{"canonical":"https://sealedbidder.com/opportunities/36c26125q0841","key":"36C26125Q0841","url":"https://sealedbidder.com/opportunities/36c26125q0841","title":"J061--VACCHCS GENERATOR PMS TESTING AND MAINTENANCE","solicitation_number":"36C26125Q0841","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-12T20:00:00Z","first_posted":"2025-08-06","last_posted":"2025-08-06","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"811210","psc":"J061","set_aside":null,"place_state":"CA","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"06019","place_county_name":"Fresno County","place_city":"0627000","place_city_name":"Fresno","winner":"BAMAJACK, LLC","award_amount":null,"publications":[{"notice_id":"8ab5f4b3971449a593e3b66bb9da9cbc","title":"J061--VACCHCS GENERATOR PMS TESTING AND MAINTENANCE","solicitation_number":"36C26125Q0841","notice_type":"r","base_type":"r","posted":"2025-08-06","posted_at":"2025-08-06T23:02:56.522Z","due_at":"2025-08-12T20:00:00Z","due_date":"2025-08-12","cancelled":false,"archived":true,"archive_date":"2025-10-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/8ab5f4b3971449a593e3b66bb9da9cbc/view","enriched":true,"history":[{"index":3,"title":"J061--VACCHCS GENERATOR PMS TESTING AND MAINTENANCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T23:02:56.522Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"8ab5f4b3971449a593e3b66bb9da9cbc","solicitation_number":"36C26125Q0841"}]}],"latest_notice_id":"8ab5f4b3971449a593e3b66bb9da9cbc","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-08-06","posted_at":"2025-08-06T23:02:56.522Z","created_at":"2025-08-06T23:02:54.335Z","modified_at":"2025-10-11T04:04:28.656Z","response_deadline":{"raw":"2025-08-12T13:00:00-07:00","utc":"2025-08-12T20:00:00Z","date":"2025-08-12","time":"13:00:00","timezone":"America/Los_Angeles","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/8ab5f4b3971449a593e3b66bb9da9cbc/view"},"naics":{"codes":["811210"],"primary":"811210"},"title":"J061--VACCHCS GENERATOR PMS TESTING AND MAINTENANCE","agency":{"office":{"code":"36C261","name":"261-NETWORK CONTRACT OFFICE 21 (36C261)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"95655","city":"MATHER","state":"CA","country":"USA"},"organization_id":"100163852","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-11","archive_type":"auto_custom"},"history":[{"index":3,"title":"J061--VACCHCS GENERATOR PMS TESTING AND MAINTENANCE","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-08-06T23:02:56.522Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"8ab5f4b3971449a593e3b66bb9da9cbc","solicitation_number":"36C26125Q0841"}],"contacts":[{"name":"Larry Facio","role":"primary","email":"Larry.Facio@va.gov","phone":"916-923-4553","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"8ab5f4b3971449a593e3b66bb9da9cbc","lineage_id":"8ab5f4b3971449a593e3b66bb9da9cbc","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-05T03:54:45.806434442Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"8f011abf8f932588754a9f45c0e90a9a92dcd5651e3b6c6eabd52ed5a56ff205","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-05T03:54:45.806434442Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY \n\nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 08/12/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing. \n\nDescription of Services:\n\n1. BACKGROUND: The VA Central California Healthcare System (VA CCHCS) Medical\nCenter requires generator and ATS maintenance service in compliance with NFPA 99,\n100,110 and ASTM Code Requirements.\n\n2. SCOPE OF WORK: The awarded contractor(s) shall be responsible for all costs associated\nwith accomplishing repairs and replacements, including labor, equipment and supplies for all\nequipment and systems specified or recommended by the equipment manufacturer. A\ncomprehensive list of equipment systems is available in Attachment #1\n\n2.1. The Contractor shall provide all labor, materials, equipment, supervision,\nadministrative support, and any necessary professional engineering services required\nfor the inspection, testing, maintenance (including cleaning) and repair of the 6\nGenerators and 17 ATSs listed in Attachment # 1.\n\n2.2. The Contractor shall provide maintenance service, in compliance with the following\ncodes, standards and references:\n2.2.1. NFPA 70E, 99, 100, and 110\n2.2.2. Equipment manufacturer's recommendations,\n2.2.3. ASTM   975 rules and ASTM D5837\n2.2.4. National Electrical Code,\n2.2.5. IEC 61198\n2.2.6. All other applicable laws, regulations, rules, ordinances, codes, etc.\n\n2.3. The specific tasks and services required for this contract are listed in Attachment #2.\n\n2.4. For service that does not require any power outages, the Contractor shall perform\nservices during normal hospital working hours acceptable to the COR. For services\nthat require complete or localized power outages, the Contractor shall perform these\nservices outside of normal working hours (5pm to 7am or weekends), coordinated in\nadvance with the COR. All services that interrupt or interfere with Medical or patient\nservices shall be coordinated in advance with the COR; this may require Contractor\nservice being performed outside of normal working hours. In some cases where\nmedical emergency or scheduled services such as surgery are performed, scheduling\nmay require advance planning up to a week in advance in coordination with the COR.\n\n2.5. The contractor shall perform no service on energized equipment without written\napproval from the Safety Officer, Engineering Chief, and Hospital Director. VACCHCS\nhas a formal procedure for approval of service on energized equipment. The Contractor will coordinate with the COR who will obtain these approvals for the Contractor. Approvals can take up to a week to obtain and are usually disapproved.\n\n2.6. The Contractor will adhere to NFPA 70E for Lock Out/ Tag Out and local VACCHCS\nprocedures for performing service on de-energized equipment.\n\n2.7. All fluids, parts or materials shall be disposed of in compliance with EPA, State, and\nlocal regulations and laws. The contractor will provide documentation to the COR in\naccordance with these regulations and laws.\n\n2.8. All equipment shall be serviced in accordance with the manufacturer's\nrecommendations, the best practices of the industry, and applicable codes, standards,\nand regulations. If a conflict arises between these standards, the most stringent will\nprevail.\n\n2.9. The contractor shall be responsible for the installation of signs and or barricades as\nrelated to equipment and / or systems as deemed necessary by the COR.\n\n2.10. If repairs require work outside the scope of routine maintenance, the contractor shall\nnotify the COR for appropriate decision and action. Demand maintenance procedures\nshall be followed for non-reoccurring maintenance repair work.\n\n2.11. The Contractor shall maintain workspaces in a clean and orderly manner. When work\nis performed in these areas, the Contractor's personnel shall clean up all debris and\nleave the area in a presentable condition. Floors shall be swept and mopped when\nrequired and all dust shall be removed from vertical and horizontal surfaces at each\nvisit. Remnant oil spots or stains are not tolerated. The Contractor must obtain the\napproval of the COR before storing anything in VA spaces. Operating supplies such\nas lubricants, rags, cleaners, etc., shall be properly secured in containers approved by\nthe COR. Storage shall not negatively impact the means of egress, fire protection\nsystems, and emergency lighting. Clearances from electrical equipment shall be\nmaintained as required by NFPA 70, the National Electrical Code.\n\n2.12. The Emergency Generators and ATSs which shall be inspected, tested, maintained\nand repaired under the contract can be found in Attachment 1.\n\n2.13. All inspection and testing intervals shall strictly adhere to the intervals required by the\ngoverning codes and standards and manufactures recommendations.\n2.13.1.  Annual: Once in a 12-month period with a minimum of 330 calendar days and a maximum of 390 calendar days between tests events\n2.13.2. Semi-Annual: Twice in a 12-month period with a minimum of 160 calendar days and a maximum of 200 calendar days between test events.\n2.13.3. Quarterly: Four times in a 12-month period with a minimum of 75 calendar days and a maximum of 105 calendar days between test events. For ATS inspections and maintenance, a quarterly inspection is not required during the quarter that the annual maintenance is performed.\n 2.13.4. Monthly: Every Calendar Month.\n 2.13.5. Weekly: Every Calendar Week.\n\n2.14 At each quarterly scheduled preventative maintenance visit, the contractor shall\nobtain a hot oil sample, conduct a Spectro chemical analysis of the oil and provide a\nreport detailing the results of the test; add make up coolant and battery electrolyte to\nreplace any lost due to normal evaporation, and inspect as a minimum the items listed\nbelow, record findings and correction made.\n\n2.15  Contractor shall provide and preplace all fluids and filters.\nContractor is responsible for disposal of the fluids and providing appropriate\ndocumentation of disposal to the POC per EPA regulations.\n\n2.16 Contractor shall perform fuel testing and perform underground storage tank tightness testing. Fuel Tank Tightness test contractor shall provide a tightness test on all generators\nunderground fuel tanks annually in compliance with NFPA 30.21.5. (2021 Edition),\nFlammable and combustible Liquids to be completed\n\n2.17  At the conclusion of each inspection and test day the contractor shall go over all\nfindings in an informal setting with the Electrical Shop Supervisor for each piece of\nequipment inspected. The contractor shall clearly indicate and justify any adjustments,\nrepairs or replacements made to correct any problems or deficiencies. Sufficient\nspecifications shall be provided to the POC if the medical center is to provide any parts.\nContractor shall advise whether parts have been cleaned and lubricated where necessary.\n\n3. EMERGENCY / CALL BACK SERVICES:\n3.1. Emergency, urgent, and routine services and call back services are performed on a\nreimbursable basis based upon the contractor s labor rates provided in paragraph 8.1\n3.2. Emergency Services. The contractor shall response for emergency calls upon the\ndiscretion of the CO or COR. The contractor shall perform emergency repairs to the\nemergency generator and ATS systems. Emergency calls consist of correcting\nfailures that constitute an immediate danger to personnel, threaten to damage property,\nthreaten the environment, and threaten to disrupt operations. Contractor shall respond\nto emergency calls within thirty (30) minutes of initial call and provide on-site response\nwithin 4 hours of initial call. Contractor shall provide a list of contacts and phone\nnumbers.\n3.3. Urgent services. Urgent service calls will be classified as urgent at the discretion of the\nCO or COR. Generally, urgent calls consist of providing services or correcting failures\nwhich do not immediately threaten personnel, property, environment, or operations, but\nhave the potential of becoming threatening. Contractor shall response to urgent calls\nwithin two (2) hours of initial call and provide on-site response within 6 hours of initial\ncall.\n3.4. Routine services. Routine service call will be classified as routine when the work does\nnot qualify as an emergency or urgent call. Contractor shall respond to routine\nservices calls within three (3) days of initial call.\n3.5. Call list and log. Contractor shall provide and update a list of contacts and phone\nnumbers. Call numbers shall be for a 24-hour phone number monitored by the\ncontractor personnel at all times. A log shall be maintained of all service calls received;\na description of the problem or requested work, date and time received location, name,\nand number. The contractor shall plan and schedule work to assure material, labor,\nand equipment are available to complete work requirements with regard to the\nestablished time limits and quality standards. Call log shall be submitted the end of\nevery month no later than 5 days of following month. In the months with no calls,\ncontractor shall submit call log with an annotation that shall read NO EVENTS FOR\nTHE MONTH.\n\n4. SCHEDULED MAINTENANCE:\n4.1. MATERIALS TO BE FURNISHED:\nThe Contractor shall furnish all lubricants, fluids, cleaning supplies, parts and tools\nnecessary to perform the work described above. All lubricants shall be recommended\nby the manufacturer of the equipment.\n\n4.2. PARTS TO BE FURNISHED AND INSTALLED OR REPAIRED:\nThe Contractor shall provide the COR with a detailed cost report of the work to be\ndone. The COR will receive the detailed cost report prior to authorizing the work and\nthe billing shall be completed on a separate detailed invoice.\n\n4.3 SERVICE MANUALS/TOOLS/EQUIPMENT:\nThe Medical Centers will not provide tools, test equipment, service manuals or\nservice diagnostic software to the contractor. The contractor shall obtain and have on\nfile, all operational and technical documentation (such as: operational and service\nmanuals, schematics, and parts lists) which are necessary to meet the performance\nrequirements of this contract. The location and listing of the service data manuals, by\nname, and/or the manuals themselves shall be provided to the CO or COR upon\nrequest.\n\n4.3. REPORT OF SERVICES/DOCUMENTATION:\nUpon completion of any maintenance and / or repair services, the contractor shall\nreport to the COR and provide a written report detailing services performed and obtain\nthe signature and name of an authorized representative of the VA prior to departure\nfrom the site. Contractor shall prepare and submit a written report on or before the\nthird (3rd) day of each month detailing all services performed during the previous\nmonth. This report shall be required prior to billing. Invoices shall not be paid until\nreport is received and verified. Contractor shall maintain a complete orderly and\nchronological file, including, but not limited to, parts list, copies of reports required by\ncontract, etc. A hardcopy of this file shall be submitted to the COR every 12 months\nand shall also available for inspection upon request of the Contracting Officer or COR.\nThe contractor will provide an electronic means 24/7 to obtain and download current\nand archived reports, equipment photos, repair information, and VA specific data on\nVA equipment condition and age.\n\n5. INSPECTION AND TESTING SERVICES:\n5.1. INSPECTION:\nRoutine and Periodic inspections of the equipment for this contract shall be performed\nby qualified technicians. Upon completion of a routine inspection, the VA shall be\nfurnished with the inspection report listing deficiencies necessary to repair. The\ncontractor shall furnish a written report of each inspection to the COR.\n\n6. SERVICE CALLS:\nContractor shall provide information as to where service calls are to be placed. The\nContractor shall respond promptly within one (1) hour to requests for service after\nnormal business hours and provide on-site response within five (5) hours of initial call.\nThe Contractor shall maintain a service call log or record which shall be available for\ninspection by the VA at all times. As a minimum, the call log or record shall contain\nthe information specified herein\n6.1. Name of Caller.\n6.2. Description of problem; location where problem exists\n6.3. Time and date call was received\n6.4. Description of the action taken to resolve the problem and the time and date\ncorrective action was taken.\n\n7. EMERGENCY CALL-BACK SERVICE\n7.1. Emergency call-back service consists of promptly responding to requests for\nemergency service 24 hours per day, 7 days per week. The contractor shall report to\nthe site of the emergency within five (5) hours of the time of notification and shall\nremain on the job until the emergency has been resolved. If the situation cannot be\nresolved immediately, the Contractor shall promptly notify the COR of the time and\ndate corrective action shall be taken.\n\n7.2. For service other than what is considered to be an emergency, outside the normal\nworking hours of 8:00 a.m. to 4:30 p.m. Monday through Friday, the contractor shall\nreport to the site within five (5) hours after time of notification. If the situation cannot\nbe resolved within 4 hours after on-site arrival, the contractor shall notify the COR of\nthe problem and the time and date corrective action will be completed.\n\n7.3. Requests for service may be made by the COR or his/her representative by telephone\nor other means.\n\n7.4. The contractor shall be reimbursed at the hourly rate previously agreed upon for\nemergency call-back service during other than normal working hours. Refer to the\nREPAIRS section for pricing schedule for demand service repairs. Please include this\nin your bid submission\n\n8. REPAIRS:\nThe government will fund the purchase order associated with the contract an additional\nsum of $15,000.00 for reimbursement of contractor costs for repair or investigation\nwork. Repair and investigation work may be requested through the emergency/call\nback procedures or as a result of routine inspection/testing services.\n8.1. Labor: Contractor shall submit with their bid proposal a schedule of labor rates that\nwill be charged for repair work performed during normal business hours and during\nnon-business hours, holidays and weekends. The labor rates shall be submitted for\nthe base year and each option year. The submitted shall remain unchanged\nthroughout the term of the contract. Prevailing wages apply.\n8.2. Materials: The contractor shall provide all materials associated with repair work at the\nContractor s cost plus a reasonable mark-up for overhead, profit and handling. The\ncontractor may be requested by the COR to provide evidence documenting the\ncontractors  procurement costs associated with materials. Contractor shall submit a\nschedule with their bid proposal for the base year and each option year, listing the\namount(s) or percentage(s) associated with materials mark-up. The submitted markup\nfor materials shall remain unchanged throughout the term of the contract.\n8.3. Travel/Per Diem: Costs associated with contractor travel/Per Diem shall not exceed\nthe amounts established by the U.S. General Services Administration (GSA). Rates\ncan be obtained at: https://www.gsa.gov/travel-resources\n8.4. Labor Costs Incurred During Travel (Travel Time): Contractor may charge for no\nmore than four hours of labor per an employee, per a repair when Contractors staff\nmust travel to perform Demand Maintenance.