{"canonical":"https://sealedbidder.com/opportunities/36c26225q0972","key":"36C26225Q0972","url":"https://sealedbidder.com/opportunities/36c26225q0972","title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","solicitation_number":"36C26225Q0972","notice_type":"k","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-06-13T17:00:00Z","first_posted":"2025-06-05","last_posted":"2025-06-05","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"811210","psc":"J065","set_aside":"SBA","place_state":"CA","place_scope":"site","site":null,"place_state_source":"sam_state_name","place_evidence":null,"place_county":"06037","place_county_name":"Los Angeles County","place_city":"0644000","place_city_name":"Los Angeles","winner":null,"award_amount":null,"publications":[{"notice_id":"a57da14ae4b44ac6a597de3f4a167ebd","title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","solicitation_number":"36C26225Q0972","notice_type":"k","base_type":"k","posted":"2025-06-05","posted_at":"2025-06-05T13:33:21.998Z","due_at":"2025-06-13T17:00:00Z","due_date":"2025-06-13","cancelled":false,"archived":true,"archive_date":"2025-07-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/a57da14ae4b44ac6a597de3f4a167ebd/view","enriched":true,"history":[{"index":3,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:33:21.998Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a57da14ae4b44ac6a597de3f4a167ebd","solicitation_number":"36C26225Q0972","parent_opportunity_id":"c64be5fadc91467f877d62c03bc3dcda"},{"index":1,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:29:03.764Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"c64be5fadc91467f877d62c03bc3dcda","solicitation_number":"36C26225Q0972"}]},{"notice_id":"c64be5fadc91467f877d62c03bc3dcda","title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","solicitation_number":"36C26225Q0972","notice_type":"k","base_type":"k","posted":"2025-06-05","posted_at":"2025-06-05T13:29:03.764Z","due_at":"2025-06-13T17:00:00Z","due_date":"2025-06-13","cancelled":false,"archived":true,"archive_date":"2025-07-13","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c64be5fadc91467f877d62c03bc3dcda/view","enriched":true,"history":[{"index":3,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:33:21.998Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a57da14ae4b44ac6a597de3f4a167ebd","solicitation_number":"36C26225Q0972","parent_opportunity_id":"c64be5fadc91467f877d62c03bc3dcda"},{"index":1,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:29:03.764Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"c64be5fadc91467f877d62c03bc3dcda","solicitation_number":"36C26225Q0972"}]}],"latest_notice_id":"c64be5fadc91467f877d62c03bc3dcda","first_type":"k","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-06-05","posted_at":"2025-06-05T13:33:21.998Z","created_at":"2025-06-05T13:31:51.205Z","modified_at":"2025-07-14T03:55:47.329Z","response_deadline":{"raw":"2025-06-13T10:00:00-07:00","utc":"2025-06-13T17:00:00Z","date":"2025-06-13","time":"10:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/a57da14ae4b44ac6a597de3f4a167ebd/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","agency":{"office":{"code":"36C262","name":"262-NETWORK CONTRACT OFFICE 22 (36C262)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"organization_id":"100173469","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-13","archive_type":"auto_custom"},"history":[{"index":3,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:33:21.998Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a57da14ae4b44ac6a597de3f4a167ebd","solicitation_number":"36C26225Q0972","parent_opportunity_id":"c64be5fadc91467f877d62c03bc3dcda"},{"index":1,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:29:03.764Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"c64be5fadc91467f877d62c03bc3dcda","solicitation_number":"36C26225Q0972"}],"contacts":[{"name":"Loan Dho","role":"primary","email":"loan.dho@va.gov","title":"Contract Specialist"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"a57da14ae4b44ac6a597de3f4a167ebd","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"c64be5fadc91467f877d62c03bc3dcda","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T03:48:57.362109628Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"5fc5241d55010a6aab4909c862f7fda3f882ce1962f9cc753e45d4a1f9182b7c","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T03:48:57.362109628Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Description\nThis is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6,  Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,  as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nThis solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05, effective 04/02/2025.\n\nThis solicitation is a set-aside for 100% Small Business (SBA). This is a firm fixed price contract. \n\nThe associated North American Industrial Classification System (NAICS) code for this procurement is 811210 - Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of $34 Million. \n\nThe FSC/PSC is J065- Maintenance, repair, and rebuilding of equipment   Medical, Dental, and veterinary equipment and supplies. \n\nThe Department of Veterans Affairs, Network Contracting 22 is seeking to a contractor to perform preventative maintenance inspection (PMI) and corrective maintenance (CM) on different audiology diagnostic equipment s at the VA Greater Los Angeles Healthcare System. \n\nSTATEMENT OF WORK\n\nTITLE: VA Audiology Equipment Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) Support\n\nBACKGROUND: The VA Greater Los Angeles Healthcare System requires preventative maintenance inspection (PMI) and corrective maintenance (CM) on select diagnostic audiology equipment throughout the VA Greater LA Healthcare system and CBOCs including West Los Angeles Medical Center, Sepulveda VA Medical Center, Los Angeles VA Ambulatory Care Center, Bakersfield VA Clinic Antelope Valley VA Clinic, Santa Maria VA Clinic, San Luis Obispo VA Clinic, and Ventura Outpatient Clinic.\n\nScope: The Contractor shall provide all necessary labor, materials, supplies, parts, software (needed for the general operation of the equipment), tools, equipment, travel, transportation expenses and other related costs to provide Preventive Maintenance Inspection (PMI) and Corrective Maintenance services on selected Government Owned diagnostic audiology equipment defined in included list (Attachment-  VA Audiology Equipment List ). All services to inspect, adjustments, repairs, replace parts, test for operating efficiency and other such services in accordance with manufacturer recommended specifications shall be performed in accordance with the terms, conditions, provisions, and specification of the contract. Contractor shall perform work in strict accordance with the statement of work, and all VA local, state and federal polices, and regulations. \n\nParticipating Facilities:\n\nVA Greater Los Angeles Healthcare System\n11301 Wilshire Blvd\nLos Angeles, CA 90073\n\nSepulveda VA Hospital Medical Center\n16111 Plummer St, \nSepulveda, CA 91343\n\nVA LOS ANGELES AMBULATORY CARE CENTER\n351 East Temple Street\nLos Angeles, CA 90012-3328\n\nBAKERSFIELD VA CLINIC\n1801 Westwind Drive\nBakersfield, CA 93301-3028\n\nANTELOPE VALLEY VA CLINIC\n340 East Avenue I, Suite 108\nLancaster, CA 93535-1941\n\nSANTA MARIA VA CLINIC\n1550 East Main Street\nSanta Maria, CA 93454-4819\n\nSAN LUIS OBISPO VA CLINIC\n1288 Morro Street, Suite 200\nSan Luis Obispo, CA 93401-6302\n\nVA Ventura Outpatient Clinic\n5250 Ralston Street\nVentura CA 93003\n\nGeneral Requirement: \nAll work shall be in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibration, cleaning, lubrication, testing, disassembly, checkout, and replacement of worn and/or defective parts required to keep the equipment in optimum operating condition. \nVendor shall apply VA supplied PMI labels (when available) to all devices listed in this contract. No vendor labels are acceptable when VA labels are available. \n\nPreventive maintenance and Inspection (PMI)\nThe Contractor shall perform PMI annually or in accordance with the equipment manufacturer recommended schedule and perform all manufacturer recommended PMI duties during the life of the contract. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission (JC). The contractor may request a copy of the JC standards from the PPOC (Program Point of Contact). \nAt minimum PMI are to include:\nWear, misalignment, maladjustment, damage, or other malfunctions with respect to the manufacturer s specifications.\nInspection for loose boards, connectors, and cables.\nTesting of electrical components for proper voltage and grounding for safety and fire hazard.\nCleaning and lubrication of equipment as required.\nRepair or replacement of all defective components necessary to conform to instrument specifications.\nCalibration or standardization of instrument as required.\nTesting for proper operation of the entire system and subsystem.\nDocumentation on proper function and performance of instrument.\nSoftware updates, if applicable.\nThe PMI will be scheduled a minimum of two (2) weeks in advance with the program point of contact (PPOC) for this requirement. \nThe Contractor shall provide a detailed service report to the PPOC within ten business days of PMI maintenance.\n\nCorrective Maintenance / Repair Services: \nThe Contractor shall conduct corrective maintenance/software upgrades/repair services as required by the Government to maintain equipment in accordance with the equipment manufacturer specifications. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission. The Contractor may request a copy of the JC standards from the PPOC.\nThe Contractor shall provide all travel and transportation expenses at no cost to the Government.\nCorrective maintenance (CM) services are to be completed within one (1) calendar day of a reported issue. If loaner equipment is needed because a CM service cannot be completed on-site within 1 calendar day, then the loaner equipment will be provided within 48 hours. Extensions for CM services beyond one (1) calendar day require the approval of the PPOC. Such extensions are to be scheduled with the PPOC within one (1) calendar day and may not exceed 48 hours. If applicable, software updates are included for the general operation of the equipment.\nRemoval of Equipment: Should a piece of equipment require repair at the Contractor s plant, Contractor shall provide a loaner or as / like loaner at no extra charge within 48 hours. The loaner equipment shall be delivered to the Audiology clinic, set up, and calibrated in place for clinical use within 48 hours of removal of the VA-owned equipment. The Contractor may not remove equipment from a government site for only minor repairs. Government property cannot be removed from the station without a signed Property Pass and authorization by the PPOC. \nSafety Standards: Contractor shall provide electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Veterans Affairs, DM&S Supplement, MP-3  Supplement to VA Engineering  Chapter 2, Appendix 2C, Change 4, November 4, 1983,  Leakage Current Limits . A copy of these standards shall be provided upon request. These standards are strictly enforced. Any equipment not meeting the minimum standards shall be considered \"Inoperable\" until it \"Passes\" the minimum standards. All equipment shall be subject to inspection by VA Biomedical Engineering personnel to verify compliance with these standards.\nPerformance verification is required at the conclusion of every PMI and CM service. This verification procedure includes performance testing for accuracy and precision of the instrument.\nThe Contractor shall provide corrective maintenance repair and replacement parts at no additional cost to the Government.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of corrective maintenance.\nWhen repairs are needed between regular scheduled service, such repairs are rendered as directed only by the PPOC or the Contracting Officer (CO).\nThese repairs shall be verbally directed to the Contractor s employees, requested in writing, be transmitted electronically, by telephone, or any manner consistent with accepted commercial business practices.\n\nReplacement Parts:\nOnly standard new or like-new parts shall be furnished by the Contractor. All parts shall be of current manufacture and shall have versatility with presently installed. All major components and parts furnished shall carry the manufacturer s standard commercial warranty. \nAll newly installed parts will become property of the Government. Replaced parts are to be disposed by the Contractor after approval of PPOC.\nThe Contractor shall provide required replacement parts.\nAll worn or defective parts are to be replaced at no additional cost to the Government.\nOperating and consumable supplies are part of this contract and shall be itemized as no charge item(s) on the Contractor s invoice and shall be identified by part numbers listed on the manufacturer s schematics or parts list.\nThe Veterans Affairs Healthcare Facility shall not furnish parts, service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring appropriate equipment and/or supplies necessary to complete the work as required. \n\nHours of Work: \nThis contract is a full-service contract to include all necessary scheduled service calls five (5) days per week, Monday through Friday, during regular business hours, 7:00 am  3:30 pm (PT), or per site operational hours, excluding National holidays. \nAll PMI services shall be performed during the regular business hours listed above. All CM services shall occur as soon as possible, within one (1) calendar day and can be done during normal business hours with PPOC approval.\nAny service performed during other than normal work hours must have prior approval and coordinated with the PPOC or CO.\n\nNational Holiday:\n\nNew Year s Day\nJanuary 01\nMartin Luther King s Birthday\nThird Monday in January\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJuneteenth\nJune 19\nIndependence Day\nJuly 04\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\n\nIf the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.\n\nPERIOD OF PERFORMANCE: Base plus Four (4) Option Years to follow.\n\nOvertime & holiday Pay: \nAny overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.\nContractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for  availability  or  on-call  services unless otherwise provided herein.\n\nSECURITY REQUIREMENTS: \nThe C&A requirements do not apply, and Security Accreditation Package is not required.\n\nThis service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.\n\nQualification: \n Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on the specific equipment in accordance with the original manufacturer s PMI/ repair procedures.  Fully qualified  is defined as factory-trained, certified, and experienced to work on the equipment assigned.\nThe Contractor shall provide written verification and certifications of their personnel prior to the commencement of the contract.\nThe CO or PPOC reserves the right to reject any of the Contractor s personnel from performing services if he determines they are not  fully qualified  or the Contractor fails to provide the necessary documentation for approval of each FSE.\n\nService: \nAt the completion of PMI on each equipment and ensure upon departure that the equipment is in optimal working condition. Service shall include any software updates needed for the continued general operation of the equipment.\nService also includes necessary intervening service calls required to replace any worn or defective parts needed due to instrument failure and maintain equipment in optimum operating condition. Intervening services shall be rendered as directed by the PPOC. Any call back for service request for the same type of malfunction shall be at no charge to the Government.\n\nAdditional Requirement:\nContractor shall ensure all equipment is in optimal working condition at the expiration date of the contract.\nContractor personnel that perform changes, updates, or retrofits made on any component, system, or equipment will log it in the station equipment manual.\nContractor will maintain all manufactures manual necessary to perform maintenance.\n\nSubmission of Reports: \nThe Contractor shall submit a complete field service report (FSR) electronically to the PPOC within 10 business days of the work being completed. \nThe FSR at a minimum must contain company name, service technician s name, contact telephone number, date of service, a detailed description of any services performed on the equipment (model number and location included), serial number of the equipment being worked on, customer asset number (EE#), any unsafe condition concerning the equipment, signs of misuse or neglect, findings of problems and correction, including all performance verification, safety checks, listing of replacement parts, when applicable; total hours of service; safety check; performance data; and recommendations necessary from the Contractor to maintain the equipment in optimum operating condition.\n\nGeneral Information\nContractor s Program Manager:  The Contractor shall provide a Program Manager who shall be responsible for managing the performance of work.  The name of this person shall be designated in writing to the Contracting Officer.  The Contractor s program manager shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.\n\nName: \nAddress: \n               \n               \nPhone No.: \nEmail: \n\nContractor Employees:  \nThe Contractor shall not employ any person for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and general well-being of the public. \nThe Contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company. The Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract. \n\nReporting Procedures:\nFor services to be performed during normal working hours on-site, the Contractor shall report upon arrival to the Biomedical Engineering Department, Bldg 500, Room 0261 and sign-in. In addition to signing-in, the Contractor personnel shall identify him/herself to the PPOC before proceeding to the job site. \nFor services to be performed outside normal working hours, the Contractor shall obtain a visitor s badge from the security guard assigned at the facility entrance prior to signing the after-hours log book located outside the Biomedical Engineering Department, Bldg 500, and proceeding to Room 0261.\nPrior to leaving the facility the Contractor shall communicate status of equipment to the PPOC, sign out at the same location that they signed in and return the visitor s badge. \n For services performed at CBOCs and sites off from the main campus, the Contractor shall notify the PPOC via email upon arrival and finishing of services.\n\nParking: \nIt is the responsibility of Contractor personnel to park only in designated parking areas.  The Contractor shall make alternate arrangements for its personnel to park off-site if motor vehicles are required to access those facilities.  Parking information is available from the VA Police & Security Service Office. The VA will not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. The Contractor assumes full responsibility for any parking violations. \n\nSmoking: \nVAGLAHS is a smoke free facility. This includes the use of vape, electronic cigarettes and tobacco products.  \n \nInvoicing & Payment: \nThe Contractor shall submit in arrears a properly completed itemized invoice via Tungsten Network: \nhttp://www.tungsten-network.com/customer-campaigns/veterans-affairs/\n      22.2 The invoice must be itemized to include the following information. Any \ninformation listed below that is not provided on an invoice, will render that invoice \nincomplete and the invoice will be returned for immediate correction.\nDates of service.\nDescription of services.\nInvoice number, date.\nContract number.\nObligation number.\n22.3 No advance payments shall be authorized.  Payment shall be made monthly for services provided during the billing month in arrears. Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.\n\nInsurance coverage\nThe Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.\n\nThe Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.\n\nBefore commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.\n\nContractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.