{"canonical":"https://sealedbidder.com/opportunities/36c26126q0038","key":"36C26126Q0038","url":"https://sealedbidder.com/opportunities/36c26126q0038","title":"J046--Water Treatment/Storage Tank Cleaning for VA Las Vegas","solicitation_number":"36C26126Q0038","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-09-10T20:00:00Z","first_posted":"2025-09-03","last_posted":"2025-09-03","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"561210","psc":"J046","set_aside":null,"place_state":"NV","place_scope":"site","site":null,"place_state_source":"description","place_evidence":"UCH AS INFORMAL PRICING. PLACE OF PERFORMANCE: VA SOUTHERN NEVADA HEALTHCARE SYSTEM","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"11f87b3815c04c9c9ffb15480307cfb9","title":"J046--Water Treatment/Storage Tank Cleaning for VA Las Vegas","solicitation_number":"36C26126Q0038","notice_type":"r","base_type":"r","posted":"2025-09-03","posted_at":"2025-09-03T17:56:32.703Z","due_at":"2025-09-10T20:00:00Z","due_date":"2025-09-10","cancelled":false,"archived":true,"archive_date":"2025-11-09","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/11f87b3815c04c9c9ffb15480307cfb9/view","enriched":true,"history":[{"index":3,"title":"J046--Water Treatment/Storage Tank Cleaning for VA Las Vegas","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-03T17:56:32.703Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"11f87b3815c04c9c9ffb15480307cfb9","solicitation_number":"36C26126Q0038"}]}],"latest_notice_id":"11f87b3815c04c9c9ffb15480307cfb9","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-09-03","posted_at":"2025-09-03T17:56:32.703Z","created_at":"2025-09-03T17:56:30.443Z","modified_at":"2025-11-09T05:04:28.520Z","response_deadline":{"raw":"2025-09-10T13:00:00-07:00","utc":"2025-09-10T20:00:00Z","date":"2025-09-10","time":"13:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/11f87b3815c04c9c9ffb15480307cfb9/view"},"naics":{"codes":["561210"],"primary":"561210"},"title":"J046--Water Treatment/Storage Tank Cleaning for VA Las Vegas","agency":{"office":{"code":"36C261","name":"261-NETWORK CONTRACT OFFICE 21 (36C261)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"95655","city":"MATHER","state":"CA","country":"USA"},"organization_id":"100163852","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-11-09","archive_type":"auto_custom"},"history":[{"index":3,"title":"J046--Water Treatment/Storage Tank Cleaning for VA Las Vegas","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-03T17:56:32.703Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"11f87b3815c04c9c9ffb15480307cfb9","solicitation_number":"36C26126Q0038"}],"contacts":[{"name":"Larry Facio","role":"primary","email":"Larry.Facio@va.gov","phone":"916-923-4553","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"11f87b3815c04c9c9ffb15480307cfb9","lineage_id":"11f87b3815c04c9c9ffb15480307cfb9","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-01T02:41:39.527861226Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"3b30f7ce397c53af0bb4e70482f19bc7cc02096251a3008512a8b5de3c32de75","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-01T02:41:39.527861226Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY \nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 09/10/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing. \n\nPlace of Performance: \nVA Southern Nevada Healthcare System (VASNHS) \n6900 North Pecos Rd, N.\nLas Vegas, NV 89086\n\nDESCRIPTION OF SERVICES/GENERAL INFO\n1.0.  SCOPE OF WORK\nVA Southern Nevada Healthcare System (VASNHS) is contracting water treatment services as well as the cleaning of 4 water storage tanks that provide a complete service-oriented water treatment, sampling, disinfect/cleaning and test program that supplies steam, chilled water service, domestic, industrial water and heating water service loops which include a solar heating loop. This contract is specifically for all industrial systems and all 4 water storage tanks. Access to these systems is located VA Medical Center Buildings 1, 2, 5, & 6.  The contractor shall supply a complete service oriented water treatment program. A major component of maintaining equipment involves chemical treatment, real time monitoring, and water sampling.  The contractor shall provide trained, qualified and certified personnel to perform required tasks.  In addition, contractor shall provide all the necessary equipment, tools, materials, supervision, repair, replacement, and other services necessary to perform water treatment services at VASNHS facilities as defined in this Statement of Work (SOW) for Government-owned equipment. Services shall be provided at the VASNHS medical center, located at 6900 North Pecos Road, North Las Vegas, NV 89086. The contractor shall perform in accordance with all federal, state, and local regulations.\n\nSpecific Requirements for Industrial Water:\n1.1.2 The water treatment program shall service steam boilers, chillers, chilled water system, open condenser water loops, 9 closed hot water heating loops, a refrigeration condenser loop, and a Glycol energy recovery loop, along with all associated piping for the equipment listed below.  This list is not all inclusive of the Government owned equipment that may require monitoring, testing, or other services associated with the overall treatment program. Contractor is to supply all equipment and services for real time monitoring of HVAC Cooling Tower open loop. \nChilled Water: \nGlobal GTCHB2234F2615PC Side-stream Filter with MS30ES20 filter cartridges.\n\nCooling Tower (Condenser Water): \nIn-Line, Real-Time monitoring system controlling 3 LMI metering pumps and condenser water bleed valve.\nPuroflux PF64-060(B) centrifugal separator\n\nGlycol:\nNeptune 141-GFS251A.88\n\nSteam/Condensate:\nThe steam system has three LMI chemical metering pumps for the Boiler treatment, sulfite, phosphate and amine . Feed rates are set manually based on feed water / condensate testing by the operator.\nEach boiler is equipped with a pot feeder for start-up/emergency treatment. The other systems are manually dosed with pot feeders.\n\n1.2   FREQUENCY OF SERVICE & TEST REQUIREMENTS \n1.2.1.   The following charts denote the frequency of service and testing requirements. \n1.2.1.1 Specific System:   Cooling Tower System, Open Loop, Building 2.\nControl \nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\npH, Makeup Water\nPH meter\nRecord\nWeekly\npH, System Water\nPH Meter\n8.0-9.0\nWeekly\nConductivity, Makeup\nConductivity Meter\nRecord\nWeekly\nConductivity,\nSystem Water\nConductivity Meter\n  2400 ppm TDS\nWeekly\nCorrosion Inhibitor\nColorimetry\n15   30 ppm\nWeekly\nCalcium, Makeup \nWater\nDR890-PRG29\nRecord\nWeekly\nCalcium, System Water\nDR890-PRG29\n<100 ppm\nWeekly\nSteel Corrosion\nInhibitor (Active Polymer)\nDR890   PRG181\n6-8ppm\nWeekly\nIron\nDR890-PRG33\n<1.0 ppm\nWeekly\nFree Halogen (Chlorine)\nBiocide\nDR890-PRG 90\n0.05-0.5 ppm\nWeekly\nBacteria: \nTotal Heterotrophic\nDip-slides\n10^3-10^4 cfu/ml\nWeekly\nBacteria:\nSulphate Reducing\nAnalytical Lab Sample\nND\nSemi-Annual\n\nBacteria:\nIron Related\n\nAnalytical Lab Sample\n\nND\n\nSemi-Annual\nSteel Corrosion\nInhibitor (Specify)\nCoupons\n<1.0 mpy\nSemi-Annual\nCopper Corrosion\nInhibitor (Specify)\nCoupons\n<0.5 mpy\nSemi-Annual\n\n\nND = non detect\nNote:  Include tests for control parameters, from Program Calculation Sheet, Appendix A\n1.2.1.2 Specific System:   Chilled Water (Closed), Refrigerant Condenser Loop, Glycol Energy Recovery System, and Hot Closed Systems, Buildings 1, 2, 5, 6 . See Appendix D & E \nControl \nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nCorrosion Inhibitor (Nitrite)\nTitration\n600-800 ppm\nWeekly\npH\n\nPH Meter\n<10.5\nWeekly\nMonthly for hot\nConductivity\nConductivity Meter\nRecord\nWeekly\nMonthly for hot\nSteel Corrosion\n (Specify)\nCoupons\n<1.0 mpy\nQuarterly\nCopper Corrosion\n (Specify)\nCoupons\n<1.0 mpy\nQuarterly\nIron\n(Total)\nDR890-PRG33\n<2.0 ppm\nWeekly\nMonthly for hot\nCopper\n(Total)\nDR890-PRG22\n<2.0 ppm\nWeekly\nMonthly for hot\nBacteria:\nTotal Heterotrophic\nDip-slide\n<10^3 cfu/ml\nMonthly\nBacteria:\nSulfate Reducing\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria:\nIron Related\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria: Nitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\nBacteria: Denitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\n\nND = non detect\nNote:  Include tests for control parameters, from Program Calculation Sheet, Appendix A\n\n\n\n\n\n\n\n1.2.1.3  Specific System:  Steam Boiler System, Building 2.\n\nControl \nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nMakeup Water pH\nPH meter\nRecord\nWeekly\nMakeup Water Conductivity\nConductivity Meter\nRecord\nWeekly\nMakeup Water - Hardness\nDrop Test\nRecord\nWeekly\nMakeup Water Total Alkalinity\nDR890-PRG29\nRecord\nWeekly\nFeedwater   Hardness\nDrop Test\n0-2 ppm\nWeekly\nFeedwater   Iron\n\nDR890-PRG33\n<1.0 ppm\nWeekly\nFeedwater   pH\n\nPH meter\n8.3-10.5\nWeekly\nFeedwater   Conductivity\nConductivity Meter\n  300 Âµmhos\nWeekly\nFeedwater   P Alkalinity\nTitration\nRecord\nWeekly\nFeedwater   M Alkalinity\nTitration\nRecord\nWeekly\nFeedwater  Boiler Treatment\nDR890-PRG181\n20-25ppm\nWeekly\nBoiler   P Alkalinity\nTitration\n<300\nWeekly\nBoiler   M Alkalinity\nTitration\n<100\nWeekly\nBoiler   Oxygen scavenger Residual\nSulfite low level test kit\n30-60 ppm\nWeekly\nBoiler   Conductivity\nOn-Line Conductivity Meter\n<4500 Âµmhos\nWeekly\nBoiler  Neutralized Conductivity\nDR890-PRG29\n\n\nBoiler   iron\nDR890-PRG33\n<1.0 ppm\nWeekly\nCondensate - Conductivity\nConductivity Meter\n<100 Âµmhos\nWeekly\nCondensate   pH\nPH meter\n8.0-10.0\nWeekly\nCondensate   Hardness\nDrop Test\n0-1 ppm\nWeekly\nCondensate   Iron\nDR890-PRG33\n<1.0 ppm\nWeekly\n\nND = non detect\nNote:  Include tests for control parameters, from Program Calculation Sheet, Appendix A \n1.2.1.4   Industrial Water Systems\nSystem\nLocation\nAnalytical\nTest Method\nService Report Test\nFrequency\n Water Tank #1\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #3\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #4\nWater Tank Yard\nA, B, C, E, F\nMonthly\nCooling Towers\nBLD 2\nA, B, C, D,E, F\nWeekly\nIndustrial Water System\nBldg 2, Rm 2-110\nA, B, C, D, E\nMonthly\n\n1.2.1.5 Industrial Water System Analytical Test Method:\nA.  Chlorine residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test)\nB.  Conductivity / TDS; Ultrameter II Conductivity Meter \nC.  PH; Ultrameter II PH Meter.\nD.  Hardness; Drop Test, Titration\nE.         Water Temperature, Ultrameter II, or Contact Thermometer.\nF.          Dip-slide, Heterotrophic Bacteria, & Mold Indicating\n\n1.2.2.  METHOD OF TREATMENT\n1.2.2.1.  The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating, chilled, and cooling water systems.\n1.2.2.2.  Water treatments shall be performed as indicated by testing on each system in all buildings.\n1.2.2.3    Sodium Nitrite, or other corrosion inhibitor, applied to closed loops shall always include Leak Detection Dye.\n1.2.2.4. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly.\n1.2.2.5.  Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system.\n1.2.2.6 Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor s responsibility to ensure all safety precautions for chemicals have been taken.\n1.2.2.7 Chemical Tanks - The tanks MUST provide the following features:\nTank level indicators to determine chemical levels.\nFlooded suction inlets for chemical pumps to ensure pumps do not loose prime, or provide self-priming pumps.\nContainment basins capable of 150% of the tank storage capacity.\nTank sizing shall be appropriate for chemical use; chemical shall be a minimum quantity of 31 days without replenishment.\nChemical labels clearly visible on outside of tank.\nSDS sheets attached to tank container.\nTank to tank chemical transfer preferred, when pumping from drums, empty drums shall be removed from VAMC property within 3 working days.\nFull spill containment.\n1.2.2.7.1 Liquid chemicals shall be stored on site in Mini Porta Feed or equal containers.  Containers shall be stainless steel or double walled polyethylene tanks as appropriate.  Containers shall be supplied and maintained by the water treatment contractor.  \n1.2.2.7.2 All chemicals shall be directly injected in to their respective loops via corporation stop injectors whenever provided.  Pot feeders are available at the boilers (start-up), and all closed loops.\n1.2.3.   TESTS\n1.2.3.1.  Routine Testing.  The routine Cooling Tower testing to be performed according to the chart in 1.2.1.1, Closed Loops according to 1.2.1.2 and Boiler testing performed according to chart in 1.2.1.3.  which will provide results showing:. Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total Alkalinity, pH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Nitrite, Calcium Hardness, Free Chlorine, Sulfite, Iron and Copper. Routine testing by the Contractor shall also provide services as listed in Appendix B and C. The contractor shall submit documentation of results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1.\n1.2.3.2.  Weekly water tests and treatment for each operating system in building 2 shall provide:\nBoilers and Steam:\nOrthophosphate (PO4) (Operating Boiler s water)\nSodium Sulfite (SO3) (Operating Boilers)\nP-Alkalinity (Operating Boiler s water)\nConductivity (Âµmhos/cm) (Operating Boiler s water and Feed Water)\nTotal Hardness, pH, iron, and conductivity (Feed Water, Condensate, High Pressure Drain, Condensate from Bldg 1.\nAdd neutralizing amine blend to treatment tank, for injection into steam header outlet piping.\nDetermine gallons/day feed rate for sodium polymethacrylate* and add to proper tank with proper adjustments to feed rate. (*or recommended chemical.)\nAdd sodium sulfite in chemical feed tank for feedwater treatment.\nAdd sodium hexametaphosphate*, caustic flake*, and adjustments for feed rates to boiler chemical feed tanks. ( *or recommended chemical).\nSodium Nitrite added to (Hot & Chilled) closed loops to provide protection of metal piping and maintain residual.  \nCooling Tower / Open Condenser Loop:\n Organophosphonate\nOxidizing and Non-Oxidizing Biocides\n1.2.4.  STANDARDS.   The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 Âµmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dip-slide culture test. ORP measurements will be taken on condenser water to verify relationship between Biocide effective ness and corrosion of tower metal, maintain range of 250 to 450 mV.   The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count, determined by dip-slide culture, shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1. \n 1.2.4.1. The following standards apply to each operating system in building 2 and shall be on contractor s report. The contractor shall maintain systems within the standards listed in paragraph 1.2.4:\nBoilers\nPhosphate (PO4) = 15   25 PPM\nP-Alkalinity (CaCO3) = 300   600 PPM\nSulfite (SO3) = 30   60 PPM\nNeutralized Conductivity (Âµmhos/cm):  3000-3500\nBoiler PH = 10.5   12.0 PPM\n\nCondensate:\n PH = 8.3   9.2 SU\nConductivity= < 100 Âµmhos\n\nSodium Softeners:  (Hardness Maximum) 1 PPM or 7.1 grains\n\nLow Temperature Hot Water Heat (HWH)   the following standards apply:\nNitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron, copper.\n\nChilled Water   the following standards apply:\nNitrite = 600-800 ppm as nitrite. Test and record pH, conductivity, iron, copper.\nContractor shall clean and replace Side-Stream filters as necessary.\n\nOpen Condenser Loop (Cooling Towers)   the following standards apply:     \nConductivity= 3200 Âµmhos / TDS=   2400 ppm\nOrganophosphonate = 15   30 ppm, PTSA trace = 160   170\nBiocide = .05   0.5 ppm\n\n1.2.5.  MONITORING.   The contractor shall inspect, monitor and document each system listed in Appendix B, C, D, & E.  to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR. \nScale formation onto waterside surfaces\nCorrosion of waterside metal surfaces\nSlime producing bacteria within the bulk water (dip-slide test)\nMake-up water rate\nBleed-off/Blowdown rate\nChemical treatment feed rates\n1.2.6.  INSPECTIONS\n1.2.6.1.  The contractor shall perform weekly inspections of the cooling tower,  boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of the side-stream filter installed in the condenser water system . Adjustments shall be made to backwash timing and frequency.  Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR.\n1.2.6.2.  The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line.\n1.2.6.3.  The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location . Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes.\n1.2.7.  REVIEWS AND ANALYSIS.  \n1.2.7.1.  The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including side-stream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic data-site of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals.\n1.2.7.2.  The contractor shall document results and recommendations for purposes of long-range planning. Documentation shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.3.  The contractor shall provide actual values of: Bleed-off/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values, and industry standards. The Contractor shall make recommendations to the government to optimize operations. All final decisions are by the government. Documentation shall be IAW Section 1.2.10.3.\n1.2.7.4.  The contractor shall document the collection of and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.5.  Condensate Quality Profile.  A Quality Profile shall be created and documented for each condensate stream.  Information and targeted performance guidelines shall include:\npH (properly cooled)     8.0   9.0\nIron                      <0.10 ppm\nConductivity                 < 50 Âµmhos/cm\nThis data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR.\n1.2.8.  STUDIES.  The contractor shall perform and document the following studies:\n1.2.8.1. Corrosion Studies.   Documented Corrosion studies shall include maintain continuous exposure periods for 90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate (<5.00 mpy) and Copper Corrosion Rate (<.50 mpy).  Boiler and heat exchange systems shall be maintained IAW American Society of Mechanical Engineers (ASME) standards.\n1.2.8.2.  Annual Flow Rate and Elusion Studies.  The contractor shall provide flow rate and elusion studies on ion exchange equipment to evaluate: Operation, Mechanical Status and Efficiency. \n1.2.9.  BOILER FEEDWATER (BFW)\n1.2.9.1.   The contractor shall evaluate the overall Boiler Feed water (BFW) program for compliance with American Society of Mechanical Engineers (ASME) and Cooling Technology Institute (CTI) control parameters and operational procedures, Federal and State of Nevada Environmental Protection Agency regulations and environmental compliance issues. The contractor shall inform the government orally and in writing quarterly and annually of all compliance problems associated with the operation of the industrial water treatment program.\n1.2.9.2.   Evaluate and report, the boiler feed water characteristics to establish siteline data within the first month of contract.\n1.2.9.3.   Maximum cycles of concentration (no cycles to exceed 20) sited on the following ASME Guidelines: The contractor shall calibrate Government chemical feed and control equipment to maintain water chemistry within industry specifications. Calibration of all monitoring equipment shall be performed accurately and at specified frequency. The calibration results shall be documented and available to COR as requested.\n1.2.10.   REPORTS AND OTHER DOCUMENTS.   The contractor shall send a copy of reports to the Contracting Officer Representative (COR).  All urgent problems regarding maintenance of water treatment parameters shall be discussed with the COR on the day of discovery referenced in 1.3.5.2.  All reports shall be submitted electronically to the Facility COR.  \n1.2.10.1.   Weekly reports.  The contractor shall prepare a written report each week. This report shall describe the results of routine tests (Section 1.2.3.1), the results of system inspections (Section 1.2.6). The reports shall contain recommendations and written proposed corrective actions. The contractor shall review the report with the COR/CO within seven (7) calendar days of data collection.\n1.2.10.2.   Quarterly reports.  The contractor shall prepare a quarterly written report, accurately and on time, due by the 15th of Jan, Apr, Jul, and Oct. This report shall describe conditions of each water system. The reports shall include those items discussed in Section 1.2.5 and the effectiveness of the treatment program and any areas of concern/problems incurred with recommendations for correction. The report shall include all chemical usage (Volume) by the contractor. The contractor shall conduct meeting with the COR and go over the Quarterly report.\n1.2.10.3.   Annual Reports.  An annual report shall be compiled and submitted by the last day of the 11th month of each contract year, for each industrial water system. Each report shall describe sampled trends throughout the year, start and end conditions, and those items identified in Sections 1.2.7 through 1.2.9. The report shall include total yearly chemical usage by the contractor. The contractor shall meet with the COR and affected Contracting Officer and go over the Annual report.