motor and gear boxes (8 ea)\nCheck oil sump heater and purge pump oil heater where applicable.\nAll electric wiring integral to each chiller.\nAll refrigerant piping associated with the chiller systems.\nInsulation on the refrigerant piping and equipment, to be re-installed up to Industry standards.\nCheck and test all operating and safety controls.\nInspect and test all pressure and temperature controls, thermometers, and manual valves located on the equipment.\nCalibration of three Refrigerant Leak Detection Systems in Chiller Mechanical Rooms\n\nSeasonal Shut down / End of season preventative maintenance:\n\nPerform Spectro-chemical oil Analysis.\nRefrigerant analysis.\nOil and filter change per manufactures service manual for each chiller.\nTube Brushing. Brushing and Cleaning of all condensers and tubes, which include both bell ends being removed. Brushing and cleaning Service only applies to chillers 1, 2, 3, 4, 5, 6 and 7.\nEvaporator Tube Brushing every 3 years Due FY 28\nEddy current testing every 3 years. Due Feb 2028.\nInspect main starter and control panel.\nLeak test chiller for refrigerant and oil systems leaks using an electronic leak detector.\nTest electrical wiring insulation using the Megohmmeter method for compressor motor and oil pump motor.\nClean and tighten all electrical terminals.\nTest oil for acidity.\nCheck oil sump heater operation.\nService York Variable Speed drive including OEM York Inhibitor annually.\n\nVibration Analysis:\n\nParameters tested: Results:\nMeasure horizontal deflections Report\nMeasure vertical deflections Trends\nMeasure axial deflections Recommendations\nEstablish baseline\nVibration analysis shall be performed annually.\n\nProvide detailed vibration analysis reports. Reports shall include information about the condition of pumps or cooling towers and solutions to repair each item.\n\nSpectrochemical oil analysis:\n\nParameters tested: Results:\nMetals Diagnosis\nMoisture Trends\nAcid Number Recommendations\n1-oil analysis shall be performed annually.\n\nProvide detailed report for each sample.\n\nRefrigerant analysis:\n\nParameters tested: Results:\nHigh boiling residue Diagnosis\nAcid Number Trends\nMoisture Content Recommendations\nRefrigerant analysis shall be performed annually.\n\nProvide a detailed report for each sample.\n\nEddy current testing shall be performed in Fiscal Year 2028 (Every 3 calendar years). Analyses are to be performed on both evaporator and condenser tubes. Both end bells shall be removed during the process of the Eddy Current Testing and the evaporator/ condenser cleaning procedure.\n\nParameters tested: Results:\nCorrosion Verbal report\nSupport wear Written report\nFreeze bulge Charts/diagrams\nSplit fins Recommendations\nLeakers Pitting\n\nEND","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C26325Q0538","place_of_performance":{"zip":"55417","city":{"code":"43000","name":"Minneapolis"},"state":{"code":"MN","name":"Minnesota"},"street":"Minneapolis VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1 Veterans Drive"},"product_service_code":"J041"}],"due_at":"2025-03-14T22:00:00Z","due_date":"2025-03-14","closes_at":"2025-03-14T22:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C263","office_name":"NETWORK CONTRACT OFFICE 23 (36C263)","state":"MN","county":"27053","county_name":"Hennepin County","city":"2743000","city_name":"Minneapolis","country":"USA","state_source":null,"state_evidence":null,"site_key":"minneapolis-va-medical-center-mn","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-21T03:23:40.946336Z","principal_notice_id":"f9c6116b1044478dacb32647035c22f7","description":{"text":"The Minneapolis VAMC requires chiller maintenance and inspection services in accordance with the draft Statement of Work (SOW) below.\nThis is a sources sought/proof of capability solicitation looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement.\nIf you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a description of proof of capability to: Jeffrey.Brown8@va.gov on or before March 14th, 2025. Only emailed responses will be considered.\nAdditionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy.\n1.\nIdentify your organization's socio-economic category.\n2.\nState whether any of the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.).\n3.\nState if subcontracting is contemplated for this requirement and what percentage of the work will be subcontracted and for what tasks.\nÂ\n*If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses.*\n*If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.*\n\nSTATEMENT OF WORK\n\nMinneapolis Veteran Affairs Health Care System\nChiller Maintenance\n\nIntroduction:\n\nThe MVAHCS Chillers and associated equipment require preventative, scheduled maintenance, repairs and emergency service repairs. Requesting a Base year plus four option years (5 years total).\n\nObjectives:\n\nEstablish a chiller preventative maintenance contract with a reputable company that has a minimum of 5 years experience performing all aspects of chiller maintenance on the makes and models listed below:\n\nEquipment\nBrand\nSize\nModel\nSerial\nLocation\nChiller 1\nYork\n1100 ton\nYKNQNRK1-CZGS\nSMWM-774210\n69\nChiller 2\nYork\n1100 ton\nYKNQNRK1-CZG\nSMWM-753090\n69\nChiller3\nYork\n1100 ton\nYKNQNRK1-CZG\nSMWM-481550\n69\nChiller 4\nYork\n1100 ton\nYKNQNRK2-CZG\nSMWM-700880\n69\nChiller 5\nMcQuay\n290 ton\nWMC290DSC-ER10\nSTNU081000119\nBJ101-70\nChiller 6\nMcQuay\n290 ton\nWMC290DSC-ER10\nSTNU0810001000\nBJ101-70\nChiller 7\nTrane\n500 ton\nCVHE0500\nL99C01119M\nA104-49\nChiller 8\nTrane\n70 ton\nRTAE 300F\nU17B07263\n70\nchiller 9\nTrane\n70 ton\nRTAE 300F\nU17B07264\n70\nChiller 10\nYork\n60 ton\nYCAL0060EB17X\nRCNM007937\n9\nChiller 11\nMcQuay\n50 ton\nAGZ050CHHNN\nSTNU090800034\nMRI 70\nChiller 12\nDimplex\n15 ton\nHW02-7500\n29643\nMRI 70\nChiller 13\nDimplex\nUNK\nW02-10000-2P-NF-L-M4\nW000055-001\nMRI 70\nChiller 14\nArtic\n30 ton\nTMACRPV0300D4-DS1\nA001040421\n49-CH-001\n\nStatement of Work:\n\nContractor will provide all labor, tools, equipment and preventative maintenance materials (parts/supplies) to preform Preventative Maintenance, Seasonal Maintenance and Periodic Services on the equipment listed above as per manufacture s service manual, technical bulletins and other documentation. Provide service parts and labor for end of season preventative maintenance services. All repair parts will meet manufacture s Specifications. Service to include maintaining York Variable Speed drive including replaced with OEM York Inhibitor annually.\n\nPreventative Maintenance Program includes:\n\nSeasonal Start Up\nSeasonal Shut down / End of season preventative maintenance.\nOil Analysis.\nOil and filter changes.\nVibration Analysis on Circulating Pumps (Annually).\nVibration Analysis on Cooling towers (Annually).\nCalibrate differential pressure sensors (Annually).\nCalibrate Flow Sensors (Annually).\nCondenser Tube Brushing- (Chillers 1, 2, 3, 4, 5, 6 and 7 - Annually)\nEvaporator Tube Brushing (every 3 years) Due FY 28\nEddy current testing (every 3 years) Due FY 28 chiller (Seasonal shut down).\n\n(see appendix A for details)\n\nSeasonal startup and shut down dates vary year to year depending on the weather conditions in Minneapolis, Minnesota. Typically, startup is in May and shut down is done in September. Exact dates will be coordinated with contractor each season in advance.\n\nProvide a service report to the Energy Plant Supervisor and the HVAC Shop Supervisor for each service completed. Provide any recommendations for necessary repairs or enhancements to maintain capacity, reliability, and efficiency. The written reports shall be submitted to the VAHCS Energy Center and HVAC Shop Supervisor within 10 calendar days after service is complete.\n\nContractor must be able to properly troubleshoot and diagnose all aspects of chiller system failures.