\n8.5. Contractor Reimbursement: Contractor shall be reimbursed for Time and Material\nwork by submitting an invoice to the COR for review and approval prior to invoicing\nthrough Tungsten. The government shall approve for payment submission or reject\nthe invoice within 14 calendar days.\n8.6. The contractor shall not perform any repairs not included in the PWS or beyond the\nallotment made for repair reimbursement. Contractor will not be compensated for any\naddition repairs without proper authority. Contractor shall obtain a written approval or\nchange order with authorization and notification of available funds. Only the\nContracting Officer has the authority to approve change orders. The contractor shall\nnot assume that an increase to the allotted repair funds will be approved or available.\nThe contract shall not invoice against the repair funds without approval of the COR or\nCO. All repairs shall be authorized in writing. The contractor is responsible for ensuring\nthe repair fund allocation is not exceeded.\n\n9. REPORTS:\n9.1 Service Report submissions: The contractor shall provide sample testing and\ninspection reports in their technical package for COR review and approval. Contractor\nshall deliver formal/ final reports of service no later than seven (7) calendar days from\ncompletion of each service. Contractor shall transmit the reports digitally in PDF by email\nto the COR. All reports shall adhere to and shall be equivalent to NFPA templates or\nstandards and shall be completed in full and signed. At the conclusion of the annual\ntesting/inspection/maintenance the contractor shall supply a comprehensive report\ninclusive of the most recent year of services in two (2) hard copies in three ring binders\nwith cover page, table of contents and tabulated with dividers and one PDF copy on CD\nRom of all reports. The annual reports shall include sections for all callback services\nand for all repair reports. Repair reports must clearly link to the\ntesting/inspection/maintenance deficiency to demonstrate proper resolution of each\ndeficiency identified during testing/inspection. Quarterly and Annual Inspection\nReports shall be submitted within 7 calendar days of the service in two (2) hard three\nring binders with cover page, table of contents and tabulated with dividers and one PDF\ncopy on CD Rom. The contractor will provide an electronic means 24/7 to obtain and\ndownload current and archived reports, equipment photos, repair information, and VA\nspecific data on VA equipment condition and age.\n\n9.2 Deficiency Report. When any deficiencies are identified, the contractor shall inform the\nCOR immediately via verbal and written notification email. Contractor shall submit the\ndeficiency report to the COR within two (2) business days. The deficiency report shall\ninclude at a minimum the following information:\n9.2.2 Location\n9.2.2 Equipment/system name\n9.2.3 Date of failure identification\n9.2.4 Description of failure (pictures, drawings, etc.)\n9.2.5 Justification (if repair is not accomplished)\n9.2.6 Description of repair work (pictures, drawings, etc.)\n9.2.7 Material list (description of article, quantity, catalogue-cut, pictures, etc.) for   repair\n9.2.8 Proposed repair schedule\n9.2.9 Cost proposal\n9.2.10 Submission date of the report\n9.2.11 Signature of technician\n\n9.3 Repair report. Upon completion of any repair work, whether via callback or following\nroutine testing/inspection service, the contractor shall supply a repair report certifying the\nrepair work was completed. The report shall be provided by email within two (2)\nbusiness days of completion.\n\n9.4 Annual Schedule. The contractor shall submit an annual schedule to the COR to obtain\napproval within fifteen (15) days from contract award date and the start date of each\noption year. The annual schedule shall show the order in which the contractor proposes\nto perform the inspections, testing, calibration, and maintenance service, the dates on\nwhich the contractor will start each work element, and the scheduled date for completion\nof each element.\n\n10 . CONTRACTOR QUALIFICATIONS:\n10.1  Contractor personnel performing service on this contract shall be trained and qualified\nfor the specific manufacturer s equipment and have all required certifications and/or\nlicenses. The Contractor shall maintain certifications, training records of each\nemployee and/or laboratory testing agencies performing services under this contract.\nThe Contractor shall make all updates to certification or records for individuals and/or\nlaboratory testing agencies available for review by the VA. The contractor shall provide\na copy of the certification records and photocopy of the employee s identification prior to\nthe start of work.\n\n10.2  It is the contractor s responsibility to ensure that only properly trained and competent\npersons perform inspections, testing and maintenance on the emergency generator and\nelectrical system. Evidence of training shall be supplied to the VA prior to the start of\nwork and if/when new individuals are added by the contractor to perform on this\ncontract.\n\n11. PLACE OF PERFORMANCE: Fresno VA Medical Center - 2615 E. Clinton Ave. Fresno,\nCA 93703\n\n12. PERIOD OF PERFORMANCE: Base Plus (1) Option Year.\nBase Period: September 30, 2025 thru September 29, 2026\nOption Year #1: September 30, 2026 thru September 29, 2027\n\n\n13. HOLIDAYS:\n13.1 Legal holidays recognized by the Federal Government in accordance with 5 U.S.C.\n6103, Executive Order 11582 and Public Law 94-97 or any other by the President of the\nUnited States to be a national holiday, the following national holidays are observed\nand for the purpose of this contract is defined as  Legal Federal, official holidays  as\nfollows:\n Recognized Holidays\n\n New Year s Day     January 1\n Martin Luther King Jr. s Birthday   Third Monday in January\n President s Day     Third Monday in February\n Memorial Day      Last Monday in May\n Juneteenth      June 19\n Independence Day     July 4\n Labor Day First     Monday in September\n Columbus Day     Second Monday in October\n Veteran s Day     November 11\n Thanksgiving Day     Fourth Thursday in November\n Christmas Day     December 25\n\n13.2 Hours of Operation. The contractor is responsible for conducting services, between\nthe hours of 8:00 am to 4:30 pm from Monday thru Friday except federal holidays or\nwhen the Government facility is closed due to local or national emergencies\nadministrative closing.\n\n14. GENERAL REQUIREMENTS:\n14.1 A two-week (fourteen work-day notice) request for any non-urgent maintenance\nshutdown required during business hours shall be provided to the COR from the\ncontractor in writing. Contractor shall not proceed with shutdown until the COR\nauthorizes to do so. Contractor to verify with COR prior to start of work, and on a daily,\nor system basis that effected systems have been properly shut down and secured to\nprevent risk to safety.\n\na. Contractor shall be responsible for the protection of all building floors, floor coverings,\nwalls, wall coverings, furniture, light fixtures and equipment in that may be subjected to damage while performing this contract. Contractor shall replace all damaged items with exactly matching item or a like item at the VACCHCS discretion.\n\nb. The contractor shall be responsible for removal and replacement of any ceiling tiles\naffected by the work.\n\nc. Work site shall be left free and clean of all debris after completion of work. Contractor\nshall be responsible for the safety of all VACCHCS employees, patients and visitors while performing contracted work, including slipping and tripping hazards. Contractor shall adequately barricade the immediate work site to prevent unauthorized individuals into the work area.\n\n15. GENERAL INFORMATION:\na. Contract Manager. The contractor shall provide a contract manager who shall be\nresponsible for the work. The name of this person, and an alternate(s) who shall act for\nthe contractor when the manager is absent, shall be designated in writing to the\ncontracting officer. The contract manager or alternate shall have full authority to act for\nthe contractor on all matters relating to this contract.\nb. The contract manager or alternate shall be available during normal working hours to meet with COR to discuss problem areas. The contract manager shall provide an emergency contract number for any emergency situation.\nc. The contractor shall keep its employees trained and certified at all time during contract\nperiod. The contractor shall ensure all employee certifications are submitted to CO and\nCOR for proper recording of training no later than ten (10) days after award of contract.\nVA has the right to inspect and request verification of licenses and certificates of during\nthe contract period. Contractor shall update list of any changes with personnel or\ncertificates/license and submit to COR and CO no later than 5 days of occurrence.\nd. Removal of Contractor s Employees. The contractor shall utilize only experienced,\nresponsible, and capable employees in the performance of this contract. The CO may\nrequire that the contractor remove from the Government job any employee that\nendangers persons, property, environment, EEO policy, Hostile work environment, or\nfederal workplace policy or violates the standards noted in this PWS.\ne. Government Furnished Equipment. This PWS does not have any government furnished\nequipment. Contractor shall not use any government own equipment, material, supplies,\nor tools. Contractor shall furnish all requirements.\n\n16. RECORDS:\n The contractor shall be responsible for creating, maintaining government required\nrecords that are specifically cited in this PWS or required by the Federal, State, and Local law and authorities. The contractor shall provide the original records or a reproducible copy of any such record upon request from the government at no additional cost. The cost of reproductions and delivery shall be the contractor s responsibility. Only\nVACCHCS Engineering Service, COR, or CO shall have the authority to approve request and receive records. Contractor shall safeguard all information. Contractor shall inform CO and COR of any request made for which the CO or COR is required to approve. Additionally, the following standard items relate to records generated in executing the contract:\n a. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29,\n31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a);\n36 CFR Part 1222 and Part 1228.\nb. Contractor shall treat all deliverables under the contract as the property of the U.S.\nGovernment for which the Government Agency shall have unlimited rights to use,\ndispose of, or disclose such data contained therein as it determines to be in the\npublic interest.\nc. Contractor shall not create or maintain any records that are not specifically tied to or\nauthorized by the contract using Government IT equipment and/or Government\nrecords.\nd. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that\ncontains information covered by the Privacy Act of 1974 or that which is generally\nprotected by the Freedom of Information Act.\ne. Contractor shall not create or maintain any records containing any Government\nAgency records that are not specifically tied to or authorized by the contract.\nf. The Government Agency owns the rights to all data/records produced as part of this\ncontract.\ng. The Government Agency owns the rights to all electronic information (electronic\ndata, electronic information systems, electronic databases, etc.) and all supporting\ndocumentation created as part of this contract. Contractor must deliver sufficient\ntechnical documentation with all data deliverables to permit the agency to use the\ndata.\nh. Contractor agrees to comply with Federal and Agency records management policies,\nincluding those policies associated with the safeguarding of records covered by the\nPrivacy Act of 1974. These policies include the preservation of all records created or\nreceived regardless of format [paper, electronic, etc.] or mode of transmission [email,\nfax, etc.] or state of completion [draft, final, etc.].\ni. No disposition of documents will be allowed without the prior written consent of the\nContracting Officer. The Agency and its Contractors are responsible for preventing\nthe alienation or unauthorized destruction of records, including all forms of mutilation.\nWillful and unlawful destruction, damage or alienation of Federal records is subject to\nthe fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed\nfrom the legal custody of the Agency or destroyed without regard to the provisions of\nthe agency records schedules.\nj. Contractor is required to obtain the Contracting Officer's approval prior to engaging\nin any contractual relationship (Subcontractor) in support of this contract requiring\nthe disclosure of information, documentary material and/or records generated under,\nor relating to, this contract. The Contractor (and any Subcontractor) is required to\nabide by Government and Agency guidance for protecting sensitive and proprietary\ninformation.\n\n17. SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK:\n a. The Contractor acknowledges that it has taken steps reasonably necessary to\nascertain the nature and location of the work, and that it has investigated and\nsatisfied itself as to the general and local conditions which can affect the work or its\ncost, including but not limited to (1) conditions bearing upon transportation, disposal,\nhandling, and storage of materials; (2) the availability of labor, water, electric power,\nand roads; (3) uncertainties of weather, or similar physical conditions at the site; (4)\nthe conformation and condition of the ground; and (5) the character of equipment and\nfacilities needed preliminary to and during work performance. The Contractor also\nacknowledges that it has satisfied itself as to the character, quality, and quantity of\nmaterials or obstacles to be encountered insofar as this information is reasonably\nascertainable from an inspection of the site, as well as from any documents made a\npart of this contract. Any failure of the Contractor to take the actions described and\nacknowledged in this paragraph will not relieve the Contractor from responsibility for\nestimating properly the difficulty and cost of successfully performing the work, or for\nproceeding to successfully perform the work without additional expense to the\nGovernment.\n b. The Government assumes no responsibility for any conclusions or interpretations\nmade by the Contractor based on the information made available by the Government.\nNor does the Government assume responsibility for any understanding reached or\nrepresentation made concerning conditions which can affect the work by any of its\nofficers or agents before the execution of this contract, unless that understanding or\nrepresentation is expressly stated in this contract.\n\n18. QUALITY CONTROL PROGRAM: The Contractor shall coordinate, report, and ensure the\ntimely completion of the work specified in this PWS. This encompasses the planning,\ncoordination, technical direction, and surveillance of all activities necessary to execute all\nwork. The contractor shall submit their Quality Control plan in hardcopy in hard three ring\nbinders with cover page, table of contents and tabulated with dividers and digitally in PDF within\nten (10) days of contract award date. The COR will review the document and note any\nneeded clarifications and return to the Contractor for revisions, if necessary. A VA approved\nQAQC Plan shall be in place within thirty (30) days of the contract start date.\na. The contractor shall provide the overall management effort required to integrate\ntechnical and programmatic functions.\nb. The contractor shall ensure the technical excellence, cost effectiveness, and\ntimeliness of all required work deliverable products.\nc. The contractor shall develop and maintain an effective quality control program to\nensure service is performed in accordance with this PWS. The contractor shall\ndevelop and implement procedures to identify, prevent, and ensure non-recurrence of\ndefective services. The contractor s quality control program is the means by which\nhe/she assures that his/her work complies with the requirements of the contract. The\noverall goal of the program should be to identify and correct any problems that may\nexist before they are identified by or reported to the COR. The Government has the\nright to review and ask for corrections, additional items, and updates during the\ncontract period.\nd. The Contractors QAQC Plan shall include the following at a minimum:\ni. A comprehensive list of all devices and associated equipment required to be\nmaintained and/or inspected as part of this service contract in accordance\nwith the NFPA codes list in paragraph 2.1 above. This list shall be reviewed\nwith VA and discrepancies addressed prior to contract award.\nii. An inspection plan and schedule covering all services required by this\ncontract. The inspection plan must specify the areas to be inspected on either\na scheduled or unscheduled basis and how often inspections will be\naccomplished and documented. The name and title of the individual(s) who\nwill perform the inspections shall be noted.\niii. On site records of all inspections conducted by the Contractor noting\nnecessary corrective action(s) taken. The Government reserves the right to\nrequest copies of any inspection.\niv. The methods for identifying and/or preventing deficiencies in the quality of\nservice performed before the level of performance becomes unacceptable.\nv. Organizational structure and functions noting intermediate supervisory\nresponsibilities and overall management responsibilities for ensuring total\ncontract performance.\nvi. The Contractor shall provide as part of the QAQC Plan and maintain records\nidentifying the required certifications (per NFPA requirements) and ongoing\ntraining of each employee and/or laboratory testing agencies performing\nservices under this contract. The Contractor shall make any updates to\ncertifications or records for individuals and/or laboratory testing agencies\navailable for review by the VA.\n\n\n19. ATTACHMENTS:\n Attachment 1: Generators and ATSs\n  Attachment 2: Specific tasks and service categories\n  Attachment 3: Quality Assurance Surveillance Plan (QASP)\n  Attachment 4: Delivery Schedule\n\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VACCHCS Gen Services\n\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 811210 ($34,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Testing, Inspection, and Maintenance Services of Emergency Generators and Automatic Throw Switches within Attachment 1. \n\n6. UEI Number\n\n7. If participant in GSA Federal Supply Schedule or Veterans Affairs national contracts; provide contract #. \n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions. \n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","text":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY\n\nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 08/12/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing.\n\nDescription of Services:\n\n1. BACKGROUND: The VA Central California Healthcare System (VA CCHCS) Medical\nCenter requires generator and ATS maintenance service in compliance with NFPA 99,\n100,110 and ASTM Code Requirements.\n\n2. SCOPE OF WORK: The awarded contractor(s) shall be responsible for all costs associated\nwith accomplishing repairs and replacements, including labor, equipment and supplies for all\nequipment and systems specified or recommended by the equipment manufacturer. A\ncomprehensive list of equipment systems is available in Attachment #1\n\n2.1. The Contractor shall provide all labor, materials, equipment, supervision,\nadministrative support, and any necessary professional engineering services required\nfor the inspection, testing, maintenance (including cleaning) and repair of the 6\nGenerators and 17 ATSs listed in Attachment # 1.\n\n2.2. The Contractor shall provide maintenance service, in compliance with the following\ncodes, standards and references:\n2.2.1. NFPA 70E, 99, 100, and 110\n2.2.2. Equipment manufacturer's recommendations,\n2.2.3. ASTM 975 rules and ASTM D5837\n2.2.4. National Electrical Code,\n2.2.5. IEC 61198\n2.2.6. All other applicable laws, regulations, rules, ordinances, codes, etc.\n\n2.3. The specific tasks and services required for this contract are listed in Attachment #2.\n\n2.4. For service that does not require any power outages, the Contractor shall perform\nservices during normal hospital working hours acceptable to the COR. For services\nthat require complete or localized power outages, the Contractor shall perform these\nservices outside of normal working hours (5pm to 7am or weekends), coordinated in\nadvance with the COR. All services that interrupt or interfere with Medical or patient\nservices shall be coordinated in advance with the COR; this may require Contractor\nservice being performed outside of normal working hours. In some cases where\nmedical emergency or scheduled services such as surgery are performed, scheduling\nmay require advance planning up to a week in advance in coordination with the COR.\n\n2.5. The contractor shall perform no service on energized equipment without written\napproval from the Safety Officer, Engineering Chief, and Hospital Director. VACCHCS\nhas a formal procedure for approval of service on energized equipment. The Contractor will coordinate with the COR who will obtain these approvals for the Contractor. Approvals can take up to a week to obtain and are usually disapproved.\n\n2.6. The Contractor will adhere to NFPA 70E for Lock Out/ Tag Out and local VACCHCS\nprocedures for performing service on de-energized equipment.\n\n2.7. All fluids, parts or materials shall be disposed of in compliance with EPA, State, and\nlocal regulations and laws. The contractor will provide documentation to the COR in\naccordance with these regulations and laws.\n\n2.8. All equipment shall be serviced in accordance with the manufacturer's\nrecommendations, the best practices of the industry, and applicable codes, standards,\nand regulations. If a conflict arises between these standards, the most stringent will\nprevail.\n\n2.9. The contractor shall be responsible for the installation of signs and or barricades as\nrelated to equipment and / or systems as deemed necessary by the COR.\n\n2.10. If repairs require work outside the scope of routine maintenance, the contractor shall\nnotify the COR for appropriate decision and action. Demand maintenance procedures\nshall be followed for non-reoccurring maintenance repair work.\n\n2.11. The Contractor shall maintain workspaces in a clean and orderly manner. When work\nis performed in these areas, the Contractor's personnel shall clean up all debris and\nleave the area in a presentable condition. Floors shall be swept and mopped when\nrequired and all dust shall be removed from vertical and horizontal surfaces at each\nvisit. Remnant oil spots or stains are not tolerated. The Contractor must obtain the\napproval of the COR before storing anything in VA spaces. Operating supplies such\nas lubricants, rags, cleaners, etc., shall be properly secured in containers approved by\nthe COR. Storage shall not negatively impact the means of egress, fire protection\nsystems, and emergency lighting. Clearances from electrical equipment shall be\nmaintained as required by NFPA 70, the National Electrical Code.\n\n2.12. The Emergency Generators and ATSs which shall be inspected, tested, maintained\nand repaired under the contract can be found in Attachment 1.\n\n2.13. All inspection and testing intervals shall strictly adhere to the intervals required by the\ngoverning codes and standards and manufactures recommendations.\n2.13.1. Annual: Once in a 12-month period with a minimum of 330 calendar days and a maximum of 390 calendar days between tests events\n2.13.2. Semi-Annual: Twice in a 12-month period with a minimum of 160 calendar days and a maximum of 200 calendar days between test events.\n2.13.3. Quarterly: Four times in a 12-month period with a minimum of 75 calendar days and a maximum of 105 calendar days between test events. For ATS inspections and maintenance, a quarterly inspection is not required during the quarter that the annual maintenance is performed.\n2.13.4. Monthly: Every Calendar Month.\n2.13.5. Weekly: Every Calendar Week.\n\n2.14 At each quarterly scheduled preventative maintenance visit, the contractor shall\nobtain a hot oil sample, conduct a Spectro chemical analysis of the oil and provide a\nreport detailing the results of the test; add make up coolant and battery electrolyte to\nreplace any lost due to normal evaporation, and inspect as a minimum the items listed\nbelow, record findings and correction made.\n\n2.15 Contractor shall provide and preplace all fluids and filters.\nContractor is responsible for disposal of the fluids and providing appropriate\ndocumentation of disposal to the POC per EPA regulations.\n\n2.16 Contractor shall perform fuel testing and perform underground storage tank tightness testing. Fuel Tank Tightness test contractor shall provide a tightness test on all generators\nunderground fuel tanks annually in compliance with NFPA 30.21.5. (2021 Edition),\nFlammable and combustible Liquids to be completed\n\n2.17 At the conclusion of each inspection and test day the contractor shall go over all\nfindings in an informal setting with the Electrical Shop Supervisor for each piece of\nequipment inspected. The contractor shall clearly indicate and justify any adjustments,\nrepairs or replacements made to correct any problems or deficiencies. Sufficient\nspecifications shall be provided to the POC if the medical center is to provide any parts.\nContractor shall advise whether parts have been cleaned and lubricated where necessary.\n\n3. EMERGENCY / CALL BACK SERVICES:\n3.1. Emergency, urgent, and routine services and call back services are performed on a\nreimbursable basis based upon the contractor s labor rates provided in paragraph 8.1\n3.2. Emergency Services. The contractor shall response for emergency calls upon the\ndiscretion of the CO or COR. The contractor shall perform emergency repairs to the\nemergency generator and ATS systems. Emergency calls consist of correcting\nfailures that constitute an immediate danger to personnel, threaten to damage property,\nthreaten the environment, and threaten to disrupt operations. Contractor shall respond\nto emergency calls within thirty (30) minutes of initial call and provide on-site response\nwithin 4 hours of initial call. Contractor shall provide a list of contacts and phone\nnumbers.\n3.3. Urgent services. Urgent service calls will be classified as urgent at the discretion of the\nCO or COR. Generally, urgent calls consist of providing services or correcting failures\nwhich do not immediately threaten personnel, property, environment, or operations, but\nhave the potential of becoming threatening. Contractor shall response to urgent calls\nwithin two (2) hours of initial call and provide on-site response within 6 hours of initial\ncall.\n3.4. Routine services. Routine service call will be classified as routine when the work does\nnot qualify as an emergency or urgent call. Contractor shall respond to routine\nservices calls within three (3) days of initial call.\n3.5. Call list and log. Contractor shall provide and update a list of contacts and phone\nnumbers. Call numbers shall be for a 24-hour phone number monitored by the\ncontractor personnel at all times. A log shall be maintained of all service calls received;\na description of the problem or requested work, date and time received location, name,\nand number. The contractor shall plan and schedule work to assure material, labor,\nand equipment are available to complete work requirements with regard to the\nestablished time limits and quality standards. Call log shall be submitted the end of\nevery month no later than 5 days of following month. In the months with no calls,\ncontractor shall submit call log with an annotation that shall read NO EVENTS FOR\nTHE MONTH.\n\n4. SCHEDULED MAINTENANCE:\n4.1. MATERIALS TO BE FURNISHED:\nThe Contractor shall furnish all lubricants, fluids, cleaning supplies, parts and tools\nnecessary to perform the work described above. All lubricants shall be recommended\nby the manufacturer of the equipment.\n\n4.2. PARTS TO BE FURNISHED AND INSTALLED OR REPAIRED:\nThe Contractor shall provide the COR with a detailed cost report of the work to be\ndone. The COR will receive the detailed cost report prior to authorizing the work and\nthe billing shall be completed on a separate detailed invoice.\n\n4.3 SERVICE MANUALS/TOOLS/EQUIPMENT:\nThe Medical Centers will not provide tools, test equipment, service manuals or\nservice diagnostic software to the contractor. The contractor shall obtain and have on\nfile, all operational and technical documentation (such as: operational and service\nmanuals, schematics, and parts lists) which are necessary to meet the performance\nrequirements of this contract. The location and listing of the service data manuals, by\nname, and/or the manuals themselves shall be provided to the CO or COR upon\nrequest.\n\n4.3. REPORT OF SERVICES/DOCUMENTATION:\nUpon completion of any maintenance and / or repair services, the contractor shall\nreport to the COR and provide a written report detailing services performed and obtain\nthe signature and name of an authorized representative of the VA prior to departure\nfrom the site. Contractor shall prepare and submit a written report on or before the\nthird (3rd) day of each month detailing all services performed during the previous\nmonth. This report shall be required prior to billing. Invoices shall not be paid until\nreport is received and verified. Contractor shall maintain a complete orderly and\nchronological file, including, but not limited to, parts list, copies of reports required by\ncontract, etc. A hardcopy of this file shall be submitted to the COR every 12 months\nand shall also available for inspection upon request of the Contracting Officer or COR.\nThe contractor will provide an electronic means 24/7 to obtain and download current\nand archived reports, equipment photos, repair information, and VA specific data on\nVA equipment condition and age.\n\n5. INSPECTION AND TESTING SERVICES:\n5.1. INSPECTION:\nRoutine and Periodic inspections of the equipment for this contract shall be performed\nby qualified technicians. Upon completion of a routine inspection, the VA shall be\nfurnished with the inspection report listing deficiencies necessary to repair. The\ncontractor shall furnish a written report of each inspection to the COR.\n\n6. SERVICE CALLS:\nContractor shall provide information as to where service calls are to be placed. The\nContractor shall respond promptly within one (1) hour to requests for service after\nnormal business hours and provide on-site response within five (5) hours of initial call.\nThe Contractor shall maintain a service call log or record which shall be available for\ninspection by the VA at all times. As a minimum, the call log or record shall contain\nthe information specified herein\n6.1. Name of Caller.\n6.2. Description of problem; location where problem exists\n6.3. Time and date call was received\n6.4. Description of the action taken to resolve the problem and the time and date\ncorrective action was taken.\n\n7. EMERGENCY CALL-BACK SERVICE\n7.1. Emergency call-back service consists of promptly responding to requests for\nemergency service 24 hours per day, 7 days per week. The contractor shall report to\nthe site of the emergency within five (5) hours of the time of notification and shall\nremain on the job until the emergency has been resolved. If the situation cannot be\nresolved immediately, the Contractor shall promptly notify the COR of the time and\ndate corrective action shall be taken.\n\n7.2. For service other than what is considered to be an emergency, outside the normal\nworking hours of 8:00 a.m. to 4:30 p.m. Monday through Friday, the contractor shall\nreport to the site within five (5) hours after time of notification. If the situation cannot\nbe resolved within 4 hours after on-site arrival, the contractor shall notify the COR of\nthe problem and the time and date corrective action will be completed.\n\n7.3. Requests for service may be made by the COR or his/her representative by telephone\nor other means.\n\n7.4. The contractor shall be reimbursed at the hourly rate previously agreed upon for\nemergency call-back service during other than normal working hours. Refer to the\nREPAIRS section for pricing schedule for demand service repairs. Please include this\nin your bid submission\n\n8. REPAIRS:\nThe government will fund the purchase order associated with the contract an additional\nsum of $15,000.00 for reimbursement of contractor costs for repair or investigation\nwork. Repair and investigation work may be requested through the emergency/call\nback procedures or as a result of routine inspection/testing services.\n8.1. Labor: Contractor shall submit with their bid proposal a schedule of labor rates that\nwill be charged for repair work performed during normal business hours and during\nnon-business hours, holidays and weekends. The labor rates shall be submitted for\nthe base year and each option year. The submitted shall remain unchanged\nthroughout the term of the contract. Prevailing wages apply.\n8.2. Materials: The contractor shall provide all materials associated with repair work at the\nContractor s cost plus a reasonable mark-up for overhead, profit and handling. The\ncontractor may be requested by the COR to provide evidence documenting the\ncontractors procurement costs associated with materials. Contractor shall submit a\nschedule with their bid proposal for the base year and each option year, listing the\namount(s) or percentage(s) associated with materials mark-up. The submitted markup\nfor materials shall remain unchanged throughout the term of the contract.\n8.3. Travel/Per Diem: Costs associated with contractor travel/Per Diem shall not exceed\nthe amounts established by the U.S. General Services Administration (GSA). Rates\ncan be obtained at: https://www.gsa.gov/travel-resources\n8.4. Labor Costs Incurred During Travel (Travel Time): Contractor may charge for no\nmore than four hours of labor per an employee, per a repair when Contractors staff\nmust travel to perform Demand Maintenance.\n8.5. Contractor Reimbursement: Contractor shall be reimbursed for Time and Material\nwork by submitting an invoice to the COR for review and approval prior to invoicing\nthrough Tungsten. The government shall approve for payment submission or reject\nthe invoice within 14 calendar days.\n8.6. The contractor shall not perform any repairs not included in the PWS or beyond the\nallotment made for repair reimbursement. Contractor will not be compensated for any\naddition repairs without proper authority. Contractor shall obtain a written approval or\nchange order with authorization and notification of available funds. Only the\nContracting Officer has the authority to approve change orders. The contractor shall\nnot assume that an increase to the allotted repair funds will be approved or available.\nThe contract shall not invoice against the repair funds without approval of the COR or\nCO. All repairs shall be authorized in writing. The contractor is responsible for ensuring\nthe repair fund allocation is not exceeded.\n\n9. REPORTS:\n9.1 Service Report submissions: The contractor shall provide sample testing and\ninspection reports in their technical package for COR review and approval. Contractor\nshall deliver formal/ final reports of service no later than seven (7) calendar days from\ncompletion of each service. Contractor shall transmit the reports digitally in PDF by email\nto the COR. All reports shall adhere to and shall be equivalent to NFPA templates or\nstandards and shall be completed in full and signed. At the conclusion of the annual\ntesting/inspection/maintenance the contractor shall supply a comprehensive report\ninclusive of the most recent year of services in two (2) hard copies in three ring binders\nwith cover page, table of contents and tabulated with dividers and one PDF copy on CD\nRom of all reports. The annual reports shall include sections for all callback services\nand for all repair reports. Repair reports must clearly link to the\ntesting/inspection/maintenance deficiency to demonstrate proper resolution of each\ndeficiency identified during testing/inspection. Quarterly and Annual Inspection\nReports shall be submitted within 7 calendar days of the service in two (2) hard three\nring binders with cover page, table of contents and tabulated with dividers and one PDF\ncopy on CD Rom. The contractor will provide an electronic means 24/7 to obtain and\ndownload current and archived reports, equipment photos, repair information, and VA\nspecific data on VA equipment condition and age.\n\n9.2 Deficiency Report. When any deficiencies are identified, the contractor shall inform the\nCOR immediately via verbal and written notification email. Contractor shall submit the\ndeficiency report to the COR within two (2) business days. The deficiency report shall\ninclude at a minimum the following information:\n9.2.2 Location\n9.2.2 Equipment/system name\n9.2.3 Date of failure identification\n9.2.4 Description of failure (pictures, drawings, etc.)\n9.2.5 Justification (if repair is not accomplished)\n9.2.6 Description of repair work (pictures, drawings, etc.)