\nII. SERVICES SUMMARY. \n2.1. Â Â Â Â  Performance Requirements Summary\n\n2.1.2 Summary Table:\nPerformance\nIndicator\nPerformance Standard \nPerformance Threshold\nMethod   Type of\nSurveillance\n\nReference\nCooling Tower Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.1 to\na 90% accomplishment\nWeekly testing\n1.2.4\nChilled Water System Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nClosed Loop Treatment\nMaintain Treatment levels, perform coupon checks\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nMonthly testing. Quarterly coupon change-out, submitted for analysis\n1.2.4.1\nBoiler Water Treatment\nMaintain Treatment levels, Recommend changes to chemical pumps and blowdown settings\nMaintain levels in accordance with parameters in Table 1.2.1.3 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nRecords and Report Management\nReports filled out timely and delivered to Utility Supervisor or COR\nWeekly   within 7 days of collection.\nMonthly   Within 7 days of collection.\nQuarterly   on time.\nAnnually   Before end of contract.  To a 100% accomplishment\nMeetings with COR, one on one.\n1.2.10\nInspections\nInspect Cooling Towers, Boilers, and Heat Exchangers during maintenance periods\nCheck for indications of corrosion, under-treatment, over-treatment. Make recommendations that show results.\nCOR to attend inspections\n1.2.6\nInventory Management\nSufficient testing and treatment materials on site to ensure plant condition not affected\nAll treatment levels in all systems maintained to a 90% accomplishment.\nDaily checks by COR, contractor notified by email of low levels or missing items\n1.0\n\nAppendix B\n\n*The procedures set forth in the Inspection of Services Clause will be used to remedy all deficiencies.  The re-performance times will be sited upon sensitivity of the issue.\nORP Oxidation Reduction Potential, measurement of the tendency of a chemical substance to oxidize or reduce another chemical substance. Has a relationship to Biocide reactions.\nWelch-Allyn fiber optic inspection.  A high-level inspection system that examines tube bundles in great detail to determine if gross deficiencies in water treatment exist.\nHigh Temperature Hot Water (HTHW).  Heating system water that is generally circulated at temperatures from 320 to 440 degrees.\nCondensate.  Condensed water resulting from the removal latent heat from steam.\nDeaerator Oxygen Analysis.  A study to determine the oxygen removal efficiency of the deaerator.  The collected data assists in predicting the potential for oxygen related problems in the feedwater and boiler system(s).\nEmbrittlement Analysis.  A study of the embrittling characteristics of the boiler water.\nControlled Limits.  Operating parameters (boundaries)\nElution Studies on Ion Exchange Equipment.  A series of tests conducted on the softeners, dealkalizers or demineralizers to determine the efficiency of the regeneration cycle.  The collected data is evaluated by drawing an elution curve.  The information reveals the regenerate concentrations at all stages of the cycle.\nSteam Purity Analysis.  A study monitoring the quality of the steam being produced to determine the steam purity.\nCorrosion Studies on Feedwater/Condensate Systems.  A study to determine the corrosion rates of the pre-boiler systems.  The collected data provides information relating to the corrosion protection provided by the chemical treatment program.\nQuantitative Deposit Analysis.  A study to determine the composition of a deposit.\nResin Analysis.  A study generally performed to determine the efficiency of zeolite resin in water. \nAppendix B\nCooling tower tonnage, Building 2\nBuilding Number\nCapacity in Approx Tons\nSidestream Filters\nTower Treatment\nOperation\n2\n6,500\nN/A\nAcid or Softwater Blend\nYear Round\n\nHVAC main cooling tower open loop\nThe water treatment program shall include all cooling tower systems and all water pre-treatment equipment. The water treatment program shall include all chemical products, equipment, tools, supervision, professional consulting services, and any additional items necessary to perform the services as specified in the SOW.\nThe cooling towers consist of five cells.  \nThe water treatment program shall provide control and remote monitoring capability for the following: \nController capable of the following features:\nMonitor system conductivity\nMonitor system pH\nMonitor system ORP, Oxidation Reduction Potential\nFlow switch \nChemical levels in chemical feed tanks/containers\nMonitor makeup water use (via contacting head water meter)\nMonitor blow down water use (via contacting head water meter)\nReceive 4-20mA inputs and provide direct control of system parameters based on input signals.\nProvide data logging features, with download capability to a PC via Ethernet or wireless network\n  Real-Time  monitoring of scale/corrosion inhibitor levels in the cooling tower systems whenever they are running.\n Real-Time  monitor for both planktonic (free flowing) and sessile (attached) microbiological activity in re-circulating cooling water systems. \nMultiple controller inputs\nMultiple controller outputs\nOnline corrosion monitors to log corrosion data  Real-Time  so that immediate chemistry changes can be made.\nAppendix C\nBuilding 2 Systems, and Equipment\n Boilers: \nThree natural gas fired, 25,000 pound per hour, fire tube, 100 PSIG\nDomestic Water:\n3 sodium zeolite softeners.\n3 charcoal bed filters.\nCondensate Return:\nOne condensate receiver\nDeaerators:\nOne 20,000 pound per hour, spray and tray type\nFeedwater Pumps:\nThree electric driven pumps\nBoiler Chemicals Currently Used:\nSodium Bisulfite\nSodium Sulfate\nCyclohexylamine\nDiethylethanolamine\nMorpholine\nPotassuim Bisulfite\nCobalt Sulfate\nMethanol\nSodium Hydroxide\nGlutaraldehyde\nAlkaline Liquid Bromine\nHVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set-point. Building 1- five loops, building 2, Boiler room- one loop, building 5- one loop, Building 6- one steam heated loop and one solar heated loop. Systems must be closely monitored and sampled at least monthly; corrosion indicator coupons examined every 90 days. Water treatment shall be on an as needed basis to control any corrosion.\nAppendix D\nBuilding 1,2, 5 & 6 Systems and Equipment\n1.   HVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set point. Building 1- Four Loops: D&T Basement; Room BD-423 D&T, Ambulatory Basement; BB-208, Admin Basement; BD-160, MH Basement; BE-101, Emergency Department extension (roof-top).  Building 2   one loop, Boiler Room, building 5- one loop, basement, building 6- one loop (steam heated) & one loop (solar heated), room to be determined (currently under construction).  Systems must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion and maintain proper residual.\n2.  REFRIGERANT CONDENSER WATER SYSTEM (Closed Loop)\nChilled water system for cooling the condenser water for freezers, and refrigerators. Water is continuously circulated in a closed loop through plate/frame heat exchangers to maintained temperature set point. Building 1, Fourth floor. System must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion.\n3.  HVAC ENERGY RECOVERY SYSTEM (GLYCOL LOOP, 30%)\nThe glycol and water run-around coil system are an energy recovery system for the HVAC air handling units located in Building 1, on the fourth floor and the roof. All the individual water systems are combined into a single fill and chemical addition location. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations.  All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\n4.HVAC SOLAR ENERGY HEATING SYSTEM \nThe Solar Energy Heating System for Building 6 is designed to capture heat from solar panels on the roof and use that heat through the closed loop system to heat up, directly or augment, the building heating/re-heat system. The solar heating system is integrated with the steam heating system utilizing the same circulating pumps and the same heat exchangers. Treatment must be sufficient in chemical nature to provide corrosion inhibitor to all piping, and freeze protection to the exposed panels/piping in colder months. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations.  All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\nAppendix E\n Chilled Water System\nBUILDING\nSYSTEM\nOperation\nFrequency\nSide Filter \n2\nChilled Water, Closed Loop\nFive 1300-ton chillers\nYear-round\nMonthly\nYes\n\nWater Storage Tanks\n\nThe Potable water storage tank will have a maintenance service accomplished annually, and the Industrial water storage tank will have a maintenance service accomplished every three years.  The Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  All the associated equipment is located at the VA facilities Water Storage Tank area and Central Energy Plant Building #2 at the Veteran s Hospital on 6900 North Pecos Rd, North Las Vegas, Nevada.  \n\nSPECIFIC REQUIREMENTS: \n\nWater Storage Tanks (1ea. Potable water and 3ea. Industrial water total of 4ea. tanks)\nManufacturer: Storage Product Engineering\nModel: 7013 WT\nStorage Capacity: 360,000 gallons\n\nThis service contract is to clean and disinfect the water tanks according to American Water Works Association (AWWA) standards for disinfection process.  Details of maintenance service are listed below.  The contractor must minimize interruption of the water system to the medical center prior and during the service contract.  If lengthy water systems service interruptions are needed, the interruption has to be scheduled two weeks prior to the start of the job.  Furthermore, all interruptions are subject to approval by the Engineer Service Chief.   The contractor must be authorized and approved to work, service, and make proper recommendations to resolve discrepancies with the Water Storage Tanks and associated components as recommended by manufacturer s recommendation as well as meet local and federal health standards and requirements.  Lastly, the contractor will provide detailed documentation and cleaning certifications for the Water Storage Tank to suffice the annual requirements.  This data will be provided to the Energy Plant supervisor or designee.  \n\n\nTank Cleaning and chlorination process according to AWWA:\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  \n\nMethods of Chlorination\n\nThree methods of chlorination are explained in this standard. Typically, only\none method will be used for a given storage-facility disinfection, but combinations\nof the methods may be used. The three methods are (1) chlorination of the full\nstorage facility such that, at the end of the appropriate retention period, the water\nwill have a free chlorine residual of not less than 10 mg/L; (2) spraying or painting of all storage facility water-contact surfaces with a solution of 200 mg/L free chlorine.\nand (3) a two-step process of chlorinating the bottom portion of the storage facility\nwith 50 mg/L free chlorine followed by filling to overflow with potable water. It\nshall be held full for a period of not less than 24 h. In chlorinated systems,\nachieving a free chlorine residual requires the addition of sufficient additional\nchlorine to pass through breakpoint chlorination.\n\n4.3.1 Chlorination method 1. The water-storage facility shall be filled to\nthe overflow level with potable water to which enough chlorine shall be added\nto provide a free chlorine residual in the full facility of not less than 10 mg/L\nat the end of the appropriate 6-h or 24-h period, as described in Sec. 4.3.1.4.\nThis method should be evaluated to assess its appropriateness for chloraminated\nsystems. For chloraminated systems, additional chlorine may be required to\nachieve a free chlorine residual of 10 mg/L. The chlorine, either as liquid chlorine,\nsodium hypochlorite, or calcium hypochlorite, shall be introduced into the water\nas described in the following subsections.\n4.3.1.1 Liquid-chlorine (gas) use. Liquid chlorine (gas) shall be introduced\ninto the water filling the storage facility in such a way as to give a uniform chlorine\nconcentration during the entire filling operation. Portable chlorination equipment\nshall be carefully operated and shall include a liquid-chlorine cylinder, gas-flow\nchlorinator, chlorine ejector, safety equipment, and an appropriate solution tube to\ninject the high-concentration chlorine solution into the filling water. The solution\ntube shall be inserted through an appropriate valve located on the inlet pipe and\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\nDISINFECTION OF WATER-STORAGE FACILITIES 7\nnear the storage facility such that the chlorine solution will mix readily with the\ninfluent water.\n\n4.3.1.2 Sodium hypochlorite use. Sodium hypochlorite shall be added to\nthe water entering the storage facility by means of a chemical-feed pump or shall be\napplied by hand-pouring into the storage facility and allowing the influent water to\nprovide the desired mixing.\n\n4.3.1.2.1 When a chemical-feed pump is used, the concentrated chlorine\nsolution shall be pumped through an appropriate solution tube to inject the\nhigh-concentration chlorine solution at a rate that will give a uniform chlorine\nconcentration in the filling water. The solution tube shall be inserted through an\nappropriate valve located on the inlet pipe and near the storage facility, or through\nan appropriate valve located on the storage facility such that the chlorine solution\nwill mix readily with the filling water.\n4.3.1.2.2 When sodium hypochlorite is poured into the storage facility,\nthe filling of the storage facility shall begin immediately thereafter or as soon as\nany removed manhole covers can be closed. Sodium hypochlorite may be poured\nthrough the cleanout or inspection manhole in the lower course or level of the\nstorage facility, in the riser pipe of an elevated tank, or through the roof manhole.\nSodium hypochlorite shall be poured into the water in the storage facility when the\nwater is not more than 3 ft (0.9 m) in depth, nor less than 1 ft (0.3 m) in depth or\nas close thereto as manhole locations permit.\n\n4.3.1.3 Calcium hypochlorite use. Calcium hypochlorite granules\nor tablets broken or crushed to sizes not larger than 1/4-in. (6.4-mm) maximum\ndimension may be poured or carried into the storage facility through the cleanout\nor inspection manhole in the lower course or level of the storage facility, into the\nriser pipe of an elevated tank, or through the roof manhole. The granules or tablet\nparticles shall be placed in the storage facility before flowing water into it. The\ngranules or tablets shall be located so that the influent water will circulate through\nthe calcium hypochlorite, dissolving it during the filling operation. The calcium\nhypochlorite shall be placed only on dry surfaces unless adequate precautions are\ntaken to provide ventilation or protective breathing equipment.\n4.3.1.4 Retention period. After the storage facility has been filled with\nthe disinfecting water, it shall stand full as follows: (1) for a period of not less than\n6 h when the water entering the storage facility has been chlorinated uniformly by\ngas-feed equipment or chemical pump, or (2) for a period of not less than 24 h\nwhen the storage facility has been filled with water that has been mixed with sodium\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\n8 AWWA C652-19\nhypochlorite or calcium hypochlorite within the storage facility as described in\nSec. 4.3.1.2 and 4.3.1.3.\n\n4.3.1.5 Handling of disinfection water. After the retention period stated\nin Sec. 4.3.1.4, the free chlorine residual in the storage facility shall be reduced to\na concentration appropriate for distribution by completely draining the storage\nfacility and refilling with potable water, or by a combination of additional holding\ntime and blending with potable water having a lower chlorine concentration.\nFollowing this procedure and subject to satisfactory bacteriological testing,\nappropriate chlorine residual, and acceptable aesthetic water quality (as described\nin Sec. 5.1), the water may be delivered to the distribution system.\nMethod to Follow: \n\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  \n4.3.3 Chlorination method 3. Water and chlorine shall be added to the storage facility in amounts such that the solution will initially contain at least 50 mg/L free chlorine and will fill approximately 5 percent of the total storage volume. This solution shall be held in the storage facility for a period of not less than 6 h. The storage facility shall then be filled to the overflow level by flowing potable water into the highly chlorinated water. It shall be held full for a period of not less than 24 h. Highly chlorinated water shall then be purged from the drain piping. Following this procedure and subject to satisfactory bacteriological testing, appropriate chlorine residual, and acceptable aesthetic water quality as described in Sec. 5.1, the remaining water may be delivered to the distribution system. It should be noted that the final chlorine residual may be either as free, total, or combined chlorine depending on the potable water characteristics.\n4.3.3.1 Adding chlorine. Chlorine shall be added to the storage facility by the method described in Sec. 4.3.1.1, 4.3.1.2, or 4.3.1.3. In chloraminated systems, the addition of excess chlorine may be required to eliminate the combined chlorine and achieve the specified free chlorine residual (breakpoint chlorination).\n4.3.3.2 For any chlorinated water discharges to the environment, refer\nto ANSI/AWWA C655 Field Dechlorination, if dechlorination is required.\nThe environment into which the chlorinated water is to be discharged shall be\ninspected. Federal, state or provincial, and local environmental regulations may\nrequire special provisions or permits before disposal of highly chlorinated water.\nProper authorities should be contacted before disposal of highly chlorinated water.\n\nTank Specifications:\nTank Gallon Capacity for each tank. Â 360,000 gal\nTank Dimensions (Diameter x Height) for each tank 12  x 69  11-1/4 \nTank Construction Type: (Steel Welded, Concrete, Poly... On grade, Buried or Elevated Tower or Standpipe) Fiber Glass with Edge Coat Process lining, on concrete foundation above ground\nTank Manway Access (At least a 24\" diameter roof access hatch) Yes\nTank Equipment Access (Can a 20' trailer and truck come within 50\\ of the tanks No, need hoses and pump to transfer water from tank to tank.\nDischarge requirements (Can water and sediment from the cleaning process be discharged within 100' of the tank(s)?Â  Yes.Â  Water must be pump from tank to tank to minimize water loss.\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  \n\n\nAnticipated Performance Schedule:\nPeriod of performance: October to November\nBase year: clean potable storage tank only: October to November \nOption year #1: clean all 4 storage tanks: October to November \nOption year #2 & #3: clean potable storage tank only: October to November  \nOption year #4: clean all 4 storage tanks: October to November\nCost estimate: base on per tank cleaning will be funded\n\n1.3.6. WORK HOURS  \n1.3.6.1.   Normal Hours.  The contractor shall perform the services required under this contract during the following hours: 0730-1600 HRS, Monday through Friday. The contractor may work, with prior approval of the Contracting Officer's representative, extended hours to ensure timely completion of work at no additional cost to the government.\n1.3.6.2.   Emergency Services.  The contractor shall provide services to support emergency situations for the water treatment facilities 24/7. Contract service technician must be able to report to the Facility within 2 hours after request for emergency service.\n1.3.6.3.   Seasons.  The heating season (Winter) is from 1 October to 31 May and the cooling season (Summer) is from 1 June to 30 September.  The actual dates are sited on temperature. If changes in dates occur, the government will notify the contractor.\n1.3.7.1.  When a holiday falls on a Saturday, the preceding Friday shall be considered a holiday.  When a holiday falls on a Sunday, the following Monday shall be observed.  If a task, falls on one of the above listed holidays, the contractor shall perform said task on the next workday immediately following the holiday.\nGOVERNMENT FURNISHED PROPERTY AND SERVICES.\n3.1.   GENERAL.  \n3.1.1   The government will provide, without cost, the facilities, equipment, materials, and/or services listed below.\n3.1.2. PROPERTY.\n3.1.2.1.  Storage Facilities.  The government will provide storage for equipment and materials not to exceed a thirty (30) day supply. The government will not be responsible for the protection or loss of any equipment and materials. The contractor shall obtain approval from before storing equipment or chemicals.\n3.2.   UTILITIES.\n3.2.1. Contractor must provide written request prior to use of government utilities for those outside of the normal use. This written request must be approved by the COR before the contractor uses any Government utilities.