\n\nAll interested companies shall provide quotations for the following:\n\nSupplies/Services\nBASE YEAR\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n0001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n0002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n0003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n0004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n0005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n0006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n0007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n0008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 1\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n1001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n1002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n1003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n1004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n1005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n1006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n1007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n1008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 2\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n2001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n2002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n2003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n2004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n2005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n2006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n2007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n2008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 3\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n3001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n3002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n3003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n3004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n3005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n3006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n3007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n3008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 4\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n4001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n4002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n4003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n4004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n4005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n4006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n4007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n4008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\n\nTotal Cost (Base Plus Four Option Years)\n\n**Please use the format above for pricing**\n\nThe estimated contract period of performance is 07/01/2025   06/30/2030. \n\nThe full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far. \n\nThe following solicitation provisions apply to this acquisition:\nFAR 52.212-1,  Instructions to Offerors Commercial Products and Commercial Services  (SEP 2023)\nADDENDUM TO 52.212-1,  Instructions to Offerors- Commercial Products and Commercial Services  applies to and is included with this acquisition. \nFAR 52.252-1,  Solicitation Provisions Incorporated by Reference  (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-7,  System for Award Management  (NOV 2024)\nFAR 52.204-16,  Commercial and Government Entity Code Reporting  (AUG 2020)\nFAR 52.204-20,  Predecessor of Offeror  (AUG 2020)\nFAR 52.204-24,  Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment  (NOV 2021)\nFAR 52.204-29,  Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures  (DEC 2023)\nFAR 52.217-5,  Evaluation of Options  (JUL 1990)\nVAAR 852.252-70,  Solicitation Provisions or Clauses Incorporated by Reference  (JAN 2008)\n(End of Addendum to 52.212-1)\n\nFAR 52.212-3,  Offerors Representations and Certifications Commercial Products and Commercial Services  (MAY 2024)\n\nOfferors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3,  Offerors Representations and Certifications Commercial Products and Commercial Services.  If paragraph (j) of the provision is applicable, a written submission is required.\n\nThe following contract clauses apply to this acquisition: \nFAR 52.212-4,  Contract Terms and Conditions Commercial Products and Commercial Services  (NOV 2023)\nADDENDUM TO 52.212-4,  Contract Terms and Conditions   Commercial Products and Commercial Services , applies to and is included with this acquisition.\nFAR 52.252-2,  Clauses Incorporated by Reference  (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-13  System for Award Management Maintenance  (OCT 2018)\nFAR 52.204-18,  Commercial and Government Entity Code Maintenance  (AUG 2020)\nFAR 52.217-8,  Option to Extend Services  (NOV 1999)\nFAR 52.217-9,  Option to Extend the Term of the Contract  (MAR 2000)\nVAAR 852.203-70,  Commercial Advertising  (MAY 2018)\nVAAR 852.211-72,  Technical Industry Standards  (NOV 2018)\nVAAR 852.219-75,  VA Notice of Limitations on Subcontracting   Certificate of Compliance for Services and Construction  (JAN 2023)\nVAAR 852.232-72,  Electronic Submission of Payment Requests  (NOV 2018)\nVAAR 852.242-71,  Administrative Contracting Officer  (OCT 2020)\n(End of Addendum to 52.212-4)\n\nFAR 52.212-5,  Contract Terms and Conditions Required to Implement Statutes or Executive Orders   Commercial Products and Commercial Services  (JAN 2025)\n\nThe following subparagraphs of FAR 52.212-5 are applicable:\n(b)(3), (4), (5), (7), (9), (12), (18)(i), (23), (26), (31), (36), (39)(i), (55), (59), (c)(5). \n\nFAR 52.212-2 Evaluation-Commercial Products and Commercial Services \nPrice and Other Factors: See Attachment 2    FAR 52.212-2 Evaluation-Commercial Products and Commercial Services . \n\nAward will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Decision factors to be considered are Experience, Past Performance, Qualifications, and Cost Schedule. (See Attachment 2), Addendum to FAR 52.212-2,  Evaluation   Commercial Products and Commercial Services . \n\nQuote evaluations will be based on the following:\nElement 1: Experience \na. Contractor shall submit documentation that their firm is able to acquire the necessary resources to perform the tasks in the scope of work and how the firm will meet preventative maintenance inspection and corrective maintenance for all audiology diagnostic equipment s listed in Attachment-  VA Audiology Equipment List . \n\nElement 2: Past Performance   Prior experience in maintaining equipment s listed in Attachment   VA Audiology Equipment List . \n\na. Contractor shall provide a list and description of a minimum of 2-3 contracts performed on similar preventative maintenance inspection (PMI) and corrective maintenance of audiology diagnostic equipment s.\n\nb. The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/;   or any other reasonable basis.\n\nElement 3: Qualifications: Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on specific equipment in accordance with the original manufacturer s maintenance and repair procedures.  Fully qualified  is defined as factory- trained and experienced to work on the equipment assigned. \n\na. Contractor shall provide proof and/or statement of ability to perform maintenance and corrective maintenance on all listed audiology diagnostic equipment s (Attachment -  VA Audiology Equipment List ).\nManufacturer: Grason Stadler, AudioScan, Bio-Logic, Astera 2, Interacoustics, Micromedical, Otometrics, GN Otometrics, Neurocom, and Neurokinetics, \n\nb. Contractor shall submit documentation that their firm is able to provide loaner equipment as needed basis to the facility if the equipment is offline for the duration of maintenance and/or repair period (Attachment-  VA Audiology Equipment List ).\n\nElement 4: Cost Schedule- This award will be made to the Contractor that proposes a quote that is most advantageous to the Government. \n\nThe award will be made to the response most advantageous to the Government.\nResponses should contain your best terms, conditions.\n\nTo facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:\n\"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\"\nOR\n\"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\"\n Quoters shall list exception(s) and rationale for the exception(s), if any.\n\nAll quoters shall submit the following in accordance with Attachment 1,  FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services  (SEP 2023). \n\nAll quotes shall be sent to the Network Contracting Office (NCO) 22, Contract Specialist, Loan Dho at loan.dho@va.gov. \n\nNo inquiries will be addressed for this RFQ solicitation 36C26225Q0972. \n\nSubmission of your response shall be received No Later Than June 13th, 2025, at 10:00 AM Pacific Standard Time to loan.dho@va.gov. Subject Line shall include:  RESPONSE TO RFQ 36C26225Q0972  for consideration. \n\nLate submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). \n\nAny questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. \n\nPoint of Contact\nContract Specialist\nLoan Dho\nLoan.dho@va.gov","text":"Description\nThis is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nThis solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05, effective 04/02/2025.\n\nThis solicitation is a set-aside for 100% Small Business (SBA). This is a firm fixed price contract.\n\nThe associated North American Industrial Classification System (NAICS) code for this procurement is 811210 - Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of $34 Million.\n\nThe FSC/PSC is J065- Maintenance, repair, and rebuilding of equipment Medical, Dental, and veterinary equipment and supplies.\n\nThe Department of Veterans Affairs, Network Contracting 22 is seeking to a contractor to perform preventative maintenance inspection (PMI) and corrective maintenance (CM) on different audiology diagnostic equipment s at the VA Greater Los Angeles Healthcare System.\n\nSTATEMENT OF WORK\n\nTITLE: VA Audiology Equipment Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) Support\n\nBACKGROUND: The VA Greater Los Angeles Healthcare System requires preventative maintenance inspection (PMI) and corrective maintenance (CM) on select diagnostic audiology equipment throughout the VA Greater LA Healthcare system and CBOCs including West Los Angeles Medical Center, Sepulveda VA Medical Center, Los Angeles VA Ambulatory Care Center, Bakersfield VA Clinic Antelope Valley VA Clinic, Santa Maria VA Clinic, San Luis Obispo VA Clinic, and Ventura Outpatient Clinic.\n\nScope: The Contractor shall provide all necessary labor, materials, supplies, parts, software (needed for the general operation of the equipment), tools, equipment, travel, transportation expenses and other related costs to provide Preventive Maintenance Inspection (PMI) and Corrective Maintenance services on selected Government Owned diagnostic audiology equipment defined in included list (Attachment- VA Audiology Equipment List ). All services to inspect, adjustments, repairs, replace parts, test for operating efficiency and other such services in accordance with manufacturer recommended specifications shall be performed in accordance with the terms, conditions, provisions, and specification of the contract. Contractor shall perform work in strict accordance with the statement of work, and all VA local, state and federal polices, and regulations.\n\nParticipating Facilities:\n\nVA Greater Los Angeles Healthcare System\n11301 Wilshire Blvd\nLos Angeles, CA 90073\n\nSepulveda VA Hospital Medical Center\n16111 Plummer St,\nSepulveda, CA 91343\n\nVA LOS ANGELES AMBULATORY CARE CENTER\n351 East Temple Street\nLos Angeles, CA 90012-3328\n\nBAKERSFIELD VA CLINIC\n1801 Westwind Drive\nBakersfield, CA 93301-3028\n\nANTELOPE VALLEY VA CLINIC\n340 East Avenue I, Suite 108\nLancaster, CA 93535-1941\n\nSANTA MARIA VA CLINIC\n1550 East Main Street\nSanta Maria, CA 93454-4819\n\nSAN LUIS OBISPO VA CLINIC\n1288 Morro Street, Suite 200\nSan Luis Obispo, CA 93401-6302\n\nVA Ventura Outpatient Clinic\n5250 Ralston Street\nVentura CA 93003\n\nGeneral Requirement:\nAll work shall be in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibration, cleaning, lubrication, testing, disassembly, checkout, and replacement of worn and/or defective parts required to keep the equipment in optimum operating condition.\nVendor shall apply VA supplied PMI labels (when available) to all devices listed in this contract. No vendor labels are acceptable when VA labels are available.\n\nPreventive maintenance and Inspection (PMI)\nThe Contractor shall perform PMI annually or in accordance with the equipment manufacturer recommended schedule and perform all manufacturer recommended PMI duties during the life of the contract. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission (JC). The contractor may request a copy of the JC standards from the PPOC (Program Point of Contact).\nAt minimum PMI are to include:\nWear, misalignment, maladjustment, damage, or other malfunctions with respect to the manufacturer s specifications.\nInspection for loose boards, connectors, and cables.\nTesting of electrical components for proper voltage and grounding for safety and fire hazard.\nCleaning and lubrication of equipment as required.\nRepair or replacement of all defective components necessary to conform to instrument specifications.\nCalibration or standardization of instrument as required.\nTesting for proper operation of the entire system and subsystem.\nDocumentation on proper function and performance of instrument.\nSoftware updates, if applicable.\nThe PMI will be scheduled a minimum of two (2) weeks in advance with the program point of contact (PPOC) for this requirement.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of PMI maintenance.\n\nCorrective Maintenance / Repair Services:\nThe Contractor shall conduct corrective maintenance/software upgrades/repair services as required by the Government to maintain equipment in accordance with the equipment manufacturer specifications. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission. The Contractor may request a copy of the JC standards from the PPOC.\nThe Contractor shall provide all travel and transportation expenses at no cost to the Government.\nCorrective maintenance (CM) services are to be completed within one (1) calendar day of a reported issue. If loaner equipment is needed because a CM service cannot be completed on-site within 1 calendar day, then the loaner equipment will be provided within 48 hours. Extensions for CM services beyond one (1) calendar day require the approval of the PPOC. Such extensions are to be scheduled with the PPOC within one (1) calendar day and may not exceed 48 hours. If applicable, software updates are included for the general operation of the equipment.\nRemoval of Equipment: Should a piece of equipment require repair at the Contractor s plant, Contractor shall provide a loaner or as / like loaner at no extra charge within 48 hours. The loaner equipment shall be delivered to the Audiology clinic, set up, and calibrated in place for clinical use within 48 hours of removal of the VA-owned equipment. The Contractor may not remove equipment from a government site for only minor repairs. Government property cannot be removed from the station without a signed Property Pass and authorization by the PPOC.\nSafety Standards: Contractor shall provide electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Veterans Affairs, DM&S Supplement, MP-3 Supplement to VA Engineering Chapter 2, Appendix 2C, Change 4, November 4, 1983, Leakage Current Limits . A copy of these standards shall be provided upon request. These standards are strictly enforced. Any equipment not meeting the minimum standards shall be considered \"Inoperable\" until it \"Passes\" the minimum standards. All equipment shall be subject to inspection by VA Biomedical Engineering personnel to verify compliance with these standards.\nPerformance verification is required at the conclusion of every PMI and CM service. This verification procedure includes performance testing for accuracy and precision of the instrument.\nThe Contractor shall provide corrective maintenance repair and replacement parts at no additional cost to the Government.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of corrective maintenance.\nWhen repairs are needed between regular scheduled service, such repairs are rendered as directed only by the PPOC or the Contracting Officer (CO).\nThese repairs shall be verbally directed to the Contractor s employees, requested in writing, be transmitted electronically, by telephone, or any manner consistent with accepted commercial business practices.\n\nReplacement Parts:\nOnly standard new or like-new parts shall be furnished by the Contractor. All parts shall be of current manufacture and shall have versatility with presently installed. All major components and parts furnished shall carry the manufacturer s standard commercial warranty.\nAll newly installed parts will become property of the Government. Replaced parts are to be disposed by the Contractor after approval of PPOC.\nThe Contractor shall provide required replacement parts.\nAll worn or defective parts are to be replaced at no additional cost to the Government.\nOperating and consumable supplies are part of this contract and shall be itemized as no charge item(s) on the Contractor s invoice and shall be identified by part numbers listed on the manufacturer s schematics or parts list.\nThe Veterans Affairs Healthcare Facility shall not furnish parts, service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring appropriate equipment and/or supplies necessary to complete the work as required.\n\nHours of Work:\nThis contract is a full-service contract to include all necessary scheduled service calls five (5) days per week, Monday through Friday, during regular business hours, 7:00 am 3:30 pm (PT), or per site operational hours, excluding National holidays.\nAll PMI services shall be performed during the regular business hours listed above. All CM services shall occur as soon as possible, within one (1) calendar day and can be done during normal business hours with PPOC approval.\nAny service performed during other than normal work hours must have prior approval and coordinated with the PPOC or CO.\n\nNational Holiday:\n\nNew Year s Day\nJanuary 01\nMartin Luther King s Birthday\nThird Monday in January\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJuneteenth\nJune 19\nIndependence Day\nJuly 04\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\n\nIf the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.\n\nPERIOD OF PERFORMANCE: Base plus Four (4) Option Years to follow.\n\nOvertime & holiday Pay:\nAny overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.\nContractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for availability or on-call services unless otherwise provided herein.\n\nSECURITY REQUIREMENTS:\nThe C&A requirements do not apply, and Security Accreditation Package is not required.\n\nThis service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.\n\nQualification:\nPersonnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on the specific equipment in accordance with the original manufacturer s PMI/ repair procedures. Fully qualified is defined as factory-trained, certified, and experienced to work on the equipment assigned.\nThe Contractor shall provide written verification and certifications of their personnel prior to the commencement of the contract.\nThe CO or PPOC reserves the right to reject any of the Contractor s personnel from performing services if he determines they are not fully qualified or the Contractor fails to provide the necessary documentation for approval of each FSE.\n\nService:\nAt the completion of PMI on each equipment and ensure upon departure that the equipment is in optimal working condition. Service shall include any software updates needed for the continued general operation of the equipment.\nService also includes necessary intervening service calls required to replace any worn or defective parts needed due to instrument failure and maintain equipment in optimum operating condition. Intervening services shall be rendered as directed by the PPOC. Any call back for service request for the same type of malfunction shall be at no charge to the Government.\n\nAdditional Requirement:\nContractor shall ensure all equipment is in optimal working condition at the expiration date of the contract.\nContractor personnel that perform changes, updates, or retrofits made on any component, system, or equipment will log it in the station equipment manual.\nContractor will maintain all manufactures manual necessary to perform maintenance.\n\nSubmission of Reports:\nThe Contractor shall submit a complete field service report (FSR) electronically to the PPOC within 10 business days of the work being completed.