\n\nTechnician s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the chiller system failure and that they have verified the chiller system has been properly diagnosed and concur with the technician s assessment.\n\nThe VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert s points that contradict the Contractor s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert s opinion.\n\nWorking hours:\n\nAnticipated hours of work will be Monday through Friday from 7:00 am 5:00 pm. Emergency repairs may be required after hours, weekends and/or federal holidays.\n\nObserved Federal Holidays:\n\nNew Year s Day Martin Luther King Birthday\nWashington s Birthday Memorial Day\nJuneteenth Independence Day\nLabor Day Columbus Day\nVeteran s Day Thanksgiving Day\nChristmas Day\n\nSafety:\n\nContractor is responsible for maintaining a safe working environment for their employees as well as the MVAHACS Staff. Work areas will be kept cleaned throughout the day and all trash and demolished materials properly disposed of daily.\n\nAppropriate Personnel Protective Equipment (PPE) will be worn while performing work on the VA Campus. Contact COR for additional requirements. This may include PPE mandated by the facility.\n\nSecurity:\n\nContractor s personnel will utilize a temporary vendor s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.\n\nThe Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Contractors employees must complete web-based Rules of Behavior training.\n\nAll employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.\n\nContractor will submit all required security badging documents for each employee that will be on site to perform work. Signatures on documents must be wet signatures. The following documents must be completed .and returned within 5 business days from the award date of contract:\n\nOF 306- Must be Typed. Handwritten document will not be accepted.\nSelf Certification\nVA 10-2417\nEmployee Fingerprint Resource Form\n\nContractors are required to check in with the Energy Center Supervisor, HVAC Supervisor or the designated representative upon arrival at facility to obtain instructions, work orders and project location information.\n\nParking/Storage:\n\nParking is available by Bldg 69 (Energy Center) and at the main hospital in parking lots 11, 43A and 43B for vehicles (automobiles and Pickup trucks). Larger vehicles, equipment, job site trailers or storage containers must utilize parking lot 43A only. Contractor s contact information (name and phone number) is required to be displayed on all vehicles, equipment, trailers or containers that are stored overnight at the MVAHCS. Dropping off tools and materials at the loading dock is permitted but no parking is allowed in the loading dock area. Unattended vehicles in unauthorized parking areas will be ticketed by MVAHCS Police.\n\nAppendix A\n\nThe contractor shall use each manufacturer s specifications and guidelines, as a final determination to keep the chiller system operating as designed. The following list emphasizes the required tasks required to keep the chillers in good operating condition.\n\nSeasonal Start up:\n\nReview manufacturer's recommendations for startup.\nStart condenser, evaporator and cooling towers.\nStart chiller and monitor for proper operation and performance.\nLeak-test chiller for refrigerant system leaks with an electronic leak detector.\nCheck for any Oil leaks.\nLog all operating conditions after unit stabilizes.\nReview Owners logs and log all operating conditions.\nReview operating procedures and owners log with chiller operator.\nRetrieve oil samples after startup and send to test lab analysis.\nCheck refrigerant levels (Annually)\nCheck oil levels (Annually).\nCalibrate Flow sensors (25 ea - Flow sensors).\nCalibrate Differential Sensors (35 ea- Differential pressure sensors).\nPerform Vibration Analysis for Pumps and motor assemblies (45 ea - Pumps).\nPerform Vibration Analysis for Cooling Tower motor and gear boxes (8 ea)\nCheck oil sump heater and purge pump oil heater where applicable.