\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VASNHCS Water Services SAM\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 561210 ($47,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Water Treatment/Storage Tank Cleaning as described above. \n\n6. UEI Number\n\n7. If participant in GSA/FSS or Veterans Affairs national contracts; provide contract #. \n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions. \n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","text":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY\nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 09/10/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing.\n\nPlace of Performance:\nVA Southern Nevada Healthcare System (VASNHS)\n6900 North Pecos Rd, N.\nLas Vegas, NV 89086\n\nDESCRIPTION OF SERVICES/GENERAL INFO\n1.0. SCOPE OF WORK\nVA Southern Nevada Healthcare System (VASNHS) is contracting water treatment services as well as the cleaning of 4 water storage tanks that provide a complete service-oriented water treatment, sampling, disinfect/cleaning and test program that supplies steam, chilled water service, domestic, industrial water and heating water service loops which include a solar heating loop. This contract is specifically for all industrial systems and all 4 water storage tanks. Access to these systems is located VA Medical Center Buildings 1, 2, 5, & 6. The contractor shall supply a complete service oriented water treatment program. A major component of maintaining equipment involves chemical treatment, real time monitoring, and water sampling. The contractor shall provide trained, qualified and certified personnel to perform required tasks. In addition, contractor shall provide all the necessary equipment, tools, materials, supervision, repair, replacement, and other services necessary to perform water treatment services at VASNHS facilities as defined in this Statement of Work (SOW) for Government-owned equipment. Services shall be provided at the VASNHS medical center, located at 6900 North Pecos Road, North Las Vegas, NV 89086. The contractor shall perform in accordance with all federal, state, and local regulations.\n\nSpecific Requirements for Industrial Water:\n1.1.2 The water treatment program shall service steam boilers, chillers, chilled water system, open condenser water loops, 9 closed hot water heating loops, a refrigeration condenser loop, and a Glycol energy recovery loop, along with all associated piping for the equipment listed below. This list is not all inclusive of the Government owned equipment that may require monitoring, testing, or other services associated with the overall treatment program. Contractor is to supply all equipment and services for real time monitoring of HVAC Cooling Tower open loop.\nChilled Water:\nGlobal GTCHB2234F2615PC Side-stream Filter with MS30ES20 filter cartridges.\n\nCooling Tower (Condenser Water):\nIn-Line, Real-Time monitoring system controlling 3 LMI metering pumps and condenser water bleed valve.\nPuroflux PF64-060(B) centrifugal separator\n\nGlycol:\nNeptune 141-GFS251A.88\n\nSteam/Condensate:\nThe steam system has three LMI chemical metering pumps for the Boiler treatment, sulfite, phosphate and amine . Feed rates are set manually based on feed water / condensate testing by the operator.\nEach boiler is equipped with a pot feeder for start-up/emergency treatment. The other systems are manually dosed with pot feeders.\n\n1.2 FREQUENCY OF SERVICE & TEST REQUIREMENTS\n1.2.1. The following charts denote the frequency of service and testing requirements.\n1.2.1.1 Specific System: Cooling Tower System, Open Loop, Building 2.\nControl\nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\npH, Makeup Water\nPH meter\nRecord\nWeekly\npH, System Water\nPH Meter\n8.0-9.0\nWeekly\nConductivity, Makeup\nConductivity Meter\nRecord\nWeekly\nConductivity,\nSystem Water\nConductivity Meter\n2400 ppm TDS\nWeekly\nCorrosion Inhibitor\nColorimetry\n15 30 ppm\nWeekly\nCalcium, Makeup\nWater\nDR890-PRG29\nRecord\nWeekly\nCalcium, System Water\nDR890-PRG29\n<100 ppm\nWeekly\nSteel Corrosion\nInhibitor (Active Polymer)\nDR890 PRG181\n6-8ppm\nWeekly\nIron\nDR890-PRG33\n<1.0 ppm\nWeekly\nFree Halogen (Chlorine)\nBiocide\nDR890-PRG 90\n0.05-0.5 ppm\nWeekly\nBacteria:\nTotal Heterotrophic\nDip-slides\n10^3-10^4 cfu/ml\nWeekly\nBacteria:\nSulphate Reducing\nAnalytical Lab Sample\nND\nSemi-Annual\n\nBacteria:\nIron Related\n\nAnalytical Lab Sample\n\nND\n\nSemi-Annual\nSteel Corrosion\nInhibitor (Specify)\nCoupons\n<1.0 mpy\nSemi-Annual\nCopper Corrosion\nInhibitor (Specify)\nCoupons\n<0.5 mpy\nSemi-Annual\n\nND = non detect\nNote: Include tests for control parameters, from Program Calculation Sheet, Appendix A\n1.2.1.2 Specific System: Chilled Water (Closed), Refrigerant Condenser Loop, Glycol Energy Recovery System, and Hot Closed Systems, Buildings 1, 2, 5, 6 . See Appendix D & E\nControl\nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nCorrosion Inhibitor (Nitrite)\nTitration\n600-800 ppm\nWeekly\npH\n\nPH Meter\n<10.5\nWeekly\nMonthly for hot\nConductivity\nConductivity Meter\nRecord\nWeekly\nMonthly for hot\nSteel Corrosion\n(Specify)\nCoupons\n<1.0 mpy\nQuarterly\nCopper Corrosion\n(Specify)\nCoupons\n<1.0 mpy\nQuarterly\nIron\n(Total)\nDR890-PRG33\n<2.0 ppm\nWeekly\nMonthly for hot\nCopper\n(Total)\nDR890-PRG22\n<2.0 ppm\nWeekly\nMonthly for hot\nBacteria:\nTotal Heterotrophic\nDip-slide\n<10^3 cfu/ml\nMonthly\nBacteria:\nSulfate Reducing\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria:\nIron Related\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria: Nitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\nBacteria: Denitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\n\nND = non detect\nNote: Include tests for control parameters, from Program Calculation Sheet, Appendix A\n\n1.2.1.3 Specific System: Steam Boiler System, Building 2.\n\nControl\nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nMakeup Water pH\nPH meter\nRecord\nWeekly\nMakeup Water Conductivity\nConductivity Meter\nRecord\nWeekly\nMakeup Water - Hardness\nDrop Test\nRecord\nWeekly\nMakeup Water Total Alkalinity\nDR890-PRG29\nRecord\nWeekly\nFeedwater Hardness\nDrop Test\n0-2 ppm\nWeekly\nFeedwater Iron\n\nDR890-PRG33\n<1.0 ppm\nWeekly\nFeedwater pH\n\nPH meter\n8.3-10.5\nWeekly\nFeedwater Conductivity\nConductivity Meter\n300 Âµmhos\nWeekly\nFeedwater P Alkalinity\nTitration\nRecord\nWeekly\nFeedwater M Alkalinity\nTitration\nRecord\nWeekly\nFeedwater Boiler Treatment\nDR890-PRG181\n20-25ppm\nWeekly\nBoiler P Alkalinity\nTitration\n<300\nWeekly\nBoiler M Alkalinity\nTitration\n<100\nWeekly\nBoiler Oxygen scavenger Residual\nSulfite low level test kit\n30-60 ppm\nWeekly\nBoiler Conductivity\nOn-Line Conductivity Meter\n<4500 Âµmhos\nWeekly\nBoiler Neutralized Conductivity\nDR890-PRG29\n\nBoiler iron\nDR890-PRG33\n<1.0 ppm\nWeekly\nCondensate - Conductivity\nConductivity Meter\n<100 Âµmhos\nWeekly\nCondensate pH\nPH meter\n8.0-10.0\nWeekly\nCondensate Hardness\nDrop Test\n0-1 ppm\nWeekly\nCondensate Iron\nDR890-PRG33\n<1.0 ppm\nWeekly\n\nND = non detect\nNote: Include tests for control parameters, from Program Calculation Sheet, Appendix A\n1.2.1.4 Industrial Water Systems\nSystem\nLocation\nAnalytical\nTest Method\nService Report Test\nFrequency\nWater Tank #1\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #3\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #4\nWater Tank Yard\nA, B, C, E, F\nMonthly\nCooling Towers\nBLD 2\nA, B, C, D,E, F\nWeekly\nIndustrial Water System\nBldg 2, Rm 2-110\nA, B, C, D, E\nMonthly\n\n1.2.1.5 Industrial Water System Analytical Test Method:\nA. Chlorine residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test)\nB. Conductivity / TDS; Ultrameter II Conductivity Meter\nC. PH; Ultrameter II PH Meter.\nD. Hardness; Drop Test, Titration\nE. Water Temperature, Ultrameter II, or Contact Thermometer.\nF. Dip-slide, Heterotrophic Bacteria, & Mold Indicating\n\n1.2.2. METHOD OF TREATMENT\n1.2.2.1. The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating, chilled, and cooling water systems.\n1.2.2.2. Water treatments shall be performed as indicated by testing on each system in all buildings.\n1.2.2.3 Sodium Nitrite, or other corrosion inhibitor, applied to closed loops shall always include Leak Detection Dye.\n1.2.2.4. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly.\n1.2.2.5. Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system.\n1.2.2.6 Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor s responsibility to ensure all safety precautions for chemicals have been taken.\n1.2.2.7 Chemical Tanks - The tanks MUST provide the following features:\nTank level indicators to determine chemical levels.\nFlooded suction inlets for chemical pumps to ensure pumps do not loose prime, or provide self-priming pumps.\nContainment basins capable of 150% of the tank storage capacity.\nTank sizing shall be appropriate for chemical use; chemical shall be a minimum quantity of 31 days without replenishment.\nChemical labels clearly visible on outside of tank.\nSDS sheets attached to tank container.\nTank to tank chemical transfer preferred, when pumping from drums, empty drums shall be removed from VAMC property within 3 working days.\nFull spill containment.\n1.2.2.7.1 Liquid chemicals shall be stored on site in Mini Porta Feed or equal containers. Containers shall be stainless steel or double walled polyethylene tanks as appropriate. Containers shall be supplied and maintained by the water treatment contractor.\n1.2.2.7.2 All chemicals shall be directly injected in to their respective loops via corporation stop injectors whenever provided. Pot feeders are available at the boilers (start-up), and all closed loops.\n1.2.3. TESTS\n1.2.3.1. Routine Testing. The routine Cooling Tower testing to be performed according to the chart in 1.2.1.1, Closed Loops according to 1.2.1.2 and Boiler testing performed according to chart in 1.2.1.3. which will provide results showing:. Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total Alkalinity, pH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Nitrite, Calcium Hardness, Free Chlorine, Sulfite, Iron and Copper. Routine testing by the Contractor shall also provide services as listed in Appendix B and C. The contractor shall submit documentation of results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1.\n1.2.3.2. Weekly water tests and treatment for each operating system in building 2 shall provide:\nBoilers and Steam:\nOrthophosphate (PO4) (Operating Boiler s water)\nSodium Sulfite (SO3) (Operating Boilers)\nP-Alkalinity (Operating Boiler s water)\nConductivity (Âµmhos/cm) (Operating Boiler s water and Feed Water)\nTotal Hardness, pH, iron, and conductivity (Feed Water, Condensate, High Pressure Drain, Condensate from Bldg 1.\nAdd neutralizing amine blend to treatment tank, for injection into steam header outlet piping.\nDetermine gallons/day feed rate for sodium polymethacrylate* and add to proper tank with proper adjustments to feed rate. (*or recommended chemical.)\nAdd sodium sulfite in chemical feed tank for feedwater treatment.\nAdd sodium hexametaphosphate*, caustic flake*, and adjustments for feed rates to boiler chemical feed tanks. ( *or recommended chemical).\nSodium Nitrite added to (Hot & Chilled) closed loops to provide protection of metal piping and maintain residual.\nCooling Tower / Open Condenser Loop:\nOrganophosphonate\nOxidizing and Non-Oxidizing Biocides\n1.2.4. STANDARDS. The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 Âµmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dip-slide culture test. ORP measurements will be taken on condenser water to verify relationship between Biocide effective ness and corrosion of tower metal, maintain range of 250 to 450 mV. The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count, determined by dip-slide culture, shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1.\n1.2.4.1. The following standards apply to each operating system in building 2 and shall be on contractor s report. The contractor shall maintain systems within the standards listed in paragraph 1.2.4:\nBoilers\nPhosphate (PO4) = 15 25 PPM\nP-Alkalinity (CaCO3) = 300 600 PPM\nSulfite (SO3) = 30 60 PPM\nNeutralized Conductivity (Âµmhos/cm): 3000-3500\nBoiler PH = 10.5 12.0 PPM\n\nCondensate:\nPH = 8.3 9.2 SU\nConductivity= < 100 Âµmhos\n\nSodium Softeners: (Hardness Maximum) 1 PPM or 7.1 grains\n\nLow Temperature Hot Water Heat (HWH) the following standards apply:\nNitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron, copper.\n\nChilled Water the following standards apply:\nNitrite = 600-800 ppm as nitrite. Test and record pH, conductivity, iron, copper.\nContractor shall clean and replace Side-Stream filters as necessary.\n\nOpen Condenser Loop (Cooling Towers) the following standards apply:\nConductivity= 3200 Âµmhos / TDS= 2400 ppm\nOrganophosphonate = 15 30 ppm, PTSA trace = 160 170\nBiocide = .05 0.5 ppm\n\n1.2.5. MONITORING. The contractor shall inspect, monitor and document each system listed in Appendix B, C, D, & E. to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR.\nScale formation onto waterside surfaces\nCorrosion of waterside metal surfaces\nSlime producing bacteria within the bulk water (dip-slide test)\nMake-up water rate\nBleed-off/Blowdown rate\nChemical treatment feed rates\n1.2.6. INSPECTIONS\n1.2.6.1. The contractor shall perform weekly inspections of the cooling tower, boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of the side-stream filter installed in the condenser water system . Adjustments shall be made to backwash timing and frequency. Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR.\n1.2.6.2. The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line.\n1.2.6.3. The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location . Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes.\n1.2.7. REVIEWS AND ANALYSIS.\n1.2.7.1. The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including side-stream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic data-site of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals.\n1.2.7.2. The contractor shall document results and recommendations for purposes of long-range planning. Documentation shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.3. The contractor shall provide actual values of: Bleed-off/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values, and industry standards. The Contractor shall make recommendations to the government to optimize operations. All final decisions are by the government. Documentation shall be IAW Section 1.2.10.3.\n1.2.7.4. The contractor shall document the collection of and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.5. Condensate Quality Profile. A Quality Profile shall be created and documented for each condensate stream. Information and targeted performance guidelines shall include:\npH (properly cooled) 8.0 9.0\nIron <0.10 ppm\nConductivity < 50 Âµmhos/cm\nThis data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR.\n1.2.8. STUDIES. The contractor shall perform and document the following studies:\n1.2.8.1. Corrosion Studies. Documented Corrosion studies shall include maintain continuous exposure periods for 90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate (<5.00 mpy) and Copper Corrosion Rate (<.50 mpy). Boiler and heat exchange systems shall be maintained IAW American Society of Mechanical Engineers (ASME) standards.\n1.2.8.2. Annual Flow Rate and Elusion Studies. The contractor shall provide flow rate and elusion studies on ion exchange equipment to evaluate: Operation, Mechanical Status and Efficiency.\n1.2.9. BOILER FEEDWATER (BFW)\n1.2.9.1. The contractor shall evaluate the overall Boiler Feed water (BFW) program for compliance with American Society of Mechanical Engineers (ASME) and Cooling Technology Institute (CTI) control parameters and operational procedures, Federal and State of Nevada Environmental Protection Agency regulations and environmental compliance issues. The contractor shall inform the government orally and in writing quarterly and annually of all compliance problems associated with the operation of the industrial water treatment program.\n1.2.9.2. Evaluate and report, the boiler feed water characteristics to establish siteline data within the first month of contract.\n1.2.9.3. Maximum cycles of concentration (no cycles to exceed 20) sited on the following ASME Guidelines: The contractor shall calibrate Government chemical feed and control equipment to maintain water chemistry within industry specifications. Calibration of all monitoring equipment shall be performed accurately and at specified frequency. The calibration results shall be documented and available to COR as requested.\n1.2.10. REPORTS AND OTHER DOCUMENTS. The contractor shall send a copy of reports to the Contracting Officer Representative (COR). All urgent problems regarding maintenance of water treatment parameters shall be discussed with the COR on the day of discovery referenced in 1.3.5.2. All reports shall be submitted electronically to the Facility COR.\n1.2.10.1. Weekly reports. The contractor shall prepare a written report each week. This report shall describe the results of routine tests (Section 1.2.3.1), the results of system inspections (Section 1.2.6). The reports shall contain recommendations and written proposed corrective actions. The contractor shall review the report with the COR/CO within seven (7) calendar days of data collection.\n1.2.10.2. Quarterly reports. The contractor shall prepare a quarterly written report, accurately and on time, due by the 15th of Jan, Apr, Jul, and Oct. This report shall describe conditions of each water system. The reports shall include those items discussed in Section 1.2.5 and the effectiveness of the treatment program and any areas of concern/problems incurred with recommendations for correction. The report shall include all chemical usage (Volume) by the contractor. The contractor shall conduct meeting with the COR and go over the Quarterly report.\n1.2.10.3. Annual Reports. An annual report shall be compiled and submitted by the last day of the 11th month of each contract year, for each industrial water system. Each report shall describe sampled trends throughout the year, start and end conditions, and those items identified in Sections 1.2.7 through 1.2.9. The report shall include total yearly chemical usage by the contractor. The contractor shall meet with the COR and affected Contracting Officer and go over the Annual report.\nII. SERVICES SUMMARY.\n2.1. Â Â Â Â Performance Requirements Summary\n\n2.1.2 Summary Table:\nPerformance\nIndicator\nPerformance Standard\nPerformance Threshold\nMethod Type of\nSurveillance\n\nReference\nCooling Tower Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.1 to\na 90% accomplishment\nWeekly testing\n1.2.4\nChilled Water System Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nClosed Loop Treatment\nMaintain Treatment levels, perform coupon checks\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nMonthly testing. Quarterly coupon change-out, submitted for analysis\n1.2.4.1\nBoiler Water Treatment\nMaintain Treatment levels, Recommend changes to chemical pumps and blowdown settings\nMaintain levels in accordance with parameters in Table 1.2.1.3 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nRecords and Report Management\nReports filled out timely and delivered to Utility Supervisor or COR\nWeekly within 7 days of collection.\nMonthly Within 7 days of collection.\nQuarterly on time.\nAnnually Before end of contract. To a 100% accomplishment\nMeetings with COR, one on one.\n1.2.10\nInspections\nInspect Cooling Towers, Boilers, and Heat Exchangers during maintenance periods\nCheck for indications of corrosion, under-treatment, over-treatment. Make recommendations that show results.\nCOR to attend inspections\n1.2.6\nInventory Management\nSufficient testing and treatment materials on site to ensure plant condition not affected\nAll treatment levels in all systems maintained to a 90% accomplishment.\nDaily checks by COR, contractor notified by email of low levels or missing items\n1.0\n\nAppendix B\n\n*The procedures set forth in the Inspection of Services Clause will be used to remedy all deficiencies. The re-performance times will be sited upon sensitivity of the issue.\nORP Oxidation Reduction Potential, measurement of the tendency of a chemical substance to oxidize or reduce another chemical substance. Has a relationship to Biocide reactions.\nWelch-Allyn fiber optic inspection. A high-level inspection system that examines tube bundles in great detail to determine if gross deficiencies in water treatment exist.\nHigh Temperature Hot Water (HTHW). Heating system water that is generally circulated at temperatures from 320 to 440 degrees.\nCondensate. Condensed water resulting from the removal latent heat from steam.\nDeaerator Oxygen Analysis. A study to determine the oxygen removal efficiency of the deaerator. The collected data assists in predicting the potential for oxygen related problems in the feedwater and boiler system(s).\nEmbrittlement Analysis. A study of the embrittling characteristics of the boiler water.