\nThe FSR at a minimum must contain company name, service technician s name, contact telephone number, date of service, a detailed description of any services performed on the equipment (model number and location included), serial number of the equipment being worked on, customer asset number (EE#), any unsafe condition concerning the equipment, signs of misuse or neglect, findings of problems and correction, including all performance verification, safety checks, listing of replacement parts, when applicable; total hours of service; safety check; performance data; and recommendations necessary from the Contractor to maintain the equipment in optimum operating condition.\n\nGeneral Information\nContractor s Program Manager: The Contractor shall provide a Program Manager who shall be responsible for managing the performance of work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor s program manager shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.\n\nName:\nAddress:\n\nPhone No.:\nEmail:\n\nContractor Employees:\nThe Contractor shall not employ any person for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and general well-being of the public.\nThe Contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company. The Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract.\n\nReporting Procedures:\nFor services to be performed during normal working hours on-site, the Contractor shall report upon arrival to the Biomedical Engineering Department, Bldg 500, Room 0261 and sign-in. In addition to signing-in, the Contractor personnel shall identify him/herself to the PPOC before proceeding to the job site.\nFor services to be performed outside normal working hours, the Contractor shall obtain a visitor s badge from the security guard assigned at the facility entrance prior to signing the after-hours log book located outside the Biomedical Engineering Department, Bldg 500, and proceeding to Room 0261.\nPrior to leaving the facility the Contractor shall communicate status of equipment to the PPOC, sign out at the same location that they signed in and return the visitor s badge.\nFor services performed at CBOCs and sites off from the main campus, the Contractor shall notify the PPOC via email upon arrival and finishing of services.\n\nParking:\nIt is the responsibility of Contractor personnel to park only in designated parking areas. The Contractor shall make alternate arrangements for its personnel to park off-site if motor vehicles are required to access those facilities. Parking information is available from the VA Police & Security Service Office. The VA will not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. The Contractor assumes full responsibility for any parking violations.\n\nSmoking:\nVAGLAHS is a smoke free facility. This includes the use of vape, electronic cigarettes and tobacco products.\n\nInvoicing & Payment:\nThe Contractor shall submit in arrears a properly completed itemized invoice via Tungsten Network:\nhttp://www.tungsten-network.com/customer-campaigns/veterans-affairs/\n22.2 The invoice must be itemized to include the following information. Any\ninformation listed below that is not provided on an invoice, will render that invoice\nincomplete and the invoice will be returned for immediate correction.\nDates of service.\nDescription of services.\nInvoice number, date.\nContract number.\nObligation number.\n22.3 No advance payments shall be authorized. Payment shall be made monthly for services provided during the billing month in arrears. Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.\n\nInsurance coverage\nThe Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.\n\nThe Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.\n\nBefore commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.\n\nContractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.\n\nAll interested companies shall provide quotations for the following:\n\nSupplies/Services\nBASE YEAR\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n0001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n0002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n0003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n0004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n0005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n0006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n0007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n0008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 1\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n1001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n1002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n1003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n1004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n1005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n1006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n1007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n1008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 2\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n2001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n2002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n2003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n2004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n2005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n2006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n2007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n2008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 3\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n3001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n3002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n3003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n3004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n3005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n3006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n3007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n3008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 4\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n4001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n4002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n4003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n4004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n4005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n4006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n4007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n4008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nTotal Cost (Base Plus Four Option Years)\n\n**Please use the format above for pricing**\n\nThe estimated contract period of performance is 07/01/2025 06/30/2030.\n\nThe full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far.\n\nThe following solicitation provisions apply to this acquisition:\nFAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023)\nADDENDUM TO 52.212-1, Instructions to Offerors- Commercial Products and Commercial Services applies to and is included with this acquisition.\nFAR 52.252-1, Solicitation Provisions Incorporated by Reference (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-7, System for Award Management (NOV 2024)\nFAR 52.204-16, Commercial and Government Entity Code Reporting (AUG 2020)\nFAR 52.204-20, Predecessor of Offeror (AUG 2020)\nFAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)\nFAR 52.204-29, Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (DEC 2023)\nFAR 52.217-5, Evaluation of Options (JUL 1990)\nVAAR 852.252-70, Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(End of Addendum to 52.212-1)\n\nFAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services (MAY 2024)\n\nOfferors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required.\n\nThe following contract clauses apply to this acquisition:\nFAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services (NOV 2023)\nADDENDUM TO 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services , applies to and is included with this acquisition.\nFAR 52.252-2, Clauses Incorporated by Reference (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-13 System for Award Management Maintenance (OCT 2018)\nFAR 52.204-18, Commercial and Government Entity Code Maintenance (AUG 2020)\nFAR 52.217-8, Option to Extend Services (NOV 1999)\nFAR 52.217-9, Option to Extend the Term of the Contract (MAR 2000)\nVAAR 852.203-70, Commercial Advertising (MAY 2018)\nVAAR 852.211-72, Technical Industry Standards (NOV 2018)\nVAAR 852.219-75, VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023)\nVAAR 852.232-72, Electronic Submission of Payment Requests (NOV 2018)\nVAAR 852.242-71, Administrative Contracting Officer (OCT 2020)\n(End of Addendum to 52.212-4)\n\nFAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services (JAN 2025)\n\nThe following subparagraphs of FAR 52.212-5 are applicable:\n(b)(3), (4), (5), (7), (9), (12), (18)(i), (23), (26), (31), (36), (39)(i), (55), (59), (c)(5).\n\nFAR 52.212-2 Evaluation-Commercial Products and Commercial Services\nPrice and Other Factors: See Attachment 2 FAR 52.212-2 Evaluation-Commercial Products and Commercial Services .\n\nAward will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Decision factors to be considered are Experience, Past Performance, Qualifications, and Cost Schedule. (See Attachment 2), Addendum to FAR 52.212-2, Evaluation Commercial Products and Commercial Services .\n\nQuote evaluations will be based on the following:\nElement 1: Experience\na. Contractor shall submit documentation that their firm is able to acquire the necessary resources to perform the tasks in the scope of work and how the firm will meet preventative maintenance inspection and corrective maintenance for all audiology diagnostic equipment s listed in Attachment- VA Audiology Equipment List .\n\nElement 2: Past Performance Prior experience in maintaining equipment s listed in Attachment VA Audiology Equipment List .\n\na. Contractor shall provide a list and description of a minimum of 2-3 contracts performed on similar preventative maintenance inspection (PMI) and corrective maintenance of audiology diagnostic equipment s.\n\nb. The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/; or any other reasonable basis.\n\nElement 3: Qualifications: Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on specific equipment in accordance with the original manufacturer s maintenance and repair procedures. Fully qualified is defined as factory- trained and experienced to work on the equipment assigned.\n\na. Contractor shall provide proof and/or statement of ability to perform maintenance and corrective maintenance on all listed audiology diagnostic equipment s (Attachment - VA Audiology Equipment List ).\nManufacturer: Grason Stadler, AudioScan, Bio-Logic, Astera 2, Interacoustics, Micromedical, Otometrics, GN Otometrics, Neurocom, and Neurokinetics,\n\nb. Contractor shall submit documentation that their firm is able to provide loaner equipment as needed basis to the facility if the equipment is offline for the duration of maintenance and/or repair period (Attachment- VA Audiology Equipment List ).\n\nElement 4: Cost Schedule- This award will be made to the Contractor that proposes a quote that is most advantageous to the Government.\n\nThe award will be made to the response most advantageous to the Government.\nResponses should contain your best terms, conditions.\n\nTo facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:\n\"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\"\nOR\n\"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\"\nQuoters shall list exception(s) and rationale for the exception(s), if any.\n\nAll quoters shall submit the following in accordance with Attachment 1, FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023).\n\nAll quotes shall be sent to the Network Contracting Office (NCO) 22, Contract Specialist, Loan Dho at loan.dho@va.gov.\n\nNo inquiries will be addressed for this RFQ solicitation 36C26225Q0972.\n\nSubmission of your response shall be received No Later Than June 13th, 2025, at 10:00 AM Pacific Standard Time to loan.dho@va.gov. Subject Line shall include: RESPONSE TO RFQ 36C26225Q0972 for consideration.\n\nLate submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).\n\nAny questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.\n\nPoint of Contact\nContract Specialist\nLoan Dho\nLoan.dho@va.gov","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C26225Q0972","place_of_performance":{"zip":"90073","city":{"name":"Los Angeles"},"state":{"name":"CA"},"street":"Greater Los Angeles VA Healthcare System West Los Angeles Medical Center","street2":"11301 Wilshire Blvd."},"product_service_code":"J065"},{"award":{"awardee":{}},"dates":{"posted":"2025-06-05","posted_at":"2025-06-05T13:29:03.764Z","created_at":"2025-06-05T13:28:38.432Z","modified_at":"2025-07-14T03:55:47.329Z","response_deadline":{"raw":"2025-06-13T10:00:00-07:00","utc":"2025-06-13T17:00:00Z","date":"2025-06-13","time":"10:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c64be5fadc91467f877d62c03bc3dcda/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","agency":{"office":{"code":"36C262","name":"262-NETWORK CONTRACT OFFICE 22 (36C262)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"organization_id":"100173469","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-07-13","archive_type":"auto_custom"},"history":[{"index":3,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:33:21.998Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"a57da14ae4b44ac6a597de3f4a167ebd","solicitation_number":"36C26225Q0972","parent_opportunity_id":"c64be5fadc91467f877d62c03bc3dcda"},{"index":1,"title":"J065--Audiology Diagnostic Equipment's Preventative Inspection Maintenance and Corrective Maintenance at the Greater Los Angeles VA Healthcare System","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T13:29:03.764Z","notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"request_type":"submit","opportunity_id":"c64be5fadc91467f877d62c03bc3dcda","solicitation_number":"36C26225Q0972"}],"contacts":[{"name":"Loan Dho","role":"primary","email":"loan.dho@va.gov","title":"Contract Specialist"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"c64be5fadc91467f877d62c03bc3dcda","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"lineage_id":"c64be5fadc91467f877d62c03bc3dcda","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T03:54:43.975721302Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f0c5f8a52f4c69088a444d01b4a87e54c7bf6d3983d934e818ad59577b8185b4","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T03:54:43.975721302Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Description\nThis is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6,  Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,  as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nThis solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05, effective 04/02/2025.\n\nThis solicitation is a set-aside for 100% Small Business (SBA). This is a firm fixed price contract. \n\nThe associated North American Industrial Classification System (NAICS) code for this procurement is 811210 - Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of $34 Million. \n\nThe FSC/PSC is J065- Maintenance, repair, and rebuilding of equipment   Medical, Dental, and veterinary equipment and supplies. \n\nThe Department of Veterans Affairs, Network Contracting 22 is seeking to a contractor to perform preventative maintenance inspection (PMI) and corrective maintenance (CM) on different audiology diagnostic equipment s at the VA Greater Los Angeles Healthcare System. \n\nSTATEMENT OF WORK\n\nTITLE: VA Audiology Equipment Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) Support\n\nBACKGROUND: The VA Greater Los Angeles Healthcare System requires preventative maintenance inspection (PMI) and corrective maintenance (CM) on select diagnostic audiology equipment throughout the VA Greater LA Healthcare system and CBOCs including West Los Angeles Medical Center, Sepulveda VA Medical Center, Los Angeles VA Ambulatory Care Center, Bakersfield VA Clinic Antelope Valley VA Clinic, Santa Maria VA Clinic, San Luis Obispo VA Clinic, and Ventura Outpatient Clinic.\n\nScope: The Contractor shall provide all necessary labor, materials, supplies, parts, software (needed for the general operation of the equipment), tools, equipment, travel, transportation expenses and other related costs to provide Preventive Maintenance Inspection (PMI) and Corrective Maintenance services on selected Government Owned diagnostic audiology equipment defined in included list (Attachment-  VA Audiology Equipment List ). All services to inspect, adjustments, repairs, replace parts, test for operating efficiency and other such services in accordance with manufacturer recommended specifications shall be performed in accordance with the terms, conditions, provisions, and specification of the contract. Contractor shall perform work in strict accordance with the statement of work, and all VA local, state and federal polices, and regulations. \n\nParticipating Facilities:\n\nVA Greater Los Angeles Healthcare System\n11301 Wilshire Blvd\nLos Angeles, CA 90073\n\nSepulveda VA Hospital Medical Center\n16111 Plummer St, \nSepulveda, CA 91343\n\nVA LOS ANGELES AMBULATORY CARE CENTER\n351 East Temple Street\nLos Angeles, CA 90012-3328\n\nBAKERSFIELD VA CLINIC\n1801 Westwind Drive\nBakersfield, CA 93301-3028\n\nANTELOPE VALLEY VA CLINIC\n340 East Avenue I, Suite 108\nLancaster, CA 93535-1941\n\nSANTA MARIA VA CLINIC\n1550 East Main Street\nSanta Maria, CA 93454-4819\n\nSAN LUIS OBISPO VA CLINIC\n1288 Morro Street, Suite 200\nSan Luis Obispo, CA 93401-6302\n\nVA Ventura Outpatient Clinic\n5250 Ralston Street\nVentura CA 93003\n\nGeneral Requirement: \nAll work shall be in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibration, cleaning, lubrication, testing, disassembly, checkout, and replacement of worn and/or defective parts required to keep the equipment in optimum operating condition. \nVendor shall apply VA supplied PMI labels (when available) to all devices listed in this contract. No vendor labels are acceptable when VA labels are available. \n\nPreventive maintenance and Inspection (PMI)\nThe Contractor shall perform PMI annually or in accordance with the equipment manufacturer recommended schedule and perform all manufacturer recommended PMI duties during the life of the contract. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission (JC). The contractor may request a copy of the JC standards from the PPOC (Program Point of Contact). \nAt minimum PMI are to include:\nWear, misalignment, maladjustment, damage, or other malfunctions with respect to the manufacturer s specifications.\nInspection for loose boards, connectors, and cables.\nTesting of electrical components for proper voltage and grounding for safety and fire hazard.\nCleaning and lubrication of equipment as required.\nRepair or replacement of all defective components necessary to conform to instrument specifications.\nCalibration or standardization of instrument as required.\nTesting for proper operation of the entire system and subsystem.\nDocumentation on proper function and performance of instrument.\nSoftware updates, if applicable.\nThe PMI will be scheduled a minimum of two (2) weeks in advance with the program point of contact (PPOC) for this requirement. \nThe Contractor shall provide a detailed service report to the PPOC within ten business days of PMI maintenance.\n\nCorrective Maintenance / Repair Services: \nThe Contractor shall conduct corrective maintenance/software upgrades/repair services as required by the Government to maintain equipment in accordance with the equipment manufacturer specifications. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission. The Contractor may request a copy of the JC standards from the PPOC.\nThe Contractor shall provide all travel and transportation expenses at no cost to the Government.\nCorrective maintenance (CM) services are to be completed within one (1) calendar day of a reported issue. If loaner equipment is needed because a CM service cannot be completed on-site within 1 calendar day, then the loaner equipment will be provided within 48 hours. Extensions for CM services beyond one (1) calendar day require the approval of the PPOC. Such extensions are to be scheduled with the PPOC within one (1) calendar day and may not exceed 48 hours. If applicable, software updates are included for the general operation of the equipment.