\n9.2.7 Material list (description of article, quantity, catalogue-cut, pictures, etc.) for repair\n9.2.8 Proposed repair schedule\n9.2.9 Cost proposal\n9.2.10 Submission date of the report\n9.2.11 Signature of technician\n\n9.3 Repair report. Upon completion of any repair work, whether via callback or following\nroutine testing/inspection service, the contractor shall supply a repair report certifying the\nrepair work was completed. The report shall be provided by email within two (2)\nbusiness days of completion.\n\n9.4 Annual Schedule. The contractor shall submit an annual schedule to the COR to obtain\napproval within fifteen (15) days from contract award date and the start date of each\noption year. The annual schedule shall show the order in which the contractor proposes\nto perform the inspections, testing, calibration, and maintenance service, the dates on\nwhich the contractor will start each work element, and the scheduled date for completion\nof each element.\n\n10 . CONTRACTOR QUALIFICATIONS:\n10.1 Contractor personnel performing service on this contract shall be trained and qualified\nfor the specific manufacturer s equipment and have all required certifications and/or\nlicenses. The Contractor shall maintain certifications, training records of each\nemployee and/or laboratory testing agencies performing services under this contract.\nThe Contractor shall make all updates to certification or records for individuals and/or\nlaboratory testing agencies available for review by the VA. The contractor shall provide\na copy of the certification records and photocopy of the employee s identification prior to\nthe start of work.\n\n10.2 It is the contractor s responsibility to ensure that only properly trained and competent\npersons perform inspections, testing and maintenance on the emergency generator and\nelectrical system. Evidence of training shall be supplied to the VA prior to the start of\nwork and if/when new individuals are added by the contractor to perform on this\ncontract.\n\n11. PLACE OF PERFORMANCE: Fresno VA Medical Center - 2615 E. Clinton Ave. Fresno,\nCA 93703\n\n12. PERIOD OF PERFORMANCE: Base Plus (1) Option Year.\nBase Period: September 30, 2025 thru September 29, 2026\nOption Year #1: September 30, 2026 thru September 29, 2027\n\n13. HOLIDAYS:\n13.1 Legal holidays recognized by the Federal Government in accordance with 5 U.S.C.\n6103, Executive Order 11582 and Public Law 94-97 or any other by the President of the\nUnited States to be a national holiday, the following national holidays are observed\nand for the purpose of this contract is defined as Legal Federal, official holidays as\nfollows:\nRecognized Holidays\n\nNew Year s Day January 1\nMartin Luther King Jr. s Birthday Third Monday in January\nPresident s Day Third Monday in February\nMemorial Day Last Monday in May\nJuneteenth June 19\nIndependence Day July 4\nLabor Day First Monday in September\nColumbus Day Second Monday in October\nVeteran s Day November 11\nThanksgiving Day Fourth Thursday in November\nChristmas Day December 25\n\n13.2 Hours of Operation. The contractor is responsible for conducting services, between\nthe hours of 8:00 am to 4:30 pm from Monday thru Friday except federal holidays or\nwhen the Government facility is closed due to local or national emergencies\nadministrative closing.\n\n14. GENERAL REQUIREMENTS:\n14.1 A two-week (fourteen work-day notice) request for any non-urgent maintenance\nshutdown required during business hours shall be provided to the COR from the\ncontractor in writing. Contractor shall not proceed with shutdown until the COR\nauthorizes to do so. Contractor to verify with COR prior to start of work, and on a daily,\nor system basis that effected systems have been properly shut down and secured to\nprevent risk to safety.\n\na. Contractor shall be responsible for the protection of all building floors, floor coverings,\nwalls, wall coverings, furniture, light fixtures and equipment in that may be subjected to damage while performing this contract. Contractor shall replace all damaged items with exactly matching item or a like item at the VACCHCS discretion.\n\nb. The contractor shall be responsible for removal and replacement of any ceiling tiles\naffected by the work.\n\nc. Work site shall be left free and clean of all debris after completion of work. Contractor\nshall be responsible for the safety of all VACCHCS employees, patients and visitors while performing contracted work, including slipping and tripping hazards. Contractor shall adequately barricade the immediate work site to prevent unauthorized individuals into the work area.\n\n15. GENERAL INFORMATION:\na. Contract Manager. The contractor shall provide a contract manager who shall be\nresponsible for the work. The name of this person, and an alternate(s) who shall act for\nthe contractor when the manager is absent, shall be designated in writing to the\ncontracting officer. The contract manager or alternate shall have full authority to act for\nthe contractor on all matters relating to this contract.\nb. The contract manager or alternate shall be available during normal working hours to meet with COR to discuss problem areas. The contract manager shall provide an emergency contract number for any emergency situation.\nc. The contractor shall keep its employees trained and certified at all time during contract\nperiod. The contractor shall ensure all employee certifications are submitted to CO and\nCOR for proper recording of training no later than ten (10) days after award of contract.\nVA has the right to inspect and request verification of licenses and certificates of during\nthe contract period. Contractor shall update list of any changes with personnel or\ncertificates/license and submit to COR and CO no later than 5 days of occurrence.\nd. Removal of Contractor s Employees. The contractor shall utilize only experienced,\nresponsible, and capable employees in the performance of this contract. The CO may\nrequire that the contractor remove from the Government job any employee that\nendangers persons, property, environment, EEO policy, Hostile work environment, or\nfederal workplace policy or violates the standards noted in this PWS.\ne. Government Furnished Equipment. This PWS does not have any government furnished\nequipment. Contractor shall not use any government own equipment, material, supplies,\nor tools. Contractor shall furnish all requirements.\n\n16. RECORDS:\nThe contractor shall be responsible for creating, maintaining government required\nrecords that are specifically cited in this PWS or required by the Federal, State, and Local law and authorities. The contractor shall provide the original records or a reproducible copy of any such record upon request from the government at no additional cost. The cost of reproductions and delivery shall be the contractor s responsibility. Only\nVACCHCS Engineering Service, COR, or CO shall have the authority to approve request and receive records. Contractor shall safeguard all information. Contractor shall inform CO and COR of any request made for which the CO or COR is required to approve. Additionally, the following standard items relate to records generated in executing the contract:\na. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29,\n31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a);\n36 CFR Part 1222 and Part 1228.\nb. Contractor shall treat all deliverables under the contract as the property of the U.S.\nGovernment for which the Government Agency shall have unlimited rights to use,\ndispose of, or disclose such data contained therein as it determines to be in the\npublic interest.\nc. Contractor shall not create or maintain any records that are not specifically tied to or\nauthorized by the contract using Government IT equipment and/or Government\nrecords.\nd. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that\ncontains information covered by the Privacy Act of 1974 or that which is generally\nprotected by the Freedom of Information Act.\ne. Contractor shall not create or maintain any records containing any Government\nAgency records that are not specifically tied to or authorized by the contract.\nf. The Government Agency owns the rights to all data/records produced as part of this\ncontract.\ng. The Government Agency owns the rights to all electronic information (electronic\ndata, electronic information systems, electronic databases, etc.) and all supporting\ndocumentation created as part of this contract. Contractor must deliver sufficient\ntechnical documentation with all data deliverables to permit the agency to use the\ndata.\nh. Contractor agrees to comply with Federal and Agency records management policies,\nincluding those policies associated with the safeguarding of records covered by the\nPrivacy Act of 1974. These policies include the preservation of all records created or\nreceived regardless of format [paper, electronic, etc.] or mode of transmission [email,\nfax, etc.] or state of completion [draft, final, etc.].\ni. No disposition of documents will be allowed without the prior written consent of the\nContracting Officer. The Agency and its Contractors are responsible for preventing\nthe alienation or unauthorized destruction of records, including all forms of mutilation.\nWillful and unlawful destruction, damage or alienation of Federal records is subject to\nthe fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed\nfrom the legal custody of the Agency or destroyed without regard to the provisions of\nthe agency records schedules.\nj. Contractor is required to obtain the Contracting Officer's approval prior to engaging\nin any contractual relationship (Subcontractor) in support of this contract requiring\nthe disclosure of information, documentary material and/or records generated under,\nor relating to, this contract. The Contractor (and any Subcontractor) is required to\nabide by Government and Agency guidance for protecting sensitive and proprietary\ninformation.\n\n17. SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK:\na. The Contractor acknowledges that it has taken steps reasonably necessary to\nascertain the nature and location of the work, and that it has investigated and\nsatisfied itself as to the general and local conditions which can affect the work or its\ncost, including but not limited to (1) conditions bearing upon transportation, disposal,\nhandling, and storage of materials; (2) the availability of labor, water, electric power,\nand roads; (3) uncertainties of weather, or similar physical conditions at the site; (4)\nthe conformation and condition of the ground; and (5) the character of equipment and\nfacilities needed preliminary to and during work performance. The Contractor also\nacknowledges that it has satisfied itself as to the character, quality, and quantity of\nmaterials or obstacles to be encountered insofar as this information is reasonably\nascertainable from an inspection of the site, as well as from any documents made a\npart of this contract. Any failure of the Contractor to take the actions described and\nacknowledged in this paragraph will not relieve the Contractor from responsibility for\nestimating properly the difficulty and cost of successfully performing the work, or for\nproceeding to successfully perform the work without additional expense to the\nGovernment.\nb. The Government assumes no responsibility for any conclusions or interpretations\nmade by the Contractor based on the information made available by the Government.\nNor does the Government assume responsibility for any understanding reached or\nrepresentation made concerning conditions which can affect the work by any of its\nofficers or agents before the execution of this contract, unless that understanding or\nrepresentation is expressly stated in this contract.\n\n18. QUALITY CONTROL PROGRAM: The Contractor shall coordinate, report, and ensure the\ntimely completion of the work specified in this PWS. This encompasses the planning,\ncoordination, technical direction, and surveillance of all activities necessary to execute all\nwork. The contractor shall submit their Quality Control plan in hardcopy in hard three ring\nbinders with cover page, table of contents and tabulated with dividers and digitally in PDF within\nten (10) days of contract award date. The COR will review the document and note any\nneeded clarifications and return to the Contractor for revisions, if necessary. A VA approved\nQAQC Plan shall be in place within thirty (30) days of the contract start date.\na. The contractor shall provide the overall management effort required to integrate\ntechnical and programmatic functions.\nb. The contractor shall ensure the technical excellence, cost effectiveness, and\ntimeliness of all required work deliverable products.\nc. The contractor shall develop and maintain an effective quality control program to\nensure service is performed in accordance with this PWS. The contractor shall\ndevelop and implement procedures to identify, prevent, and ensure non-recurrence of\ndefective services. The contractor s quality control program is the means by which\nhe/she assures that his/her work complies with the requirements of the contract. The\noverall goal of the program should be to identify and correct any problems that may\nexist before they are identified by or reported to the COR. The Government has the\nright to review and ask for corrections, additional items, and updates during the\ncontract period.\nd. The Contractors QAQC Plan shall include the following at a minimum:\ni. A comprehensive list of all devices and associated equipment required to be\nmaintained and/or inspected as part of this service contract in accordance\nwith the NFPA codes list in paragraph 2.1 above. This list shall be reviewed\nwith VA and discrepancies addressed prior to contract award.\nii. An inspection plan and schedule covering all services required by this\ncontract. The inspection plan must specify the areas to be inspected on either\na scheduled or unscheduled basis and how often inspections will be\naccomplished and documented. The name and title of the individual(s) who\nwill perform the inspections shall be noted.\niii. On site records of all inspections conducted by the Contractor noting\nnecessary corrective action(s) taken. The Government reserves the right to\nrequest copies of any inspection.\niv. The methods for identifying and/or preventing deficiencies in the quality of\nservice performed before the level of performance becomes unacceptable.\nv. Organizational structure and functions noting intermediate supervisory\nresponsibilities and overall management responsibilities for ensuring total\ncontract performance.\nvi. The Contractor shall provide as part of the QAQC Plan and maintain records\nidentifying the required certifications (per NFPA requirements) and ongoing\ntraining of each employee and/or laboratory testing agencies performing\nservices under this contract. The Contractor shall make any updates to\ncertifications or records for individuals and/or laboratory testing agencies\navailable for review by the VA.\n\n19. ATTACHMENTS:\nAttachment 1: Generators and ATSs\nAttachment 2: Specific tasks and service categories\nAttachment 3: Quality Assurance Surveillance Plan (QASP)\nAttachment 4: Delivery Schedule\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VACCHCS Gen Services\n\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 811210 ($34,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Testing, Inspection, and Maintenance Services of Emergency Generators and Automatic Throw Switches within Attachment 1.\n\n6. UEI Number\n\n7. If participant in GSA Federal Supply Schedule or Veterans Affairs national contracts; provide contract #.\n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions.\n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C26125Q0841","product_service_code":"J061"}],"due_at":"2025-08-12T20:00:00Z","due_date":"2025-08-12","closes_at":"2025-08-12T20:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","state":"CA","county":"06019","county_name":"Fresno County","city":"0627000","city_name":"Fresno","country":null,"state_source":null,"state_evidence":null,"site_key":null,"winner_key":"D2FSNNK4V5J7","amount":null,"linked_awards":1,"cancelled":false,"archived":true,"updated_at":"2026-11-05T04:14:16.450617Z","principal_notice_id":"8ab5f4b3971449a593e3b66bb9da9cbc","description":{"text":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY\n\nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 08/12/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing.\n\nDescription of Services:\n\n1. BACKGROUND: The VA Central California Healthcare System (VA CCHCS) Medical\nCenter requires generator and ATS maintenance service in compliance with NFPA 99,\n100,110 and ASTM Code Requirements.\n\n2. SCOPE OF WORK: The awarded contractor(s) shall be responsible for all costs associated\nwith accomplishing repairs and replacements, including labor, equipment and supplies for all\nequipment and systems specified or recommended by the equipment manufacturer. A\ncomprehensive list of equipment systems is available in Attachment #1\n\n2.1. The Contractor shall provide all labor, materials, equipment, supervision,\nadministrative support, and any necessary professional engineering services required\nfor the inspection, testing, maintenance (including cleaning) and repair of the 6\nGenerators and 17 ATSs listed in Attachment # 1.\n\n2.2. The Contractor shall provide maintenance service, in compliance with the following\ncodes, standards and references:\n2.2.1. NFPA 70E, 99, 100, and 110\n2.2.2. Equipment manufacturer's recommendations,\n2.2.3. ASTM 975 rules and ASTM D5837\n2.2.4. National Electrical Code,\n2.2.5. IEC 61198\n2.2.6. All other applicable laws, regulations, rules, ordinances, codes, etc.\n\n2.3. The specific tasks and services required for this contract are listed in Attachment #2.\n\n2.4. For service that does not require any power outages, the Contractor shall perform\nservices during normal hospital working hours acceptable to the COR. For services\nthat require complete or localized power outages, the Contractor shall perform these\nservices outside of normal working hours (5pm to 7am or weekends), coordinated in\nadvance with the COR. All services that interrupt or interfere with Medical or patient\nservices shall be coordinated in advance with the COR; this may require Contractor\nservice being performed outside of normal working hours. In some cases where\nmedical emergency or scheduled services such as surgery are performed, scheduling\nmay require advance planning up to a week in advance in coordination with the COR.\n\n2.5. The contractor shall perform no service on energized equipment without written\napproval from the Safety Officer, Engineering Chief, and Hospital Director. VACCHCS\nhas a formal procedure for approval of service on energized equipment. The Contractor will coordinate with the COR who will obtain these approvals for the Contractor. Approvals can take up to a week to obtain and are usually disapproved.