\nControlled Limits. Operating parameters (boundaries)\nElution Studies on Ion Exchange Equipment. A series of tests conducted on the softeners, dealkalizers or demineralizers to determine the efficiency of the regeneration cycle. The collected data is evaluated by drawing an elution curve. The information reveals the regenerate concentrations at all stages of the cycle.\nSteam Purity Analysis. A study monitoring the quality of the steam being produced to determine the steam purity.\nCorrosion Studies on Feedwater/Condensate Systems. A study to determine the corrosion rates of the pre-boiler systems. The collected data provides information relating to the corrosion protection provided by the chemical treatment program.\nQuantitative Deposit Analysis. A study to determine the composition of a deposit.\nResin Analysis. A study generally performed to determine the efficiency of zeolite resin in water.\nAppendix B\nCooling tower tonnage, Building 2\nBuilding Number\nCapacity in Approx Tons\nSidestream Filters\nTower Treatment\nOperation\n2\n6,500\nN/A\nAcid or Softwater Blend\nYear Round\n\nHVAC main cooling tower open loop\nThe water treatment program shall include all cooling tower systems and all water pre-treatment equipment. The water treatment program shall include all chemical products, equipment, tools, supervision, professional consulting services, and any additional items necessary to perform the services as specified in the SOW.\nThe cooling towers consist of five cells.\nThe water treatment program shall provide control and remote monitoring capability for the following:\nController capable of the following features:\nMonitor system conductivity\nMonitor system pH\nMonitor system ORP, Oxidation Reduction Potential\nFlow switch\nChemical levels in chemical feed tanks/containers\nMonitor makeup water use (via contacting head water meter)\nMonitor blow down water use (via contacting head water meter)\nReceive 4-20mA inputs and provide direct control of system parameters based on input signals.\nProvide data logging features, with download capability to a PC via Ethernet or wireless network\nReal-Time monitoring of scale/corrosion inhibitor levels in the cooling tower systems whenever they are running.\nReal-Time monitor for both planktonic (free flowing) and sessile (attached) microbiological activity in re-circulating cooling water systems.\nMultiple controller inputs\nMultiple controller outputs\nOnline corrosion monitors to log corrosion data Real-Time so that immediate chemistry changes can be made.\nAppendix C\nBuilding 2 Systems, and Equipment\nBoilers:\nThree natural gas fired, 25,000 pound per hour, fire tube, 100 PSIG\nDomestic Water:\n3 sodium zeolite softeners.\n3 charcoal bed filters.\nCondensate Return:\nOne condensate receiver\nDeaerators:\nOne 20,000 pound per hour, spray and tray type\nFeedwater Pumps:\nThree electric driven pumps\nBoiler Chemicals Currently Used:\nSodium Bisulfite\nSodium Sulfate\nCyclohexylamine\nDiethylethanolamine\nMorpholine\nPotassuim Bisulfite\nCobalt Sulfate\nMethanol\nSodium Hydroxide\nGlutaraldehyde\nAlkaline Liquid Bromine\nHVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set-point. Building 1- five loops, building 2, Boiler room- one loop, building 5- one loop, Building 6- one steam heated loop and one solar heated loop. Systems must be closely monitored and sampled at least monthly; corrosion indicator coupons examined every 90 days. Water treatment shall be on an as needed basis to control any corrosion.\nAppendix D\nBuilding 1,2, 5 & 6 Systems and Equipment\n1. HVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set point. Building 1- Four Loops: D&T Basement; Room BD-423 D&T, Ambulatory Basement; BB-208, Admin Basement; BD-160, MH Basement; BE-101, Emergency Department extension (roof-top). Building 2 one loop, Boiler Room, building 5- one loop, basement, building 6- one loop (steam heated) & one loop (solar heated), room to be determined (currently under construction). Systems must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion and maintain proper residual.\n2. REFRIGERANT CONDENSER WATER SYSTEM (Closed Loop)\nChilled water system for cooling the condenser water for freezers, and refrigerators. Water is continuously circulated in a closed loop through plate/frame heat exchangers to maintained temperature set point. Building 1, Fourth floor. System must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion.\n3. HVAC ENERGY RECOVERY SYSTEM (GLYCOL LOOP, 30%)\nThe glycol and water run-around coil system are an energy recovery system for the HVAC air handling units located in Building 1, on the fourth floor and the roof. All the individual water systems are combined into a single fill and chemical addition location. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\n4.HVAC SOLAR ENERGY HEATING SYSTEM\nThe Solar Energy Heating System for Building 6 is designed to capture heat from solar panels on the roof and use that heat through the closed loop system to heat up, directly or augment, the building heating/re-heat system. The solar heating system is integrated with the steam heating system utilizing the same circulating pumps and the same heat exchangers. Treatment must be sufficient in chemical nature to provide corrosion inhibitor to all piping, and freeze protection to the exposed panels/piping in colder months. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\nAppendix E\nChilled Water System\nBUILDING\nSYSTEM\nOperation\nFrequency\nSide Filter\n2\nChilled Water, Closed Loop\nFive 1300-ton chillers\nYear-round\nMonthly\nYes\n\nWater Storage Tanks\n\nThe Potable water storage tank will have a maintenance service accomplished annually, and the Industrial water storage tank will have a maintenance service accomplished every three years. The Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project. All the associated equipment is located at the VA facilities Water Storage Tank area and Central Energy Plant Building #2 at the Veteran s Hospital on 6900 North Pecos Rd, North Las Vegas, Nevada.\n\nSPECIFIC REQUIREMENTS:\n\nWater Storage Tanks (1ea. Potable water and 3ea. Industrial water total of 4ea. tanks)\nManufacturer: Storage Product Engineering\nModel: 7013 WT\nStorage Capacity: 360,000 gallons\n\nThis service contract is to clean and disinfect the water tanks according to American Water Works Association (AWWA) standards for disinfection process. Details of maintenance service are listed below. The contractor must minimize interruption of the water system to the medical center prior and during the service contract. If lengthy water systems service interruptions are needed, the interruption has to be scheduled two weeks prior to the start of the job. Furthermore, all interruptions are subject to approval by the Engineer Service Chief. The contractor must be authorized and approved to work, service, and make proper recommendations to resolve discrepancies with the Water Storage Tanks and associated components as recommended by manufacturer s recommendation as well as meet local and federal health standards and requirements. Lastly, the contractor will provide detailed documentation and cleaning certifications for the Water Storage Tank to suffice the annual requirements. This data will be provided to the Energy Plant supervisor or designee.\n\nTank Cleaning and chlorination process according to AWWA:\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.\n\nMethods of Chlorination\n\nThree methods of chlorination are explained in this standard. Typically, only\none method will be used for a given storage-facility disinfection, but combinations\nof the methods may be used. The three methods are (1) chlorination of the full\nstorage facility such that, at the end of the appropriate retention period, the water\nwill have a free chlorine residual of not less than 10 mg/L; (2) spraying or painting of all storage facility water-contact surfaces with a solution of 200 mg/L free chlorine.\nand (3) a two-step process of chlorinating the bottom portion of the storage facility\nwith 50 mg/L free chlorine followed by filling to overflow with potable water. It\nshall be held full for a period of not less than 24 h. In chlorinated systems,\nachieving a free chlorine residual requires the addition of sufficient additional\nchlorine to pass through breakpoint chlorination.\n\n4.3.1 Chlorination method 1. The water-storage facility shall be filled to\nthe overflow level with potable water to which enough chlorine shall be added\nto provide a free chlorine residual in the full facility of not less than 10 mg/L\nat the end of the appropriate 6-h or 24-h period, as described in Sec. 4.3.1.4.\nThis method should be evaluated to assess its appropriateness for chloraminated\nsystems. For chloraminated systems, additional chlorine may be required to\nachieve a free chlorine residual of 10 mg/L. The chlorine, either as liquid chlorine,\nsodium hypochlorite, or calcium hypochlorite, shall be introduced into the water\nas described in the following subsections.\n4.3.1.1 Liquid-chlorine (gas) use. Liquid chlorine (gas) shall be introduced\ninto the water filling the storage facility in such a way as to give a uniform chlorine\nconcentration during the entire filling operation. Portable chlorination equipment\nshall be carefully operated and shall include a liquid-chlorine cylinder, gas-flow\nchlorinator, chlorine ejector, safety equipment, and an appropriate solution tube to\ninject the high-concentration chlorine solution into the filling water. The solution\ntube shall be inserted through an appropriate valve located on the inlet pipe and\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\nDISINFECTION OF WATER-STORAGE FACILITIES 7\nnear the storage facility such that the chlorine solution will mix readily with the\ninfluent water.\n\n4.3.1.2 Sodium hypochlorite use. Sodium hypochlorite shall be added to\nthe water entering the storage facility by means of a chemical-feed pump or shall be\napplied by hand-pouring into the storage facility and allowing the influent water to\nprovide the desired mixing.\n\n4.3.1.2.1 When a chemical-feed pump is used, the concentrated chlorine\nsolution shall be pumped through an appropriate solution tube to inject the\nhigh-concentration chlorine solution at a rate that will give a uniform chlorine\nconcentration in the filling water. The solution tube shall be inserted through an\nappropriate valve located on the inlet pipe and near the storage facility, or through\nan appropriate valve located on the storage facility such that the chlorine solution\nwill mix readily with the filling water.\n4.3.1.2.2 When sodium hypochlorite is poured into the storage facility,\nthe filling of the storage facility shall begin immediately thereafter or as soon as\nany removed manhole covers can be closed. Sodium hypochlorite may be poured\nthrough the cleanout or inspection manhole in the lower course or level of the\nstorage facility, in the riser pipe of an elevated tank, or through the roof manhole.\nSodium hypochlorite shall be poured into the water in the storage facility when the\nwater is not more than 3 ft (0.9 m) in depth, nor less than 1 ft (0.3 m) in depth or\nas close thereto as manhole locations permit.\n\n4.3.1.3 Calcium hypochlorite use. Calcium hypochlorite granules\nor tablets broken or crushed to sizes not larger than 1/4-in. (6.4-mm) maximum\ndimension may be poured or carried into the storage facility through the cleanout\nor inspection manhole in the lower course or level of the storage facility, into the\nriser pipe of an elevated tank, or through the roof manhole. The granules or tablet\nparticles shall be placed in the storage facility before flowing water into it. The\ngranules or tablets shall be located so that the influent water will circulate through\nthe calcium hypochlorite, dissolving it during the filling operation. The calcium\nhypochlorite shall be placed only on dry surfaces unless adequate precautions are\ntaken to provide ventilation or protective breathing equipment.\n4.3.1.4 Retention period. After the storage facility has been filled with\nthe disinfecting water, it shall stand full as follows: (1) for a period of not less than\n6 h when the water entering the storage facility has been chlorinated uniformly by\ngas-feed equipment or chemical pump, or (2) for a period of not less than 24 h\nwhen the storage facility has been filled with water that has been mixed with sodium\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\n8 AWWA C652-19\nhypochlorite or calcium hypochlorite within the storage facility as described in\nSec. 4.3.1.2 and 4.3.1.3.\n\n4.3.1.5 Handling of disinfection water. After the retention period stated\nin Sec. 4.3.1.4, the free chlorine residual in the storage facility shall be reduced to\na concentration appropriate for distribution by completely draining the storage\nfacility and refilling with potable water, or by a combination of additional holding\ntime and blending with potable water having a lower chlorine concentration.\nFollowing this procedure and subject to satisfactory bacteriological testing,\nappropriate chlorine residual, and acceptable aesthetic water quality (as described\nin Sec. 5.1), the water may be delivered to the distribution system.\nMethod to Follow:\n\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.\n4.3.3 Chlorination method 3. Water and chlorine shall be added to the storage facility in amounts such that the solution will initially contain at least 50 mg/L free chlorine and will fill approximately 5 percent of the total storage volume. This solution shall be held in the storage facility for a period of not less than 6 h. The storage facility shall then be filled to the overflow level by flowing potable water into the highly chlorinated water. It shall be held full for a period of not less than 24 h. Highly chlorinated water shall then be purged from the drain piping. Following this procedure and subject to satisfactory bacteriological testing, appropriate chlorine residual, and acceptable aesthetic water quality as described in Sec. 5.1, the remaining water may be delivered to the distribution system. It should be noted that the final chlorine residual may be either as free, total, or combined chlorine depending on the potable water characteristics.\n4.3.3.1 Adding chlorine. Chlorine shall be added to the storage facility by the method described in Sec. 4.3.1.1, 4.3.1.2, or 4.3.1.3. In chloraminated systems, the addition of excess chlorine may be required to eliminate the combined chlorine and achieve the specified free chlorine residual (breakpoint chlorination).\n4.3.3.2 For any chlorinated water discharges to the environment, refer\nto ANSI/AWWA C655 Field Dechlorination, if dechlorination is required.\nThe environment into which the chlorinated water is to be discharged shall be\ninspected. Federal, state or provincial, and local environmental regulations may\nrequire special provisions or permits before disposal of highly chlorinated water.\nProper authorities should be contacted before disposal of highly chlorinated water.\n\nTank Specifications:\nTank Gallon Capacity for each tank. Â 360,000 gal\nTank Dimensions (Diameter x Height) for each tank 12 x 69 11-1/4\nTank Construction Type: (Steel Welded, Concrete, Poly... On grade, Buried or Elevated Tower or Standpipe) Fiber Glass with Edge Coat Process lining, on concrete foundation above ground\nTank Manway Access (At least a 24\" diameter roof access hatch) Yes\nTank Equipment Access (Can a 20' trailer and truck come within 50\\ of the tanks No, need hoses and pump to transfer water from tank to tank.\nDischarge requirements (Can water and sediment from the cleaning process be discharged within 100' of the tank(s)?Â Yes.Â Water must be pump from tank to tank to minimize water loss.\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.\n\nAnticipated Performance Schedule:\nPeriod of performance: October to November\nBase year: clean potable storage tank only: October to November\nOption year #1: clean all 4 storage tanks: October to November\nOption year #2 & #3: clean potable storage tank only: October to November\nOption year #4: clean all 4 storage tanks: October to November\nCost estimate: base on per tank cleaning will be funded\n\n1.3.6. WORK HOURS\n1.3.6.1. Normal Hours. The contractor shall perform the services required under this contract during the following hours: 0730-1600 HRS, Monday through Friday. The contractor may work, with prior approval of the Contracting Officer's representative, extended hours to ensure timely completion of work at no additional cost to the government.\n1.3.6.2. Emergency Services. The contractor shall provide services to support emergency situations for the water treatment facilities 24/7. Contract service technician must be able to report to the Facility within 2 hours after request for emergency service.\n1.3.6.3. Seasons. The heating season (Winter) is from 1 October to 31 May and the cooling season (Summer) is from 1 June to 30 September. The actual dates are sited on temperature. If changes in dates occur, the government will notify the contractor.\n1.3.7.1. When a holiday falls on a Saturday, the preceding Friday shall be considered a holiday. When a holiday falls on a Sunday, the following Monday shall be observed. If a task, falls on one of the above listed holidays, the contractor shall perform said task on the next workday immediately following the holiday.\nGOVERNMENT FURNISHED PROPERTY AND SERVICES.\n3.1. GENERAL.\n3.1.1 The government will provide, without cost, the facilities, equipment, materials, and/or services listed below.\n3.1.2. PROPERTY.\n3.1.2.1. Storage Facilities. The government will provide storage for equipment and materials not to exceed a thirty (30) day supply. The government will not be responsible for the protection or loss of any equipment and materials. The contractor shall obtain approval from before storing equipment or chemicals.\n3.2. UTILITIES.\n3.2.1. Contractor must provide written request prior to use of government utilities for those outside of the normal use. This written request must be approved by the COR before the contractor uses any Government utilities.\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VASNHCS Water Services SAM\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 561210 ($47,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Water Treatment/Storage Tank Cleaning as described above.\n\n6. UEI Number\n\n7. If participant in GSA/FSS or Veterans Affairs national contracts; provide contract #.\n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions.\n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C26126Q0038","product_service_code":"J046"}],"due_at":"2025-09-10T20:00:00Z","due_date":"2025-09-10","closes_at":"2025-09-10T20:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","state":"NV","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":"description","state_evidence":"UCH AS INFORMAL PRICING. PLACE OF PERFORMANCE: VA SOUTHERN NEVADA HEALTHCARE SYSTEM","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-01T03:19:09.728457Z","principal_notice_id":"11f87b3815c04c9c9ffb15480307cfb9","description":{"text":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY\nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 09/10/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing.\n\nPlace of Performance:\nVA Southern Nevada Healthcare System (VASNHS)\n6900 North Pecos Rd, N.\nLas Vegas, NV 89086\n\nDESCRIPTION OF SERVICES/GENERAL INFO\n1.0. SCOPE OF WORK\nVA Southern Nevada Healthcare System (VASNHS) is contracting water treatment services as well as the cleaning of 4 water storage tanks that provide a complete service-oriented water treatment, sampling, disinfect/cleaning and test program that supplies steam, chilled water service, domestic, industrial water and heating water service loops which include a solar heating loop. This contract is specifically for all industrial systems and all 4 water storage tanks. Access to these systems is located VA Medical Center Buildings 1, 2, 5, & 6. The contractor shall supply a complete service oriented water treatment program. A major component of maintaining equipment involves chemical treatment, real time monitoring, and water sampling. The contractor shall provide trained, qualified and certified personnel to perform required tasks. In addition, contractor shall provide all the necessary equipment, tools, materials, supervision, repair, replacement, and other services necessary to perform water treatment services at VASNHS facilities as defined in this Statement of Work (SOW) for Government-owned equipment. Services shall be provided at the VASNHS medical center, located at 6900 North Pecos Road, North Las Vegas, NV 89086. The contractor shall perform in accordance with all federal, state, and local regulations.\n\nSpecific Requirements for Industrial Water:\n1.1.2 The water treatment program shall service steam boilers, chillers, chilled water system, open condenser water loops, 9 closed hot water heating loops, a refrigeration condenser loop, and a Glycol energy recovery loop, along with all associated piping for the equipment listed below. This list is not all inclusive of the Government owned equipment that may require monitoring, testing, or other services associated with the overall treatment program. Contractor is to supply all equipment and services for real time monitoring of HVAC Cooling Tower open loop.