\nRemoval of Equipment: Should a piece of equipment require repair at the Contractor s plant, Contractor shall provide a loaner or as / like loaner at no extra charge within 48 hours. The loaner equipment shall be delivered to the Audiology clinic, set up, and calibrated in place for clinical use within 48 hours of removal of the VA-owned equipment. The Contractor may not remove equipment from a government site for only minor repairs. Government property cannot be removed from the station without a signed Property Pass and authorization by the PPOC. \nSafety Standards: Contractor shall provide electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Veterans Affairs, DM&S Supplement, MP-3  Supplement to VA Engineering  Chapter 2, Appendix 2C, Change 4, November 4, 1983,  Leakage Current Limits . A copy of these standards shall be provided upon request. These standards are strictly enforced. Any equipment not meeting the minimum standards shall be considered \"Inoperable\" until it \"Passes\" the minimum standards. All equipment shall be subject to inspection by VA Biomedical Engineering personnel to verify compliance with these standards.\nPerformance verification is required at the conclusion of every PMI and CM service. This verification procedure includes performance testing for accuracy and precision of the instrument.\nThe Contractor shall provide corrective maintenance repair and replacement parts at no additional cost to the Government.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of corrective maintenance.\nWhen repairs are needed between regular scheduled service, such repairs are rendered as directed only by the PPOC or the Contracting Officer (CO).\nThese repairs shall be verbally directed to the Contractor s employees, requested in writing, be transmitted electronically, by telephone, or any manner consistent with accepted commercial business practices.\n\nReplacement Parts:\nOnly standard new or like-new parts shall be furnished by the Contractor. All parts shall be of current manufacture and shall have versatility with presently installed. All major components and parts furnished shall carry the manufacturer s standard commercial warranty. \nAll newly installed parts will become property of the Government. Replaced parts are to be disposed by the Contractor after approval of PPOC.\nThe Contractor shall provide required replacement parts.\nAll worn or defective parts are to be replaced at no additional cost to the Government.\nOperating and consumable supplies are part of this contract and shall be itemized as no charge item(s) on the Contractor s invoice and shall be identified by part numbers listed on the manufacturer s schematics or parts list.\nThe Veterans Affairs Healthcare Facility shall not furnish parts, service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring appropriate equipment and/or supplies necessary to complete the work as required. \n\nHours of Work: \nThis contract is a full-service contract to include all necessary scheduled service calls five (5) days per week, Monday through Friday, during regular business hours, 7:00 am  3:30 pm (PT), or per site operational hours, excluding National holidays. \nAll PMI services shall be performed during the regular business hours listed above. All CM services shall occur as soon as possible, within one (1) calendar day and can be done during normal business hours with PPOC approval.\nAny service performed during other than normal work hours must have prior approval and coordinated with the PPOC or CO.\n\nNational Holiday:\n\nNew Year s Day\nJanuary 01\nMartin Luther King s Birthday\nThird Monday in January\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJuneteenth\nJune 19\nIndependence Day\nJuly 04\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\n\nIf the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.\n\nPERIOD OF PERFORMANCE: Base plus Four (4) Option Years to follow.\n\nOvertime & holiday Pay: \nAny overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.\nContractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for  availability  or  on-call  services unless otherwise provided herein.\n\nSECURITY REQUIREMENTS: \nThe C&A requirements do not apply, and Security Accreditation Package is not required.\n\nThis service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.\n\nQualification: \n Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on the specific equipment in accordance with the original manufacturer s PMI/ repair procedures.  Fully qualified  is defined as factory-trained, certified, and experienced to work on the equipment assigned.\nThe Contractor shall provide written verification and certifications of their personnel prior to the commencement of the contract.\nThe CO or PPOC reserves the right to reject any of the Contractor s personnel from performing services if he determines they are not  fully qualified  or the Contractor fails to provide the necessary documentation for approval of each FSE.\n\nService: \nAt the completion of PMI on each equipment and ensure upon departure that the equipment is in optimal working condition. Service shall include any software updates needed for the continued general operation of the equipment.\nService also includes necessary intervening service calls required to replace any worn or defective parts needed due to instrument failure and maintain equipment in optimum operating condition. Intervening services shall be rendered as directed by the PPOC. Any call back for service request for the same type of malfunction shall be at no charge to the Government.\n\nAdditional Requirement:\nContractor shall ensure all equipment is in optimal working condition at the expiration date of the contract.\nContractor personnel that perform changes, updates, or retrofits made on any component, system, or equipment will log it in the station equipment manual.\nContractor will maintain all manufactures manual necessary to perform maintenance.\n\nSubmission of Reports: \nThe Contractor shall submit a complete field service report (FSR) electronically to the PPOC within 10 business days of the work being completed. \nThe FSR at a minimum must contain company name, service technician s name, contact telephone number, date of service, a detailed description of any services performed on the equipment (model number and location included), serial number of the equipment being worked on, customer asset number (EE#), any unsafe condition concerning the equipment, signs of misuse or neglect, findings of problems and correction, including all performance verification, safety checks, listing of replacement parts, when applicable; total hours of service; safety check; performance data; and recommendations necessary from the Contractor to maintain the equipment in optimum operating condition.\n\nGeneral Information\nContractor s Program Manager:  The Contractor shall provide a Program Manager who shall be responsible for managing the performance of work.  The name of this person shall be designated in writing to the Contracting Officer.  The Contractor s program manager shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.\n\nName: \nAddress: \n               \n               \nPhone No.: \nEmail: \n\nContractor Employees:  \nThe Contractor shall not employ any person for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and general well-being of the public. \nThe Contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company. The Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract. \n\nReporting Procedures:\nFor services to be performed during normal working hours on-site, the Contractor shall report upon arrival to the Biomedical Engineering Department, Bldg 500, Room 0261 and sign-in. In addition to signing-in, the Contractor personnel shall identify him/herself to the PPOC before proceeding to the job site. \nFor services to be performed outside normal working hours, the Contractor shall obtain a visitor s badge from the security guard assigned at the facility entrance prior to signing the after-hours log book located outside the Biomedical Engineering Department, Bldg 500, and proceeding to Room 0261.\nPrior to leaving the facility the Contractor shall communicate status of equipment to the PPOC, sign out at the same location that they signed in and return the visitor s badge. \n For services performed at CBOCs and sites off from the main campus, the Contractor shall notify the PPOC via email upon arrival and finishing of services.\n\nParking: \nIt is the responsibility of Contractor personnel to park only in designated parking areas.  The Contractor shall make alternate arrangements for its personnel to park off-site if motor vehicles are required to access those facilities.  Parking information is available from the VA Police & Security Service Office. The VA will not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. The Contractor assumes full responsibility for any parking violations. \n\nSmoking: \nVAGLAHS is a smoke free facility. This includes the use of vape, electronic cigarettes and tobacco products.  \n \nInvoicing & Payment: \nThe Contractor shall submit in arrears a properly completed itemized invoice via Tungsten Network: \nhttp://www.tungsten-network.com/customer-campaigns/veterans-affairs/\n      22.2 The invoice must be itemized to include the following information. Any \ninformation listed below that is not provided on an invoice, will render that invoice \nincomplete and the invoice will be returned for immediate correction.\nDates of service.\nDescription of services.\nInvoice number, date.\nContract number.\nObligation number.\n22.3 No advance payments shall be authorized.  Payment shall be made monthly for services provided during the billing month in arrears. Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.\n\nInsurance coverage\nThe Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.\n\nThe Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.\n\nBefore commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.\n\nContractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.\n\nAll interested companies shall provide quotations for the following:\n\nSupplies/Services\nBASE YEAR\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n0001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n0002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n0003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n0004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n0005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n0006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n0007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n0008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 1\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n1001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n1002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n1003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n1004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n1005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n1006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n1007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n1008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 2\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n2001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n2002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n2003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n2004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n2005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n2006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n2007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n2008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 3\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n3001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n3002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n3003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n3004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n3005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n3006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n3007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n3008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 4\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n4001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n4002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n4003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n4004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n4005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n4006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n4007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n4008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\n\nTotal Cost (Base Plus Four Option Years)\n\n**Please use the format above for pricing**\n\nThe estimated contract period of performance is 07/01/2025   06/30/2030. \n\nThe full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far. \n\nThe following solicitation provisions apply to this acquisition:\nFAR 52.212-1,  Instructions to Offerors Commercial Products and Commercial Services  (SEP 2023)\nADDENDUM TO 52.212-1,  Instructions to Offerors- Commercial Products and Commercial Services  applies to and is included with this acquisition. \nFAR 52.252-1,  Solicitation Provisions Incorporated by Reference  (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-7,  System for Award Management  (NOV 2024)\nFAR 52.204-16,  Commercial and Government Entity Code Reporting  (AUG 2020)\nFAR 52.204-20,  Predecessor of Offeror  (AUG 2020)\nFAR 52.204-24,  Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment  (NOV 2021)\nFAR 52.204-29,  Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures  (DEC 2023)\nFAR 52.217-5,  Evaluation of Options  (JUL 1990)\nVAAR 852.252-70,  Solicitation Provisions or Clauses Incorporated by Reference  (JAN 2008)\n(End of Addendum to 52.212-1)\n\nFAR 52.212-3,  Offerors Representations and Certifications Commercial Products and Commercial Services  (MAY 2024)\n\nOfferors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3,  Offerors Representations and Certifications Commercial Products and Commercial Services.  If paragraph (j) of the provision is applicable, a written submission is required.\n\nThe following contract clauses apply to this acquisition: \nFAR 52.212-4,  Contract Terms and Conditions Commercial Products and Commercial Services  (NOV 2023)\nADDENDUM TO 52.212-4,  Contract Terms and Conditions   Commercial Products and Commercial Services , applies to and is included with this acquisition.\nFAR 52.252-2,  Clauses Incorporated by Reference  (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-13  System for Award Management Maintenance  (OCT 2018)\nFAR 52.204-18,  Commercial and Government Entity Code Maintenance  (AUG 2020)\nFAR 52.217-8,  Option to Extend Services  (NOV 1999)\nFAR 52.217-9,  Option to Extend the Term of the Contract  (MAR 2000)\nVAAR 852.203-70,  Commercial Advertising  (MAY 2018)\nVAAR 852.211-72,  Technical Industry Standards  (NOV 2018)\nVAAR 852.219-75,  VA Notice of Limitations on Subcontracting   Certificate of Compliance for Services and Construction  (JAN 2023)\nVAAR 852.232-72,  Electronic Submission of Payment Requests  (NOV 2018)\nVAAR 852.242-71,  Administrative Contracting Officer  (OCT 2020)\n(End of Addendum to 52.212-4)\n\nFAR 52.212-5,  Contract Terms and Conditions Required to Implement Statutes or Executive Orders   Commercial Products and Commercial Services  (JAN 2025)\n\nThe following subparagraphs of FAR 52.212-5 are applicable:\n(b)(3), (4), (5), (7), (9), (12), (18)(i), (23), (26), (31), (36), (39)(i), (55), (59), (c)(5). \n\nFAR 52.212-2 Evaluation-Commercial Products and Commercial Services \nPrice and Other Factors: See Attachment 2    FAR 52.212-2 Evaluation-Commercial Products and Commercial Services . \n\nAward will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Decision factors to be considered are Experience, Past Performance, Qualifications, and Cost Schedule. (See Attachment 2), Addendum to FAR 52.212-2,  Evaluation   Commercial Products and Commercial Services . \n\nQuote evaluations will be based on the following:\nElement 1: Experience \na. Contractor shall submit documentation that their firm is able to acquire the necessary resources to perform the tasks in the scope of work and how the firm will meet preventative maintenance inspection and corrective maintenance for all audiology diagnostic equipment s listed in Attachment-  VA Audiology Equipment List . \n\nElement 2: Past Performance   Prior experience in maintaining equipment s listed in Attachment   VA Audiology Equipment List . \n\na. Contractor shall provide a list and description of a minimum of 2-3 contracts performed on similar preventative maintenance inspection (PMI) and corrective maintenance of audiology diagnostic equipment s.\n\nb. The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/;   or any other reasonable basis.\n\nElement 3: Qualifications: Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on specific equipment in accordance with the original manufacturer s maintenance and repair procedures.  Fully qualified  is defined as factory- trained and experienced to work on the equipment assigned. \n\na. Contractor shall provide proof and/or statement of ability to perform maintenance and corrective maintenance on all listed audiology diagnostic equipment s (Attachment -  VA Audiology Equipment List ).\nManufacturer: Grason Stadler, AudioScan, Bio-Logic, Astera 2, Interacoustics, Micromedical, Otometrics, GN Otometrics, Neurocom, and Neurokinetics, \n\nb. Contractor shall submit documentation that their firm is able to provide loaner equipment as needed basis to the facility if the equipment is offline for the duration of maintenance and/or repair period (Attachment-  VA Audiology Equipment List ).\n\nElement 4: Cost Schedule- This award will be made to the Contractor that proposes a quote that is most advantageous to the Government. \n\nThe award will be made to the response most advantageous to the Government.\nResponses should contain your best terms, conditions.\n\nTo facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:\n\"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\"\nOR\n\"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\"\n Quoters shall list exception(s) and rationale for the exception(s), if any.\n\nAll quoters shall submit the following in accordance with Attachment 1,  FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services  (SEP 2023). \n\nAll quotes shall be sent to the Network Contracting Office (NCO) 22, Contract Specialist, Loan Dho at loan.dho@va.gov. \n\nNo inquiries will be addressed for this RFQ solicitation 36C26225Q0972. \n\nSubmission of your response shall be received No Later Than June 13th, 2025, at 10:00 AM Pacific Standard Time to loan.dho@va.gov. Subject Line shall include:  RESPONSE TO RFQ 36C26225Q0972  for consideration. \n\nLate submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). \n\nAny questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. \n\nPoint of Contact\nContract Specialist\nLoan Dho\nLoan.dho@va.gov","text":"Description\nThis is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nThis solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05, effective 04/02/2025.\n\nThis solicitation is a set-aside for 100% Small Business (SBA). This is a firm fixed price contract.\n\nThe associated North American Industrial Classification System (NAICS) code for this procurement is 811210 - Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of $34 Million.\n\nThe FSC/PSC is J065- Maintenance, repair, and rebuilding of equipment Medical, Dental, and veterinary equipment and supplies.\n\nThe Department of Veterans Affairs, Network Contracting 22 is seeking to a contractor to perform preventative maintenance inspection (PMI) and corrective maintenance (CM) on different audiology diagnostic equipment s at the VA Greater Los Angeles Healthcare System.\n\nSTATEMENT OF WORK\n\nTITLE: VA Audiology Equipment Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) Support\n\nBACKGROUND: The VA Greater Los Angeles Healthcare System requires preventative maintenance inspection (PMI) and corrective maintenance (CM) on select diagnostic audiology equipment throughout the VA Greater LA Healthcare system and CBOCs including West Los Angeles Medical Center, Sepulveda VA Medical Center, Los Angeles VA Ambulatory Care Center, Bakersfield VA Clinic Antelope Valley VA Clinic, Santa Maria VA Clinic, San Luis Obispo VA Clinic, and Ventura Outpatient Clinic.\n\nScope: The Contractor shall provide all necessary labor, materials, supplies, parts, software (needed for the general operation of the equipment), tools, equipment, travel, transportation expenses and other related costs to provide Preventive Maintenance Inspection (PMI) and Corrective Maintenance services on selected Government Owned diagnostic audiology equipment defined in included list (Attachment- VA Audiology Equipment List ). All services to inspect, adjustments, repairs, replace parts, test for operating efficiency and other such services in accordance with manufacturer recommended specifications shall be performed in accordance with the terms, conditions, provisions, and specification of the contract. Contractor shall perform work in strict accordance with the statement of work, and all VA local, state and federal polices, and regulations.