\nAll electric wiring integral to each chiller.\nAll refrigerant piping associated with the chiller systems.\nInsulation on the refrigerant piping and equipment, to be re-installed up to Industry standards.\nCheck and test all operating and safety controls.\nInspect and test all pressure and temperature controls, thermometers, and manual valves located on the equipment.\nCalibration of three Refrigerant Leak Detection Systems in Chiller Mechanical Rooms\n\nSeasonal Shut down / End of season preventative maintenance:\n\nPerform Spectro-chemical oil Analysis.\nRefrigerant analysis.\nOil and filter change per manufactures service manual for each chiller.\nTube Brushing. Brushing and Cleaning of all condensers and tubes, which include both bell ends being removed. Brushing and cleaning Service only applies to chillers 1, 2, 3, 4, 5, 6 and 7.\nEvaporator Tube Brushing every 3 years Due FY 28\nEddy current testing every 3 years. Due Feb 2028.\nInspect main starter and control panel.\nLeak test chiller for refrigerant and oil systems leaks using an electronic leak detector.\nTest electrical wiring insulation using the Megohmmeter method for compressor motor and oil pump motor.\nClean and tighten all electrical terminals.\nTest oil for acidity.\nCheck oil sump heater operation.\nService York Variable Speed drive including OEM York Inhibitor annually.\n\nVibration Analysis:\n\nParameters tested: Results:\nMeasure horizontal deflections Report\nMeasure vertical deflections Trends\nMeasure axial deflections Recommendations\nEstablish baseline\nVibration analysis shall be performed annually.\n\nProvide detailed vibration analysis reports. Reports shall include information about the condition of pumps or cooling towers and solutions to repair each item.\n\nSpectrochemical oil analysis:\n\nParameters tested: Results:\nMetals Diagnosis\nMoisture Trends\nAcid Number Recommendations\n1-oil analysis shall be performed annually.\n\nProvide detailed report for each sample.\n\nRefrigerant analysis:\n\nParameters tested: Results:\nHigh boiling residue Diagnosis\nAcid Number Trends\nMoisture Content Recommendations\nRefrigerant analysis shall be performed annually.\n\nProvide a detailed report for each sample.\n\nEddy current testing shall be performed in Fiscal Year 2028 (Every 3 calendar years). Analyses are to be performed on both evaporator and condenser tubes. Both end bells shall be removed during the process of the Eddy Current Testing and the evaporator/ condenser cleaning procedure.\n\nParameters tested: Results:\nCorrosion Verbal report\nSupport wear Written report\nFreeze bulge Charts/diagrams\nSplit fins Recommendations\nLeakers Pitting\n\nEND","html":"The Minneapolis VAMC requires chiller maintenance and inspection services in accordance with the draft Statement of Work (SOW) below. \nThis is a sources sought/proof of capability solicitation looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement.\nIf you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a description of proof of capability to: Jeffrey.Brown8@va.gov on or before March 14th, 2025. Only emailed responses will be considered.\nAdditionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy. \n1.\nIdentify your organization's socio-economic category.\n2.\nState whether any of the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.).\n3.\nState if subcontracting is contemplated for this requirement and what percentage of the work will be subcontracted and for what tasks.\nÂ \n*If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses.*\n*If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.*\n\n\n\n\n\n\n\nSTATEMENT OF WORK\n\nMinneapolis Veteran Affairs Health Care System\nChiller Maintenance\n\n\nIntroduction:\n\nThe MVAHCS Chillers and associated equipment require preventative, scheduled maintenance, repairs and emergency service repairs. Requesting a Base year plus four option years (5 years total).