\n\n2.6. The Contractor will adhere to NFPA 70E for Lock Out/ Tag Out and local VACCHCS\nprocedures for performing service on de-energized equipment.\n\n2.7. All fluids, parts or materials shall be disposed of in compliance with EPA, State, and\nlocal regulations and laws. The contractor will provide documentation to the COR in\naccordance with these regulations and laws.\n\n2.8. All equipment shall be serviced in accordance with the manufacturer's\nrecommendations, the best practices of the industry, and applicable codes, standards,\nand regulations. If a conflict arises between these standards, the most stringent will\nprevail.\n\n2.9. The contractor shall be responsible for the installation of signs and or barricades as\nrelated to equipment and / or systems as deemed necessary by the COR.\n\n2.10. If repairs require work outside the scope of routine maintenance, the contractor shall\nnotify the COR for appropriate decision and action. Demand maintenance procedures\nshall be followed for non-reoccurring maintenance repair work.\n\n2.11. The Contractor shall maintain workspaces in a clean and orderly manner. When work\nis performed in these areas, the Contractor's personnel shall clean up all debris and\nleave the area in a presentable condition. Floors shall be swept and mopped when\nrequired and all dust shall be removed from vertical and horizontal surfaces at each\nvisit. Remnant oil spots or stains are not tolerated. The Contractor must obtain the\napproval of the COR before storing anything in VA spaces. Operating supplies such\nas lubricants, rags, cleaners, etc., shall be properly secured in containers approved by\nthe COR. Storage shall not negatively impact the means of egress, fire protection\nsystems, and emergency lighting. Clearances from electrical equipment shall be\nmaintained as required by NFPA 70, the National Electrical Code.\n\n2.12. The Emergency Generators and ATSs which shall be inspected, tested, maintained\nand repaired under the contract can be found in Attachment 1.\n\n2.13. All inspection and testing intervals shall strictly adhere to the intervals required by the\ngoverning codes and standards and manufactures recommendations.\n2.13.1. Annual: Once in a 12-month period with a minimum of 330 calendar days and a maximum of 390 calendar days between tests events\n2.13.2. Semi-Annual: Twice in a 12-month period with a minimum of 160 calendar days and a maximum of 200 calendar days between test events.\n2.13.3. Quarterly: Four times in a 12-month period with a minimum of 75 calendar days and a maximum of 105 calendar days between test events. For ATS inspections and maintenance, a quarterly inspection is not required during the quarter that the annual maintenance is performed.\n2.13.4. Monthly: Every Calendar Month.\n2.13.5. Weekly: Every Calendar Week.\n\n2.14 At each quarterly scheduled preventative maintenance visit, the contractor shall\nobtain a hot oil sample, conduct a Spectro chemical analysis of the oil and provide a\nreport detailing the results of the test; add make up coolant and battery electrolyte to\nreplace any lost due to normal evaporation, and inspect as a minimum the items listed\nbelow, record findings and correction made.\n\n2.15 Contractor shall provide and preplace all fluids and filters.\nContractor is responsible for disposal of the fluids and providing appropriate\ndocumentation of disposal to the POC per EPA regulations.\n\n2.16 Contractor shall perform fuel testing and perform underground storage tank tightness testing. Fuel Tank Tightness test contractor shall provide a tightness test on all generators\nunderground fuel tanks annually in compliance with NFPA 30.21.5. (2021 Edition),\nFlammable and combustible Liquids to be completed\n\n2.17 At the conclusion of each inspection and test day the contractor shall go over all\nfindings in an informal setting with the Electrical Shop Supervisor for each piece of\nequipment inspected. The contractor shall clearly indicate and justify any adjustments,\nrepairs or replacements made to correct any problems or deficiencies. Sufficient\nspecifications shall be provided to the POC if the medical center is to provide any parts.\nContractor shall advise whether parts have been cleaned and lubricated where necessary.\n\n3. EMERGENCY / CALL BACK SERVICES:\n3.1. Emergency, urgent, and routine services and call back services are performed on a\nreimbursable basis based upon the contractor s labor rates provided in paragraph 8.1\n3.2. Emergency Services. The contractor shall response for emergency calls upon the\ndiscretion of the CO or COR. The contractor shall perform emergency repairs to the\nemergency generator and ATS systems. Emergency calls consist of correcting\nfailures that constitute an immediate danger to personnel, threaten to damage property,\nthreaten the environment, and threaten to disrupt operations. Contractor shall respond\nto emergency calls within thirty (30) minutes of initial call and provide on-site response\nwithin 4 hours of initial call. Contractor shall provide a list of contacts and phone\nnumbers.\n3.3. Urgent services. Urgent service calls will be classified as urgent at the discretion of the\nCO or COR. Generally, urgent calls consist of providing services or correcting failures\nwhich do not immediately threaten personnel, property, environment, or operations, but\nhave the potential of becoming threatening. Contractor shall response to urgent calls\nwithin two (2) hours of initial call and provide on-site response within 6 hours of initial\ncall.\n3.4. Routine services. Routine service call will be classified as routine when the work does\nnot qualify as an emergency or urgent call. Contractor shall respond to routine\nservices calls within three (3) days of initial call.\n3.5. Call list and log. Contractor shall provide and update a list of contacts and phone\nnumbers. Call numbers shall be for a 24-hour phone number monitored by the\ncontractor personnel at all times. A log shall be maintained of all service calls received;\na description of the problem or requested work, date and time received location, name,\nand number. The contractor shall plan and schedule work to assure material, labor,\nand equipment are available to complete work requirements with regard to the\nestablished time limits and quality standards. Call log shall be submitted the end of\nevery month no later than 5 days of following month. In the months with no calls,\ncontractor shall submit call log with an annotation that shall read NO EVENTS FOR\nTHE MONTH.\n\n4. SCHEDULED MAINTENANCE:\n4.1. MATERIALS TO BE FURNISHED:\nThe Contractor shall furnish all lubricants, fluids, cleaning supplies, parts and tools\nnecessary to perform the work described above. All lubricants shall be recommended\nby the manufacturer of the equipment.\n\n4.2. PARTS TO BE FURNISHED AND INSTALLED OR REPAIRED:\nThe Contractor shall provide the COR with a detailed cost report of the work to be\ndone. The COR will receive the detailed cost report prior to authorizing the work and\nthe billing shall be completed on a separate detailed invoice.\n\n4.3 SERVICE MANUALS/TOOLS/EQUIPMENT:\nThe Medical Centers will not provide tools, test equipment, service manuals or\nservice diagnostic software to the contractor. The contractor shall obtain and have on\nfile, all operational and technical documentation (such as: operational and service\nmanuals, schematics, and parts lists) which are necessary to meet the performance\nrequirements of this contract. The location and listing of the service data manuals, by\nname, and/or the manuals themselves shall be provided to the CO or COR upon\nrequest.\n\n4.3. REPORT OF SERVICES/DOCUMENTATION:\nUpon completion of any maintenance and / or repair services, the contractor shall\nreport to the COR and provide a written report detailing services performed and obtain\nthe signature and name of an authorized representative of the VA prior to departure\nfrom the site. Contractor shall prepare and submit a written report on or before the\nthird (3rd) day of each month detailing all services performed during the previous\nmonth. This report shall be required prior to billing. Invoices shall not be paid until\nreport is received and verified. Contractor shall maintain a complete orderly and\nchronological file, including, but not limited to, parts list, copies of reports required by\ncontract, etc. A hardcopy of this file shall be submitted to the COR every 12 months\nand shall also available for inspection upon request of the Contracting Officer or COR.\nThe contractor will provide an electronic means 24/7 to obtain and download current\nand archived reports, equipment photos, repair information, and VA specific data on\nVA equipment condition and age.\n\n5. INSPECTION AND TESTING SERVICES:\n5.1. INSPECTION:\nRoutine and Periodic inspections of the equipment for this contract shall be performed\nby qualified technicians. Upon completion of a routine inspection, the VA shall be\nfurnished with the inspection report listing deficiencies necessary to repair. The\ncontractor shall furnish a written report of each inspection to the COR.\n\n6. SERVICE CALLS:\nContractor shall provide information as to where service calls are to be placed. The\nContractor shall respond promptly within one (1) hour to requests for service after\nnormal business hours and provide on-site response within five (5) hours of initial call.\nThe Contractor shall maintain a service call log or record which shall be available for\ninspection by the VA at all times. As a minimum, the call log or record shall contain\nthe information specified herein\n6.1. Name of Caller.\n6.2. Description of problem; location where problem exists\n6.3. Time and date call was received\n6.4. Description of the action taken to resolve the problem and the time and date\ncorrective action was taken.\n\n7. EMERGENCY CALL-BACK SERVICE\n7.1. Emergency call-back service consists of promptly responding to requests for\nemergency service 24 hours per day, 7 days per week. The contractor shall report to\nthe site of the emergency within five (5) hours of the time of notification and shall\nremain on the job until the emergency has been resolved. If the situation cannot be\nresolved immediately, the Contractor shall promptly notify the COR of the time and\ndate corrective action shall be taken.\n\n7.2. For service other than what is considered to be an emergency, outside the normal\nworking hours of 8:00 a.m. to 4:30 p.m. Monday through Friday, the contractor shall\nreport to the site within five (5) hours after time of notification. If the situation cannot\nbe resolved within 4 hours after on-site arrival, the contractor shall notify the COR of\nthe problem and the time and date corrective action will be completed.\n\n7.3. Requests for service may be made by the COR or his/her representative by telephone\nor other means.\n\n7.4. The contractor shall be reimbursed at the hourly rate previously agreed upon for\nemergency call-back service during other than normal working hours. Refer to the\nREPAIRS section for pricing schedule for demand service repairs. Please include this\nin your bid submission\n\n8. REPAIRS:\nThe government will fund the purchase order associated with the contract an additional\nsum of $15,000.00 for reimbursement of contractor costs for repair or investigation\nwork. Repair and investigation work may be requested through the emergency/call\nback procedures or as a result of routine inspection/testing services.\n8.1. Labor: Contractor shall submit with their bid proposal a schedule of labor rates that\nwill be charged for repair work performed during normal business hours and during\nnon-business hours, holidays and weekends. The labor rates shall be submitted for\nthe base year and each option year. The submitted shall remain unchanged\nthroughout the term of the contract. Prevailing wages apply.\n8.2. Materials: The contractor shall provide all materials associated with repair work at the\nContractor s cost plus a reasonable mark-up for overhead, profit and handling. The\ncontractor may be requested by the COR to provide evidence documenting the\ncontractors procurement costs associated with materials. Contractor shall submit a\nschedule with their bid proposal for the base year and each option year, listing the\namount(s) or percentage(s) associated with materials mark-up. The submitted markup\nfor materials shall remain unchanged throughout the term of the contract.\n8.3. Travel/Per Diem: Costs associated with contractor travel/Per Diem shall not exceed\nthe amounts established by the U.S. General Services Administration (GSA). Rates\ncan be obtained at: https://www.gsa.gov/travel-resources\n8.4. Labor Costs Incurred During Travel (Travel Time): Contractor may charge for no\nmore than four hours of labor per an employee, per a repair when Contractors staff\nmust travel to perform Demand Maintenance.\n8.5. Contractor Reimbursement: Contractor shall be reimbursed for Time and Material\nwork by submitting an invoice to the COR for review and approval prior to invoicing\nthrough Tungsten. The government shall approve for payment submission or reject\nthe invoice within 14 calendar days.\n8.6. The contractor shall not perform any repairs not included in the PWS or beyond the\nallotment made for repair reimbursement. Contractor will not be compensated for any\naddition repairs without proper authority. Contractor shall obtain a written approval or\nchange order with authorization and notification of available funds. Only the\nContracting Officer has the authority to approve change orders. The contractor shall\nnot assume that an increase to the allotted repair funds will be approved or available.\nThe contract shall not invoice against the repair funds without approval of the COR or\nCO. All repairs shall be authorized in writing. The contractor is responsible for ensuring\nthe repair fund allocation is not exceeded.\n\n9. REPORTS:\n9.1 Service Report submissions: The contractor shall provide sample testing and\ninspection reports in their technical package for COR review and approval. Contractor\nshall deliver formal/ final reports of service no later than seven (7) calendar days from\ncompletion of each service. Contractor shall transmit the reports digitally in PDF by email\nto the COR. All reports shall adhere to and shall be equivalent to NFPA templates or\nstandards and shall be completed in full and signed. At the conclusion of the annual\ntesting/inspection/maintenance the contractor shall supply a comprehensive report\ninclusive of the most recent year of services in two (2) hard copies in three ring binders\nwith cover page, table of contents and tabulated with dividers and one PDF copy on CD\nRom of all reports. The annual reports shall include sections for all callback services\nand for all repair reports. Repair reports must clearly link to the\ntesting/inspection/maintenance deficiency to demonstrate proper resolution of each\ndeficiency identified during testing/inspection. Quarterly and Annual Inspection\nReports shall be submitted within 7 calendar days of the service in two (2) hard three\nring binders with cover page, table of contents and tabulated with dividers and one PDF\ncopy on CD Rom. The contractor will provide an electronic means 24/7 to obtain and\ndownload current and archived reports, equipment photos, repair information, and VA\nspecific data on VA equipment condition and age.\n\n9.2 Deficiency Report. When any deficiencies are identified, the contractor shall inform the\nCOR immediately via verbal and written notification email. Contractor shall submit the\ndeficiency report to the COR within two (2) business days. The deficiency report shall\ninclude at a minimum the following information:\n9.2.2 Location\n9.2.2 Equipment/system name\n9.2.3 Date of failure identification\n9.2.4 Description of failure (pictures, drawings, etc.)\n9.2.5 Justification (if repair is not accomplished)\n9.2.6 Description of repair work (pictures, drawings, etc.)\n9.2.7 Material list (description of article, quantity, catalogue-cut, pictures, etc.) for repair\n9.2.8 Proposed repair schedule\n9.2.9 Cost proposal\n9.2.10 Submission date of the report\n9.2.11 Signature of technician\n\n9.3 Repair report. Upon completion of any repair work, whether via callback or following\nroutine testing/inspection service, the contractor shall supply a repair report certifying the\nrepair work was completed. The report shall be provided by email within two (2)\nbusiness days of completion.\n\n9.4 Annual Schedule. The contractor shall submit an annual schedule to the COR to obtain\napproval within fifteen (15) days from contract award date and the start date of each\noption year. The annual schedule shall show the order in which the contractor proposes\nto perform the inspections, testing, calibration, and maintenance service, the dates on\nwhich the contractor will start each work element, and the scheduled date for completion\nof each element.\n\n10 . CONTRACTOR QUALIFICATIONS:\n10.1 Contractor personnel performing service on this contract shall be trained and qualified\nfor the specific manufacturer s equipment and have all required certifications and/or\nlicenses. The Contractor shall maintain certifications, training records of each\nemployee and/or laboratory testing agencies performing services under this contract.\nThe Contractor shall make all updates to certification or records for individuals and/or\nlaboratory testing agencies available for review by the VA. The contractor shall provide\na copy of the certification records and photocopy of the employee s identification prior to\nthe start of work.\n\n10.2 It is the contractor s responsibility to ensure that only properly trained and competent\npersons perform inspections, testing and maintenance on the emergency generator and\nelectrical system. Evidence of training shall be supplied to the VA prior to the start of\nwork and if/when new individuals are added by the contractor to perform on this\ncontract.\n\n11. PLACE OF PERFORMANCE: Fresno VA Medical Center - 2615 E. Clinton Ave. Fresno,\nCA 93703\n\n12. PERIOD OF PERFORMANCE: Base Plus (1) Option Year.\nBase Period: September 30, 2025 thru September 29, 2026\nOption Year #1: September 30, 2026 thru September 29, 2027\n\n13. HOLIDAYS:\n13.1 Legal holidays recognized by the Federal Government in accordance with 5 U.S.C.