\n\nParticipating Facilities:\n\nVA Greater Los Angeles Healthcare System\n11301 Wilshire Blvd\nLos Angeles, CA 90073\n\nSepulveda VA Hospital Medical Center\n16111 Plummer St,\nSepulveda, CA 91343\n\nVA LOS ANGELES AMBULATORY CARE CENTER\n351 East Temple Street\nLos Angeles, CA 90012-3328\n\nBAKERSFIELD VA CLINIC\n1801 Westwind Drive\nBakersfield, CA 93301-3028\n\nANTELOPE VALLEY VA CLINIC\n340 East Avenue I, Suite 108\nLancaster, CA 93535-1941\n\nSANTA MARIA VA CLINIC\n1550 East Main Street\nSanta Maria, CA 93454-4819\n\nSAN LUIS OBISPO VA CLINIC\n1288 Morro Street, Suite 200\nSan Luis Obispo, CA 93401-6302\n\nVA Ventura Outpatient Clinic\n5250 Ralston Street\nVentura CA 93003\n\nGeneral Requirement:\nAll work shall be in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibration, cleaning, lubrication, testing, disassembly, checkout, and replacement of worn and/or defective parts required to keep the equipment in optimum operating condition.\nVendor shall apply VA supplied PMI labels (when available) to all devices listed in this contract. No vendor labels are acceptable when VA labels are available.\n\nPreventive maintenance and Inspection (PMI)\nThe Contractor shall perform PMI annually or in accordance with the equipment manufacturer recommended schedule and perform all manufacturer recommended PMI duties during the life of the contract. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission (JC). The contractor may request a copy of the JC standards from the PPOC (Program Point of Contact).\nAt minimum PMI are to include:\nWear, misalignment, maladjustment, damage, or other malfunctions with respect to the manufacturer s specifications.\nInspection for loose boards, connectors, and cables.\nTesting of electrical components for proper voltage and grounding for safety and fire hazard.\nCleaning and lubrication of equipment as required.\nRepair or replacement of all defective components necessary to conform to instrument specifications.\nCalibration or standardization of instrument as required.\nTesting for proper operation of the entire system and subsystem.\nDocumentation on proper function and performance of instrument.\nSoftware updates, if applicable.\nThe PMI will be scheduled a minimum of two (2) weeks in advance with the program point of contact (PPOC) for this requirement.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of PMI maintenance.\n\nCorrective Maintenance / Repair Services:\nThe Contractor shall conduct corrective maintenance/software upgrades/repair services as required by the Government to maintain equipment in accordance with the equipment manufacturer specifications. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission. The Contractor may request a copy of the JC standards from the PPOC.\nThe Contractor shall provide all travel and transportation expenses at no cost to the Government.\nCorrective maintenance (CM) services are to be completed within one (1) calendar day of a reported issue. If loaner equipment is needed because a CM service cannot be completed on-site within 1 calendar day, then the loaner equipment will be provided within 48 hours. Extensions for CM services beyond one (1) calendar day require the approval of the PPOC. Such extensions are to be scheduled with the PPOC within one (1) calendar day and may not exceed 48 hours. If applicable, software updates are included for the general operation of the equipment.\nRemoval of Equipment: Should a piece of equipment require repair at the Contractor s plant, Contractor shall provide a loaner or as / like loaner at no extra charge within 48 hours. The loaner equipment shall be delivered to the Audiology clinic, set up, and calibrated in place for clinical use within 48 hours of removal of the VA-owned equipment. The Contractor may not remove equipment from a government site for only minor repairs. Government property cannot be removed from the station without a signed Property Pass and authorization by the PPOC.\nSafety Standards: Contractor shall provide electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Veterans Affairs, DM&S Supplement, MP-3 Supplement to VA Engineering Chapter 2, Appendix 2C, Change 4, November 4, 1983, Leakage Current Limits . A copy of these standards shall be provided upon request. These standards are strictly enforced. Any equipment not meeting the minimum standards shall be considered \"Inoperable\" until it \"Passes\" the minimum standards. All equipment shall be subject to inspection by VA Biomedical Engineering personnel to verify compliance with these standards.\nPerformance verification is required at the conclusion of every PMI and CM service. This verification procedure includes performance testing for accuracy and precision of the instrument.\nThe Contractor shall provide corrective maintenance repair and replacement parts at no additional cost to the Government.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of corrective maintenance.\nWhen repairs are needed between regular scheduled service, such repairs are rendered as directed only by the PPOC or the Contracting Officer (CO).\nThese repairs shall be verbally directed to the Contractor s employees, requested in writing, be transmitted electronically, by telephone, or any manner consistent with accepted commercial business practices.\n\nReplacement Parts:\nOnly standard new or like-new parts shall be furnished by the Contractor. All parts shall be of current manufacture and shall have versatility with presently installed. All major components and parts furnished shall carry the manufacturer s standard commercial warranty.\nAll newly installed parts will become property of the Government. Replaced parts are to be disposed by the Contractor after approval of PPOC.\nThe Contractor shall provide required replacement parts.\nAll worn or defective parts are to be replaced at no additional cost to the Government.\nOperating and consumable supplies are part of this contract and shall be itemized as no charge item(s) on the Contractor s invoice and shall be identified by part numbers listed on the manufacturer s schematics or parts list.\nThe Veterans Affairs Healthcare Facility shall not furnish parts, service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring appropriate equipment and/or supplies necessary to complete the work as required.\n\nHours of Work:\nThis contract is a full-service contract to include all necessary scheduled service calls five (5) days per week, Monday through Friday, during regular business hours, 7:00 am 3:30 pm (PT), or per site operational hours, excluding National holidays.\nAll PMI services shall be performed during the regular business hours listed above. All CM services shall occur as soon as possible, within one (1) calendar day and can be done during normal business hours with PPOC approval.\nAny service performed during other than normal work hours must have prior approval and coordinated with the PPOC or CO.\n\nNational Holiday:\n\nNew Year s Day\nJanuary 01\nMartin Luther King s Birthday\nThird Monday in January\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJuneteenth\nJune 19\nIndependence Day\nJuly 04\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\n\nIf the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.\n\nPERIOD OF PERFORMANCE: Base plus Four (4) Option Years to follow.\n\nOvertime & holiday Pay:\nAny overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.\nContractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for availability or on-call services unless otherwise provided herein.\n\nSECURITY REQUIREMENTS:\nThe C&A requirements do not apply, and Security Accreditation Package is not required.\n\nThis service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.\n\nQualification:\nPersonnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on the specific equipment in accordance with the original manufacturer s PMI/ repair procedures. Fully qualified is defined as factory-trained, certified, and experienced to work on the equipment assigned.\nThe Contractor shall provide written verification and certifications of their personnel prior to the commencement of the contract.\nThe CO or PPOC reserves the right to reject any of the Contractor s personnel from performing services if he determines they are not fully qualified or the Contractor fails to provide the necessary documentation for approval of each FSE.\n\nService:\nAt the completion of PMI on each equipment and ensure upon departure that the equipment is in optimal working condition. Service shall include any software updates needed for the continued general operation of the equipment.\nService also includes necessary intervening service calls required to replace any worn or defective parts needed due to instrument failure and maintain equipment in optimum operating condition. Intervening services shall be rendered as directed by the PPOC. Any call back for service request for the same type of malfunction shall be at no charge to the Government.\n\nAdditional Requirement:\nContractor shall ensure all equipment is in optimal working condition at the expiration date of the contract.\nContractor personnel that perform changes, updates, or retrofits made on any component, system, or equipment will log it in the station equipment manual.\nContractor will maintain all manufactures manual necessary to perform maintenance.\n\nSubmission of Reports:\nThe Contractor shall submit a complete field service report (FSR) electronically to the PPOC within 10 business days of the work being completed.\nThe FSR at a minimum must contain company name, service technician s name, contact telephone number, date of service, a detailed description of any services performed on the equipment (model number and location included), serial number of the equipment being worked on, customer asset number (EE#), any unsafe condition concerning the equipment, signs of misuse or neglect, findings of problems and correction, including all performance verification, safety checks, listing of replacement parts, when applicable; total hours of service; safety check; performance data; and recommendations necessary from the Contractor to maintain the equipment in optimum operating condition.\n\nGeneral Information\nContractor s Program Manager: The Contractor shall provide a Program Manager who shall be responsible for managing the performance of work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor s program manager shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.\n\nName:\nAddress:\n\nPhone No.:\nEmail:\n\nContractor Employees:\nThe Contractor shall not employ any person for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and general well-being of the public.\nThe Contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company. The Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract.\n\nReporting Procedures:\nFor services to be performed during normal working hours on-site, the Contractor shall report upon arrival to the Biomedical Engineering Department, Bldg 500, Room 0261 and sign-in. In addition to signing-in, the Contractor personnel shall identify him/herself to the PPOC before proceeding to the job site.\nFor services to be performed outside normal working hours, the Contractor shall obtain a visitor s badge from the security guard assigned at the facility entrance prior to signing the after-hours log book located outside the Biomedical Engineering Department, Bldg 500, and proceeding to Room 0261.\nPrior to leaving the facility the Contractor shall communicate status of equipment to the PPOC, sign out at the same location that they signed in and return the visitor s badge.\nFor services performed at CBOCs and sites off from the main campus, the Contractor shall notify the PPOC via email upon arrival and finishing of services.\n\nParking:\nIt is the responsibility of Contractor personnel to park only in designated parking areas. The Contractor shall make alternate arrangements for its personnel to park off-site if motor vehicles are required to access those facilities. Parking information is available from the VA Police & Security Service Office. The VA will not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. The Contractor assumes full responsibility for any parking violations.\n\nSmoking:\nVAGLAHS is a smoke free facility. This includes the use of vape, electronic cigarettes and tobacco products.\n\nInvoicing & Payment:\nThe Contractor shall submit in arrears a properly completed itemized invoice via Tungsten Network:\nhttp://www.tungsten-network.com/customer-campaigns/veterans-affairs/\n22.2 The invoice must be itemized to include the following information. Any\ninformation listed below that is not provided on an invoice, will render that invoice\nincomplete and the invoice will be returned for immediate correction.\nDates of service.\nDescription of services.\nInvoice number, date.\nContract number.\nObligation number.\n22.3 No advance payments shall be authorized. Payment shall be made monthly for services provided during the billing month in arrears. Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.\n\nInsurance coverage\nThe Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.\n\nThe Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.\n\nBefore commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.\n\nContractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.\n\nAll interested companies shall provide quotations for the following:\n\nSupplies/Services\nBASE YEAR\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n0001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n0002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n0003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n0004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n0005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n0006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n0007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n0008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 1\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n1001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n1002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n1003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n1004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n1005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n1006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n1007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n1008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 2\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n2001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n2002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n2003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n2004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n2005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n2006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n2007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n2008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 3\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n3001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n3002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n3003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n3004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n3005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n3006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n3007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n3008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 4\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n4001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n4002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n4003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n4004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n4005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n4006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n4007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n4008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nTotal Cost (Base Plus Four Option Years)\n\n**Please use the format above for pricing**\n\nThe estimated contract period of performance is 07/01/2025 06/30/2030.\n\nThe full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far.\n\nThe following solicitation provisions apply to this acquisition:\nFAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023)\nADDENDUM TO 52.212-1, Instructions to Offerors- Commercial Products and Commercial Services applies to and is included with this acquisition.\nFAR 52.252-1, Solicitation Provisions Incorporated by Reference (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-7, System for Award Management (NOV 2024)\nFAR 52.204-16, Commercial and Government Entity Code Reporting (AUG 2020)\nFAR 52.204-20, Predecessor of Offeror (AUG 2020)\nFAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)\nFAR 52.204-29, Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (DEC 2023)\nFAR 52.217-5, Evaluation of Options (JUL 1990)\nVAAR 852.252-70, Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(End of Addendum to 52.212-1)\n\nFAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services (MAY 2024)\n\nOfferors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required.\n\nThe following contract clauses apply to this acquisition:\nFAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services (NOV 2023)\nADDENDUM TO 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services , applies to and is included with this acquisition.\nFAR 52.252-2, Clauses Incorporated by Reference (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-13 System for Award Management Maintenance (OCT 2018)\nFAR 52.204-18, Commercial and Government Entity Code Maintenance (AUG 2020)\nFAR 52.217-8, Option to Extend Services (NOV 1999)\nFAR 52.217-9, Option to Extend the Term of the Contract (MAR 2000)\nVAAR 852.203-70, Commercial Advertising (MAY 2018)\nVAAR 852.211-72, Technical Industry Standards (NOV 2018)\nVAAR 852.219-75, VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023)\nVAAR 852.232-72, Electronic Submission of Payment Requests (NOV 2018)\nVAAR 852.242-71, Administrative Contracting Officer (OCT 2020)\n(End of Addendum to 52.212-4)\n\nFAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services (JAN 2025)\n\nThe following subparagraphs of FAR 52.212-5 are applicable:\n(b)(3), (4), (5), (7), (9), (12), (18)(i), (23), (26), (31), (36), (39)(i), (55), (59), (c)(5).\n\nFAR 52.212-2 Evaluation-Commercial Products and Commercial Services\nPrice and Other Factors: See Attachment 2 FAR 52.212-2 Evaluation-Commercial Products and Commercial Services .\n\nAward will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Decision factors to be considered are Experience, Past Performance, Qualifications, and Cost Schedule. (See Attachment 2), Addendum to FAR 52.212-2, Evaluation Commercial Products and Commercial Services .\n\nQuote evaluations will be based on the following:\nElement 1: Experience\na. Contractor shall submit documentation that their firm is able to acquire the necessary resources to perform the tasks in the scope of work and how the firm will meet preventative maintenance inspection and corrective maintenance for all audiology diagnostic equipment s listed in Attachment- VA Audiology Equipment List .\n\nElement 2: Past Performance Prior experience in maintaining equipment s listed in Attachment VA Audiology Equipment List .\n\na. Contractor shall provide a list and description of a minimum of 2-3 contracts performed on similar preventative maintenance inspection (PMI) and corrective maintenance of audiology diagnostic equipment s.\n\nb. The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/; or any other reasonable basis.\n\nElement 3: Qualifications: Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on specific equipment in accordance with the original manufacturer s maintenance and repair procedures. Fully qualified is defined as factory- trained and experienced to work on the equipment assigned.\n\na. Contractor shall provide proof and/or statement of ability to perform maintenance and corrective maintenance on all listed audiology diagnostic equipment s (Attachment - VA Audiology Equipment List ).