\n\nObjectives:\n\nEstablish a chiller preventative maintenance contract with a reputable company that has a minimum of 5 years  experience performing all aspects of chiller maintenance on the makes and models listed below:\n\nEquipment\nBrand\nSize\nModel\nSerial\nLocation\nChiller 1\nYork\n1100 ton\nYKNQNRK1-CZGS    \nSMWM-774210\n69\nChiller 2\nYork\n1100 ton\nYKNQNRK1-CZG\nSMWM-753090 \n69\nChiller3\nYork\n1100 ton\nYKNQNRK1-CZG     \nSMWM-481550   \n69\nChiller 4\nYork\n1100 ton\nYKNQNRK2-CZG\nSMWM-700880   \n69\nChiller 5\nMcQuay\n290 ton\nWMC290DSC-ER10 \nSTNU081000119\nBJ101-70\nChiller 6\nMcQuay\n290 ton\nWMC290DSC-ER10\nSTNU0810001000\nBJ101-70\nChiller 7\nTrane\n500 ton\nCVHE0500\nL99C01119M\nA104-49\nChiller 8\nTrane\n70 ton\nRTAE 300F\nU17B07263\n70\nchiller 9\nTrane\n70 ton\nRTAE 300F\nU17B07264\n70\nChiller 10\nYork\n60 ton\nYCAL0060EB17X\nRCNM007937\n9\nChiller 11\nMcQuay\n50 ton\nAGZ050CHHNN\nSTNU090800034\nMRI 70\nChiller 12\nDimplex\n15 ton\nHW02-7500\n29643\nMRI 70\nChiller 13\nDimplex\nUNK\nW02-10000-2P-NF-L-M4\nW000055-001\nMRI 70\nChiller 14\nArtic\n30 ton\nTMACRPV0300D4-DS1\nA001040421\n49-CH-001\n\n \n\nStatement of Work:\n\nContractor will provide all labor, tools, equipment and preventative maintenance materials (parts/supplies) to preform Preventative Maintenance, Seasonal Maintenance and Periodic Services on the equipment listed above as per manufacture s service manual, technical bulletins and other documentation. Provide service parts and labor for end of season preventative maintenance services. All repair parts will meet manufacture s Specifications. Service to include maintaining York Variable Speed drive including replaced with OEM York Inhibitor annually.\n\n\nPreventative Maintenance Program includes:\n\nSeasonal Start Up\nSeasonal Shut down / End of season preventative maintenance.\nOil Analysis.\nOil and filter changes.\nVibration Analysis on Circulating Pumps (Annually).\nVibration Analysis on Cooling towers (Annually).\nCalibrate differential pressure sensors (Annually).\nCalibrate Flow Sensors (Annually).\nCondenser Tube Brushing- (Chillers 1, 2, 3, 4, 5, 6 and 7 - Annually) \nEvaporator Tube Brushing (every 3 years) Due FY 28\nEddy current testing (every 3 years) Due FY 28 chiller (Seasonal shut down).\n\n(see appendix A for details)\n\nSeasonal startup and shut down dates vary year to year depending on the weather conditions in Minneapolis, Minnesota. Typically, startup is in May and shut down is done in September. Exact dates will be coordinated with contractor each season in advance.\n\nProvide a service report to the Energy Plant Supervisor and the HVAC Shop Supervisor for each service completed. Provide any recommendations for necessary repairs or enhancements to maintain capacity, reliability, and efficiency. The written reports shall be submitted to the VAHCS Energy Center and HVAC Shop Supervisor within 10 calendar days after service is complete.\n\nContractor must be able to properly troubleshoot and diagnose all aspects of chiller system failures.\n\nTechnician s Supervisor shall provide the MVAHCS with a written statement and itemized quote assessing the chiller system failure and that they have verified the chiller system has been properly diagnosed and concur with the technician s assessment.\n\nThe VA reserves the right to enlist a third-party expert to provide a 2nd opinion. It is the responsibility of the Contractor to reassess their proposed repairs and either reaffirm or correct their proposal based on the expert s notes. The reassessment shall include at a minimum, a substantive analysis of the third-party expert s points that contradict the Contractor s original conclusion. This reassessment shall be submitted within 5 business days of receipt of the third-party expert s opinion.