\n6103, Executive Order 11582 and Public Law 94-97 or any other by the President of the\nUnited States to be a national holiday, the following national holidays are observed\nand for the purpose of this contract is defined as Legal Federal, official holidays as\nfollows:\nRecognized Holidays\n\nNew Year s Day January 1\nMartin Luther King Jr. s Birthday Third Monday in January\nPresident s Day Third Monday in February\nMemorial Day Last Monday in May\nJuneteenth June 19\nIndependence Day July 4\nLabor Day First Monday in September\nColumbus Day Second Monday in October\nVeteran s Day November 11\nThanksgiving Day Fourth Thursday in November\nChristmas Day December 25\n\n13.2 Hours of Operation. The contractor is responsible for conducting services, between\nthe hours of 8:00 am to 4:30 pm from Monday thru Friday except federal holidays or\nwhen the Government facility is closed due to local or national emergencies\nadministrative closing.\n\n14. GENERAL REQUIREMENTS:\n14.1 A two-week (fourteen work-day notice) request for any non-urgent maintenance\nshutdown required during business hours shall be provided to the COR from the\ncontractor in writing. Contractor shall not proceed with shutdown until the COR\nauthorizes to do so. Contractor to verify with COR prior to start of work, and on a daily,\nor system basis that effected systems have been properly shut down and secured to\nprevent risk to safety.\n\na. Contractor shall be responsible for the protection of all building floors, floor coverings,\nwalls, wall coverings, furniture, light fixtures and equipment in that may be subjected to damage while performing this contract. Contractor shall replace all damaged items with exactly matching item or a like item at the VACCHCS discretion.\n\nb. The contractor shall be responsible for removal and replacement of any ceiling tiles\naffected by the work.\n\nc. Work site shall be left free and clean of all debris after completion of work. Contractor\nshall be responsible for the safety of all VACCHCS employees, patients and visitors while performing contracted work, including slipping and tripping hazards. Contractor shall adequately barricade the immediate work site to prevent unauthorized individuals into the work area.\n\n15. GENERAL INFORMATION:\na. Contract Manager. The contractor shall provide a contract manager who shall be\nresponsible for the work. The name of this person, and an alternate(s) who shall act for\nthe contractor when the manager is absent, shall be designated in writing to the\ncontracting officer. The contract manager or alternate shall have full authority to act for\nthe contractor on all matters relating to this contract.\nb. The contract manager or alternate shall be available during normal working hours to meet with COR to discuss problem areas. The contract manager shall provide an emergency contract number for any emergency situation.\nc. The contractor shall keep its employees trained and certified at all time during contract\nperiod. The contractor shall ensure all employee certifications are submitted to CO and\nCOR for proper recording of training no later than ten (10) days after award of contract.\nVA has the right to inspect and request verification of licenses and certificates of during\nthe contract period. Contractor shall update list of any changes with personnel or\ncertificates/license and submit to COR and CO no later than 5 days of occurrence.\nd. Removal of Contractor s Employees. The contractor shall utilize only experienced,\nresponsible, and capable employees in the performance of this contract. The CO may\nrequire that the contractor remove from the Government job any employee that\nendangers persons, property, environment, EEO policy, Hostile work environment, or\nfederal workplace policy or violates the standards noted in this PWS.\ne. Government Furnished Equipment. This PWS does not have any government furnished\nequipment. Contractor shall not use any government own equipment, material, supplies,\nor tools. Contractor shall furnish all requirements.\n\n16. RECORDS:\nThe contractor shall be responsible for creating, maintaining government required\nrecords that are specifically cited in this PWS or required by the Federal, State, and Local law and authorities. The contractor shall provide the original records or a reproducible copy of any such record upon request from the government at no additional cost. The cost of reproductions and delivery shall be the contractor s responsibility. Only\nVACCHCS Engineering Service, COR, or CO shall have the authority to approve request and receive records. Contractor shall safeguard all information. Contractor shall inform CO and COR of any request made for which the CO or COR is required to approve. Additionally, the following standard items relate to records generated in executing the contract:\na. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29,\n31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a);\n36 CFR Part 1222 and Part 1228.\nb. Contractor shall treat all deliverables under the contract as the property of the U.S.\nGovernment for which the Government Agency shall have unlimited rights to use,\ndispose of, or disclose such data contained therein as it determines to be in the\npublic interest.\nc. Contractor shall not create or maintain any records that are not specifically tied to or\nauthorized by the contract using Government IT equipment and/or Government\nrecords.\nd. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that\ncontains information covered by the Privacy Act of 1974 or that which is generally\nprotected by the Freedom of Information Act.\ne. Contractor shall not create or maintain any records containing any Government\nAgency records that are not specifically tied to or authorized by the contract.\nf. The Government Agency owns the rights to all data/records produced as part of this\ncontract.\ng. The Government Agency owns the rights to all electronic information (electronic\ndata, electronic information systems, electronic databases, etc.) and all supporting\ndocumentation created as part of this contract. Contractor must deliver sufficient\ntechnical documentation with all data deliverables to permit the agency to use the\ndata.\nh. Contractor agrees to comply with Federal and Agency records management policies,\nincluding those policies associated with the safeguarding of records covered by the\nPrivacy Act of 1974. These policies include the preservation of all records created or\nreceived regardless of format [paper, electronic, etc.] or mode of transmission [email,\nfax, etc.] or state of completion [draft, final, etc.].\ni. No disposition of documents will be allowed without the prior written consent of the\nContracting Officer. The Agency and its Contractors are responsible for preventing\nthe alienation or unauthorized destruction of records, including all forms of mutilation.\nWillful and unlawful destruction, damage or alienation of Federal records is subject to\nthe fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed\nfrom the legal custody of the Agency or destroyed without regard to the provisions of\nthe agency records schedules.\nj. Contractor is required to obtain the Contracting Officer's approval prior to engaging\nin any contractual relationship (Subcontractor) in support of this contract requiring\nthe disclosure of information, documentary material and/or records generated under,\nor relating to, this contract. The Contractor (and any Subcontractor) is required to\nabide by Government and Agency guidance for protecting sensitive and proprietary\ninformation.\n\n17. SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK:\na. The Contractor acknowledges that it has taken steps reasonably necessary to\nascertain the nature and location of the work, and that it has investigated and\nsatisfied itself as to the general and local conditions which can affect the work or its\ncost, including but not limited to (1) conditions bearing upon transportation, disposal,\nhandling, and storage of materials; (2) the availability of labor, water, electric power,\nand roads; (3) uncertainties of weather, or similar physical conditions at the site; (4)\nthe conformation and condition of the ground; and (5) the character of equipment and\nfacilities needed preliminary to and during work performance. The Contractor also\nacknowledges that it has satisfied itself as to the character, quality, and quantity of\nmaterials or obstacles to be encountered insofar as this information is reasonably\nascertainable from an inspection of the site, as well as from any documents made a\npart of this contract. Any failure of the Contractor to take the actions described and\nacknowledged in this paragraph will not relieve the Contractor from responsibility for\nestimating properly the difficulty and cost of successfully performing the work, or for\nproceeding to successfully perform the work without additional expense to the\nGovernment.\nb. The Government assumes no responsibility for any conclusions or interpretations\nmade by the Contractor based on the information made available by the Government.\nNor does the Government assume responsibility for any understanding reached or\nrepresentation made concerning conditions which can affect the work by any of its\nofficers or agents before the execution of this contract, unless that understanding or\nrepresentation is expressly stated in this contract.\n\n18. QUALITY CONTROL PROGRAM: The Contractor shall coordinate, report, and ensure the\ntimely completion of the work specified in this PWS. This encompasses the planning,\ncoordination, technical direction, and surveillance of all activities necessary to execute all\nwork. The contractor shall submit their Quality Control plan in hardcopy in hard three ring\nbinders with cover page, table of contents and tabulated with dividers and digitally in PDF within\nten (10) days of contract award date. The COR will review the document and note any\nneeded clarifications and return to the Contractor for revisions, if necessary. A VA approved\nQAQC Plan shall be in place within thirty (30) days of the contract start date.\na. The contractor shall provide the overall management effort required to integrate\ntechnical and programmatic functions.\nb. The contractor shall ensure the technical excellence, cost effectiveness, and\ntimeliness of all required work deliverable products.\nc. The contractor shall develop and maintain an effective quality control program to\nensure service is performed in accordance with this PWS. The contractor shall\ndevelop and implement procedures to identify, prevent, and ensure non-recurrence of\ndefective services. The contractor s quality control program is the means by which\nhe/she assures that his/her work complies with the requirements of the contract. The\noverall goal of the program should be to identify and correct any problems that may\nexist before they are identified by or reported to the COR. The Government has the\nright to review and ask for corrections, additional items, and updates during the\ncontract period.\nd. The Contractors QAQC Plan shall include the following at a minimum:\ni. A comprehensive list of all devices and associated equipment required to be\nmaintained and/or inspected as part of this service contract in accordance\nwith the NFPA codes list in paragraph 2.1 above. This list shall be reviewed\nwith VA and discrepancies addressed prior to contract award.\nii. An inspection plan and schedule covering all services required by this\ncontract. The inspection plan must specify the areas to be inspected on either\na scheduled or unscheduled basis and how often inspections will be\naccomplished and documented. The name and title of the individual(s) who\nwill perform the inspections shall be noted.\niii. On site records of all inspections conducted by the Contractor noting\nnecessary corrective action(s) taken. The Government reserves the right to\nrequest copies of any inspection.\niv. The methods for identifying and/or preventing deficiencies in the quality of\nservice performed before the level of performance becomes unacceptable.\nv. Organizational structure and functions noting intermediate supervisory\nresponsibilities and overall management responsibilities for ensuring total\ncontract performance.\nvi. The Contractor shall provide as part of the QAQC Plan and maintain records\nidentifying the required certifications (per NFPA requirements) and ongoing\ntraining of each employee and/or laboratory testing agencies performing\nservices under this contract. The Contractor shall make any updates to\ncertifications or records for individuals and/or laboratory testing agencies\navailable for review by the VA.\n\n19. ATTACHMENTS:\nAttachment 1: Generators and ATSs\nAttachment 2: Specific tasks and service categories\nAttachment 3: Quality Assurance Surveillance Plan (QASP)\nAttachment 4: Delivery Schedule\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VACCHCS Gen Services\n\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 811210 ($34,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Testing, Inspection, and Maintenance Services of Emergency Generators and Automatic Throw Switches within Attachment 1.\n\n6. UEI Number\n\n7. If participant in GSA Federal Supply Schedule or Veterans Affairs national contracts; provide contract #.\n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions.\n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","html":"This is a SOURCES SOUGHT ANNOUNCEMENT ONLY \n\nThe intent of this Sources Sought Announcement is to assist in our decision-making process for services procurement. This is not a solicitation, nor request for quotes or proposals. Through the receipt of responses, this will enable a more precise type of procurement process. The Government is not obligated to, nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award of a contract, nor does it restrict the Government to a particular acquisition approach. Any inquiries are to be made in writing by email to the point of contact, Larry Facio, Contracting Officer. Responses to this notice shall be sent by email to larry.facio@va.gov by the due date and time of 08/12/2025 by 1:00 p.m. (Pacific Time). Upon receipt of capabilities statement, Contracting Officer may request additional market research aid such as informal pricing. \n\nDescription of Services:\n\n1. BACKGROUND: The VA Central California Healthcare System (VA CCHCS) Medical\nCenter requires generator and ATS maintenance service in compliance with NFPA 99,\n100,110 and ASTM Code Requirements.\n\n2. SCOPE OF WORK: The awarded contractor(s) shall be responsible for all costs associated\nwith accomplishing repairs and replacements, including labor, equipment and supplies for all\nequipment and systems specified or recommended by the equipment manufacturer. A\ncomprehensive list of equipment systems is available in Attachment #1\n\n2.1. The Contractor shall provide all labor, materials, equipment, supervision,\nadministrative support, and any necessary professional engineering services required\nfor the inspection, testing, maintenance (including cleaning) and repair of the 6\nGenerators and 17 ATSs listed in Attachment # 1.\n\n2.2. The Contractor shall provide maintenance service, in compliance with the following\ncodes, standards and references:\n2.2.1. NFPA 70E, 99, 100, and 110\n2.2.2. Equipment manufacturer's recommendations,\n2.2.3. ASTM   975 rules and ASTM D5837\n2.2.4. National Electrical Code,\n2.2.5. IEC 61198\n2.2.6. All other applicable laws, regulations, rules, ordinances, codes, etc.\n\n2.3. The specific tasks and services required for this contract are listed in Attachment #2.\n\n2.4. For service that does not require any power outages, the Contractor shall perform\nservices during normal hospital working hours acceptable to the COR. For services\nthat require complete or localized power outages, the Contractor shall perform these\nservices outside of normal working hours (5pm to 7am or weekends), coordinated in\nadvance with the COR. All services that interrupt or interfere with Medical or patient\nservices shall be coordinated in advance with the COR; this may require Contractor\nservice being performed outside of normal working hours. In some cases where\nmedical emergency or scheduled services such as surgery are performed, scheduling\nmay require advance planning up to a week in advance in coordination with the COR.\n\n2.5. The contractor shall perform no service on energized equipment without written\napproval from the Safety Officer, Engineering Chief, and Hospital Director. VACCHCS\nhas a formal procedure for approval of service on energized equipment. The Contractor will coordinate with the COR who will obtain these approvals for the Contractor. Approvals can take up to a week to obtain and are usually disapproved.\n\n2.6. The Contractor will adhere to NFPA 70E for Lock Out/ Tag Out and local VACCHCS\nprocedures for performing service on de-energized equipment.\n\n2.7. All fluids, parts or materials shall be disposed of in compliance with EPA, State, and\nlocal regulations and laws. The contractor will provide documentation to the COR in\naccordance with these regulations and laws.\n\n2.8. All equipment shall be serviced in accordance with the manufacturer's\nrecommendations, the best practices of the industry, and applicable codes, standards,\nand regulations. If a conflict arises between these standards, the most stringent will\nprevail.\n\n2.9. The contractor shall be responsible for the installation of signs and or barricades as\nrelated to equipment and / or systems as deemed necessary by the COR.\n\n2.10. If repairs require work outside the scope of routine maintenance, the contractor shall\nnotify the COR for appropriate decision and action. Demand maintenance procedures\nshall be followed for non-reoccurring maintenance repair work.\n\n2.11. The Contractor shall maintain workspaces in a clean and orderly manner. When work\nis performed in these areas, the Contractor's personnel shall clean up all debris and\nleave the area in a presentable condition. Floors shall be swept and mopped when\nrequired and all dust shall be removed from vertical and horizontal surfaces at each\nvisit. Remnant oil spots or stains are not tolerated. The Contractor must obtain the\napproval of the COR before storing anything in VA spaces. Operating supplies such\nas lubricants, rags, cleaners, etc., shall be properly secured in containers approved by\nthe COR. Storage shall not negatively impact the means of egress, fire protection\nsystems, and emergency lighting. Clearances from electrical equipment shall be\nmaintained as required by NFPA 70, the National Electrical Code.\n\n2.12. The Emergency Generators and ATSs which shall be inspected, tested, maintained\nand repaired under the contract can be found in Attachment 1.\n\n2.13. All inspection and testing intervals shall strictly adhere to the intervals required by the\ngoverning codes and standards and manufactures recommendations.\n2.13.1.  