\nChilled Water:\nGlobal GTCHB2234F2615PC Side-stream Filter with MS30ES20 filter cartridges.\n\nCooling Tower (Condenser Water):\nIn-Line, Real-Time monitoring system controlling 3 LMI metering pumps and condenser water bleed valve.\nPuroflux PF64-060(B) centrifugal separator\n\nGlycol:\nNeptune 141-GFS251A.88\n\nSteam/Condensate:\nThe steam system has three LMI chemical metering pumps for the Boiler treatment, sulfite, phosphate and amine . Feed rates are set manually based on feed water / condensate testing by the operator.\nEach boiler is equipped with a pot feeder for start-up/emergency treatment. The other systems are manually dosed with pot feeders.\n\n1.2 FREQUENCY OF SERVICE & TEST REQUIREMENTS\n1.2.1. The following charts denote the frequency of service and testing requirements.\n1.2.1.1 Specific System: Cooling Tower System, Open Loop, Building 2.\nControl\nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\npH, Makeup Water\nPH meter\nRecord\nWeekly\npH, System Water\nPH Meter\n8.0-9.0\nWeekly\nConductivity, Makeup\nConductivity Meter\nRecord\nWeekly\nConductivity,\nSystem Water\nConductivity Meter\n2400 ppm TDS\nWeekly\nCorrosion Inhibitor\nColorimetry\n15 30 ppm\nWeekly\nCalcium, Makeup\nWater\nDR890-PRG29\nRecord\nWeekly\nCalcium, System Water\nDR890-PRG29\n<100 ppm\nWeekly\nSteel Corrosion\nInhibitor (Active Polymer)\nDR890 PRG181\n6-8ppm\nWeekly\nIron\nDR890-PRG33\n<1.0 ppm\nWeekly\nFree Halogen (Chlorine)\nBiocide\nDR890-PRG 90\n0.05-0.5 ppm\nWeekly\nBacteria:\nTotal Heterotrophic\nDip-slides\n10^3-10^4 cfu/ml\nWeekly\nBacteria:\nSulphate Reducing\nAnalytical Lab Sample\nND\nSemi-Annual\n\nBacteria:\nIron Related\n\nAnalytical Lab Sample\n\nND\n\nSemi-Annual\nSteel Corrosion\nInhibitor (Specify)\nCoupons\n<1.0 mpy\nSemi-Annual\nCopper Corrosion\nInhibitor (Specify)\nCoupons\n<0.5 mpy\nSemi-Annual\n\nND = non detect\nNote: Include tests for control parameters, from Program Calculation Sheet, Appendix A\n1.2.1.2 Specific System: Chilled Water (Closed), Refrigerant Condenser Loop, Glycol Energy Recovery System, and Hot Closed Systems, Buildings 1, 2, 5, 6 . See Appendix D & E\nControl\nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nCorrosion Inhibitor (Nitrite)\nTitration\n600-800 ppm\nWeekly\npH\n\nPH Meter\n<10.5\nWeekly\nMonthly for hot\nConductivity\nConductivity Meter\nRecord\nWeekly\nMonthly for hot\nSteel Corrosion\n(Specify)\nCoupons\n<1.0 mpy\nQuarterly\nCopper Corrosion\n(Specify)\nCoupons\n<1.0 mpy\nQuarterly\nIron\n(Total)\nDR890-PRG33\n<2.0 ppm\nWeekly\nMonthly for hot\nCopper\n(Total)\nDR890-PRG22\n<2.0 ppm\nWeekly\nMonthly for hot\nBacteria:\nTotal Heterotrophic\nDip-slide\n<10^3 cfu/ml\nMonthly\nBacteria:\nSulfate Reducing\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria:\nIron Related\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria: Nitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\nBacteria: Denitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\n\nND = non detect\nNote: Include tests for control parameters, from Program Calculation Sheet, Appendix A\n\n1.2.1.3 Specific System: Steam Boiler System, Building 2.\n\nControl\nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nMakeup Water pH\nPH meter\nRecord\nWeekly\nMakeup Water Conductivity\nConductivity Meter\nRecord\nWeekly\nMakeup Water - Hardness\nDrop Test\nRecord\nWeekly\nMakeup Water Total Alkalinity\nDR890-PRG29\nRecord\nWeekly\nFeedwater Hardness\nDrop Test\n0-2 ppm\nWeekly\nFeedwater Iron\n\nDR890-PRG33\n<1.0 ppm\nWeekly\nFeedwater pH\n\nPH meter\n8.3-10.5\nWeekly\nFeedwater Conductivity\nConductivity Meter\n300 Âµmhos\nWeekly\nFeedwater P Alkalinity\nTitration\nRecord\nWeekly\nFeedwater M Alkalinity\nTitration\nRecord\nWeekly\nFeedwater Boiler Treatment\nDR890-PRG181\n20-25ppm\nWeekly\nBoiler P Alkalinity\nTitration\n<300\nWeekly\nBoiler M Alkalinity\nTitration\n<100\nWeekly\nBoiler Oxygen scavenger Residual\nSulfite low level test kit\n30-60 ppm\nWeekly\nBoiler Conductivity\nOn-Line Conductivity Meter\n<4500 Âµmhos\nWeekly\nBoiler Neutralized Conductivity\nDR890-PRG29\n\nBoiler iron\nDR890-PRG33\n<1.0 ppm\nWeekly\nCondensate - Conductivity\nConductivity Meter\n<100 Âµmhos\nWeekly\nCondensate pH\nPH meter\n8.0-10.0\nWeekly\nCondensate Hardness\nDrop Test\n0-1 ppm\nWeekly\nCondensate Iron\nDR890-PRG33\n<1.0 ppm\nWeekly\n\nND = non detect\nNote: Include tests for control parameters, from Program Calculation Sheet, Appendix A\n1.2.1.4 Industrial Water Systems\nSystem\nLocation\nAnalytical\nTest Method\nService Report Test\nFrequency\nWater Tank #1\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #3\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #4\nWater Tank Yard\nA, B, C, E, F\nMonthly\nCooling Towers\nBLD 2\nA, B, C, D,E, F\nWeekly\nIndustrial Water System\nBldg 2, Rm 2-110\nA, B, C, D, E\nMonthly\n\n1.2.1.5 Industrial Water System Analytical Test Method:\nA. Chlorine residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test)\nB. Conductivity / TDS; Ultrameter II Conductivity Meter\nC. PH; Ultrameter II PH Meter.\nD. Hardness; Drop Test, Titration\nE. Water Temperature, Ultrameter II, or Contact Thermometer.\nF. Dip-slide, Heterotrophic Bacteria, & Mold Indicating\n\n1.2.2. METHOD OF TREATMENT\n1.2.2.1. The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating, chilled, and cooling water systems.\n1.2.2.2. Water treatments shall be performed as indicated by testing on each system in all buildings.\n1.2.2.3 Sodium Nitrite, or other corrosion inhibitor, applied to closed loops shall always include Leak Detection Dye.\n1.2.2.4. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly.\n1.2.2.5. Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system.\n1.2.2.6 Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor s responsibility to ensure all safety precautions for chemicals have been taken.\n1.2.2.7 Chemical Tanks - The tanks MUST provide the following features:\nTank level indicators to determine chemical levels.\nFlooded suction inlets for chemical pumps to ensure pumps do not loose prime, or provide self-priming pumps.\nContainment basins capable of 150% of the tank storage capacity.\nTank sizing shall be appropriate for chemical use; chemical shall be a minimum quantity of 31 days without replenishment.\nChemical labels clearly visible on outside of tank.\nSDS sheets attached to tank container.\nTank to tank chemical transfer preferred, when pumping from drums, empty drums shall be removed from VAMC property within 3 working days.\nFull spill containment.\n1.2.2.7.1 Liquid chemicals shall be stored on site in Mini Porta Feed or equal containers. Containers shall be stainless steel or double walled polyethylene tanks as appropriate. Containers shall be supplied and maintained by the water treatment contractor.\n1.2.2.7.2 All chemicals shall be directly injected in to their respective loops via corporation stop injectors whenever provided. Pot feeders are available at the boilers (start-up), and all closed loops.\n1.2.3. TESTS\n1.2.3.1. Routine Testing. The routine Cooling Tower testing to be performed according to the chart in 1.2.1.1, Closed Loops according to 1.2.1.2 and Boiler testing performed according to chart in 1.2.1.3. which will provide results showing:. Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total Alkalinity, pH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Nitrite, Calcium Hardness, Free Chlorine, Sulfite, Iron and Copper. Routine testing by the Contractor shall also provide services as listed in Appendix B and C. The contractor shall submit documentation of results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1.\n1.2.3.2. Weekly water tests and treatment for each operating system in building 2 shall provide:\nBoilers and Steam:\nOrthophosphate (PO4) (Operating Boiler s water)\nSodium Sulfite (SO3) (Operating Boilers)\nP-Alkalinity (Operating Boiler s water)\nConductivity (Âµmhos/cm) (Operating Boiler s water and Feed Water)\nTotal Hardness, pH, iron, and conductivity (Feed Water, Condensate, High Pressure Drain, Condensate from Bldg 1.\nAdd neutralizing amine blend to treatment tank, for injection into steam header outlet piping.\nDetermine gallons/day feed rate for sodium polymethacrylate* and add to proper tank with proper adjustments to feed rate. (*or recommended chemical.)\nAdd sodium sulfite in chemical feed tank for feedwater treatment.\nAdd sodium hexametaphosphate*, caustic flake*, and adjustments for feed rates to boiler chemical feed tanks. ( *or recommended chemical).\nSodium Nitrite added to (Hot & Chilled) closed loops to provide protection of metal piping and maintain residual.\nCooling Tower / Open Condenser Loop:\nOrganophosphonate\nOxidizing and Non-Oxidizing Biocides\n1.2.4. STANDARDS. The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 Âµmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dip-slide culture test. ORP measurements will be taken on condenser water to verify relationship between Biocide effective ness and corrosion of tower metal, maintain range of 250 to 450 mV. The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count, determined by dip-slide culture, shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1.\n1.2.4.1. The following standards apply to each operating system in building 2 and shall be on contractor s report. The contractor shall maintain systems within the standards listed in paragraph 1.2.4:\nBoilers\nPhosphate (PO4) = 15 25 PPM\nP-Alkalinity (CaCO3) = 300 600 PPM\nSulfite (SO3) = 30 60 PPM\nNeutralized Conductivity (Âµmhos/cm): 3000-3500\nBoiler PH = 10.5 12.0 PPM\n\nCondensate:\nPH = 8.3 9.2 SU\nConductivity= < 100 Âµmhos\n\nSodium Softeners: (Hardness Maximum) 1 PPM or 7.1 grains\n\nLow Temperature Hot Water Heat (HWH) the following standards apply:\nNitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron, copper.\n\nChilled Water the following standards apply:\nNitrite = 600-800 ppm as nitrite. Test and record pH, conductivity, iron, copper.\nContractor shall clean and replace Side-Stream filters as necessary.\n\nOpen Condenser Loop (Cooling Towers) the following standards apply:\nConductivity= 3200 Âµmhos / TDS= 2400 ppm\nOrganophosphonate = 15 30 ppm, PTSA trace = 160 170\nBiocide = .05 0.5 ppm\n\n1.2.5. MONITORING. The contractor shall inspect, monitor and document each system listed in Appendix B, C, D, & E. to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR.\nScale formation onto waterside surfaces\nCorrosion of waterside metal surfaces\nSlime producing bacteria within the bulk water (dip-slide test)\nMake-up water rate\nBleed-off/Blowdown rate\nChemical treatment feed rates\n1.2.6. INSPECTIONS\n1.2.6.1. The contractor shall perform weekly inspections of the cooling tower, boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of the side-stream filter installed in the condenser water system . Adjustments shall be made to backwash timing and frequency. Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR.\n1.2.6.2. The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line.\n1.2.6.3. The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location . Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes.\n1.2.7. REVIEWS AND ANALYSIS.\n1.2.7.1. The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including side-stream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic data-site of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals.\n1.2.7.2. The contractor shall document results and recommendations for purposes of long-range planning. Documentation shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.3. The contractor shall provide actual values of: Bleed-off/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values, and industry standards. The Contractor shall make recommendations to the government to optimize operations. All final decisions are by the government. Documentation shall be IAW Section 1.2.10.3.\n1.2.7.4. The contractor shall document the collection of and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.5. Condensate Quality Profile. A Quality Profile shall be created and documented for each condensate stream. Information and targeted performance guidelines shall include:\npH (properly cooled) 8.0 9.0\nIron <0.10 ppm\nConductivity < 50 Âµmhos/cm\nThis data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR.\n1.2.8. STUDIES. The contractor shall perform and document the following studies:\n1.2.8.1. Corrosion Studies. Documented Corrosion studies shall include maintain continuous exposure periods for 90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate (<5.00 mpy) and Copper Corrosion Rate (<.50 mpy). Boiler and heat exchange systems shall be maintained IAW American Society of Mechanical Engineers (ASME) standards.\n1.2.8.2. Annual Flow Rate and Elusion Studies. The contractor shall provide flow rate and elusion studies on ion exchange equipment to evaluate: Operation, Mechanical Status and Efficiency.\n1.2.9. BOILER FEEDWATER (BFW)\n1.2.9.1. The contractor shall evaluate the overall Boiler Feed water (BFW) program for compliance with American Society of Mechanical Engineers (ASME) and Cooling Technology Institute (CTI) control parameters and operational procedures, Federal and State of Nevada Environmental Protection Agency regulations and environmental compliance issues. The contractor shall inform the government orally and in writing quarterly and annually of all compliance problems associated with the operation of the industrial water treatment program.\n1.2.9.2. Evaluate and report, the boiler feed water characteristics to establish siteline data within the first month of contract.\n1.2.9.3. Maximum cycles of concentration (no cycles to exceed 20) sited on the following ASME Guidelines: The contractor shall calibrate Government chemical feed and control equipment to maintain water chemistry within industry specifications. Calibration of all monitoring equipment shall be performed accurately and at specified frequency. The calibration results shall be documented and available to COR as requested.\n1.2.10. REPORTS AND OTHER DOCUMENTS. The contractor shall send a copy of reports to the Contracting Officer Representative (COR). All urgent problems regarding maintenance of water treatment parameters shall be discussed with the COR on the day of discovery referenced in 1.3.5.2. All reports shall be submitted electronically to the Facility COR.\n1.2.10.1. Weekly reports. The contractor shall prepare a written report each week. This report shall describe the results of routine tests (Section 1.2.3.1), the results of system inspections (Section 1.2.6). The reports shall contain recommendations and written proposed corrective actions. The contractor shall review the report with the COR/CO within seven (7) calendar days of data collection.\n1.2.10.2. Quarterly reports. The contractor shall prepare a quarterly written report, accurately and on time, due by the 15th of Jan, Apr, Jul, and Oct. This report shall describe conditions of each water system. The reports shall include those items discussed in Section 1.2.5 and the effectiveness of the treatment program and any areas of concern/problems incurred with recommendations for correction. The report shall include all chemical usage (Volume) by the contractor. The contractor shall conduct meeting with the COR and go over the Quarterly report.\n1.2.10.3. Annual Reports. An annual report shall be compiled and submitted by the last day of the 11th month of each contract year, for each industrial water system. Each report shall describe sampled trends throughout the year, start and end conditions, and those items identified in Sections 1.2.7 through 1.2.9. The report shall include total yearly chemical usage by the contractor. The contractor shall meet with the COR and affected Contracting Officer and go over the Annual report.\nII. SERVICES SUMMARY.\n2.1. Â Â Â Â Performance Requirements Summary\n\n2.1.2 Summary Table:\nPerformance\nIndicator\nPerformance Standard\nPerformance Threshold\nMethod Type of\nSurveillance\n\nReference\nCooling Tower Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.1 to\na 90% accomplishment\nWeekly testing\n1.2.4\nChilled Water System Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nClosed Loop Treatment\nMaintain Treatment levels, perform coupon checks\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nMonthly testing. Quarterly coupon change-out, submitted for analysis\n1.2.4.1\nBoiler Water Treatment\nMaintain Treatment levels, Recommend changes to chemical pumps and blowdown settings\nMaintain levels in accordance with parameters in Table 1.2.1.3 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nRecords and Report Management\nReports filled out timely and delivered to Utility Supervisor or COR\nWeekly within 7 days of collection.\nMonthly Within 7 days of collection.\nQuarterly on time.\nAnnually Before end of contract. To a 100% accomplishment\nMeetings with COR, one on one.\n1.2.10\nInspections\nInspect Cooling Towers, Boilers, and Heat Exchangers during maintenance periods\nCheck for indications of corrosion, under-treatment, over-treatment. Make recommendations that show results.\nCOR to attend inspections\n1.2.6\nInventory Management\nSufficient testing and treatment materials on site to ensure plant condition not affected\nAll treatment levels in all systems maintained to a 90% accomplishment.\nDaily checks by COR, contractor notified by email of low levels or missing items\n1.0\n\nAppendix B\n\n*The procedures set forth in the Inspection of Services Clause will be used to remedy all deficiencies. The re-performance times will be sited upon sensitivity of the issue.\nORP Oxidation Reduction Potential, measurement of the tendency of a chemical substance to oxidize or reduce another chemical substance. Has a relationship to Biocide reactions.\nWelch-Allyn fiber optic inspection. A high-level inspection system that examines tube bundles in great detail to determine if gross deficiencies in water treatment exist.\nHigh Temperature Hot Water (HTHW). Heating system water that is generally circulated at temperatures from 320 to 440 degrees.\nCondensate. Condensed water resulting from the removal latent heat from steam.\nDeaerator Oxygen Analysis. A study to determine the oxygen removal efficiency of the deaerator. The collected data assists in predicting the potential for oxygen related problems in the feedwater and boiler system(s).\nEmbrittlement Analysis. A study of the embrittling characteristics of the boiler water.\nControlled Limits. Operating parameters (boundaries)\nElution Studies on Ion Exchange Equipment. A series of tests conducted on the softeners, dealkalizers or demineralizers to determine the efficiency of the regeneration cycle. The collected data is evaluated by drawing an elution curve. The information reveals the regenerate concentrations at all stages of the cycle.\nSteam Purity Analysis. A study monitoring the quality of the steam being produced to determine the steam purity.\nCorrosion Studies on Feedwater/Condensate Systems. A study to determine the corrosion rates of the pre-boiler systems. The collected data provides information relating to the corrosion protection provided by the chemical treatment program.\nQuantitative Deposit Analysis. A study to determine the composition of a deposit.\nResin Analysis. A study generally performed to determine the efficiency of zeolite resin in water.\nAppendix B\nCooling tower tonnage, Building 2\nBuilding Number\nCapacity in Approx Tons\nSidestream Filters\nTower Treatment\nOperation\n2\n6,500\nN/A\nAcid or Softwater Blend\nYear Round\n\nHVAC main cooling tower open loop\nThe water treatment program shall include all cooling tower systems and all water pre-treatment equipment. The water treatment program shall include all chemical products, equipment, tools, supervision, professional consulting services, and any additional items necessary to perform the services as specified in the SOW.\nThe cooling towers consist of five cells.\nThe water treatment program shall provide control and remote monitoring capability for the following:\nController capable of the following features:\nMonitor system conductivity\nMonitor system pH\nMonitor system ORP, Oxidation Reduction Potential\nFlow switch\nChemical levels in chemical feed tanks/containers\nMonitor makeup water use (via contacting head water meter)\nMonitor blow down water use (via contacting head water meter)\nReceive 4-20mA inputs and provide direct control of system parameters based on input signals.\nProvide data logging features, with download capability to a PC via Ethernet or wireless network\nReal-Time monitoring of scale/corrosion inhibitor levels in the cooling tower systems whenever they are running.\nReal-Time monitor for both planktonic (free flowing) and sessile (attached) microbiological activity in re-circulating cooling water systems.\nMultiple controller inputs\nMultiple controller outputs\nOnline corrosion monitors to log corrosion data Real-Time so that immediate chemistry changes can be made.