\n\nWorking hours:\n\nAnticipated hours of work will be Monday through Friday from 7:00 am   5:00 pm. Emergency repairs may be required after hours, weekends and/or federal holidays. \n\nObserved Federal Holidays:\n\nNew Year s Day  Martin Luther King Birthday\nWashington s Birthday Memorial Day\nJuneteenth   Independence Day  \nLabor Day   Columbus Day\nVeteran s Day   Thanksgiving Day\nChristmas Day \n\n\nSafety:\n\nContractor is responsible for maintaining a safe working environment for their employees as well as the MVAHACS Staff. Work areas will be kept cleaned throughout the day and all trash and demolished materials properly disposed of daily.\n\nAppropriate Personnel Protective Equipment (PPE) will be worn while performing work on the VA Campus. Contact COR for additional requirements. This may include PPE mandated by the facility.\n\n\nSecurity:\n\nContractor s personnel will utilize a temporary vendor s security badge until a permanent security PIV badge can be issued. Temporary badge use will not exceed 30 calendar days.\n\nThe Contractor shall comply with Minneapolis VA security, access and badging requirements. Employees must provide fingerprints and be able to pass a background check so they can obtain Security access badge. Contractors employees must complete web-based Rules of Behavior training.\n\nAll employees will need a valid personal email account. Fingerprint scheduling/appointments, background investigation tasks and Training Management System (TMS) required classes notifications will be sent to their email address throughout the process.\n\nContractor will submit all required security badging documents for each employee that will be on site to perform work. Signatures on documents must be wet signatures. The following documents must be completed .and returned within 5 business days from the award date of contract:\n\nOF 306- Must be Typed. Handwritten document will not be accepted.\nSelf Certification\nVA 10-2417\nEmployee Fingerprint Resource Form\n\nContractors are required to check in with the Energy Center Supervisor, HVAC Supervisor or the designated representative upon arrival at facility to obtain instructions, work orders and project location information.\n\n\n\nParking/Storage:\n\nParking is available by Bldg 69 (Energy Center) and at the main hospital in parking lots 11, 43A and 43B for vehicles (automobiles and Pickup trucks). Larger vehicles, equipment, job site trailers or storage containers must utilize parking lot 43A only. Contractor s contact information (name and phone number) is required to be displayed on all vehicles, equipment, trailers or containers that are stored overnight at the MVAHCS. Dropping off tools and materials at the loading dock is permitted but no parking is allowed in the loading dock area. Unattended vehicles in unauthorized parking areas will be ticketed by MVAHCS Police.\n\nAppendix A\n\nThe contractor shall use each manufacturer s specifications and guidelines, as a final determination to keep the chiller system operating as designed. The following list emphasizes the required tasks required to keep the chillers in good operating condition.\n\n\nSeasonal Start up: \n\nReview manufacturer's recommendations for startup. \nStart condenser, evaporator and cooling towers.\nStart chiller and monitor for proper operation and performance.\nLeak-test chiller for refrigerant system leaks with an electronic leak detector.\nCheck for any Oil leaks.\nLog all operating conditions after unit stabilizes.\nReview Owners logs and log all operating conditions.\nReview operating procedures and owners log with chiller operator.\nRetrieve oil samples after startup and send to test lab analysis.\nCheck refrigerant levels (Annually)\nCheck oil levels (Annually).\nCalibrate Flow sensors (25 ea - Flow sensors).\nCalibrate Differential Sensors (35 ea- Differential pressure sensors).\nPerform Vibration Analysis for Pumps and motor assemblies (45 ea - Pumps).\nPerform Vibration Analysis for Cooling Tower motor and gear boxes (8 ea)\nCheck oil sump heater and purge pump oil heater where applicable.\nAll electric wiring integral to each chiller.\nAll refrigerant piping associated with the chiller systems.