Annual: Once in a 12-month period with a minimum of 330 calendar days and a maximum of 390 calendar days between tests events\n2.13.2. Semi-Annual: Twice in a 12-month period with a minimum of 160 calendar days and a maximum of 200 calendar days between test events.\n2.13.3. Quarterly: Four times in a 12-month period with a minimum of 75 calendar days and a maximum of 105 calendar days between test events. For ATS inspections and maintenance, a quarterly inspection is not required during the quarter that the annual maintenance is performed.\n 2.13.4. Monthly: Every Calendar Month.\n 2.13.5. Weekly: Every Calendar Week.\n\n2.14 At each quarterly scheduled preventative maintenance visit, the contractor shall\nobtain a hot oil sample, conduct a Spectro chemical analysis of the oil and provide a\nreport detailing the results of the test; add make up coolant and battery electrolyte to\nreplace any lost due to normal evaporation, and inspect as a minimum the items listed\nbelow, record findings and correction made.\n\n2.15  Contractor shall provide and preplace all fluids and filters.\nContractor is responsible for disposal of the fluids and providing appropriate\ndocumentation of disposal to the POC per EPA regulations.\n\n2.16 Contractor shall perform fuel testing and perform underground storage tank tightness testing. Fuel Tank Tightness test contractor shall provide a tightness test on all generators\nunderground fuel tanks annually in compliance with NFPA 30.21.5. (2021 Edition),\nFlammable and combustible Liquids to be completed\n\n2.17  At the conclusion of each inspection and test day the contractor shall go over all\nfindings in an informal setting with the Electrical Shop Supervisor for each piece of\nequipment inspected. The contractor shall clearly indicate and justify any adjustments,\nrepairs or replacements made to correct any problems or deficiencies. Sufficient\nspecifications shall be provided to the POC if the medical center is to provide any parts.\nContractor shall advise whether parts have been cleaned and lubricated where necessary.\n\n3. EMERGENCY / CALL BACK SERVICES:\n3.1. Emergency, urgent, and routine services and call back services are performed on a\nreimbursable basis based upon the contractor s labor rates provided in paragraph 8.1\n3.2. Emergency Services. The contractor shall response for emergency calls upon the\ndiscretion of the CO or COR. The contractor shall perform emergency repairs to the\nemergency generator and ATS systems. Emergency calls consist of correcting\nfailures that constitute an immediate danger to personnel, threaten to damage property,\nthreaten the environment, and threaten to disrupt operations. Contractor shall respond\nto emergency calls within thirty (30) minutes of initial call and provide on-site response\nwithin 4 hours of initial call. Contractor shall provide a list of contacts and phone\nnumbers.\n3.3. Urgent services. Urgent service calls will be classified as urgent at the discretion of the\nCO or COR. Generally, urgent calls consist of providing services or correcting failures\nwhich do not immediately threaten personnel, property, environment, or operations, but\nhave the potential of becoming threatening. Contractor shall response to urgent calls\nwithin two (2) hours of initial call and provide on-site response within 6 hours of initial\ncall.\n3.4. Routine services. Routine service call will be classified as routine when the work does\nnot qualify as an emergency or urgent call. Contractor shall respond to routine\nservices calls within three (3) days of initial call.\n3.5. Call list and log. Contractor shall provide and update a list of contacts and phone\nnumbers. Call numbers shall be for a 24-hour phone number monitored by the\ncontractor personnel at all times. A log shall be maintained of all service calls received;\na description of the problem or requested work, date and time received location, name,\nand number. The contractor shall plan and schedule work to assure material, labor,\nand equipment are available to complete work requirements with regard to the\nestablished time limits and quality standards. Call log shall be submitted the end of\nevery month no later than 5 days of following month. In the months with no calls,\ncontractor shall submit call log with an annotation that shall read NO EVENTS FOR\nTHE MONTH.\n\n4. SCHEDULED MAINTENANCE:\n4.1. MATERIALS TO BE FURNISHED:\nThe Contractor shall furnish all lubricants, fluids, cleaning supplies, parts and tools\nnecessary to perform the work described above. All lubricants shall be recommended\nby the manufacturer of the equipment.\n\n4.2. PARTS TO BE FURNISHED AND INSTALLED OR REPAIRED:\nThe Contractor shall provide the COR with a detailed cost report of the work to be\ndone. The COR will receive the detailed cost report prior to authorizing the work and\nthe billing shall be completed on a separate detailed invoice.\n\n4.3 SERVICE MANUALS/TOOLS/EQUIPMENT:\nThe Medical Centers will not provide tools, test equipment, service manuals or\nservice diagnostic software to the contractor. The contractor shall obtain and have on\nfile, all operational and technical documentation (such as: operational and service\nmanuals, schematics, and parts lists) which are necessary to meet the performance\nrequirements of this contract. The location and listing of the service data manuals, by\nname, and/or the manuals themselves shall be provided to the CO or COR upon\nrequest.\n\n4.3. REPORT OF SERVICES/DOCUMENTATION:\nUpon completion of any maintenance and / or repair services, the contractor shall\nreport to the COR and provide a written report detailing services performed and obtain\nthe signature and name of an authorized representative of the VA prior to departure\nfrom the site. Contractor shall prepare and submit a written report on or before the\nthird (3rd) day of each month detailing all services performed during the previous\nmonth. This report shall be required prior to billing. Invoices shall not be paid until\nreport is received and verified. Contractor shall maintain a complete orderly and\nchronological file, including, but not limited to, parts list, copies of reports required by\ncontract, etc. A hardcopy of this file shall be submitted to the COR every 12 months\nand shall also available for inspection upon request of the Contracting Officer or COR.\nThe contractor will provide an electronic means 24/7 to obtain and download current\nand archived reports, equipment photos, repair information, and VA specific data on\nVA equipment condition and age.\n\n5. INSPECTION AND TESTING SERVICES:\n5.1. INSPECTION:\nRoutine and Periodic inspections of the equipment for this contract shall be performed\nby qualified technicians. Upon completion of a routine inspection, the VA shall be\nfurnished with the inspection report listing deficiencies necessary to repair. The\ncontractor shall furnish a written report of each inspection to the COR.\n\n6. SERVICE CALLS:\nContractor shall provide information as to where service calls are to be placed. The\nContractor shall respond promptly within one (1) hour to requests for service after\nnormal business hours and provide on-site response within five (5) hours of initial call.\nThe Contractor shall maintain a service call log or record which shall be available for\ninspection by the VA at all times. As a minimum, the call log or record shall contain\nthe information specified herein\n6.1. Name of Caller.\n6.2. Description of problem; location where problem exists\n6.3. Time and date call was received\n6.4. Description of the action taken to resolve the problem and the time and date\ncorrective action was taken.\n\n7. EMERGENCY CALL-BACK SERVICE\n7.1. Emergency call-back service consists of promptly responding to requests for\nemergency service 24 hours per day, 7 days per week. The contractor shall report to\nthe site of the emergency within five (5) hours of the time of notification and shall\nremain on the job until the emergency has been resolved. If the situation cannot be\nresolved immediately, the Contractor shall promptly notify the COR of the time and\ndate corrective action shall be taken.\n\n7.2. For service other than what is considered to be an emergency, outside the normal\nworking hours of 8:00 a.m. to 4:30 p.m. Monday through Friday, the contractor shall\nreport to the site within five (5) hours after time of notification. If the situation cannot\nbe resolved within 4 hours after on-site arrival, the contractor shall notify the COR of\nthe problem and the time and date corrective action will be completed.\n\n7.3. Requests for service may be made by the COR or his/her representative by telephone\nor other means.\n\n7.4. The contractor shall be reimbursed at the hourly rate previously agreed upon for\nemergency call-back service during other than normal working hours. Refer to the\nREPAIRS section for pricing schedule for demand service repairs. Please include this\nin your bid submission\n\n8. REPAIRS:\nThe government will fund the purchase order associated with the contract an additional\nsum of $15,000.00 for reimbursement of contractor costs for repair or investigation\nwork. Repair and investigation work may be requested through the emergency/call\nback procedures or as a result of routine inspection/testing services.\n8.1. Labor: Contractor shall submit with their bid proposal a schedule of labor rates that\nwill be charged for repair work performed during normal business hours and during\nnon-business hours, holidays and weekends. The labor rates shall be submitted for\nthe base year and each option year. The submitted shall remain unchanged\nthroughout the term of the contract. Prevailing wages apply.\n8.2. Materials: The contractor shall provide all materials associated with repair work at the\nContractor s cost plus a reasonable mark-up for overhead, profit and handling. The\ncontractor may be requested by the COR to provide evidence documenting the\ncontractors  procurement costs associated with materials. Contractor shall submit a\nschedule with their bid proposal for the base year and each option year, listing the\namount(s) or percentage(s) associated with materials mark-up. The submitted markup\nfor materials shall remain unchanged throughout the term of the contract.\n8.3. Travel/Per Diem: Costs associated with contractor travel/Per Diem shall not exceed\nthe amounts established by the U.S. General Services Administration (GSA). Rates\ncan be obtained at: https://www.gsa.gov/travel-resources\n8.4. Labor Costs Incurred During Travel (Travel Time): Contractor may charge for no\nmore than four hours of labor per an employee, per a repair when Contractors staff\nmust travel to perform Demand Maintenance.\n8.5. Contractor Reimbursement: Contractor shall be reimbursed for Time and Material\nwork by submitting an invoice to the COR for review and approval prior to invoicing\nthrough Tungsten. The government shall approve for payment submission or reject\nthe invoice within 14 calendar days.\n8.6. The contractor shall not perform any repairs not included in the PWS or beyond the\nallotment made for repair reimbursement. Contractor will not be compensated for any\naddition repairs without proper authority. Contractor shall obtain a written approval or\nchange order with authorization and notification of available funds. Only the\nContracting Officer has the authority to approve change orders. The contractor shall\nnot assume that an increase to the allotted repair funds will be approved or available.\nThe contract shall not invoice against the repair funds without approval of the COR or\nCO. All repairs shall be authorized in writing. The contractor is responsible for ensuring\nthe repair fund allocation is not exceeded.\n\n9. REPORTS:\n9.1 Service Report submissions: The contractor shall provide sample testing and\ninspection reports in their technical package for COR review and approval. Contractor\nshall deliver formal/ final reports of service no later than seven (7) calendar days from\ncompletion of each service. Contractor shall transmit the reports digitally in PDF by email\nto the COR. All reports shall adhere to and shall be equivalent to NFPA templates or\nstandards and shall be completed in full and signed. At the conclusion of the annual\ntesting/inspection/maintenance the contractor shall supply a comprehensive report\ninclusive of the most recent year of services in two (2) hard copies in three ring binders\nwith cover page, table of contents and tabulated with dividers and one PDF copy on CD\nRom of all reports. The annual reports shall include sections for all callback services\nand for all repair reports. Repair reports must clearly link to the\ntesting/inspection/maintenance deficiency to demonstrate proper resolution of each\ndeficiency identified during testing/inspection. Quarterly and Annual Inspection\nReports shall be submitted within 7 calendar days of the service in two (2) hard three\nring binders with cover page, table of contents and tabulated with dividers and one PDF\ncopy on CD Rom. The contractor will provide an electronic means 24/7 to obtain and\ndownload current and archived reports, equipment photos, repair information, and VA\nspecific data on VA equipment condition and age.\n\n9.2 Deficiency Report. When any deficiencies are identified, the contractor shall inform the\nCOR immediately via verbal and written notification email. Contractor shall submit the\ndeficiency report to the COR within two (2) business days. The deficiency report shall\ninclude at a minimum the following information:\n9.2.2 Location\n9.2.2 Equipment/system name\n9.2.3 Date of failure identification\n9.2.4 Description of failure (pictures, drawings, etc.)\n9.2.5 Justification (if repair is not accomplished)\n9.2.6 Description of repair work (pictures, drawings, etc.)\n9.2.7 Material list (description of article, quantity, catalogue-cut, pictures, etc.) for   repair\n9.2.8 Proposed repair schedule\n9.2.9 Cost proposal\n9.2.10 Submission date of the report\n9.2.11 Signature of technician\n\n9.3 Repair report. Upon completion of any repair work, whether via callback or following\nroutine testing/inspection service, the contractor shall supply a repair report certifying the\nrepair work was completed. The report shall be provided by email within two (2)\nbusiness days of completion.\n\n9.4 Annual Schedule. The contractor shall submit an annual schedule to the COR to obtain\napproval within fifteen (15) days from contract award date and the start date of each\noption year. The annual schedule shall show the order in which the contractor proposes\nto perform the inspections, testing, calibration, and maintenance service, the dates on\nwhich the contractor will start each work element, and the scheduled date for completion\nof each element.\n\n10 . CONTRACTOR QUALIFICATIONS:\n10.1  Contractor personnel performing service on this contract shall be trained and qualified\nfor the specific manufacturer s equipment and have all required certifications and/or\nlicenses. The Contractor shall maintain certifications, training records of each\nemployee and/or laboratory testing agencies performing services under this contract.\nThe Contractor shall make all updates to certification or records for individuals and/or\nlaboratory testing agencies available for review by the VA. The contractor shall provide\na copy of the certification records and photocopy of the employee s identification prior to\nthe start of work.\n\n10.2  It is the contractor s responsibility to ensure that only properly trained and competent\npersons perform inspections, testing and maintenance on the emergency generator and\nelectrical system. Evidence of training shall be supplied to the VA prior to the start of\nwork and if/when new individuals are added by the contractor to perform on this\ncontract.\n\n11. PLACE OF PERFORMANCE: Fresno VA Medical Center - 2615 E. Clinton Ave. Fresno,\nCA 93703\n\n12. PERIOD OF PERFORMANCE: Base Plus (1) Option Year.\nBase Period: September 30, 2025 thru September 29, 2026\nOption Year #1: September 30, 2026 thru September 29, 2027\n\n\n13. HOLIDAYS:\n13.1 Legal holidays recognized by the Federal Government in accordance with 5 U.S.C.\n6103, Executive Order 11582 and Public Law 94-97 or any other by the President of the\nUnited States to be a national holiday, the following national holidays are observed\nand for the purpose of this contract is defined as  Legal Federal, official holidays  as\nfollows:\n Recognized Holidays\n\n New Year s Day     January 1\n Martin Luther King Jr. s Birthday   Third Monday in January\n President s Day     Third Monday in February\n Memorial Day      Last Monday in May\n Juneteenth      June 19\n Independence Day     July 4\n Labor Day First     Monday in September\n Columbus Day     Second Monday in October\n Veteran s Day     November 11\n Thanksgiving Day     Fourth Thursday in November\n Christmas Day     December 25\n\n13.2 Hours of Operation. The contractor is responsible for conducting services, between\nthe hours of 8:00 am to 4:30 pm from Monday thru Friday except federal holidays or\nwhen the Government facility is closed due to local or national emergencies\nadministrative closing.\n\n14. GENERAL REQUIREMENTS:\n14.1 A two-week (fourteen work-day notice) request for any non-urgent maintenance\nshutdown required during business hours shall be provided to the COR from the\ncontractor in writing. Contractor shall not proceed with shutdown until the COR\nauthorizes to do so. Contractor to verify with COR prior to start of work, and on a daily,\nor system basis that effected systems have been properly shut down and secured to\nprevent risk to safety.\n\na. Contractor shall be responsible for the protection of all building floors, floor coverings,\nwalls, wall coverings, furniture, light fixtures and equipment in that may be subjected to damage while performing this contract. Contractor shall replace all damaged items with exactly matching item or a like item at the VACCHCS discretion.\n\nb. The contractor shall be responsible for removal and replacement of any ceiling tiles\naffected by the work.\n\nc. Work site shall be left free and clean of all debris after completion of work. Contractor\nshall be responsible for the safety of all VACCHCS employees, patients and visitors while performing contracted work, including slipping and tripping hazards. Contractor shall adequately barricade the immediate work site to prevent unauthorized individuals into the work area.\n\n15. GENERAL INFORMATION:\na. Contract Manager. The contractor shall provide a contract manager who shall be\nresponsible for the work. The name of this person, and an alternate(s) who shall act for\nthe contractor when the manager is absent, shall be designated in writing to the\ncontracting officer. The contract manager or alternate shall have full authority to act for\nthe contractor on all matters relating to this contract.