\nManufacturer: Grason Stadler, AudioScan, Bio-Logic, Astera 2, Interacoustics, Micromedical, Otometrics, GN Otometrics, Neurocom, and Neurokinetics,\n\nb. Contractor shall submit documentation that their firm is able to provide loaner equipment as needed basis to the facility if the equipment is offline for the duration of maintenance and/or repair period (Attachment- VA Audiology Equipment List ).\n\nElement 4: Cost Schedule- This award will be made to the Contractor that proposes a quote that is most advantageous to the Government.\n\nThe award will be made to the response most advantageous to the Government.\nResponses should contain your best terms, conditions.\n\nTo facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:\n\"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\"\nOR\n\"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\"\nQuoters shall list exception(s) and rationale for the exception(s), if any.\n\nAll quoters shall submit the following in accordance with Attachment 1, FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023).\n\nAll quotes shall be sent to the Network Contracting Office (NCO) 22, Contract Specialist, Loan Dho at loan.dho@va.gov.\n\nNo inquiries will be addressed for this RFQ solicitation 36C26225Q0972.\n\nSubmission of your response shall be received No Later Than June 13th, 2025, at 10:00 AM Pacific Standard Time to loan.dho@va.gov. Subject Line shall include: RESPONSE TO RFQ 36C26225Q0972 for consideration.\n\nLate submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).\n\nAny questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.\n\nPoint of Contact\nContract Specialist\nLoan Dho\nLoan.dho@va.gov","origin":"detail"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"36C26225Q0972","place_of_performance":{"zip":"90073","city":{"name":"Los Angeles"},"state":{"name":"CA"},"street":"Greater Los Angeles VA Healthcare System West Los Angeles Medical Center","street2":"11301 Wilshire Blvd."},"product_service_code":"J065"}],"due_at":"2025-06-13T17:00:00Z","due_date":"2025-06-13","closes_at":"2025-06-13T17:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","state":"CA","county":"06037","county_name":"Los Angeles County","city":"0644000","city_name":"Los Angeles","country":null,"state_source":"sam_state_name","state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-13T04:27:35.381773Z","principal_notice_id":"c64be5fadc91467f877d62c03bc3dcda","description":{"text":"Description\nThis is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nThis solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05, effective 04/02/2025.\n\nThis solicitation is a set-aside for 100% Small Business (SBA). This is a firm fixed price contract.\n\nThe associated North American Industrial Classification System (NAICS) code for this procurement is 811210 - Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of $34 Million.\n\nThe FSC/PSC is J065- Maintenance, repair, and rebuilding of equipment Medical, Dental, and veterinary equipment and supplies.\n\nThe Department of Veterans Affairs, Network Contracting 22 is seeking to a contractor to perform preventative maintenance inspection (PMI) and corrective maintenance (CM) on different audiology diagnostic equipment s at the VA Greater Los Angeles Healthcare System.\n\nSTATEMENT OF WORK\n\nTITLE: VA Audiology Equipment Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) Support\n\nBACKGROUND: The VA Greater Los Angeles Healthcare System requires preventative maintenance inspection (PMI) and corrective maintenance (CM) on select diagnostic audiology equipment throughout the VA Greater LA Healthcare system and CBOCs including West Los Angeles Medical Center, Sepulveda VA Medical Center, Los Angeles VA Ambulatory Care Center, Bakersfield VA Clinic Antelope Valley VA Clinic, Santa Maria VA Clinic, San Luis Obispo VA Clinic, and Ventura Outpatient Clinic.\n\nScope: The Contractor shall provide all necessary labor, materials, supplies, parts, software (needed for the general operation of the equipment), tools, equipment, travel, transportation expenses and other related costs to provide Preventive Maintenance Inspection (PMI) and Corrective Maintenance services on selected Government Owned diagnostic audiology equipment defined in included list (Attachment- VA Audiology Equipment List ). All services to inspect, adjustments, repairs, replace parts, test for operating efficiency and other such services in accordance with manufacturer recommended specifications shall be performed in accordance with the terms, conditions, provisions, and specification of the contract. Contractor shall perform work in strict accordance with the statement of work, and all VA local, state and federal polices, and regulations.\n\nParticipating Facilities:\n\nVA Greater Los Angeles Healthcare System\n11301 Wilshire Blvd\nLos Angeles, CA 90073\n\nSepulveda VA Hospital Medical Center\n16111 Plummer St,\nSepulveda, CA 91343\n\nVA LOS ANGELES AMBULATORY CARE CENTER\n351 East Temple Street\nLos Angeles, CA 90012-3328\n\nBAKERSFIELD VA CLINIC\n1801 Westwind Drive\nBakersfield, CA 93301-3028\n\nANTELOPE VALLEY VA CLINIC\n340 East Avenue I, Suite 108\nLancaster, CA 93535-1941\n\nSANTA MARIA VA CLINIC\n1550 East Main Street\nSanta Maria, CA 93454-4819\n\nSAN LUIS OBISPO VA CLINIC\n1288 Morro Street, Suite 200\nSan Luis Obispo, CA 93401-6302\n\nVA Ventura Outpatient Clinic\n5250 Ralston Street\nVentura CA 93003\n\nGeneral Requirement:\nAll work shall be in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibration, cleaning, lubrication, testing, disassembly, checkout, and replacement of worn and/or defective parts required to keep the equipment in optimum operating condition.\nVendor shall apply VA supplied PMI labels (when available) to all devices listed in this contract. No vendor labels are acceptable when VA labels are available.\n\nPreventive maintenance and Inspection (PMI)\nThe Contractor shall perform PMI annually or in accordance with the equipment manufacturer recommended schedule and perform all manufacturer recommended PMI duties during the life of the contract. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission (JC). The contractor may request a copy of the JC standards from the PPOC (Program Point of Contact).\nAt minimum PMI are to include:\nWear, misalignment, maladjustment, damage, or other malfunctions with respect to the manufacturer s specifications.\nInspection for loose boards, connectors, and cables.\nTesting of electrical components for proper voltage and grounding for safety and fire hazard.\nCleaning and lubrication of equipment as required.\nRepair or replacement of all defective components necessary to conform to instrument specifications.\nCalibration or standardization of instrument as required.\nTesting for proper operation of the entire system and subsystem.\nDocumentation on proper function and performance of instrument.\nSoftware updates, if applicable.\nThe PMI will be scheduled a minimum of two (2) weeks in advance with the program point of contact (PPOC) for this requirement.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of PMI maintenance.\n\nCorrective Maintenance / Repair Services:\nThe Contractor shall conduct corrective maintenance/software upgrades/repair services as required by the Government to maintain equipment in accordance with the equipment manufacturer specifications. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission. The Contractor may request a copy of the JC standards from the PPOC.\nThe Contractor shall provide all travel and transportation expenses at no cost to the Government.\nCorrective maintenance (CM) services are to be completed within one (1) calendar day of a reported issue. If loaner equipment is needed because a CM service cannot be completed on-site within 1 calendar day, then the loaner equipment will be provided within 48 hours. Extensions for CM services beyond one (1) calendar day require the approval of the PPOC. Such extensions are to be scheduled with the PPOC within one (1) calendar day and may not exceed 48 hours. If applicable, software updates are included for the general operation of the equipment.\nRemoval of Equipment: Should a piece of equipment require repair at the Contractor s plant, Contractor shall provide a loaner or as / like loaner at no extra charge within 48 hours. The loaner equipment shall be delivered to the Audiology clinic, set up, and calibrated in place for clinical use within 48 hours of removal of the VA-owned equipment. The Contractor may not remove equipment from a government site for only minor repairs. Government property cannot be removed from the station without a signed Property Pass and authorization by the PPOC.\nSafety Standards: Contractor shall provide electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Veterans Affairs, DM&S Supplement, MP-3 Supplement to VA Engineering Chapter 2, Appendix 2C, Change 4, November 4, 1983, Leakage Current Limits . A copy of these standards shall be provided upon request. These standards are strictly enforced. Any equipment not meeting the minimum standards shall be considered \"Inoperable\" until it \"Passes\" the minimum standards. All equipment shall be subject to inspection by VA Biomedical Engineering personnel to verify compliance with these standards.\nPerformance verification is required at the conclusion of every PMI and CM service. This verification procedure includes performance testing for accuracy and precision of the instrument.\nThe Contractor shall provide corrective maintenance repair and replacement parts at no additional cost to the Government.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of corrective maintenance.\nWhen repairs are needed between regular scheduled service, such repairs are rendered as directed only by the PPOC or the Contracting Officer (CO).\nThese repairs shall be verbally directed to the Contractor s employees, requested in writing, be transmitted electronically, by telephone, or any manner consistent with accepted commercial business practices.\n\nReplacement Parts:\nOnly standard new or like-new parts shall be furnished by the Contractor. All parts shall be of current manufacture and shall have versatility with presently installed. All major components and parts furnished shall carry the manufacturer s standard commercial warranty.\nAll newly installed parts will become property of the Government. Replaced parts are to be disposed by the Contractor after approval of PPOC.\nThe Contractor shall provide required replacement parts.\nAll worn or defective parts are to be replaced at no additional cost to the Government.\nOperating and consumable supplies are part of this contract and shall be itemized as no charge item(s) on the Contractor s invoice and shall be identified by part numbers listed on the manufacturer s schematics or parts list.\nThe Veterans Affairs Healthcare Facility shall not furnish parts, service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring appropriate equipment and/or supplies necessary to complete the work as required.\n\nHours of Work:\nThis contract is a full-service contract to include all necessary scheduled service calls five (5) days per week, Monday through Friday, during regular business hours, 7:00 am 3:30 pm (PT), or per site operational hours, excluding National holidays.\nAll PMI services shall be performed during the regular business hours listed above. All CM services shall occur as soon as possible, within one (1) calendar day and can be done during normal business hours with PPOC approval.\nAny service performed during other than normal work hours must have prior approval and coordinated with the PPOC or CO.\n\nNational Holiday:\n\nNew Year s Day\nJanuary 01\nMartin Luther King s Birthday\nThird Monday in January\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJuneteenth\nJune 19\nIndependence Day\nJuly 04\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\n\nIf the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.\n\nPERIOD OF PERFORMANCE: Base plus Four (4) Option Years to follow.\n\nOvertime & holiday Pay:\nAny overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.\nContractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for availability or on-call services unless otherwise provided herein.\n\nSECURITY REQUIREMENTS:\nThe C&A requirements do not apply, and Security Accreditation Package is not required.\n\nThis service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.\n\nQualification:\nPersonnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on the specific equipment in accordance with the original manufacturer s PMI/ repair procedures. Fully qualified is defined as factory-trained, certified, and experienced to work on the equipment assigned.\nThe Contractor shall provide written verification and certifications of their personnel prior to the commencement of the contract.\nThe CO or PPOC reserves the right to reject any of the Contractor s personnel from performing services if he determines they are not fully qualified or the Contractor fails to provide the necessary documentation for approval of each FSE.\n\nService:\nAt the completion of PMI on each equipment and ensure upon departure that the equipment is in optimal working condition. Service shall include any software updates needed for the continued general operation of the equipment.\nService also includes necessary intervening service calls required to replace any worn or defective parts needed due to instrument failure and maintain equipment in optimum operating condition. Intervening services shall be rendered as directed by the PPOC. Any call back for service request for the same type of malfunction shall be at no charge to the Government.\n\nAdditional Requirement:\nContractor shall ensure all equipment is in optimal working condition at the expiration date of the contract.\nContractor personnel that perform changes, updates, or retrofits made on any component, system, or equipment will log it in the station equipment manual.\nContractor will maintain all manufactures manual necessary to perform maintenance.\n\nSubmission of Reports:\nThe Contractor shall submit a complete field service report (FSR) electronically to the PPOC within 10 business days of the work being completed.\nThe FSR at a minimum must contain company name, service technician s name, contact telephone number, date of service, a detailed description of any services performed on the equipment (model number and location included), serial number of the equipment being worked on, customer asset number (EE#), any unsafe condition concerning the equipment, signs of misuse or neglect, findings of problems and correction, including all performance verification, safety checks, listing of replacement parts, when applicable; total hours of service; safety check; performance data; and recommendations necessary from the Contractor to maintain the equipment in optimum operating condition.\n\nGeneral Information\nContractor s Program Manager: The Contractor shall provide a Program Manager who shall be responsible for managing the performance of work. The name of this person shall be designated in writing to the Contracting Officer. The Contractor s program manager shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.\n\nName:\nAddress:\n\nPhone No.:\nEmail:\n\nContractor Employees:\nThe Contractor shall not employ any person for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and general well-being of the public.\nThe Contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company. The Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract.\n\nReporting Procedures:\nFor services to be performed during normal working hours on-site, the Contractor shall report upon arrival to the Biomedical Engineering Department, Bldg 500, Room 0261 and sign-in. In addition to signing-in, the Contractor personnel shall identify him/herself to the PPOC before proceeding to the job site.\nFor services to be performed outside normal working hours, the Contractor shall obtain a visitor s badge from the security guard assigned at the facility entrance prior to signing the after-hours log book located outside the Biomedical Engineering Department, Bldg 500, and proceeding to Room 0261.\nPrior to leaving the facility the Contractor shall communicate status of equipment to the PPOC, sign out at the same location that they signed in and return the visitor s badge.\nFor services performed at CBOCs and sites off from the main campus, the Contractor shall notify the PPOC via email upon arrival and finishing of services.\n\nParking:\nIt is the responsibility of Contractor personnel to park only in designated parking areas. The Contractor shall make alternate arrangements for its personnel to park off-site if motor vehicles are required to access those facilities. Parking information is available from the VA Police & Security Service Office. The VA will not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. The Contractor assumes full responsibility for any parking violations.\n\nSmoking:\nVAGLAHS is a smoke free facility. This includes the use of vape, electronic cigarettes and tobacco products.\n\nInvoicing & Payment:\nThe Contractor shall submit in arrears a properly completed itemized invoice via Tungsten Network:\nhttp://www.tungsten-network.com/customer-campaigns/veterans-affairs/\n22.2 The invoice must be itemized to include the following information. Any\ninformation listed below that is not provided on an invoice, will render that invoice\nincomplete and the invoice will be returned for immediate correction.\nDates of service.\nDescription of services.\nInvoice number, date.\nContract number.\nObligation number.\n22.3 No advance payments shall be authorized. Payment shall be made monthly for services provided during the billing month in arrears. Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.\n\nInsurance coverage\nThe Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.\n\nThe Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.\n\nBefore commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.\n\nContractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.\n\nAll interested companies shall provide quotations for the following:\n\nSupplies/Services\nBASE YEAR\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n0001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n0002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n0003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n0004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n0005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n0006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n0007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n0008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 1\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n1001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n1002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n1003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n1004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n1005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n1006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n1007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n1008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 2\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n2001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n2002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n2003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n2004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n2005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n2006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n2007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n2008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 3\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n3001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n3002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n3003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n3004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n3005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n3006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n3007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n3008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nOPTION YEAR 4\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n4001\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n4002\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n4003\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n4004\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n4005\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1\nYR\n\n4006\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1\nYR\n\n4007\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1\nYR\n\n4008\nAudiology Diagnostic Equipment s (Listed in Attachment VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1\nYR\n\nTotal Cost (Base Plus Four Option Years)\n\n**Please use the format above for pricing**\n\nThe estimated contract period of performance is 07/01/2025 06/30/2030.