\nAppendix C\nBuilding 2 Systems, and Equipment\nBoilers:\nThree natural gas fired, 25,000 pound per hour, fire tube, 100 PSIG\nDomestic Water:\n3 sodium zeolite softeners.\n3 charcoal bed filters.\nCondensate Return:\nOne condensate receiver\nDeaerators:\nOne 20,000 pound per hour, spray and tray type\nFeedwater Pumps:\nThree electric driven pumps\nBoiler Chemicals Currently Used:\nSodium Bisulfite\nSodium Sulfate\nCyclohexylamine\nDiethylethanolamine\nMorpholine\nPotassuim Bisulfite\nCobalt Sulfate\nMethanol\nSodium Hydroxide\nGlutaraldehyde\nAlkaline Liquid Bromine\nHVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set-point. Building 1- five loops, building 2, Boiler room- one loop, building 5- one loop, Building 6- one steam heated loop and one solar heated loop. Systems must be closely monitored and sampled at least monthly; corrosion indicator coupons examined every 90 days. Water treatment shall be on an as needed basis to control any corrosion.\nAppendix D\nBuilding 1,2, 5 & 6 Systems and Equipment\n1. HVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set point. Building 1- Four Loops: D&T Basement; Room BD-423 D&T, Ambulatory Basement; BB-208, Admin Basement; BD-160, MH Basement; BE-101, Emergency Department extension (roof-top). Building 2 one loop, Boiler Room, building 5- one loop, basement, building 6- one loop (steam heated) & one loop (solar heated), room to be determined (currently under construction). Systems must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion and maintain proper residual.\n2. REFRIGERANT CONDENSER WATER SYSTEM (Closed Loop)\nChilled water system for cooling the condenser water for freezers, and refrigerators. Water is continuously circulated in a closed loop through plate/frame heat exchangers to maintained temperature set point. Building 1, Fourth floor. System must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion.\n3. HVAC ENERGY RECOVERY SYSTEM (GLYCOL LOOP, 30%)\nThe glycol and water run-around coil system are an energy recovery system for the HVAC air handling units located in Building 1, on the fourth floor and the roof. All the individual water systems are combined into a single fill and chemical addition location. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\n4.HVAC SOLAR ENERGY HEATING SYSTEM\nThe Solar Energy Heating System for Building 6 is designed to capture heat from solar panels on the roof and use that heat through the closed loop system to heat up, directly or augment, the building heating/re-heat system. The solar heating system is integrated with the steam heating system utilizing the same circulating pumps and the same heat exchangers. Treatment must be sufficient in chemical nature to provide corrosion inhibitor to all piping, and freeze protection to the exposed panels/piping in colder months. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations. All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\nAppendix E\nChilled Water System\nBUILDING\nSYSTEM\nOperation\nFrequency\nSide Filter\n2\nChilled Water, Closed Loop\nFive 1300-ton chillers\nYear-round\nMonthly\nYes\n\nWater Storage Tanks\n\nThe Potable water storage tank will have a maintenance service accomplished annually, and the Industrial water storage tank will have a maintenance service accomplished every three years. The Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project. All the associated equipment is located at the VA facilities Water Storage Tank area and Central Energy Plant Building #2 at the Veteran s Hospital on 6900 North Pecos Rd, North Las Vegas, Nevada.\n\nSPECIFIC REQUIREMENTS:\n\nWater Storage Tanks (1ea. Potable water and 3ea. Industrial water total of 4ea. tanks)\nManufacturer: Storage Product Engineering\nModel: 7013 WT\nStorage Capacity: 360,000 gallons\n\nThis service contract is to clean and disinfect the water tanks according to American Water Works Association (AWWA) standards for disinfection process. Details of maintenance service are listed below. The contractor must minimize interruption of the water system to the medical center prior and during the service contract. If lengthy water systems service interruptions are needed, the interruption has to be scheduled two weeks prior to the start of the job. Furthermore, all interruptions are subject to approval by the Engineer Service Chief. The contractor must be authorized and approved to work, service, and make proper recommendations to resolve discrepancies with the Water Storage Tanks and associated components as recommended by manufacturer s recommendation as well as meet local and federal health standards and requirements. Lastly, the contractor will provide detailed documentation and cleaning certifications for the Water Storage Tank to suffice the annual requirements. This data will be provided to the Energy Plant supervisor or designee.\n\nTank Cleaning and chlorination process according to AWWA:\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.\n\nMethods of Chlorination\n\nThree methods of chlorination are explained in this standard. Typically, only\none method will be used for a given storage-facility disinfection, but combinations\nof the methods may be used. The three methods are (1) chlorination of the full\nstorage facility such that, at the end of the appropriate retention period, the water\nwill have a free chlorine residual of not less than 10 mg/L; (2) spraying or painting of all storage facility water-contact surfaces with a solution of 200 mg/L free chlorine.\nand (3) a two-step process of chlorinating the bottom portion of the storage facility\nwith 50 mg/L free chlorine followed by filling to overflow with potable water. It\nshall be held full for a period of not less than 24 h. In chlorinated systems,\nachieving a free chlorine residual requires the addition of sufficient additional\nchlorine to pass through breakpoint chlorination.\n\n4.3.1 Chlorination method 1. The water-storage facility shall be filled to\nthe overflow level with potable water to which enough chlorine shall be added\nto provide a free chlorine residual in the full facility of not less than 10 mg/L\nat the end of the appropriate 6-h or 24-h period, as described in Sec. 4.3.1.4.\nThis method should be evaluated to assess its appropriateness for chloraminated\nsystems. For chloraminated systems, additional chlorine may be required to\nachieve a free chlorine residual of 10 mg/L. The chlorine, either as liquid chlorine,\nsodium hypochlorite, or calcium hypochlorite, shall be introduced into the water\nas described in the following subsections.\n4.3.1.1 Liquid-chlorine (gas) use. Liquid chlorine (gas) shall be introduced\ninto the water filling the storage facility in such a way as to give a uniform chlorine\nconcentration during the entire filling operation. Portable chlorination equipment\nshall be carefully operated and shall include a liquid-chlorine cylinder, gas-flow\nchlorinator, chlorine ejector, safety equipment, and an appropriate solution tube to\ninject the high-concentration chlorine solution into the filling water. The solution\ntube shall be inserted through an appropriate valve located on the inlet pipe and\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\nDISINFECTION OF WATER-STORAGE FACILITIES 7\nnear the storage facility such that the chlorine solution will mix readily with the\ninfluent water.\n\n4.3.1.2 Sodium hypochlorite use. Sodium hypochlorite shall be added to\nthe water entering the storage facility by means of a chemical-feed pump or shall be\napplied by hand-pouring into the storage facility and allowing the influent water to\nprovide the desired mixing.\n\n4.3.1.2.1 When a chemical-feed pump is used, the concentrated chlorine\nsolution shall be pumped through an appropriate solution tube to inject the\nhigh-concentration chlorine solution at a rate that will give a uniform chlorine\nconcentration in the filling water. The solution tube shall be inserted through an\nappropriate valve located on the inlet pipe and near the storage facility, or through\nan appropriate valve located on the storage facility such that the chlorine solution\nwill mix readily with the filling water.\n4.3.1.2.2 When sodium hypochlorite is poured into the storage facility,\nthe filling of the storage facility shall begin immediately thereafter or as soon as\nany removed manhole covers can be closed. Sodium hypochlorite may be poured\nthrough the cleanout or inspection manhole in the lower course or level of the\nstorage facility, in the riser pipe of an elevated tank, or through the roof manhole.\nSodium hypochlorite shall be poured into the water in the storage facility when the\nwater is not more than 3 ft (0.9 m) in depth, nor less than 1 ft (0.3 m) in depth or\nas close thereto as manhole locations permit.\n\n4.3.1.3 Calcium hypochlorite use. Calcium hypochlorite granules\nor tablets broken or crushed to sizes not larger than 1/4-in. (6.4-mm) maximum\ndimension may be poured or carried into the storage facility through the cleanout\nor inspection manhole in the lower course or level of the storage facility, into the\nriser pipe of an elevated tank, or through the roof manhole. The granules or tablet\nparticles shall be placed in the storage facility before flowing water into it. The\ngranules or tablets shall be located so that the influent water will circulate through\nthe calcium hypochlorite, dissolving it during the filling operation. The calcium\nhypochlorite shall be placed only on dry surfaces unless adequate precautions are\ntaken to provide ventilation or protective breathing equipment.\n4.3.1.4 Retention period. After the storage facility has been filled with\nthe disinfecting water, it shall stand full as follows: (1) for a period of not less than\n6 h when the water entering the storage facility has been chlorinated uniformly by\ngas-feed equipment or chemical pump, or (2) for a period of not less than 24 h\nwhen the storage facility has been filled with water that has been mixed with sodium\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\n8 AWWA C652-19\nhypochlorite or calcium hypochlorite within the storage facility as described in\nSec. 4.3.1.2 and 4.3.1.3.\n\n4.3.1.5 Handling of disinfection water. After the retention period stated\nin Sec. 4.3.1.4, the free chlorine residual in the storage facility shall be reduced to\na concentration appropriate for distribution by completely draining the storage\nfacility and refilling with potable water, or by a combination of additional holding\ntime and blending with potable water having a lower chlorine concentration.\nFollowing this procedure and subject to satisfactory bacteriological testing,\nappropriate chlorine residual, and acceptable aesthetic water quality (as described\nin Sec. 5.1), the water may be delivered to the distribution system.\nMethod to Follow:\n\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.\n4.3.3 Chlorination method 3. Water and chlorine shall be added to the storage facility in amounts such that the solution will initially contain at least 50 mg/L free chlorine and will fill approximately 5 percent of the total storage volume. This solution shall be held in the storage facility for a period of not less than 6 h. The storage facility shall then be filled to the overflow level by flowing potable water into the highly chlorinated water. It shall be held full for a period of not less than 24 h. Highly chlorinated water shall then be purged from the drain piping. Following this procedure and subject to satisfactory bacteriological testing, appropriate chlorine residual, and acceptable aesthetic water quality as described in Sec. 5.1, the remaining water may be delivered to the distribution system. It should be noted that the final chlorine residual may be either as free, total, or combined chlorine depending on the potable water characteristics.\n4.3.3.1 Adding chlorine. Chlorine shall be added to the storage facility by the method described in Sec. 4.3.1.1, 4.3.1.2, or 4.3.1.3. In chloraminated systems, the addition of excess chlorine may be required to eliminate the combined chlorine and achieve the specified free chlorine residual (breakpoint chlorination).\n4.3.3.2 For any chlorinated water discharges to the environment, refer\nto ANSI/AWWA C655 Field Dechlorination, if dechlorination is required.\nThe environment into which the chlorinated water is to be discharged shall be\ninspected. Federal, state or provincial, and local environmental regulations may\nrequire special provisions or permits before disposal of highly chlorinated water.\nProper authorities should be contacted before disposal of highly chlorinated water.\n\nTank Specifications:\nTank Gallon Capacity for each tank. Â 360,000 gal\nTank Dimensions (Diameter x Height) for each tank 12 x 69 11-1/4\nTank Construction Type: (Steel Welded, Concrete, Poly... On grade, Buried or Elevated Tower or Standpipe) Fiber Glass with Edge Coat Process lining, on concrete foundation above ground\nTank Manway Access (At least a 24\" diameter roof access hatch) Yes\nTank Equipment Access (Can a 20' trailer and truck come within 50\\ of the tanks No, need hoses and pump to transfer water from tank to tank.\nDischarge requirements (Can water and sediment from the cleaning process be discharged within 100' of the tank(s)?Â Yes.Â Water must be pump from tank to tank to minimize water loss.\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.\n\nAnticipated Performance Schedule:\nPeriod of performance: October to November\nBase year: clean potable storage tank only: October to November\nOption year #1: clean all 4 storage tanks: October to November\nOption year #2 & #3: clean potable storage tank only: October to November\nOption year #4: clean all 4 storage tanks: October to November\nCost estimate: base on per tank cleaning will be funded\n\n1.3.6. WORK HOURS\n1.3.6.1. Normal Hours. The contractor shall perform the services required under this contract during the following hours: 0730-1600 HRS, Monday through Friday. The contractor may work, with prior approval of the Contracting Officer's representative, extended hours to ensure timely completion of work at no additional cost to the government.\n1.3.6.2. Emergency Services. The contractor shall provide services to support emergency situations for the water treatment facilities 24/7. Contract service technician must be able to report to the Facility within 2 hours after request for emergency service.\n1.3.6.3. Seasons. The heating season (Winter) is from 1 October to 31 May and the cooling season (Summer) is from 1 June to 30 September. The actual dates are sited on temperature. If changes in dates occur, the government will notify the contractor.\n1.3.7.1. When a holiday falls on a Saturday, the preceding Friday shall be considered a holiday. When a holiday falls on a Sunday, the following Monday shall be observed. If a task, falls on one of the above listed holidays, the contractor shall perform said task on the next workday immediately following the holiday.\nGOVERNMENT FURNISHED PROPERTY AND SERVICES.\n3.1. GENERAL.\n3.1.1 The government will provide, without cost, the facilities, equipment, materials, and/or services listed below.\n3.1.2. PROPERTY.\n3.1.2.1. Storage Facilities. The government will provide storage for equipment and materials not to exceed a thirty (30) day supply. The government will not be responsible for the protection or loss of any equipment and materials. The contractor shall obtain approval from before storing equipment or chemicals.\n3.2. UTILITIES.\n3.2.1. Contractor must provide written request prior to use of government utilities for those outside of the normal use. This written request must be approved by the COR before the contractor uses any Government utilities.\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VASNHCS Water Services SAM\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 561210 ($47,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Water Treatment/Storage Tank Cleaning as described above.\n\n6. UEI Number\n\n7. If participant in GSA/FSS or Veterans Affairs national contracts; provide contract #.\n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions.\n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","html":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY \nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 09/10/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing. \n\nPlace of Performance: \nVA Southern Nevada Healthcare System (VASNHS) \n6900 North Pecos Rd, N.\nLas Vegas, NV 89086\n\nDESCRIPTION OF SERVICES/GENERAL INFO\n1.0.  SCOPE OF WORK\nVA Southern Nevada Healthcare System (VASNHS) is contracting water treatment services as well as the cleaning of 4 water storage tanks that provide a complete service-oriented water treatment, sampling, disinfect/cleaning and test program that supplies steam, chilled water service, domestic, industrial water and heating water service loops which include a solar heating loop. This contract is specifically for all industrial systems and all 4 water storage tanks. Access to these systems is located VA Medical Center Buildings 1, 2, 5, & 6.  The contractor shall supply a complete service oriented water treatment program. A major component of maintaining equipment involves chemical treatment, real time monitoring, and water sampling.  The contractor shall provide trained, qualified and certified personnel to perform required tasks.  In addition, contractor shall provide all the necessary equipment, tools, materials, supervision, repair, replacement, and other services necessary to perform water treatment services at VASNHS facilities as defined in this Statement of Work (SOW) for Government-owned equipment. Services shall be provided at the VASNHS medical center, located at 6900 North Pecos Road, North Las Vegas, NV 89086. The contractor shall perform in accordance with all federal, state, and local regulations.\n\nSpecific Requirements for Industrial Water:\n1.1.2 The water treatment program shall service steam boilers, chillers, chilled water system, open condenser water loops, 9 closed hot water heating loops, a refrigeration condenser loop, and a Glycol energy recovery loop, along with all associated piping for the equipment listed below.  This list is not all inclusive of the Government owned equipment that may require monitoring, testing, or other services associated with the overall treatment program. Contractor is to supply all equipment and services for real time monitoring of HVAC Cooling Tower open loop. \nChilled Water: \nGlobal GTCHB2234F2615PC Side-stream Filter with MS30ES20 filter cartridges.\n\nCooling Tower (Condenser Water): \nIn-Line, Real-Time monitoring system controlling 3 LMI metering pumps and condenser water bleed valve.\nPuroflux PF64-060(B) centrifugal separator\n\nGlycol:\nNeptune 141-GFS251A.88\n\nSteam/Condensate:\nThe steam system has three LMI chemical metering pumps for the Boiler treatment, sulfite, phosphate and amine . Feed rates are set manually based on feed water / condensate testing by the operator.\nEach boiler is equipped with a pot feeder for start-up/emergency treatment. The other systems are manually dosed with pot feeders.\n\n1.2   FREQUENCY OF SERVICE & TEST REQUIREMENTS \n1.2.1.   The following charts denote the frequency of service and testing requirements. \n1.2.1.1 Specific System:   Cooling Tower System, Open Loop, Building 2.\nControl \nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\npH, Makeup Water\nPH meter\nRecord\nWeekly\npH, System Water\nPH Meter\n8.0-9.0\nWeekly\nConductivity, Makeup\nConductivity Meter\nRecord\nWeekly\nConductivity,\nSystem Water\nConductivity Meter\n  2400 ppm TDS\nWeekly\nCorrosion Inhibitor\nColorimetry\n15   30 ppm\nWeekly\nCalcium, Makeup \nWater\nDR890-PRG29\nRecord\nWeekly\nCalcium, System Water\nDR890-PRG29\n<100 ppm\nWeekly\nSteel Corrosion\nInhibitor (Active Polymer)\nDR890   PRG181\n6-8ppm\nWeekly\nIron\nDR890-PRG33\n<1.0 ppm\nWeekly\nFree Halogen (Chlorine)\nBiocide\nDR890-PRG 90\n0.05-0.5 ppm\nWeekly\nBacteria: \nTotal Heterotrophic\nDip-slides\n10^3-10^4 cfu/ml\nWeekly\nBacteria:\nSulphate Reducing\nAnalytical Lab Sample\nND\nSemi-Annual\n\nBacteria:\nIron Related\n\nAnalytical Lab Sample\n\nND\n\nSemi-Annual\nSteel Corrosion\nInhibitor (Specify)\nCoupons\n<1.0 mpy\nSemi-Annual\nCopper Corrosion\nInhibitor (Specify)\nCoupons\n<0.5 mpy\nSemi-Annual\n\n\nND = non detect\nNote:  Include tests for control parameters, from Program Calculation Sheet, Appendix A\n1.2.1.2 Specific System:   Chilled Water (Closed), Refrigerant Condenser Loop, Glycol Energy Recovery System, and Hot Closed Systems, Buildings 1, 2, 5, 6 . See Appendix D & E \nControl \nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nCorrosion Inhibitor (Nitrite)\nTitration\n600-800 ppm\nWeekly\npH\n\nPH Meter\n<10.5\nWeekly\nMonthly for hot\nConductivity\nConductivity Meter\nRecord\nWeekly\nMonthly for hot\nSteel Corrosion\n (Specify)\nCoupons\n<1.0 mpy\nQuarterly\nCopper Corrosion\n (Specify)\nCoupons\n<1.0 mpy\nQuarterly\nIron\n(Total)\nDR890-PRG33\n<2.0 ppm\nWeekly\nMonthly for hot\nCopper\n(Total)\nDR890-PRG22\n<2.0 ppm\nWeekly\nMonthly for hot\nBacteria:\nTotal Heterotrophic\nDip-slide\n<10^3 cfu/ml\nMonthly\nBacteria:\nSulfate Reducing\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria:\nIron Related\nAnalytical Lab Sample\nND\nSemi-annual\nBacteria: Nitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\nBacteria: Denitrifying\nAnalytical Lab Sample\nMinimal\nSemi-annual\n\nND = non detect\nNote:  Include tests for control parameters, from Program Calculation Sheet, Appendix A\n\n\n\n\n\n\n\n1.2.1.3  Specific System:  Steam Boiler System, Building 2.