\nb. The contract manager or alternate shall be available during normal working hours to meet with COR to discuss problem areas. The contract manager shall provide an emergency contract number for any emergency situation.\nc. The contractor shall keep its employees trained and certified at all time during contract\nperiod. The contractor shall ensure all employee certifications are submitted to CO and\nCOR for proper recording of training no later than ten (10) days after award of contract.\nVA has the right to inspect and request verification of licenses and certificates of during\nthe contract period. Contractor shall update list of any changes with personnel or\ncertificates/license and submit to COR and CO no later than 5 days of occurrence.\nd. Removal of Contractor s Employees. The contractor shall utilize only experienced,\nresponsible, and capable employees in the performance of this contract. The CO may\nrequire that the contractor remove from the Government job any employee that\nendangers persons, property, environment, EEO policy, Hostile work environment, or\nfederal workplace policy or violates the standards noted in this PWS.\ne. Government Furnished Equipment. This PWS does not have any government furnished\nequipment. Contractor shall not use any government own equipment, material, supplies,\nor tools. Contractor shall furnish all requirements.\n\n16. RECORDS:\n The contractor shall be responsible for creating, maintaining government required\nrecords that are specifically cited in this PWS or required by the Federal, State, and Local law and authorities. The contractor shall provide the original records or a reproducible copy of any such record upon request from the government at no additional cost. The cost of reproductions and delivery shall be the contractor s responsibility. Only\nVACCHCS Engineering Service, COR, or CO shall have the authority to approve request and receive records. Contractor shall safeguard all information. Contractor shall inform CO and COR of any request made for which the CO or COR is required to approve. Additionally, the following standard items relate to records generated in executing the contract:\n a. Citations to pertinent laws, codes and regulations such as 44 U.S.C chapters 21, 29,\n31 and 33; Freedom of Information Act (5 U.S.C. 552); Privacy Act (5 U.S.C. 552a);\n36 CFR Part 1222 and Part 1228.\nb. Contractor shall treat all deliverables under the contract as the property of the U.S.\nGovernment for which the Government Agency shall have unlimited rights to use,\ndispose of, or disclose such data contained therein as it determines to be in the\npublic interest.\nc. Contractor shall not create or maintain any records that are not specifically tied to or\nauthorized by the contract using Government IT equipment and/or Government\nrecords.\nd. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that\ncontains information covered by the Privacy Act of 1974 or that which is generally\nprotected by the Freedom of Information Act.\ne. Contractor shall not create or maintain any records containing any Government\nAgency records that are not specifically tied to or authorized by the contract.\nf. The Government Agency owns the rights to all data/records produced as part of this\ncontract.\ng. The Government Agency owns the rights to all electronic information (electronic\ndata, electronic information systems, electronic databases, etc.) and all supporting\ndocumentation created as part of this contract. Contractor must deliver sufficient\ntechnical documentation with all data deliverables to permit the agency to use the\ndata.\nh. Contractor agrees to comply with Federal and Agency records management policies,\nincluding those policies associated with the safeguarding of records covered by the\nPrivacy Act of 1974. These policies include the preservation of all records created or\nreceived regardless of format [paper, electronic, etc.] or mode of transmission [email,\nfax, etc.] or state of completion [draft, final, etc.].\ni. No disposition of documents will be allowed without the prior written consent of the\nContracting Officer. The Agency and its Contractors are responsible for preventing\nthe alienation or unauthorized destruction of records, including all forms of mutilation.\nWillful and unlawful destruction, damage or alienation of Federal records is subject to\nthe fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed\nfrom the legal custody of the Agency or destroyed without regard to the provisions of\nthe agency records schedules.\nj. Contractor is required to obtain the Contracting Officer's approval prior to engaging\nin any contractual relationship (Subcontractor) in support of this contract requiring\nthe disclosure of information, documentary material and/or records generated under,\nor relating to, this contract. The Contractor (and any Subcontractor) is required to\nabide by Government and Agency guidance for protecting sensitive and proprietary\ninformation.\n\n17. SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK:\n a. The Contractor acknowledges that it has taken steps reasonably necessary to\nascertain the nature and location of the work, and that it has investigated and\nsatisfied itself as to the general and local conditions which can affect the work or its\ncost, including but not limited to (1) conditions bearing upon transportation, disposal,\nhandling, and storage of materials; (2) the availability of labor, water, electric power,\nand roads; (3) uncertainties of weather, or similar physical conditions at the site; (4)\nthe conformation and condition of the ground; and (5) the character of equipment and\nfacilities needed preliminary to and during work performance. The Contractor also\nacknowledges that it has satisfied itself as to the character, quality, and quantity of\nmaterials or obstacles to be encountered insofar as this information is reasonably\nascertainable from an inspection of the site, as well as from any documents made a\npart of this contract. Any failure of the Contractor to take the actions described and\nacknowledged in this paragraph will not relieve the Contractor from responsibility for\nestimating properly the difficulty and cost of successfully performing the work, or for\nproceeding to successfully perform the work without additional expense to the\nGovernment.\n b. The Government assumes no responsibility for any conclusions or interpretations\nmade by the Contractor based on the information made available by the Government.\nNor does the Government assume responsibility for any understanding reached or\nrepresentation made concerning conditions which can affect the work by any of its\nofficers or agents before the execution of this contract, unless that understanding or\nrepresentation is expressly stated in this contract.\n\n18. QUALITY CONTROL PROGRAM: The Contractor shall coordinate, report, and ensure the\ntimely completion of the work specified in this PWS. This encompasses the planning,\ncoordination, technical direction, and surveillance of all activities necessary to execute all\nwork. The contractor shall submit their Quality Control plan in hardcopy in hard three ring\nbinders with cover page, table of contents and tabulated with dividers and digitally in PDF within\nten (10) days of contract award date. The COR will review the document and note any\nneeded clarifications and return to the Contractor for revisions, if necessary. A VA approved\nQAQC Plan shall be in place within thirty (30) days of the contract start date.\na. The contractor shall provide the overall management effort required to integrate\ntechnical and programmatic functions.\nb. The contractor shall ensure the technical excellence, cost effectiveness, and\ntimeliness of all required work deliverable products.\nc. The contractor shall develop and maintain an effective quality control program to\nensure service is performed in accordance with this PWS. The contractor shall\ndevelop and implement procedures to identify, prevent, and ensure non-recurrence of\ndefective services. The contractor s quality control program is the means by which\nhe/she assures that his/her work complies with the requirements of the contract. The\noverall goal of the program should be to identify and correct any problems that may\nexist before they are identified by or reported to the COR. The Government has the\nright to review and ask for corrections, additional items, and updates during the\ncontract period.\nd. The Contractors QAQC Plan shall include the following at a minimum:\ni. A comprehensive list of all devices and associated equipment required to be\nmaintained and/or inspected as part of this service contract in accordance\nwith the NFPA codes list in paragraph 2.1 above. This list shall be reviewed\nwith VA and discrepancies addressed prior to contract award.\nii. An inspection plan and schedule covering all services required by this\ncontract. The inspection plan must specify the areas to be inspected on either\na scheduled or unscheduled basis and how often inspections will be\naccomplished and documented. The name and title of the individual(s) who\nwill perform the inspections shall be noted.\niii. On site records of all inspections conducted by the Contractor noting\nnecessary corrective action(s) taken. The Government reserves the right to\nrequest copies of any inspection.\niv. The methods for identifying and/or preventing deficiencies in the quality of\nservice performed before the level of performance becomes unacceptable.\nv. Organizational structure and functions noting intermediate supervisory\nresponsibilities and overall management responsibilities for ensuring total\ncontract performance.\nvi. The Contractor shall provide as part of the QAQC Plan and maintain records\nidentifying the required certifications (per NFPA requirements) and ongoing\ntraining of each employee and/or laboratory testing agencies performing\nservices under this contract. The Contractor shall make any updates to\ncertifications or records for individuals and/or laboratory testing agencies\navailable for review by the VA.\n\n\n19. ATTACHMENTS:\n Attachment 1: Generators and ATSs\n  Attachment 2: Specific tasks and service categories\n  Attachment 3: Quality Assurance Surveillance Plan (QASP)\n  Attachment 4: Delivery Schedule\n\n\nResponse Method:\nThe Government requests capability statements and comments from interested businesses regarding the requirements described above. Responsible sources are encouraged to submit a response to this notice with a statement of interest on company letterhead. When responding, in Subject line insert: Sources Sought VACCHCS Gen Services\n\nAt a minimum, the following information shall be provided:\n\n1. Company Name;\n\n2. Company Mailing Address;\n\n3. Point(s) of Contact including telephone number(s) & email address(es);\n\n4. Socio-Economic (i.e. Small/Large Business, HUBZone, Service-Disabled Veteran Owned, 8(a), etc.) as it relates to NAICS Code 811210 ($34,000,000.00)\n\n5. Provide a summary of the type of services performed and experience as it relates to Testing, Inspection, and Maintenance Services of Emergency Generators and Automatic Throw Switches within Attachment 1. \n\n6. UEI Number\n\n7. If participant in GSA Federal Supply Schedule or Veterans Affairs national contracts; provide contract #. \n\n8. Sub-Contracting Intentions (provide above items 1 thru 6 of intended subcontractor along with description of sub-contractor duties). This area will be heavily scrutinized so as to avoid pass-through acquisitions. \n\n9. Additional information and/or comments.\n\nVeterans First Contracting Program and the VA Rule of Two (Kingdomware v. United States) 38 U.S.C. 8127 - 8128: Service-disabled veteran owned small business (SDVOSB) or Veteran owned small business (VOSB) concern must be registered and verified in VA's Vendor Information Pages (VIP) database at www.vip.vetbiz.gov to be eligible for award as a SDVOSB or VOSB if/when a solicitation is issued for this requirement as a SDVOSB or VOSB set aside. In addition, this requirement has been determined to be set aside as SDVOSB or VOSB acquisition, only SDVOSB or VOSB that respond to this specific notice within the above stated due date will be eligible for award.","origin":"detail"},"contacts":[{"name":"Larry Facio","role":"primary","email":"Larry.Facio@va.gov","phone":"916-923-4553","title":"Contracting Officer"}],"place_of_performance":null,"office_address":{"zip":"95655","city":"MATHER","state":"CA","country":"USA"},"naics_codes":["811210"],"award":{"awardee":{}},"attachments":[{"resource_id":"80a6e11c54cd429ab26e6ebbb0194634","name":"36C26125Q0841.docx","kind":"file","mime_type":".docx","size_bytes":38433,"posted_at":"2025-08-06T23:02:56.522Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/80a6e11c54cd429ab26e6ebbb0194634/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C26125C0067_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C26125C0067_3600_-NONE-_-NONE-/","piid":"36C26125C0067","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"D2FSNNK4V5J7","recipient_name":"BAMAJACK, LLC","recipient_uei":"D2FSNNK4V5J7","recipient_cage":"92ZC2","recipient_city":"LAKE CITY","recipient_state":"MI","sub_name":"Department of Veterans Affairs","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","office_key":"o-36C261","first_action_date":"2025-08-20","last_action_date":"2026-08-03","actions":3,"obligated":"83453.64","current_total_value":"83453.64","potential_total_value":"208634.10","naics":"811210","psc":"J061","extent_competed":"NOT COMPETED UNDER SAP","set_aside":"SDVOSB SOLE SOURCE","offers_received":1,"description":"GENERATOR TESTING AND MAINTENANCE SERVICES FOR VACCHCS","method":"solicitation","confidence":"high","evidence":["solicitation number 36C26125Q0841 equals the FPDS solicitation identifier","same awarding office 36C261"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C26126Q1297","latest_notice_id":"a62af13fb8674f5c9add72a5c2417296","title":"Z2DA--654-24-004 | Remediate Old Parking Garage","solicitation_number":"36C26126Q1297","notice_type":"o","first_type":"r","first_posted":"2026-09-29","last_posted":"2026-11-18","notices":9,"due_at":"2026-11-25T23:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"236220","psc":"Z2DA","set_aside":"SDVOSBC","state":"NV","county":"32031","county_name":"Washoe County","city":"3260600","city_name":"Reno","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C26127Q0175","latest_notice_id":"6ff0b83d55464667808667710e947d25","title":"N099--Install ID Storage Shed Project Number 593-27-307 North Las Vegas, NV","solicitation_number":"36C26127Q0175","notice_type":"r","first_type":"r","first_posted":"2026-11-18","last_posted":"2026-11-18","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"236220","psc":"N099","set_aside":null,"state":"NV","county":"32003","county_name":"Clark County","city":"3251800","city_name":"North Las Vegas","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"36C26127Q0169","latest_notice_id":"9989888cf8614c8e87f9894ee00a31e7","title":"J012--Dry-Type Fire Suppression System","solicitation_number":"36C26127Q0169","notice_type":"r","first_type":"r","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":2,"due_at":"2026-11-30T23:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"811310","psc":"J012","set_aside":null,"state":"CA","county":"06085","county_name":"Santa Clara County","city":"0655282","city_name":"Palo Alto","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"},{"key":"36C26127Q0167","latest_notice_id":"28c31f3c4e3541cfa45f402ef2a11308","title":"7310--TRANSPORT CART AND SERVING TRAY_ Nutrition & Food Service","solicitation_number":"36C26127Q0167","notice_type":"r","first_type":"r","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-11-30T23:30:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T23:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"333241","psc":"7310","set_aside":null,"state":"CA","county":"06085","county_name":"Santa Clara County","city":"0655282","city_name":"Palo Alto","country":"USA","place_scope":"nationwide","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C26127Q0082","latest_notice_id":"1a5811f6c2cb4c5d887f8b4b9ad3c664","title":"Z1DZ--Project No. 640A0-27-104, Replace Roof at Building 347 - Menlo Park","solicitation_number":"36C26127Q0082","notice_type":"k","first_type":"k","first_posted":"2026-10-20","last_posted":"2026-11-12","notices":3,"due_at":"2026-12-01T21:00:00Z","due_date":"2026-12-01","closes_at":"2026-12-01T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C261","office_name":"261-NETWORK CONTRACT OFFICE 21 (36C261)","naics":"236220","psc":"Z1DZ","set_aside":"SDVOSBC","state":"CA","county":"06081","county_name":"San Mateo County","city":"0646870","city_name":"Menlo Park","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"}],"similar_open":[{"key":"36C26227Q0063","latest_notice_id":"57c32e663caa45e58aecf5d9fcc6fe70","title":"J065--ALCON CONSTELLATION LXT AND EMBEDDED LASERS & ALCON CENTURION VISION PHACOEMULSIFICATION PMI SVCS","solicitation_number":"36C26227Q0063","notice_type":"k","first_type":"r","first_posted":"2026-10-21","last_posted":"2026-11-20","notices":3,"due_at":"2026-11-27T19:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"811210","psc":"J065","set_aside":"SDVOSBC","state":"CA","county":"06037","county_name":"Los Angeles County","city":"0643000","city_name":"Long Beach","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"HT941027RFI0001","latest_notice_id":"2c32c62e3bce4447b63c762798422a0d","title":"Request for Information - Gastrointestinal Endoscopy Equipment Repair and Maintenance Services","solicitation_number":"HT941027RFI0001","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-20","notices":2,"due_at":"2026-11-28T07:59:00Z","due_date":"2026-11-27","closes_at":"2026-11-28T07:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97DH","sub_name":"DEFENSE HEALTH AGENCY (DHA)","office_key":"o-HT9410","office_name":"DEFENSE HEALTH AGENCY HCD WEST","naics":"811210","psc":"J065","set_aside":null,"state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"HT940727Q0002","latest_notice_id":"35a8a9028c54463eac08867d7bed7243","title":"Stryker Power Load installation","solicitation_number":"HT940727Q0002","notice_type":"k","first_type":"k","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-097","dept_name":"DEPT OF DEFENSE","sub_key":"s-97DH","sub_name":"DEFENSE HEALTH AGENCY (DHA)","office_key":"o-HT9407","office_name":"DEFENSE HEALTH AGENCY","naics":"811210","psc":"N065","set_aside":null,"state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"9TH MDG BEALE AFB15301 WARREN SHINGLE DR.BEALE, AFB, CA 95903","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"}],"similar_open_total":58,"indexable":false}