\nInsulation on the refrigerant piping and equipment, to be re-installed up to Industry standards.\nCheck and test all operating and safety controls.\nInspect and test all pressure and temperature controls, thermometers, and manual valves located on the equipment.\nCalibration of three Refrigerant Leak Detection Systems in Chiller Mechanical Rooms \n\n\n\nSeasonal Shut down / End of season preventative maintenance:\n\nPerform Spectro-chemical oil Analysis.\nRefrigerant analysis.\nOil and filter change per manufactures service manual for each chiller.\nTube Brushing. Brushing and Cleaning of all condensers and tubes, which include both bell ends being removed. Brushing and cleaning Service only applies to chillers 1, 2, 3, 4, 5, 6 and 7.\nEvaporator Tube Brushing every 3 years Due FY 28\nEddy current testing every 3 years. Due Feb 2028.\nInspect main starter and control panel.\nLeak test chiller for refrigerant and oil systems leaks using an electronic leak detector.\nTest electrical wiring insulation using the Megohmmeter method for compressor motor and oil pump motor.\nClean and tighten all electrical terminals.\nTest oil for acidity.\nCheck oil sump heater operation.\nService York Variable Speed drive including OEM York Inhibitor annually.\n\n\n\nVibration Analysis:\n\nParameters tested:   Results:\nMeasure horizontal deflections Report\nMeasure vertical deflections Trends\nMeasure axial deflections  Recommendations\nEstablish baseline\nVibration analysis shall be performed annually.\n\n\nProvide detailed vibration analysis reports. Reports shall include information about the condition of pumps or cooling towers and solutions to repair each item.\n\nSpectrochemical oil analysis:\n\nParameters tested:  Results:\nMetals    Diagnosis\nMoisture   Trends\nAcid Number   Recommendations\n1-oil analysis shall be performed annually. \n\nProvide detailed report for each sample.\n\nRefrigerant analysis:\n\nParameters tested:  Results:\nHigh boiling residue  Diagnosis\nAcid Number   Trends\nMoisture Content  Recommendations\nRefrigerant analysis shall be performed annually.\n\nProvide a detailed report for each sample.\n\n\nEddy current testing shall be performed in Fiscal Year 2028 (Every 3 calendar years). Analyses are to be performed on both evaporator and condenser tubes. Both end bells shall be removed during the process of the Eddy Current Testing and the evaporator/ condenser cleaning procedure.\n\nParameters tested:  Results:\nCorrosion   Verbal report\nSupport wear   Written report\nFreeze bulge   Charts/diagrams\nSplit fins   Recommendations\nLeakers   Pitting\n\n\nEND","origin":"detail"},"contacts":[{"name":"Jeffrey Brown","role":"primary","email":"Jeffrey.Brown8@va.gov","phone":"651-293-3009","title":"Contracting Officer"}],"place_of_performance":{"zip":"55417","city":{"code":"43000","name":"Minneapolis"},"state":{"code":"MN","name":"Minnesota"},"street":"Minneapolis VAMC","country":{"code":"USA","name":"UNITED STATES"},"street2":"1 Veterans Drive"},"office_address":{"zip":"55101","city":"Saint Paul","state":"MN","country":"USA"},"naics_codes":["561210"],"award":{"awardee":{}},"attachments":[{"resource_id":"e570c270591342ccba0c3e11ac4f8346","name":"Sources Sought 36C26325Q0538.docx","kind":"file","mime_type":".docx","size_bytes":37382,"posted_at":"2025-03-06T20:57:17.381Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e570c270591342ccba0c3e11ac4f8346/download","mirrored":false}],"awards":[],"related":[{"key":"36C26327R0007","latest_notice_id":"95bb4c1f961f4f338e8e9b4b060e07cc","title":"W065--V23 Home Oxygen Emergency Bridge Contract (VA-27-00021984)","solicitation_number":"36C26327R0007","notice_type":"p","first_type":"p","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C263","office_name":"NETWORK CONTRACT OFFICE 23 (36C263)","naics":"532283","psc":"W065","set_aside":null,"state":"MN","county":"27037","county_name":"Dakota