\n\nThe full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far.\n\nThe following solicitation provisions apply to this acquisition:\nFAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023)\nADDENDUM TO 52.212-1, Instructions to Offerors- Commercial Products and Commercial Services applies to and is included with this acquisition.\nFAR 52.252-1, Solicitation Provisions Incorporated by Reference (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-7, System for Award Management (NOV 2024)\nFAR 52.204-16, Commercial and Government Entity Code Reporting (AUG 2020)\nFAR 52.204-20, Predecessor of Offeror (AUG 2020)\nFAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)\nFAR 52.204-29, Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (DEC 2023)\nFAR 52.217-5, Evaluation of Options (JUL 1990)\nVAAR 852.252-70, Solicitation Provisions or Clauses Incorporated by Reference (JAN 2008)\n(End of Addendum to 52.212-1)\n\nFAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services (MAY 2024)\n\nOfferors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3, Offerors Representations and Certifications Commercial Products and Commercial Services. If paragraph (j) of the provision is applicable, a written submission is required.\n\nThe following contract clauses apply to this acquisition:\nFAR 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services (NOV 2023)\nADDENDUM TO 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services , applies to and is included with this acquisition.\nFAR 52.252-2, Clauses Incorporated by Reference (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-13 System for Award Management Maintenance (OCT 2018)\nFAR 52.204-18, Commercial and Government Entity Code Maintenance (AUG 2020)\nFAR 52.217-8, Option to Extend Services (NOV 1999)\nFAR 52.217-9, Option to Extend the Term of the Contract (MAR 2000)\nVAAR 852.203-70, Commercial Advertising (MAY 2018)\nVAAR 852.211-72, Technical Industry Standards (NOV 2018)\nVAAR 852.219-75, VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023)\nVAAR 852.232-72, Electronic Submission of Payment Requests (NOV 2018)\nVAAR 852.242-71, Administrative Contracting Officer (OCT 2020)\n(End of Addendum to 52.212-4)\n\nFAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders Commercial Products and Commercial Services (JAN 2025)\n\nThe following subparagraphs of FAR 52.212-5 are applicable:\n(b)(3), (4), (5), (7), (9), (12), (18)(i), (23), (26), (31), (36), (39)(i), (55), (59), (c)(5).\n\nFAR 52.212-2 Evaluation-Commercial Products and Commercial Services\nPrice and Other Factors: See Attachment 2 FAR 52.212-2 Evaluation-Commercial Products and Commercial Services .\n\nAward will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Decision factors to be considered are Experience, Past Performance, Qualifications, and Cost Schedule. (See Attachment 2), Addendum to FAR 52.212-2, Evaluation Commercial Products and Commercial Services .\n\nQuote evaluations will be based on the following:\nElement 1: Experience\na. Contractor shall submit documentation that their firm is able to acquire the necessary resources to perform the tasks in the scope of work and how the firm will meet preventative maintenance inspection and corrective maintenance for all audiology diagnostic equipment s listed in Attachment- VA Audiology Equipment List .\n\nElement 2: Past Performance Prior experience in maintaining equipment s listed in Attachment VA Audiology Equipment List .\n\na. Contractor shall provide a list and description of a minimum of 2-3 contracts performed on similar preventative maintenance inspection (PMI) and corrective maintenance of audiology diagnostic equipment s.\n\nb. The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/; or any other reasonable basis.\n\nElement 3: Qualifications: Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on specific equipment in accordance with the original manufacturer s maintenance and repair procedures. Fully qualified is defined as factory- trained and experienced to work on the equipment assigned.\n\na. Contractor shall provide proof and/or statement of ability to perform maintenance and corrective maintenance on all listed audiology diagnostic equipment s (Attachment - VA Audiology Equipment List ).\nManufacturer: Grason Stadler, AudioScan, Bio-Logic, Astera 2, Interacoustics, Micromedical, Otometrics, GN Otometrics, Neurocom, and Neurokinetics,\n\nb. Contractor shall submit documentation that their firm is able to provide loaner equipment as needed basis to the facility if the equipment is offline for the duration of maintenance and/or repair period (Attachment- VA Audiology Equipment List ).\n\nElement 4: Cost Schedule- This award will be made to the Contractor that proposes a quote that is most advantageous to the Government.\n\nThe award will be made to the response most advantageous to the Government.\nResponses should contain your best terms, conditions.\n\nTo facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:\n\"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\"\nOR\n\"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\"\nQuoters shall list exception(s) and rationale for the exception(s), if any.\n\nAll quoters shall submit the following in accordance with Attachment 1, FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services (SEP 2023).\n\nAll quotes shall be sent to the Network Contracting Office (NCO) 22, Contract Specialist, Loan Dho at loan.dho@va.gov.\n\nNo inquiries will be addressed for this RFQ solicitation 36C26225Q0972.\n\nSubmission of your response shall be received No Later Than June 13th, 2025, at 10:00 AM Pacific Standard Time to loan.dho@va.gov. Subject Line shall include: RESPONSE TO RFQ 36C26225Q0972 for consideration.\n\nLate submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f).\n\nAny questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below.\n\nPoint of Contact\nContract Specialist\nLoan Dho\nLoan.dho@va.gov","html":"Description\nThis is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6,  Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,  as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued.\n\nThis solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-05, effective 04/02/2025.\n\nThis solicitation is a set-aside for 100% Small Business (SBA). This is a firm fixed price contract. \n\nThe associated North American Industrial Classification System (NAICS) code for this procurement is 811210 - Electronic and Precision Equipment Repair and Maintenance, with a small business size standard of $34 Million. \n\nThe FSC/PSC is J065- Maintenance, repair, and rebuilding of equipment   Medical, Dental, and veterinary equipment and supplies. \n\nThe Department of Veterans Affairs, Network Contracting 22 is seeking to a contractor to perform preventative maintenance inspection (PMI) and corrective maintenance (CM) on different audiology diagnostic equipment s at the VA Greater Los Angeles Healthcare System. \n\nSTATEMENT OF WORK\n\nTITLE: VA Audiology Equipment Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) Support\n\nBACKGROUND: The VA Greater Los Angeles Healthcare System requires preventative maintenance inspection (PMI) and corrective maintenance (CM) on select diagnostic audiology equipment throughout the VA Greater LA Healthcare system and CBOCs including West Los Angeles Medical Center, Sepulveda VA Medical Center, Los Angeles VA Ambulatory Care Center, Bakersfield VA Clinic Antelope Valley VA Clinic, Santa Maria VA Clinic, San Luis Obispo VA Clinic, and Ventura Outpatient Clinic.\n\nScope: The Contractor shall provide all necessary labor, materials, supplies, parts, software (needed for the general operation of the equipment), tools, equipment, travel, transportation expenses and other related costs to provide Preventive Maintenance Inspection (PMI) and Corrective Maintenance services on selected Government Owned diagnostic audiology equipment defined in included list (Attachment-  VA Audiology Equipment List ). All services to inspect, adjustments, repairs, replace parts, test for operating efficiency and other such services in accordance with manufacturer recommended specifications shall be performed in accordance with the terms, conditions, provisions, and specification of the contract. Contractor shall perform work in strict accordance with the statement of work, and all VA local, state and federal polices, and regulations. \n\nParticipating Facilities:\n\nVA Greater Los Angeles Healthcare System\n11301 Wilshire Blvd\nLos Angeles, CA 90073\n\nSepulveda VA Hospital Medical Center\n16111 Plummer St, \nSepulveda, CA 91343\n\nVA LOS ANGELES AMBULATORY CARE CENTER\n351 East Temple Street\nLos Angeles, CA 90012-3328\n\nBAKERSFIELD VA CLINIC\n1801 Westwind Drive\nBakersfield, CA 93301-3028\n\nANTELOPE VALLEY VA CLINIC\n340 East Avenue I, Suite 108\nLancaster, CA 93535-1941\n\nSANTA MARIA VA CLINIC\n1550 East Main Street\nSanta Maria, CA 93454-4819\n\nSAN LUIS OBISPO VA CLINIC\n1288 Morro Street, Suite 200\nSan Luis Obispo, CA 93401-6302\n\nVA Ventura Outpatient Clinic\n5250 Ralston Street\nVentura CA 93003\n\nGeneral Requirement: \nAll work shall be in accordance with manufacturer s instructions, including, but not limited to, adjustments, calibration, cleaning, lubrication, testing, disassembly, checkout, and replacement of worn and/or defective parts required to keep the equipment in optimum operating condition. \nVendor shall apply VA supplied PMI labels (when available) to all devices listed in this contract. No vendor labels are acceptable when VA labels are available. \n\nPreventive maintenance and Inspection (PMI)\nThe Contractor shall perform PMI annually or in accordance with the equipment manufacturer recommended schedule and perform all manufacturer recommended PMI duties during the life of the contract. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission (JC). The contractor may request a copy of the JC standards from the PPOC (Program Point of Contact). \nAt minimum PMI are to include:\nWear, misalignment, maladjustment, damage, or other malfunctions with respect to the manufacturer s specifications.\nInspection for loose boards, connectors, and cables.\nTesting of electrical components for proper voltage and grounding for safety and fire hazard.\nCleaning and lubrication of equipment as required.\nRepair or replacement of all defective components necessary to conform to instrument specifications.\nCalibration or standardization of instrument as required.\nTesting for proper operation of the entire system and subsystem.\nDocumentation on proper function and performance of instrument.\nSoftware updates, if applicable.\nThe PMI will be scheduled a minimum of two (2) weeks in advance with the program point of contact (PPOC) for this requirement. \nThe Contractor shall provide a detailed service report to the PPOC within ten business days of PMI maintenance.\n\nCorrective Maintenance / Repair Services: \nThe Contractor shall conduct corrective maintenance/software upgrades/repair services as required by the Government to maintain equipment in accordance with the equipment manufacturer specifications. All equipment must also be maintained in such a condition that will satisfy the requirements of the Joint Commission. The Contractor may request a copy of the JC standards from the PPOC.\nThe Contractor shall provide all travel and transportation expenses at no cost to the Government.\nCorrective maintenance (CM) services are to be completed within one (1) calendar day of a reported issue. If loaner equipment is needed because a CM service cannot be completed on-site within 1 calendar day, then the loaner equipment will be provided within 48 hours. Extensions for CM services beyond one (1) calendar day require the approval of the PPOC. Such extensions are to be scheduled with the PPOC within one (1) calendar day and may not exceed 48 hours. If applicable, software updates are included for the general operation of the equipment.\nRemoval of Equipment: Should a piece of equipment require repair at the Contractor s plant, Contractor shall provide a loaner or as / like loaner at no extra charge within 48 hours. The loaner equipment shall be delivered to the Audiology clinic, set up, and calibrated in place for clinical use within 48 hours of removal of the VA-owned equipment. The Contractor may not remove equipment from a government site for only minor repairs. Government property cannot be removed from the station without a signed Property Pass and authorization by the PPOC. \nSafety Standards: Contractor shall provide electrical safety measurements on all equipment under this contract after all work has been completed for each visit. The standards to be used are those of the Veterans Affairs, DM&S Supplement, MP-3  Supplement to VA Engineering  Chapter 2, Appendix 2C, Change 4, November 4, 1983,  Leakage Current Limits . A copy of these standards shall be provided upon request. These standards are strictly enforced. Any equipment not meeting the minimum standards shall be considered \"Inoperable\" until it \"Passes\" the minimum standards. All equipment shall be subject to inspection by VA Biomedical Engineering personnel to verify compliance with these standards.\nPerformance verification is required at the conclusion of every PMI and CM service. This verification procedure includes performance testing for accuracy and precision of the instrument.\nThe Contractor shall provide corrective maintenance repair and replacement parts at no additional cost to the Government.\nThe Contractor shall provide a detailed service report to the PPOC within ten business days of corrective maintenance.\nWhen repairs are needed between regular scheduled service, such repairs are rendered as directed only by the PPOC or the Contracting Officer (CO).\nThese repairs shall be verbally directed to the Contractor s employees, requested in writing, be transmitted electronically, by telephone, or any manner consistent with accepted commercial business practices.\n\nReplacement Parts:\nOnly standard new or like-new parts shall be furnished by the Contractor. All parts shall be of current manufacture and shall have versatility with presently installed. All major components and parts furnished shall carry the manufacturer s standard commercial warranty. \nAll newly installed parts will become property of the Government. Replaced parts are to be disposed by the Contractor after approval of PPOC.\nThe Contractor shall provide required replacement parts.\nAll worn or defective parts are to be replaced at no additional cost to the Government.\nOperating and consumable supplies are part of this contract and shall be itemized as no charge item(s) on the Contractor s invoice and shall be identified by part numbers listed on the manufacturer s schematics or parts list.\nThe Veterans Affairs Healthcare Facility shall not furnish parts, service manuals and/or test equipment for the performance of this contract. It is the responsibility of the Contractor to bring appropriate equipment and/or supplies necessary to complete the work as required. \n\nHours of Work: \nThis contract is a full-service contract to include all necessary scheduled service calls five (5) days per week, Monday through Friday, during regular business hours, 7:00 am  3:30 pm (PT), or per site operational hours, excluding National holidays. \nAll PMI services shall be performed during the regular business hours listed above. All CM services shall occur as soon as possible, within one (1) calendar day and can be done during normal business hours with PPOC approval.\nAny service performed during other than normal work hours must have prior approval and coordinated with the PPOC or CO.\n\nNational Holiday:\n\nNew Year s Day\nJanuary 01\nMartin Luther King s Birthday\nThird Monday in January\nPresident s Day\nThird Monday in February\nMemorial Day\nLast Monday in May\nJuneteenth\nJune 19\nIndependence Day\nJuly 04\nLabor Day\nFirst Monday in September\nColumbus Day\nSecond Monday in October\nVeterans Day\nNovember 11\nThanksgiving Day\nFourth Thursday in November\nChristmas Day\nDecember 25\n\nIf the holiday falls on a Sunday, the following Monday will be observed as a National holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America.\n\nPERIOD OF PERFORMANCE: Base plus Four (4) Option Years to follow.\n\nOvertime & holiday Pay: \nAny overtime and/or holiday pay that may be entitled to the Contractor s employees shall be the sole responsibility of the Contractor and shall not be billed to nor reimbursed by the Government.\nContractor will bill and be paid for actual services provided by Contractor personnel. Contractor will not be paid for  availability  or  on-call  services unless otherwise provided herein.\n\nSECURITY REQUIREMENTS: \nThe C&A requirements do not apply, and Security Accreditation Package is not required.\n\nThis service does not involve Contractor connection of one or more contractor-owned IT devices (such as laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., non-public network) therefore Information Technology (IT) Security certification and accreditation (authorization) (C&A) requirements do not apply per VA Handbook 6500.6.\n\nQualification: \n Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on the specific equipment in accordance with the original manufacturer s PMI/ repair procedures.  Fully qualified  is defined as factory-trained, certified, and experienced to work on the equipment assigned.\nThe Contractor shall provide written verification and certifications of their personnel prior to the commencement of the contract.\nThe CO or PPOC reserves the right to reject any of the Contractor s personnel from performing services if he determines they are not  fully qualified  or the Contractor fails to provide the necessary documentation for approval of each FSE.\n\nService: \nAt the completion of PMI on each equipment and ensure upon departure that the equipment is in optimal working condition. Service shall include any software updates needed for the continued general operation of the equipment.\nService also includes necessary intervening service calls required to replace any worn or defective parts needed due to instrument failure and maintain equipment in optimum operating condition. Intervening services shall be rendered as directed by the PPOC. Any call back for service request for the same type of malfunction shall be at no charge to the Government.\n\nAdditional Requirement:\nContractor shall ensure all equipment is in optimal working condition at the expiration date of the contract.\nContractor personnel that perform changes, updates, or retrofits made on any component, system, or equipment will log it in the station equipment manual.\nContractor will maintain all manufactures manual necessary to perform maintenance.\n\nSubmission of Reports: \nThe Contractor shall submit a complete field service report (FSR) electronically to the PPOC within 10 business days of the work being completed. \nThe FSR at a minimum must contain company name, service technician s name, contact telephone number, date of service, a detailed description of any services performed on the equipment (model number and location included), serial number of the equipment being worked on, customer asset number (EE#), any unsafe condition concerning the equipment, signs of misuse or neglect, findings of problems and correction, including all performance verification, safety checks, listing of replacement parts, when applicable; total hours of service; safety check; performance data; and recommendations necessary from the Contractor to maintain the equipment in optimum operating condition.\n\nGeneral Information\nContractor s Program Manager:  The Contractor shall provide a Program Manager who shall be responsible for managing the performance of work.  The name of this person shall be designated in writing to the Contracting Officer.  The Contractor s program manager shall have full authority to act for the Contractor on all matters relating to daily operations of this contract.