Justification
Vector Gait and Safety System
36C262-24-AP-0728
Department of Veterans Affairs, 257-Network Contract Office 17. Surgical and Medical Instrument Manufacturing.
Awarded
$565,774.47 obligated so far on USAspending, March 19, 2024, contract 36C24W24N0004
Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities
This one was awarded in 2024
17 like it are open now in surgical and medical instrument manufacturing
- MEDICAL EQUIPMENT AND SUPPLIES
Department of the Army, W6QM Micc-Ft Drum
Combined synopsis and solicitationSmall businessNAICS 339112Ship to the buyerW911S227U0170Due todayNov 25 - Automated External Defibrillator (AED)
Department of the Army, W6QM Micc-Ft Drum
Combined synopsis and solicitationSmall businessNAICS 339112Ship to the buyerW911S227U0200Due tomorrowNov 26 - Vivarium Tunnel Washer
Department of Veterans Affairs, 247-Network Contract Office 7
Sources soughtNAICS 339112Ship to Decatur, GA36C24727Q0119Due in 5 daysNov 30
All 17 open in surgical and medical instrument manufacturing
Reading this notice
Worked out from the publications and the award on this page.
- Kind of notice
- Justification. Why an agency limited competition or awarded without it, citing the FAR authority. Glossary
- How it ended
- Awarded to Tryco Incorporated on March 19, 2024. The contracting office reported 1 offer (full and open competition).
Description
As published on SAM.gov.
Equipment must have the physical characteristics to enable the government to perform the capabilities: Visual Motor Rehab System - Vector Gait and Safety System, VEC-1000 Dynamic Body Weight Support Track System System Requirements: A ceiling mounted robotic trolley which provides dynamic body weight support System safety must be guaranteed by UL Certification (to IEC-60601 3rd edition) The system must be qualified and manufactured in an ISO-13485 compliant medical manufacturing facility.
The system must be FDA Compliant and Registered with specifically FDA Listing D203102 Maximum weight capacity must be 500 pounds or more. Dynamic unloading weight capacity must be 200 pounds or more. The maximum trolley speed needs to be capable of 4.9 miles per hour. The trolley must be able to detect motion at 1,000 times per second or faster. The rope let-out speed (patient fall speed) must be controlled by the trolley winch motor and should not exceed 0.45 meters per second.
Both distance-based and force-based fall detection modes must be offered by the system Capacity to support 2 robotic trolleys on the same track. Windows/Android software operating system System must have the ability to set track limits or soft walls with any mobility modes, both horizontal and vertical trolley tracking Emergency Stop and Emergency Lower must be available on every screen interface on both the system computer station as well as the handheld controller.
The following standardized outcome measures must be able to be administered directly from the dynamic system: Timed Up and Go, 10- & 5-Meter Walk Tests, 2- & 6-Minute Walk Tests The system’s attachment mechanism of the harness must have magnetic and locking carabiners. The attachment mechanism of the harness must have three attachment positions to accommodate to veterans of varied sizes.
Electrical Requirements: Inlet power - standard 110 VAC, 50/60Hz, 1.8KW;
Outlet Power: 240 VAC 50/60 Hz (to the power rail of the track);
Inlet Connector: IEC320-C14;
Output Power: rated 10 1800VA, 7.2A (1.8KW); Wall mounted power box with ON/OFF switch Size: 15” (h) x 14.5 (w) x 4.0” (d), including brackets.
Track Specification Requirements: Custom track layout provided per discretion of facility. Structural attachment details to be applied and calculated and provided to the facility based on the determined layout and properties of the facility structure. Stamped structural engineering documents are to be created and provided to the facility upon purchase of the dynamic body weight support track system. Installation of the dynamic body weight support system shall consist of:
Attachment and assembly of the upper structure including necessary hardware, strut, bracing, etc. Mounting of the mechanical I beam to the upper structure. Mounting and assembly of a power rail Mounting of the robotic trolley(s) Mounting of the power supply box to the wall at a specified and agreed upon location. Setup and configuration of the PC and handheld controls System programming, commissioning, and load test to 2.5 times the maximum weight capacity (1250 pounds) Vector Elite (VEC-1000) - RM 1F – Qty:
1 System: Robotic trolley with custom mechanical and power rail up to 100' Proprietary software application with computer and remote handheld. Five (5) harnesses Onsite Training Course & Support Electrical: For one system: customer supplied 110V / 20A, dedicated circuit. Vector Elite (VEC-1000) - RM 4F – Qty:
1 System: Robotic trolley with custom mechanical and power rail up to 100' Proprietary software application with computer and remote handheld. Five (5) harnesses Onsite Training Course & Support Electrical: For one system: customer supplied 110V / 20A, dedicated circuit.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Tryco Incorporated
- UEI
- QDK3NM1KYN91
- CAGE
- 0JP74
- Vendor location
- MC Lean, VA
- Contract
- 36C24W24N0004 under V797D70077, delivery order
- Obligated
- $565,774.47, current value $1,128,464
- Actions
- 4 between March 19, 2024 and April 23, 2025
- Competition
- Full and Open Competition, 1 offer received
- Set-aside reported
- Women Owned Small Business
- Described as
- Visual Motor Rehab System
- Match
- award number 36C24W24N0004 equals the contract number; same sub-agency 3600 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 26, 2024
Justification
SAM.gov, notice dd07dd5472024a29a34dc5b706353503
Points of contact
- Matthew Brownmatthew.brown11@va.gov