\n\nControl \nParameters\nAnalytical\nMethod\nTarget\nRange\nService Report Test\nFrequency\nMakeup Water pH\nPH meter\nRecord\nWeekly\nMakeup Water Conductivity\nConductivity Meter\nRecord\nWeekly\nMakeup Water - Hardness\nDrop Test\nRecord\nWeekly\nMakeup Water Total Alkalinity\nDR890-PRG29\nRecord\nWeekly\nFeedwater   Hardness\nDrop Test\n0-2 ppm\nWeekly\nFeedwater   Iron\n\nDR890-PRG33\n<1.0 ppm\nWeekly\nFeedwater   pH\n\nPH meter\n8.3-10.5\nWeekly\nFeedwater   Conductivity\nConductivity Meter\n  300 Âµmhos\nWeekly\nFeedwater   P Alkalinity\nTitration\nRecord\nWeekly\nFeedwater   M Alkalinity\nTitration\nRecord\nWeekly\nFeedwater  Boiler Treatment\nDR890-PRG181\n20-25ppm\nWeekly\nBoiler   P Alkalinity\nTitration\n<300\nWeekly\nBoiler   M Alkalinity\nTitration\n<100\nWeekly\nBoiler   Oxygen scavenger Residual\nSulfite low level test kit\n30-60 ppm\nWeekly\nBoiler   Conductivity\nOn-Line Conductivity Meter\n<4500 Âµmhos\nWeekly\nBoiler  Neutralized Conductivity\nDR890-PRG29\n\n\nBoiler   iron\nDR890-PRG33\n<1.0 ppm\nWeekly\nCondensate - Conductivity\nConductivity Meter\n<100 Âµmhos\nWeekly\nCondensate   pH\nPH meter\n8.0-10.0\nWeekly\nCondensate   Hardness\nDrop Test\n0-1 ppm\nWeekly\nCondensate   Iron\nDR890-PRG33\n<1.0 ppm\nWeekly\n\nND = non detect\nNote:  Include tests for control parameters, from Program Calculation Sheet, Appendix A \n1.2.1.4   Industrial Water Systems\nSystem\nLocation\nAnalytical\nTest Method\nService Report Test\nFrequency\n Water Tank #1\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #3\nWater Tank Yard\nA, B, C, E, F\nMonthly\nWater Tank #4\nWater Tank Yard\nA, B, C, E, F\nMonthly\nCooling Towers\nBLD 2\nA, B, C, D,E, F\nWeekly\nIndustrial Water System\nBldg 2, Rm 2-110\nA, B, C, D, E\nMonthly\n\n1.2.1.5 Industrial Water System Analytical Test Method:\nA.  Chlorine residual, Free/Total; DPD Colorimeter USEPA (Hach Field Test)\nB.  Conductivity / TDS; Ultrameter II Conductivity Meter \nC.  PH; Ultrameter II PH Meter.\nD.  Hardness; Drop Test, Titration\nE.         Water Temperature, Ultrameter II, or Contact Thermometer.\nF.          Dip-slide, Heterotrophic Bacteria, & Mold Indicating\n\n1.2.2.  METHOD OF TREATMENT\n1.2.2.1.  The contractor shall provide water treatment products to prevent scale, corrosion, fouling and microbiological fouling within all heating, chilled, and cooling water systems.\n1.2.2.2.  Water treatments shall be performed as indicated by testing on each system in all buildings.\n1.2.2.3    Sodium Nitrite, or other corrosion inhibitor, applied to closed loops shall always include Leak Detection Dye.\n1.2.2.4. Evaluate the flows, pressure and Total Dissolved Solids (TDS), weekly.\n1.2.2.5.  Cooling towers shall be treated by acid or soft water blend control. See Appendix B for system.\n1.2.2.6 Delivery of all water treatment chemicals to points-of use shall be placed on spill containment pallets. It is the contractor s responsibility to ensure all safety precautions for chemicals have been taken.\n1.2.2.7 Chemical Tanks - The tanks MUST provide the following features:\nTank level indicators to determine chemical levels.\nFlooded suction inlets for chemical pumps to ensure pumps do not loose prime, or provide self-priming pumps.\nContainment basins capable of 150% of the tank storage capacity.\nTank sizing shall be appropriate for chemical use; chemical shall be a minimum quantity of 31 days without replenishment.\nChemical labels clearly visible on outside of tank.\nSDS sheets attached to tank container.\nTank to tank chemical transfer preferred, when pumping from drums, empty drums shall be removed from VAMC property within 3 working days.\nFull spill containment.\n1.2.2.7.1 Liquid chemicals shall be stored on site in Mini Porta Feed or equal containers.  Containers shall be stainless steel or double walled polyethylene tanks as appropriate.  Containers shall be supplied and maintained by the water treatment contractor.  \n1.2.2.7.2 All chemicals shall be directly injected in to their respective loops via corporation stop injectors whenever provided.  Pot feeders are available at the boilers (start-up), and all closed loops.\n1.2.3.   TESTS\n1.2.3.1.  Routine Testing.  The routine Cooling Tower testing to be performed according to the chart in 1.2.1.1, Closed Loops according to 1.2.1.2 and Boiler testing performed according to chart in 1.2.1.3.  which will provide results showing:. Total Hardness, P Alkalinity, M Alkalinity, OH Alkalinity, Total Alkalinity, pH, Conductivity/TDS, Silica, Phosphates/orthophosphates, Nitrite, Calcium Hardness, Free Chlorine, Sulfite, Iron and Copper. Routine testing by the Contractor shall also provide services as listed in Appendix B and C. The contractor shall submit documentation of results and recommendations accurately and within required timeframe in accordance with Paragraph 1.2.10.1.\n1.2.3.2.  Weekly water tests and treatment for each operating system in building 2 shall provide:\nBoilers and Steam:\nOrthophosphate (PO4) (Operating Boiler s water)\nSodium Sulfite (SO3) (Operating Boilers)\nP-Alkalinity (Operating Boiler s water)\nConductivity (Âµmhos/cm) (Operating Boiler s water and Feed Water)\nTotal Hardness, pH, iron, and conductivity (Feed Water, Condensate, High Pressure Drain, Condensate from Bldg 1.\nAdd neutralizing amine blend to treatment tank, for injection into steam header outlet piping.\nDetermine gallons/day feed rate for sodium polymethacrylate* and add to proper tank with proper adjustments to feed rate. (*or recommended chemical.)\nAdd sodium sulfite in chemical feed tank for feedwater treatment.\nAdd sodium hexametaphosphate*, caustic flake*, and adjustments for feed rates to boiler chemical feed tanks. ( *or recommended chemical).\nSodium Nitrite added to (Hot & Chilled) closed loops to provide protection of metal piping and maintain residual.  \nCooling Tower / Open Condenser Loop:\n Organophosphonate\nOxidizing and Non-Oxidizing Biocides\n1.2.4.  STANDARDS.   The contractor shall inspect, monitor and document the cooling water characteristics for a stable condition. Conductivity Total Dissolved Solids (TDS) range shall be maintained within 2000 to 2500 Âµmhos/cm. The contractor shall conduct weekly total bacteria count tests on cooling tower water samples utilizing a dip-slide culture test. ORP measurements will be taken on condenser water to verify relationship between Biocide effective ness and corrosion of tower metal, maintain range of 250 to 450 mV.   The contractor shall use test results to change or optimize the biocide feed rates and the timing of the biocide feed applications to maintain bacteria counts at 10,000 CFU/mL or less. The bacteria count, determined by dip-slide culture, shall be reported weekly on the service trip report and provided accordingly to 1.2.10.1. \n 1.2.4.1. The following standards apply to each operating system in building 2 and shall be on contractor s report. The contractor shall maintain systems within the standards listed in paragraph 1.2.4:\nBoilers\nPhosphate (PO4) = 15   25 PPM\nP-Alkalinity (CaCO3) = 300   600 PPM\nSulfite (SO3) = 30   60 PPM\nNeutralized Conductivity (Âµmhos/cm):  3000-3500\nBoiler PH = 10.5   12.0 PPM\n\nCondensate:\n PH = 8.3   9.2 SU\nConductivity= < 100 Âµmhos\n\nSodium Softeners:  (Hardness Maximum) 1 PPM or 7.1 grains\n\nLow Temperature Hot Water Heat (HWH)   the following standards apply:\nNitrite = 1000-1500 ppm in nitrite. Test and record pH, conductivity, iron, copper.\n\nChilled Water   the following standards apply:\nNitrite = 600-800 ppm as nitrite. Test and record pH, conductivity, iron, copper.\nContractor shall clean and replace Side-Stream filters as necessary.\n\nOpen Condenser Loop (Cooling Towers)   the following standards apply:     \nConductivity= 3200 Âµmhos / TDS=   2400 ppm\nOrganophosphonate = 15   30 ppm, PTSA trace = 160   170\nBiocide = .05   0.5 ppm\n\n1.2.5.  MONITORING.   The contractor shall inspect, monitor and document each system listed in Appendix B, C, D, & E.  to measure effectiveness of the treatment program. The contractor shall inspect, monitor and document the below mentioned conditions. Results shall be documented IAW Section 1.2.10 and provided to COR. \nScale formation onto waterside surfaces\nCorrosion of waterside metal surfaces\nSlime producing bacteria within the bulk water (dip-slide test)\nMake-up water rate\nBleed-off/Blowdown rate\nChemical treatment feed rates\n1.2.6.  INSPECTIONS\n1.2.6.1.  The contractor shall perform weekly inspections of the cooling tower,  boilers and heat exchange systems to include: chemical feed equipment, chemical feed point locations, and sampling locations. This shall include weekly inspections of the side-stream filter installed in the condenser water system . Adjustments shall be made to backwash timing and frequency.  Results and recommendations shall be documented IAW Section 1.2.10.1 and provided to COR.\n1.2.6.2.  The contractor shall conduct internal and external inspections of steam generation equipment during seasonal shutdowns and perform external inspections when the steam generation equipment is on-line.\n1.2.6.3.  The contractor shall inspect and document all waterside surfaces of opened heat exchangers and chillers for proper water treatment according to the type of system, its size and location . Inspection results shall include: the tube sheet, end bells, water box, and the end of the tubes.\n1.2.7.  REVIEWS AND ANALYSIS.  \n1.2.7.1.  The contractor shall conduct a review and analysis of cooling and heating system operating logs and cooling tower including side-stream filters, heat exchangers, and closed system water treatment testing logs. The Contractor shall maintain an electronic data-site of all information. Trend analysis data generated using software shall be included in the Quarterly Report IAW 1.2.10. The contractor shall identify, document correctly, and submit to the COR, quarterly, any potential problem areas and assess trends of chemical consumption, costs, and residuals.\n1.2.7.2.  The contractor shall document results and recommendations for purposes of long-range planning. Documentation shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.3.  The contractor shall provide actual values of: Bleed-off/Blowdown, Make-up, Drift, Cycles of concentration, and Chemical Feed Rates. The contractor shall document and compare values to theoretical values, and industry standards. The Contractor shall make recommendations to the government to optimize operations. All final decisions are by the government. Documentation shall be IAW Section 1.2.10.3.\n1.2.7.4.  The contractor shall document the collection of and analyze scale and other deposits found in the system. Results and recommendations shall be IAW Section 1.2.10.3 and provided to COR.\n1.2.7.5.  Condensate Quality Profile.  A Quality Profile shall be created and documented for each condensate stream.  Information and targeted performance guidelines shall include:\npH (properly cooled)     8.0   9.0\nIron                      <0.10 ppm\nConductivity                 < 50 Âµmhos/cm\nThis data shall be reported quarterly IAW Section 1.2.10.2, report shall include all corrective action taken and provided to COR.\n1.2.8.  STUDIES.  The contractor shall perform and document the following studies:\n1.2.8.1. Corrosion Studies.   Documented Corrosion studies shall include maintain continuous exposure periods for 90 days, conduct coupon analysis, review results and changes in the water treatment program to maintain acceptable Cooling Technology Institute (CTI) standards for Mild Steel Corrosion Rate (<5.00 mpy) and Copper Corrosion Rate (<.50 mpy).  Boiler and heat exchange systems shall be maintained IAW American Society of Mechanical Engineers (ASME) standards.\n1.2.8.2.  Annual Flow Rate and Elusion Studies.  The contractor shall provide flow rate and elusion studies on ion exchange equipment to evaluate: Operation, Mechanical Status and Efficiency. \n1.2.9.  BOILER FEEDWATER (BFW)\n1.2.9.1.   The contractor shall evaluate the overall Boiler Feed water (BFW) program for compliance with American Society of Mechanical Engineers (ASME) and Cooling Technology Institute (CTI) control parameters and operational procedures, Federal and State of Nevada Environmental Protection Agency regulations and environmental compliance issues. The contractor shall inform the government orally and in writing quarterly and annually of all compliance problems associated with the operation of the industrial water treatment program.\n1.2.9.2.   Evaluate and report, the boiler feed water characteristics to establish siteline data within the first month of contract.\n1.2.9.3.   Maximum cycles of concentration (no cycles to exceed 20) sited on the following ASME Guidelines: The contractor shall calibrate Government chemical feed and control equipment to maintain water chemistry within industry specifications. Calibration of all monitoring equipment shall be performed accurately and at specified frequency. The calibration results shall be documented and available to COR as requested.\n1.2.10.   REPORTS AND OTHER DOCUMENTS.   The contractor shall send a copy of reports to the Contracting Officer Representative (COR).  All urgent problems regarding maintenance of water treatment parameters shall be discussed with the COR on the day of discovery referenced in 1.3.5.2.  All reports shall be submitted electronically to the Facility COR.  \n1.2.10.1.   Weekly reports.  The contractor shall prepare a written report each week. This report shall describe the results of routine tests (Section 1.2.3.1), the results of system inspections (Section 1.2.6). The reports shall contain recommendations and written proposed corrective actions. The contractor shall review the report with the COR/CO within seven (7) calendar days of data collection.\n1.2.10.2.   Quarterly reports.  The contractor shall prepare a quarterly written report, accurately and on time, due by the 15th of Jan, Apr, Jul, and Oct. This report shall describe conditions of each water system. The reports shall include those items discussed in Section 1.2.5 and the effectiveness of the treatment program and any areas of concern/problems incurred with recommendations for correction. The report shall include all chemical usage (Volume) by the contractor. The contractor shall conduct meeting with the COR and go over the Quarterly report.\n1.2.10.3.   Annual Reports.  An annual report shall be compiled and submitted by the last day of the 11th month of each contract year, for each industrial water system. Each report shall describe sampled trends throughout the year, start and end conditions, and those items identified in Sections 1.2.7 through 1.2.9. The report shall include total yearly chemical usage by the contractor. The contractor shall meet with the COR and affected Contracting Officer and go over the Annual report.\nII. SERVICES SUMMARY. \n2.1. Â Â Â Â  Performance Requirements Summary\n\n2.1.2 Summary Table:\nPerformance\nIndicator\nPerformance Standard \nPerformance Threshold\nMethod   Type of\nSurveillance\n\nReference\nCooling Tower Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.1 to\na 90% accomplishment\nWeekly testing\n1.2.4\nChilled Water System Treatment\nMaintain Treatment levels\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nClosed Loop Treatment\nMaintain Treatment levels, perform coupon checks\nMaintain levels in accordance with parameters in Table 1.2.1.2 to a 90% accomplishment\nMonthly testing. Quarterly coupon change-out, submitted for analysis\n1.2.4.1\nBoiler Water Treatment\nMaintain Treatment levels, Recommend changes to chemical pumps and blowdown settings\nMaintain levels in accordance with parameters in Table 1.2.1.3 to a 90% accomplishment\nWeekly testing\n1.2.4.1\nRecords and Report Management\nReports filled out timely and delivered to Utility Supervisor or COR\nWeekly   within 7 days of collection.\nMonthly   Within 7 days of collection.\nQuarterly   on time.\nAnnually   Before end of contract.  To a 100% accomplishment\nMeetings with COR, one on one.\n1.2.10\nInspections\nInspect Cooling Towers, Boilers, and Heat Exchangers during maintenance periods\nCheck for indications of corrosion, under-treatment, over-treatment. Make recommendations that show results.\nCOR to attend inspections\n1.2.6\nInventory Management\nSufficient testing and treatment materials on site to ensure plant condition not affected\nAll treatment levels in all systems maintained to a 90% accomplishment.\nDaily checks by COR, contractor notified by email of low levels or missing items\n1.0\n\nAppendix B\n\n*The procedures set forth in the Inspection of Services Clause will be used to remedy all deficiencies.  The re-performance times will be sited upon sensitivity of the issue.\nORP Oxidation Reduction Potential, measurement of the tendency of a chemical substance to oxidize or reduce another chemical substance. Has a relationship to Biocide reactions.\nWelch-Allyn fiber optic inspection.  A high-level inspection system that examines tube bundles in great detail to determine if gross deficiencies in water treatment exist.\nHigh Temperature Hot Water (HTHW).  Heating system water that is generally circulated at temperatures from 320 to 440 degrees.\nCondensate.  Condensed water resulting from the removal latent heat from steam.\nDeaerator Oxygen Analysis.  A study to determine the oxygen removal efficiency of the deaerator.  The collected data assists in predicting the potential for oxygen related problems in the feedwater and boiler system(s).\nEmbrittlement Analysis.  A study of the embrittling characteristics of the boiler water.\nControlled Limits.  Operating parameters (boundaries)\nElution Studies on Ion Exchange Equipment.  A series of tests conducted on the softeners, dealkalizers or demineralizers to determine the efficiency of the regeneration cycle.  The collected data is evaluated by drawing an elution curve.  The information reveals the regenerate concentrations at all stages of the cycle.\nSteam Purity Analysis.  A study monitoring the quality of the steam being produced to determine the steam purity.\nCorrosion Studies on Feedwater/Condensate Systems.  A study to determine the corrosion rates of the pre-boiler systems.  The collected data provides information relating to the corrosion protection provided by the chemical treatment program.\nQuantitative Deposit Analysis.  A study to determine the composition of a deposit.\nResin Analysis.  A study generally performed to determine the efficiency of zeolite resin in water. \nAppendix B\nCooling tower tonnage, Building 2\nBuilding Number\nCapacity in Approx Tons\nSidestream Filters\nTower Treatment\nOperation\n2\n6,500\nN/A\nAcid or Softwater Blend\nYear Round\n\nHVAC main cooling tower open loop\nThe water treatment program shall include all cooling tower systems and all water pre-treatment equipment. The water treatment program shall include all chemical products, equipment, tools, supervision, professional consulting services, and any additional items necessary to perform the services as specified in the SOW.\nThe cooling towers consist of five cells.  \nThe water treatment program shall provide control and remote monitoring capability for the following: \nController capable of the following features:\nMonitor system conductivity\nMonitor system pH\nMonitor system ORP, Oxidation Reduction Potential\nFlow switch \nChemical levels in chemical feed tanks/containers\nMonitor makeup water use (via contacting head water meter)\nMonitor blow down water use (via contacting head water meter)\nReceive 4-20mA inputs and provide direct control of system parameters based on input signals.\nProvide data logging features, with download capability to a PC via Ethernet or wireless network\n  Real-Time  monitoring of scale/corrosion inhibitor levels in the cooling tower systems whenever they are running.\n Real-Time  monitor for both planktonic (free flowing) and sessile (attached) microbiological activity in re-circulating cooling water systems. \nMultiple controller inputs\nMultiple controller outputs\nOnline corrosion monitors to log corrosion data  Real-Time  so that immediate chemistry changes can be made.\nAppendix C\nBuilding 2 Systems, and Equipment\n Boilers: \nThree natural gas fired, 25,000 pound per hour, fire tube, 100 PSIG\nDomestic Water:\n3 sodium zeolite softeners.\n3 charcoal bed filters.\nCondensate Return:\nOne condensate receiver\nDeaerators:\nOne 20,000 pound per hour, spray and tray type\nFeedwater Pumps:\nThree electric driven pumps\nBoiler Chemicals Currently Used:\nSodium Bisulfite\nSodium Sulfate\nCyclohexylamine\nDiethylethanolamine\nMorpholine\nPotassuim Bisulfite\nCobalt Sulfate\nMethanol\nSodium Hydroxide\nGlutaraldehyde\nAlkaline Liquid Bromine\nHVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set-point. Building 1- five loops, building 2, Boiler room- one loop, building 5- one loop, Building 6- one steam heated loop and one solar heated loop. Systems must be closely monitored and sampled at least monthly; corrosion indicator coupons examined every 90 days. Water treatment shall be on an as needed basis to control any corrosion.