\n\nName: \nAddress: \n               \n               \nPhone No.: \nEmail: \n\nContractor Employees:  \nThe Contractor shall not employ any person for work on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and general well-being of the public. \nThe Contractor personnel shall present a neat appearance and be easily recognized as a contractor employee. This may be accomplished by wearing distinctive clothing bearing the name of the company. The Contractor field service personnel shall be dressed to present a clean, neat appearance at all times when performing under this contract. \n\nReporting Procedures:\nFor services to be performed during normal working hours on-site, the Contractor shall report upon arrival to the Biomedical Engineering Department, Bldg 500, Room 0261 and sign-in. In addition to signing-in, the Contractor personnel shall identify him/herself to the PPOC before proceeding to the job site. \nFor services to be performed outside normal working hours, the Contractor shall obtain a visitor s badge from the security guard assigned at the facility entrance prior to signing the after-hours log book located outside the Biomedical Engineering Department, Bldg 500, and proceeding to Room 0261.\nPrior to leaving the facility the Contractor shall communicate status of equipment to the PPOC, sign out at the same location that they signed in and return the visitor s badge. \n For services performed at CBOCs and sites off from the main campus, the Contractor shall notify the PPOC via email upon arrival and finishing of services.\n\nParking: \nIt is the responsibility of Contractor personnel to park only in designated parking areas.  The Contractor shall make alternate arrangements for its personnel to park off-site if motor vehicles are required to access those facilities.  Parking information is available from the VA Police & Security Service Office. The VA will not invalidate or make reimbursement for parking violations of the Contractor's personnel under any circumstances. The Contractor assumes full responsibility for any parking violations. \n\nSmoking: \nVAGLAHS is a smoke free facility. This includes the use of vape, electronic cigarettes and tobacco products.  \n \nInvoicing & Payment: \nThe Contractor shall submit in arrears a properly completed itemized invoice via Tungsten Network: \nhttp://www.tungsten-network.com/customer-campaigns/veterans-affairs/\n      22.2 The invoice must be itemized to include the following information. Any \ninformation listed below that is not provided on an invoice, will render that invoice \nincomplete and the invoice will be returned for immediate correction.\nDates of service.\nDescription of services.\nInvoice number, date.\nContract number.\nObligation number.\n22.3 No advance payments shall be authorized.  Payment shall be made monthly for services provided during the billing month in arrears. Upon submission of a properly prepared invoice for prices stipulated in this contract for services delivered and accepted in accordance with the terms and conditions of the contract, less any deductions stipulated in this contract.\n\nInsurance coverage\nThe Contractor agrees to procure and maintain, while the contract is in effect, Workers Compensation and Employee s Public Liability Insurance in accordance with Federal and State of California laws. The Contractor shall be responsible for all damage to property, which may be done by him, or any employee engaged in the performance of this contract.\n\nThe Government shall be held harmless against any or all loss, cost, damage, claim expense or liability whatsoever, because of accident or injury to persons or property of others occurring in the performance of this contract.\n\nBefore commencing work under this contract, the Contracting Officer shall require the Contractor to furnish certification from his/her insurance company indicating that the coverage specified by FAR 52.228-5 and per FAR Subpart 28.307-2 has been obtained and that it may not be changed or canceled without guaranteed thirty (30) day notice to the Contracting Officer.\n\nContractor is required to provide copies of proof of Workers Compensation and Employee Public Liability Insurance within fifteen (15) calendar days after notification of contract award.\n\nAll interested companies shall provide quotations for the following:\n\nSupplies/Services\nBASE YEAR\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n0001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n0002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n0003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n0004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n0005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n0006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n0007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n0008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 1\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n1001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n1002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n1003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n1004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n1005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n1006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n1007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n1008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 2\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n2001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n2002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n2003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n2004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n2005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n2006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n2007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n2008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 3\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n3001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n3002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n3003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n3004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n3005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n3006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n3007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n3008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\nOPTION YEAR 4\nLine Item\nDescription\nQuantity\nUnit of Measure\nUnit Price\nTotal Price\n4001 \nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the West Los Angeles VA Healthcare Center\n1\nYR\n\n\n4002\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Sepulveda VA Medical Center\n1\nYR\n\n\n4003\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Los Angeles Ambulatory Care Center\n1\nYR\n\n\n4004\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Bakersfield VA Clinic\n1\nYR\n\n\n4005\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Antelope Valley VA Clinic\n1 \nYR\n\n\n4006\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Santa Maria VA Clinic\n1 \nYR\n\n\n4007\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the San Luis Obispo VA Clinic\n1 \nYR\n\n\n4008\nAudiology Diagnostic Equipment s (Listed in Attachment    VA Audiology Equipment List ) Preventative Maintenance Inspection (PMI) and Corrective Maintenance (CM) at the Ventura VA Clinic\n1 \nYR\n\n\n\nTotal Cost (Base Plus Four Option Years)\n\n**Please use the format above for pricing**\n\nThe estimated contract period of performance is 07/01/2025   06/30/2030. \n\nThe full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far. \n\nThe following solicitation provisions apply to this acquisition:\nFAR 52.212-1,  Instructions to Offerors Commercial Products and Commercial Services  (SEP 2023)\nADDENDUM TO 52.212-1,  Instructions to Offerors- Commercial Products and Commercial Services  applies to and is included with this acquisition. \nFAR 52.252-1,  Solicitation Provisions Incorporated by Reference  (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-7,  System for Award Management  (NOV 2024)\nFAR 52.204-16,  Commercial and Government Entity Code Reporting  (AUG 2020)\nFAR 52.204-20,  Predecessor of Offeror  (AUG 2020)\nFAR 52.204-24,  Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment  (NOV 2021)\nFAR 52.204-29,  Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures  (DEC 2023)\nFAR 52.217-5,  Evaluation of Options  (JUL 1990)\nVAAR 852.252-70,  Solicitation Provisions or Clauses Incorporated by Reference  (JAN 2008)\n(End of Addendum to 52.212-1)\n\nFAR 52.212-3,  Offerors Representations and Certifications Commercial Products and Commercial Services  (MAY 2024)\n\nOfferors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/ in accordance with FAR 52.212-3,  Offerors Representations and Certifications Commercial Products and Commercial Services.  If paragraph (j) of the provision is applicable, a written submission is required.\n\nThe following contract clauses apply to this acquisition: \nFAR 52.212-4,  Contract Terms and Conditions Commercial Products and Commercial Services  (NOV 2023)\nADDENDUM TO 52.212-4,  Contract Terms and Conditions   Commercial Products and Commercial Services , applies to and is included with this acquisition.\nFAR 52.252-2,  Clauses Incorporated by Reference  (FEB 1998)\nhttp://www.acquisition.gov/far/index.html (FAR) and http://www.va.gov/oal/library/vaar/index.asp (VAAR)\nFAR 52.204-13  System for Award Management Maintenance  (OCT 2018)\nFAR 52.204-18,  Commercial and Government Entity Code Maintenance  (AUG 2020)\nFAR 52.217-8,  Option to Extend Services  (NOV 1999)\nFAR 52.217-9,  Option to Extend the Term of the Contract  (MAR 2000)\nVAAR 852.203-70,  Commercial Advertising  (MAY 2018)\nVAAR 852.211-72,  Technical Industry Standards  (NOV 2018)\nVAAR 852.219-75,  VA Notice of Limitations on Subcontracting   Certificate of Compliance for Services and Construction  (JAN 2023)\nVAAR 852.232-72,  Electronic Submission of Payment Requests  (NOV 2018)\nVAAR 852.242-71,  Administrative Contracting Officer  (OCT 2020)\n(End of Addendum to 52.212-4)\n\nFAR 52.212-5,  Contract Terms and Conditions Required to Implement Statutes or Executive Orders   Commercial Products and Commercial Services  (JAN 2025)\n\nThe following subparagraphs of FAR 52.212-5 are applicable:\n(b)(3), (4), (5), (7), (9), (12), (18)(i), (23), (26), (31), (36), (39)(i), (55), (59), (c)(5). \n\nFAR 52.212-2 Evaluation-Commercial Products and Commercial Services \nPrice and Other Factors: See Attachment 2    FAR 52.212-2 Evaluation-Commercial Products and Commercial Services . \n\nAward will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of FAR 13. Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government. Decision factors to be considered are Experience, Past Performance, Qualifications, and Cost Schedule. (See Attachment 2), Addendum to FAR 52.212-2,  Evaluation   Commercial Products and Commercial Services . \n\nQuote evaluations will be based on the following:\nElement 1: Experience \na. Contractor shall submit documentation that their firm is able to acquire the necessary resources to perform the tasks in the scope of work and how the firm will meet preventative maintenance inspection and corrective maintenance for all audiology diagnostic equipment s listed in Attachment-  VA Audiology Equipment List . \n\nElement 2: Past Performance   Prior experience in maintaining equipment s listed in Attachment   VA Audiology Equipment List . \n\na. Contractor shall provide a list and description of a minimum of 2-3 contracts performed on similar preventative maintenance inspection (PMI) and corrective maintenance of audiology diagnostic equipment s.\n\nb. The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/;   or any other reasonable basis.\n\nElement 3: Qualifications: Personnel performing maintenance and repair services must be fully qualified, competent Field Service Engineers (FSE) who has been trained and certified to perform work on specific equipment in accordance with the original manufacturer s maintenance and repair procedures.  Fully qualified  is defined as factory- trained and experienced to work on the equipment assigned. \n\na. Contractor shall provide proof and/or statement of ability to perform maintenance and corrective maintenance on all listed audiology diagnostic equipment s (Attachment -  VA Audiology Equipment List ).\nManufacturer: Grason Stadler, AudioScan, Bio-Logic, Astera 2, Interacoustics, Micromedical, Otometrics, GN Otometrics, Neurocom, and Neurokinetics, \n\nb. Contractor shall submit documentation that their firm is able to provide loaner equipment as needed basis to the facility if the equipment is offline for the duration of maintenance and/or repair period (Attachment-  VA Audiology Equipment List ).\n\nElement 4: Cost Schedule- This award will be made to the Contractor that proposes a quote that is most advantageous to the Government. \n\nThe award will be made to the response most advantageous to the Government.\nResponses should contain your best terms, conditions.\n\nTo facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:\n\"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition.\"\nOR\n\"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:\"\n Quoters shall list exception(s) and rationale for the exception(s), if any.\n\nAll quoters shall submit the following in accordance with Attachment 1,  FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services  (SEP 2023). \n\nAll quotes shall be sent to the Network Contracting Office (NCO) 22, Contract Specialist, Loan Dho at loan.dho@va.gov. \n\nNo inquiries will be addressed for this RFQ solicitation 36C26225Q0972. \n\nSubmission of your response shall be received No Later Than June 13th, 2025, at 10:00 AM Pacific Standard Time to loan.dho@va.gov. Subject Line shall include:  RESPONSE TO RFQ 36C26225Q0972  for consideration. \n\nLate submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). \n\nAny questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. \n\nPoint of Contact\nContract Specialist\nLoan Dho\nLoan.dho@va.gov","origin":"detail"},"contacts":[{"name":"Loan Dho","role":"primary","email":"loan.dho@va.gov","title":"Contract Specialist"}],"place_of_performance":{"zip":"90073","city":{"name":"Los Angeles"},"state":{"name":"CA"},"street":"Greater Los Angeles VA Healthcare System West Los Angeles Medical Center","street2":"11301 Wilshire Blvd."},"office_address":{"zip":"85297","city":"Gilbert","state":"AZ","country":"USA"},"naics_codes":["811210"],"award":{"awardee":{}},"attachments":[{"resource_id":"4bfcd8b4bb40444888f9bea88b1c0322","name":"36C26225Q0972.docx","kind":"file","mime_type":".docx","size_bytes":43653,"posted_at":"2025-06-05T13:29:03.764Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4bfcd8b4bb40444888f9bea88b1c0322/download","mirrored":false},{"resource_id":"7ab51a69c1e84b23b45a9ae367f5ccad","name":"http://www.va.gov","kind":"link","mime_type":null,"size_bytes":null,"posted_at":"2025-06-05T13:29:03.764Z","export_controlled":false,"sha256":null,"url":"http://www.va.gov","mirrored":false},{"resource_id":"66eda0cd04444e0db6b9042476439d2e","name":"Attachment 1- FAR 52.212-1 Instructions to Offerors Commercial Products and Commercial Services.pdf","kind":"file","mime_type":".pdf","size_bytes":144885,"posted_at":"2025-06-05T13:29:03.764Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/66eda0cd04444e0db6b9042476439d2e/download","mirrored":false},{"resource_id":"716acb1d6c6741479db2a9db094e1b9e","name":"Attachment 2- 52.212-2 Evaluation - Commercial Products and Commercial Services.pdf","kind":"file","mime_type":".pdf","size_bytes":169263,"posted_at":"2025-06-05T13:29:03.764Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/716acb1d6c6741479db2a9db094e1b9e/download","mirrored":false},{"resource_id":"11fe97b4929342e3937c04ca1f35b32c","name":"Attachment 3 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting_Certificate of Compliance for Services.docx","kind":"file","mime_type":".docx","size_bytes":18049,"posted_at":"2025-06-05T13:29:03.764Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/11fe97b4929342e3937c04ca1f35b32c/download","mirrored":false},{"resource_id":"f6e03b211ef24686a227a1e92a2f90e1","name":"Statement of Work - Audiology Diagnostic PMI.pdf","kind":"file","mime_type":".pdf","size_bytes":133473,"posted_at":"2025-06-05T13:29:03.764Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/f6e03b211ef24686a227a1e92a2f90e1/download","mirrored":false},{"resource_id":"b715527f5f4b49e8aa64a6b4f335c5bf","name":"VA Audiology Equipment List.xlsx","kind":"file","mime_type":".xlsx","size_bytes":29439,"posted_at":"2025-06-05T13:33:21.998Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b715527f5f4b49e8aa64a6b4f335c5bf/download","mirrored":false}],"awards":[],"related":[{"key":"36C26227Q0085","latest_notice_id":"cdde3a94bda84b199f9d3db72af657a6","title":"S215--SDVOSB Furniture Installation Labor Storage - Base Plus Four Option Years | POP: (12/31/2026 - 12/30/2031) |","solicitation_number":"36C26227Q0085","notice_type":"o","first_type":"p","first_posted":"2026-11-16","last_posted":"2026-11-23","notices":4,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"493190","psc":"S215","set_aside":"SDVOSBC","state":"AZ","county":"04019","county_name":"Pima County","city":"0477000","city_name":"Tucson","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C26227Q0079","latest_notice_id":"00646e7746494ab38ce53bbe9f7e0f59","title":"W065--RFQ | SBAR APPROVED | BED RENTAL WD WD EXEMPT","solicitation_number":"36C26227Q0079","notice_type":"k","first_type":"r","first_posted":"2026-10-30","last_posted":"2026-11-20","notices":3,"due_at":"2026-11-26T20:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"532490","psc":"W065","set_aside":"SDVOSBC","state":"AZ","county":"04019","county_name":"Pima County","city":"0477000","city_name":"Tucson","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C26227Q0139","latest_notice_id":"156fef93406e495486eb1d4e805bb675","title":"6515--PYXIS IV PREP","solicitation_number":"36C26227Q0139","notice_type":"k","first_type":"k","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-27T15:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"541519","psc":"6515","set_aside":"SDVOSBC","state":"CA","county":"06073","county_name":"San Diego County","city":"0666000","city_name":"San Diego","country":"USA","place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C26227Q0146","latest_notice_id":"e2fc7d7b106d4b448a5b57cba568ddb4","title":"J041--KITCHEN HOOD PMIR - Base +4 ($0.00) [605] | POP: 01/01/2027 - 12/31/2031","solicitation_number":"36C26227Q0146","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"561790","psc":"J041","set_aside":"SDVOSBC","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T08:15:06.508374Z"},{"key":"36C26227Q0149","latest_notice_id":"99fd06e3089e4005bf945b21581e7d70","title":"J065--BRINE MAINTENANCE SVC - Base +4 OY ($0.00) [605] | POP: 01/01/2027 - 12/31/2031","solicitation_number":"36C26227Q0149","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"238220","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06071","county_name":"San Bernardino County","city":"0642370","city_name":"Loma Linda","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T07:05:05.540398Z"}],"similar_open":[{"key":"36C26227Q0063","latest_notice_id":"57c32e663caa45e58aecf5d9fcc6fe70","title":"J065--ALCON CONSTELLATION LXT AND EMBEDDED LASERS & ALCON CENTURION VISION PHACOEMULSIFICATION PMI SVCS","solicitation_number":"36C26227Q0063","notice_type":"k","first_type":"r","first_posted":"2026-10-21","last_posted":"2026-11-20","notices":3,"due_at":"2026-11-27T19:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"811210","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06037","county_name":"Los Angeles County","city":"0643000","city_name":"Long Beach","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"HT941027RFI0001","latest_notice_id":"2c32c62e3bce4447b63c762798422a0d","title":"Request for Information - Gastrointestinal Endoscopy Equipment Repair and Maintenance Services","solicitation_number":"HT941027RFI0001","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-20","notices":2,"due_at":"2026-11-28T07:59:00Z","due_date":"2026-11-27","closes_at":"2026-11-28T07:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97DH","sub_name":"DEFENSE HEALTH AGENCY (DHA)","office_key":"o-HT9410","office_name":"DEFENSE HEALTH AGENCY HCD WEST","naics":"811210","psc":"J065","set_aside":null,"state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"HT940727Q0002","latest_notice_id":"35a8a9028c54463eac08867d7bed7243","title":"Stryker Power Load installation","solicitation_number":"HT940727Q0002","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97DH","sub_name":"DEFENSE HEALTH AGENCY (DHA)","office_key":"o-HT9407","office_name":"DEFENSE HEALTH AGENCY","naics":"811210","psc":"N065","set_aside":null,"state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"9TH MDG BEALE AFB15301 WARREN SHINGLE DR.BEALE, AFB, CA 95903","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":63,"indexable":false}