County","city":"2717288","city_name":"Eagan","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T09:15:14.204648Z"},{"key":"36C26327Q0008","latest_notice_id":"8125dedb922a4a6faede820c70a19007","title":"Minneapolis VA Medical Library Serials & Periodicals Solicitation","solicitation_number":"36C26327Q0008","notice_type":"o","first_type":"o","first_posted":"2026-08-20","last_posted":"2026-11-13","notices":8,"due_at":"2026-11-27T23:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C263","office_name":"NETWORK CONTRACT OFFICE 23 (36C263)","naics":"513120","psc":"7630","set_aside":"SBA","state":"MN","county":"27053","county_name":"Hennepin County","city":"2743000","city_name":"Minneapolis","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"36C26326R0063","latest_notice_id":"d70c843cc4d84fd69905d2e17ce78771","title":"NWI Offsite Pathology Services","solicitation_number":"36C26326R0063","notice_type":"o","first_type":"o","first_posted":"2026-10-09","last_posted":"2026-11-20","notices":5,"due_at":"2026-11-30T16:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C263","office_name":"NETWORK CONTRACT OFFICE 23 (36C263)","naics":"621511","psc":"Q515","set_aside":"SBA","state":"NE","county":"31055","county_name":"Douglas County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C26327Q0131","latest_notice_id":"885e687dd48e45c295666a91fc27da2b","title":"6515--Medtronic FT10 Series Cauterizer","solicitation_number":"36C26327Q0131","notice_type":"k","first_type":"k","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-30T16:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C263","office_name":"NETWORK CONTRACT OFFICE 23 (36C263)","naics":"334510","psc":"6515","set_aside":"SDVOSBC","state":"ND","county":"38017","county_name":"Cass County","city":"3825700","city_name":"Fargo","country":null,"place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"},{"key":"36C26327Q0124","latest_notice_id":"20b13f623c264277af31f93dde8fdcff","title":"J041--Service - AHU PM & Filter Evaluation - NWI","solicitation_number":"36C26327Q0124","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T16:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C263","office_name":"NETWORK CONTRACT OFFICE 23 (36C263)","naics":"238220","psc":"J041","set_aside":null,"state":"NE","county":"31055","county_name":"Douglas County","city":"3137000","city_name":"Omaha","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"FA462026QA303","latest_notice_id":"da68e1a3e39e41e0ae6b6adac38e3984","title":"FA27 Fall Arrest Inspection Services","solicitation_number":"FA462026QA303","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4620","office_name":"FA4620 92 CONS LGC","naics":"561210","psc":"H342","set_aside":"SBA","state":"WA","county":"53063","county_name":"Spokane County","city":"5322955","city_name":"Fairchild AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"M0068127R0002","latest_notice_id":"309bf2fd5f174025a6c27c4c74c1461a","title":"Parachute Rigger Sources Sought","solicitation_number":"M0068127R0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-27T08:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T08:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-M00681","office_name":"COMMANDING GENERAL","naics":"561210","psc":"H281","set_aside":null,"state":"AZ","county":"04027","county_name":"Yuma County","city":"0485680","city_name":"Yuma Proving Ground","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"PANMCC27P0000058616","latest_notice_id":"9f11bedb9c904a2c954087cad2324036","title":"Ft. Belvoir LRC Central Issuing Facility (CIF) Support Services","solicitation_number":"PANMCC-27-P-0000_058616","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91QV1","office_name":"W6QM MICC-FT BELVOIR","naics":"561210","psc":"R699","set_aside":"SBA","state":"VA","county":"51059","county_name":"Fairfax County","city":"5129008","city_name":"Fort Belvoir","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Fort Belvoir","site_key":"fort-belvoir-va","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":40,"indexable":false}