\nAppendix D\nBuilding 1,2, 5 & 6 Systems and Equipment\n1.   HVAC HOT WATER SYSTEM (Closed Loop)\nHot water system for heating and reheat of HVAC systems. Water is continuously circulated in a closed loop through heat exchangers to maintained temperature set point. Building 1- Four Loops: D&T Basement; Room BD-423 D&T, Ambulatory Basement; BB-208, Admin Basement; BD-160, MH Basement; BE-101, Emergency Department extension (roof-top).  Building 2   one loop, Boiler Room, building 5- one loop, basement, building 6- one loop (steam heated) & one loop (solar heated), room to be determined (currently under construction).  Systems must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion and maintain proper residual.\n2.  REFRIGERANT CONDENSER WATER SYSTEM (Closed Loop)\nChilled water system for cooling the condenser water for freezers, and refrigerators. Water is continuously circulated in a closed loop through plate/frame heat exchangers to maintained temperature set point. Building 1, Fourth floor. System must be closely monitored and sampled. Water treatment shall be on an as needed basis to control any corrosion.\n3.  HVAC ENERGY RECOVERY SYSTEM (GLYCOL LOOP, 30%)\nThe glycol and water run-around coil system are an energy recovery system for the HVAC air handling units located in Building 1, on the fourth floor and the roof. All the individual water systems are combined into a single fill and chemical addition location. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations.  All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\n4.HVAC SOLAR ENERGY HEATING SYSTEM \nThe Solar Energy Heating System for Building 6 is designed to capture heat from solar panels on the roof and use that heat through the closed loop system to heat up, directly or augment, the building heating/re-heat system. The solar heating system is integrated with the steam heating system utilizing the same circulating pumps and the same heat exchangers. Treatment must be sufficient in chemical nature to provide corrosion inhibitor to all piping, and freeze protection to the exposed panels/piping in colder months. System shall be monitored, tested, and the water sampled to insure proper operation in accordance with manufacturers recommendations.  All consumable products and supplies for this system shall be monitored, supplied, delivered and installed by the vendor.\nAppendix E\n Chilled Water System\nBUILDING\nSYSTEM\nOperation\nFrequency\nSide Filter \n2\nChilled Water, Closed Loop\nFive 1300-ton chillers\nYear-round\nMonthly\nYes\n\nWater Storage Tanks\n\nThe Potable water storage tank will have a maintenance service accomplished annually, and the Industrial water storage tank will have a maintenance service accomplished every three years.  The Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  All the associated equipment is located at the VA facilities Water Storage Tank area and Central Energy Plant Building #2 at the Veteran s Hospital on 6900 North Pecos Rd, North Las Vegas, Nevada.  \n\nSPECIFIC REQUIREMENTS: \n\nWater Storage Tanks (1ea. Potable water and 3ea. Industrial water total of 4ea. tanks)\nManufacturer: Storage Product Engineering\nModel: 7013 WT\nStorage Capacity: 360,000 gallons\n\nThis service contract is to clean and disinfect the water tanks according to American Water Works Association (AWWA) standards for disinfection process.  Details of maintenance service are listed below.  The contractor must minimize interruption of the water system to the medical center prior and during the service contract.  If lengthy water systems service interruptions are needed, the interruption has to be scheduled two weeks prior to the start of the job.  Furthermore, all interruptions are subject to approval by the Engineer Service Chief.   The contractor must be authorized and approved to work, service, and make proper recommendations to resolve discrepancies with the Water Storage Tanks and associated components as recommended by manufacturer s recommendation as well as meet local and federal health standards and requirements.  Lastly, the contractor will provide detailed documentation and cleaning certifications for the Water Storage Tank to suffice the annual requirements.  This data will be provided to the Energy Plant supervisor or designee.  \n\n\nTank Cleaning and chlorination process according to AWWA:\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  \n\nMethods of Chlorination\n\nThree methods of chlorination are explained in this standard. Typically, only\none method will be used for a given storage-facility disinfection, but combinations\nof the methods may be used. The three methods are (1) chlorination of the full\nstorage facility such that, at the end of the appropriate retention period, the water\nwill have a free chlorine residual of not less than 10 mg/L; (2) spraying or painting of all storage facility water-contact surfaces with a solution of 200 mg/L free chlorine.\nand (3) a two-step process of chlorinating the bottom portion of the storage facility\nwith 50 mg/L free chlorine followed by filling to overflow with potable water. It\nshall be held full for a period of not less than 24 h. In chlorinated systems,\nachieving a free chlorine residual requires the addition of sufficient additional\nchlorine to pass through breakpoint chlorination.\n\n4.3.1 Chlorination method 1. The water-storage facility shall be filled to\nthe overflow level with potable water to which enough chlorine shall be added\nto provide a free chlorine residual in the full facility of not less than 10 mg/L\nat the end of the appropriate 6-h or 24-h period, as described in Sec. 4.3.1.4.\nThis method should be evaluated to assess its appropriateness for chloraminated\nsystems. For chloraminated systems, additional chlorine may be required to\nachieve a free chlorine residual of 10 mg/L. The chlorine, either as liquid chlorine,\nsodium hypochlorite, or calcium hypochlorite, shall be introduced into the water\nas described in the following subsections.\n4.3.1.1 Liquid-chlorine (gas) use. Liquid chlorine (gas) shall be introduced\ninto the water filling the storage facility in such a way as to give a uniform chlorine\nconcentration during the entire filling operation. Portable chlorination equipment\nshall be carefully operated and shall include a liquid-chlorine cylinder, gas-flow\nchlorinator, chlorine ejector, safety equipment, and an appropriate solution tube to\ninject the high-concentration chlorine solution into the filling water. The solution\ntube shall be inserted through an appropriate valve located on the inlet pipe and\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\nDISINFECTION OF WATER-STORAGE FACILITIES 7\nnear the storage facility such that the chlorine solution will mix readily with the\ninfluent water.\n\n4.3.1.2 Sodium hypochlorite use. Sodium hypochlorite shall be added to\nthe water entering the storage facility by means of a chemical-feed pump or shall be\napplied by hand-pouring into the storage facility and allowing the influent water to\nprovide the desired mixing.\n\n4.3.1.2.1 When a chemical-feed pump is used, the concentrated chlorine\nsolution shall be pumped through an appropriate solution tube to inject the\nhigh-concentration chlorine solution at a rate that will give a uniform chlorine\nconcentration in the filling water. The solution tube shall be inserted through an\nappropriate valve located on the inlet pipe and near the storage facility, or through\nan appropriate valve located on the storage facility such that the chlorine solution\nwill mix readily with the filling water.\n4.3.1.2.2 When sodium hypochlorite is poured into the storage facility,\nthe filling of the storage facility shall begin immediately thereafter or as soon as\nany removed manhole covers can be closed. Sodium hypochlorite may be poured\nthrough the cleanout or inspection manhole in the lower course or level of the\nstorage facility, in the riser pipe of an elevated tank, or through the roof manhole.\nSodium hypochlorite shall be poured into the water in the storage facility when the\nwater is not more than 3 ft (0.9 m) in depth, nor less than 1 ft (0.3 m) in depth or\nas close thereto as manhole locations permit.\n\n4.3.1.3 Calcium hypochlorite use. Calcium hypochlorite granules\nor tablets broken or crushed to sizes not larger than 1/4-in. (6.4-mm) maximum\ndimension may be poured or carried into the storage facility through the cleanout\nor inspection manhole in the lower course or level of the storage facility, into the\nriser pipe of an elevated tank, or through the roof manhole. The granules or tablet\nparticles shall be placed in the storage facility before flowing water into it. The\ngranules or tablets shall be located so that the influent water will circulate through\nthe calcium hypochlorite, dissolving it during the filling operation. The calcium\nhypochlorite shall be placed only on dry surfaces unless adequate precautions are\ntaken to provide ventilation or protective breathing equipment.\n4.3.1.4 Retention period. After the storage facility has been filled with\nthe disinfecting water, it shall stand full as follows: (1) for a period of not less than\n6 h when the water entering the storage facility has been chlorinated uniformly by\ngas-feed equipment or chemical pump, or (2) for a period of not less than 24 h\nwhen the storage facility has been filled with water that has been mixed with sodium\nCopyright Â© 2020 American Water Works Association. All Rights Reserved\nAccessed by account: Vir. Dept. of Health-Office of Drinking Water | User: Sarah Hinderliter | Date: Wed Feb 10 12:42:04 2021 | IP address: 166.67.66.244\n8 AWWA C652-19\nhypochlorite or calcium hypochlorite within the storage facility as described in\nSec. 4.3.1.2 and 4.3.1.3.\n\n4.3.1.5 Handling of disinfection water. After the retention period stated\nin Sec. 4.3.1.4, the free chlorine residual in the storage facility shall be reduced to\na concentration appropriate for distribution by completely draining the storage\nfacility and refilling with potable water, or by a combination of additional holding\ntime and blending with potable water having a lower chlorine concentration.\nFollowing this procedure and subject to satisfactory bacteriological testing,\nappropriate chlorine residual, and acceptable aesthetic water quality (as described\nin Sec. 5.1), the water may be delivered to the distribution system.\nMethod to Follow: \n\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  \n4.3.3 Chlorination method 3. Water and chlorine shall be added to the storage facility in amounts such that the solution will initially contain at least 50 mg/L free chlorine and will fill approximately 5 percent of the total storage volume. This solution shall be held in the storage facility for a period of not less than 6 h. The storage facility shall then be filled to the overflow level by flowing potable water into the highly chlorinated water. It shall be held full for a period of not less than 24 h. Highly chlorinated water shall then be purged from the drain piping. Following this procedure and subject to satisfactory bacteriological testing, appropriate chlorine residual, and acceptable aesthetic water quality as described in Sec. 5.1, the remaining water may be delivered to the distribution system. It should be noted that the final chlorine residual may be either as free, total, or combined chlorine depending on the potable water characteristics.\n4.3.3.1 Adding chlorine. Chlorine shall be added to the storage facility by the method described in Sec. 4.3.1.1, 4.3.1.2, or 4.3.1.3. In chloraminated systems, the addition of excess chlorine may be required to eliminate the combined chlorine and achieve the specified free chlorine residual (breakpoint chlorination).\n4.3.3.2 For any chlorinated water discharges to the environment, refer\nto ANSI/AWWA C655 Field Dechlorination, if dechlorination is required.\nThe environment into which the chlorinated water is to be discharged shall be\ninspected. Federal, state or provincial, and local environmental regulations may\nrequire special provisions or permits before disposal of highly chlorinated water.\nProper authorities should be contacted before disposal of highly chlorinated water.\n\nTank Specifications:\nTank Gallon Capacity for each tank. Â 360,000 gal\nTank Dimensions (Diameter x Height) for each tank 12  x 69  11-1/4 \nTank Construction Type: (Steel Welded, Concrete, Poly... On grade, Buried or Elevated Tower or Standpipe) Fiber Glass with Edge Coat Process lining, on concrete foundation above ground\nTank Manway Access (At least a 24\" diameter roof access hatch) Yes\nTank Equipment Access (Can a 20' trailer and truck come within 50\\ of the tanks No, need hoses and pump to transfer water from tank to tank.\nDischarge requirements (Can water and sediment from the cleaning process be discharged within 100' of the tank(s)?Â  Yes.Â  Water must be pump from tank to tank to minimize water loss.\nThe Contractor shall provide all labor, tools, supervision, and equipment necessary to complete this project.  \n\n\nAnticipated Performance Schedule:\nPeriod of performance: October to November\nBase year: clean potable storage tank only: October to November \nOption year #1: clean all 4 storage tanks: October to November \nOption year #2 & #3: clean potable storage tank only: October to November  \nOption year #4: clean all 4 storage tanks: October to November\nCost estimate: base on per tank cleaning will be funded\n\n1.3.6. WORK HOURS  \n1.3.6.1.   Normal Hours.  The contractor shall perform the services required under this contract during the following hours: 0730-1600 HRS, Monday through Friday. The contractor may work, with prior approval of the Contracting Officer's representative, extended hours to ensure timely completion of work at no additional cost to the government.\n1.3.6.2.   Emergency Services.  The contractor shall provide services to support emergency situations for the water treatment facilities 24/7. Contract service technician must be able to report to the Facility within 2 hours after request for emergency service.\n1.3.6.3.   Seasons.  The heating season (Winter) is from 1 October to 31 May and the cooling season (Summer) is from 1 June to 30 September.  The actual dates are sited on temperature. If changes in dates occur, the government will notify the contractor.\n1.3.7.1.  When a holiday falls on a Saturday, the preceding Friday shall be considered a holiday.  When a holiday falls on a Sunday, the following Monday shall be observed.  If a task, falls on one of the above listed holidays, the contractor shall perform said task on the next workday immediately following the holiday.\nGOVERNMENT FURNISHED PROPERTY AND SERVICES.\n3.1.   GENERAL.  \n3.1.1   The government will provide, without cost, the facilities, equipment, materials, and/or services listed below.\n3.1.2. PROPERTY.\n3.1.2.1.  Storage Facilities.  The government will provide storage for equipment and materials not to exceed a thirty (30) day supply. The government will not be responsible for the protection or loss of any equipment and materials. The contractor shall obtain approval from before storing equipment or chemicals.\n3.2.   UTILITIES.\n3.2.1. Contractor must provide written request prior to use of government utilities for those outside of the normal use. This written request must be approved by the COR before the contractor uses any Government utilities.\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VASNHCS Water Services SAM\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 561210 ($47,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Water Treatment/Storage Tank Cleaning as described above. \n\n6. UEI Number\n\n7. If participant in GSA/FSS or Veterans Affairs national contracts; provide contract #. \n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions. \n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","origin":"detail"},"contacts":[{"name":"Larry Facio","role":"primary","email":"Larry.Facio@va.gov","phone":"916-923-4553","title":"Contracting Officer"}],"place_of_performance":null,"office_address":{"zip":"95655","city":"MATHER","state":"CA","country":"USA"},"naics_codes":["561210"],"award":{"awardee":{}},"attachments":[{"resource_id":"0e61495cf7de4c81b0d575b270ebc415","name":"36C26126Q0038.docx","kind":"file","mime_type":".docx","size_bytes":47140,"posted_at":"2025-09-03T17:56:32.703Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0e61495cf7de4c81b0d575b270ebc415/download","mirrored":false}],"awards":[],"related":[{"key":"36C26127Q0175","latest_notice_id":"6ff0b83d55464667808667710e947d25","title":"N099--Install ID Storage Shed Project Number 593-27-307 North Las Vegas, NV","solicitation_number":"36C26127Q0175","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"236220","psc":"N099","set_aside":null,"state":"NV","county":"32003","county_name":"Clark County","city":"3251800","city_name":"North Las Vegas","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C26127Q0169","latest_notice_id":"9989888cf8614c8e87f9894ee00a31e7","title":"J012--Dry-Type Fire Suppression System","solicitation_number":"36C26127Q0169","notice_type":"r","first_type":"r","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":2,"due_at":"2026-11-30T23:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"811310","psc":"J012","set_aside":null,"state":"CA","county":"06085","county_name":"Santa Clara County","city":"0655282","city_name":"Palo Alto","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C26127Q0167","latest_notice_id":"28c31f3c4e3541cfa45f402ef2a11308","title":"7310--TRANSPORT CART AND SERVING TRAY_ Nutrition & Food Service","solicitation_number":"36C26127Q0167","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-11-30T23:30:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"333241","psc":"7310","set_aside":null,"state":"CA","county":"06085","county_name":"Santa Clara County","city":"0655282","city_name":"Palo Alto","country":"USA","place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C26127Q0181","latest_notice_id":"13b104cff7eb421885e630cb52d3bd1b","title":"Automated Blood Culture Detection Analyzer","solicitation_number":"36C26127Q0181","notice_type":"r","first_type":"r","first_posted":"2026-11-23","last_posted":"2026-11-23","notices":1,"due_at":"2026-12-02T18:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"325413","psc":"6640","set_aside":null,"state":"NV","county":"32031","county_name":"Washoe County","city":"3260600","city_name":"Reno","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C26127Q0182","latest_notice_id":"c68a02d37164493083a0b5af6cbd5e45","title":"8910 - Dairy Products and Refrigerated Delivery — VA Sierra Nevada Health Care System","solicitation_number":"36C26127Q0182","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-12-02T22:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"311511","psc":"8910","set_aside":null,"state":"NV","county":"32031","county_name":"Washoe County","city":"3260600","city_name":"Reno","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open":[{"key":"FA462026QA303","latest_notice_id":"da68e1a3e39e41e0ae6b6adac38e3984","title":"FA27 Fall Arrest Inspection Services","solicitation_number":"FA462026QA303","notice_type":"r","first_type":"r","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-26T18:00:00Z","due_date":"2026-11-26","closes_at":"2026-11-26T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA4620","office_name":"FA4620 92 CONS LGC","naics":"561210","psc":"H342","set_aside":"SBA","state":"WA","county":"53063","county_name":"Spokane County","city":"5322955","city_name":"Fairchild AFB","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"},{"key":"M0068127R0002","latest_notice_id":"309bf2fd5f174025a6c27c4c74c1461a","title":"Parachute Rigger Sources Sought","solicitation_number":"M0068127R0002","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-11-27T08:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T08:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-017","dept_name":"DEPT OF DEFENSE","sub_key":"s-1700","sub_name":"DEPT OF THE NAVY","office_key":"o-M00681","office_name":"COMMANDING GENERAL","naics":"561210","psc":"H281","set_aside":null,"state":"AZ","county":"04027","county_name":"Yuma County","city":"0485680","city_name":"Yuma Proving Ground","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"PANMCC27P0000058616","latest_notice_id":"9f11bedb9c904a2c954087cad2324036","title":"Ft. Belvoir LRC Central Issuing Facility (CIF) Support Services","solicitation_number":"PANMCC-27-P-0000_058616","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-27T17:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W91QV1","office_name":"W6QM MICC-FT BELVOIR","naics":"561210","psc":"R699","set_aside":"SBA","state":"VA","county":"51059","county_name":"Fairfax County","city":"5129008","city_name":"Fort Belvoir","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Fort Belvoir","site_key":"fort-belvoir-va","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":40,"indexable":false}