# Building Automation Support (BAS) Vancouver WA and Portland Oregon VA Medical Centers.

Canonical: https://sealedbidder.com/opportunities/36c26026q0816

- Solicitation number: 36C26026Q0816
- Notice type: Special notice (first published as solicitation)
- Status: Awarded to Rjy Group LLC
- Department: Department of Veterans Affairs
- Contracting office: 260-Network Contract Office 20 (36C260)
- NAICS: 561210 Facilities Support Services
- Product or service code: J059 Maintenance, Repair and Rebuilding of Equipment: Electrical and Electronic Equipment Components
- Set-aside: Service-disabled veteran-owned small business set-aside
- Small business size standard: $47 million in average annual receipts (13 CFR 121.201, NAICS 561210)
- Place of performance: Vancouver, Washington
- County: Clark County (FIPS 53011). https://sealedbidder.com/counties/clark-county-wa-53011
- City: Vancouver. https://sealedbidder.com/cities/vancouver-wa-5374060
- First posted: July 16, 2026
- Last posted: August 20, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/a914db26dc02447392c2d407804d978c/view

## Reading this notice

- Kind of notice: Special notice. Industry days, draft requirements, program announcements and other notices that are not a solicitation.
- Who may compete: Service-disabled veteran-owned small business set-aside. Reserved for service-disabled veteran-owned small businesses. Small, under NAICS 561210 (facilities support services), means no more than $47 million in average annual receipts, counted with affiliates.
- Time to respond: Bidders had 22 days from the day the solicitation was posted, July 16, 2026, to the deadline.
- How it ended: Awarded to Rjy Group LLC on September 14, 2026, 38 days after offers were due. The contracting office reported 1 offer (competed under simplified acquisition procedures).

## Description

Solicitation: 36C26026Q0816

Amendment number: 0001

Offer due date extended to 8/28/2026 due to vendors questions.

Solicitation: 36C26026Q0816

Amendment number: 0002

Questions from vendors

________________________________________________________________________________________________________

Below are questions from various vendors. The CO attempted to get all of the questions answered from the COR.

Kick-Off  What is the anticipated timeline for contract award and contract kickoff?  30-45 days

Estimated contract award is estimated to be 8/31/2026 &ndash; 9/4/2026.

Contract Kickoff is estimated to be 9/7/2026 &ndash; 9/11/2026.

How long will the awardee have to staff and start first months service?

	Answer: Unknown /  This will be discussed at the kickoff meeting

Scope and System Depth (PWS 1.2, 1.5.a-b) The PWS states maintenance and service will be performed "throughout the two campuses as applicable," but does not quantify the system footprint.

	Is there a hardware list for the supervisory panels and firmware?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	What is the approximate device/point count at each campus?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	How many buildings or systems are currently under Delta control at each site?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	Section 1.5.a references "proactive upgrades" as part of the scope. What is the current WebCTRL/ORCAview version, and is any platform upgrade or expansion planned during the base period or option years?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	Are sensor calibrations required as part of the preventative maintenance scope? If so, please advise on the current workload or required frequency.

	Answer: Unknown /  This will be discussed at the kickoff meeting

	Is there an incumbent providing this service?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	 If so, please advise if current workload is on par with the 1 day per week at each site.

	Answer: Unknown /  This will be discussed at the kickoff meeting

Onsite Cadence and Staffing Limits (PWS 1.5.c) The PWS specifies two days per week onsite, "or as dictated by specific needs" and notes "if any specific project requires extra attention that campus will be visited consecutively as necessary."

	Under a Firm-Fixed Price structure, an undefined requirement for consecutive visits creates unquantifiable labor risk. Will the VA establish a cap on the maximum number of hours/days per month included under the fixed base rate, with any additional site visits or after-hours dispatch (Task 5) billed under a separate emergency/overtime labor CLIN?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	Can you share historical trouble call volume or frequency at each site to help contractors gauge the actual staffing requirement?

	Answer: Unknown /  This will be discussed at the kickoff meeting

Material Provisioning and Pricing Structure (PWS Section 2.1, Section 3.0 Task 2) Task 2 states the Contractor is responsible for "providing hardware and software." Section 2.1 states invoices will be billed as individual line items per the price schedule.

	Please explicitly confirm if "providing" refers only to the labor of installing and configuring materials, and that all hardware components and software licenses will be Government-Furnished Property (GFP).

	Answer: Unknown /  This will be discussed at the kickoff meeting

	If the contractor must purchase the hardware/software, is this material cost intended to be absorbed into the firm-fixed-price labor rate, or will the price schedule include a separate materials/parts CLIN billed at cost or on a not-to-exceed basis?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	If material is contractor-furnished, would VA authorize vendors to purchase Delta material directly against Delta's GSA MAS schedule (47QSMS24D0003) under FAR 51.1/52.251-1, billed as the materials line item(s) in Section 2.1? This would keep material sourcing within the contractor's existing responsibility while crediting the spend to the SDVOSB award.

	Answer: Unknown /  This will be discussed at the kickoff meeting

Third-Party Integration Boundaries (Section III) The RFI requires the contractor to "Coordinate support for integrated systems or buildings not directly under Contractor control" and provide "limited third-party validation and troubleshooting."

	Will the VA define the scope boundary or place a labor hour cap on "limited third-party validation" before such troubleshooting must be handled as an out-of-scope equitable adjustment?

	Answer: Unknown /  This will be discussed at the kickoff meeting

Delta Certification Pathway (PWS Section 2) Section 2 requires the Contractor be certified to operate on Delta Controls with record of completion of the Fundamental Technical Certification Exam. Research indicates this training and certification is only accessible through Delta's authorized Partner network, with no open enrollment path for non-Partner firms. Under FAR 11.002(a)(1)(ii), specifications cannot be unduly restrictive to competition.

	Has VA identified how a non-Delta-Partner firm is expected to satisfy this requirement given the closed OEM training channel?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	Given the substantial onsite cadence required in Section 1.5.c, subcontracting for certified Delta labor raises Limitations on Subcontracting concerns under SDVOSB set-aside rules (13 CFR 125.6), as the certified work would be performed primarily by the subcontractor rather than the prime. How does the VA intend to reconcile this?

	Answer: Unknown /  This will be discussed at the kickoff meeting

	Would VA consider a certification grace period between award and required completion, or accept alternative proofs of equivalent BAS competency?

	Answer: Unknown /  This will be discussed at the kickoff meeting

Security Clearances (Section 6) Section 6 states the contractor must reimburse the VA within 30 days for background investigations conducted by OPM.

	What is the exact fixed cost per individual background check that the VA will assess to the contractor so this can be accurately priced into our fixed-price proposal?

	Answer: Unknown /  This will be discussed at the kickoff meeting

Analytics and Reporting (PWS Task 8) Task 8 requires quarterly status reports covering current status, needs, and recommendations.

	Beyond this quarterly narrative format, is VA interested in implementing any fault detection, alarm analytics, or centralized reporting capability across both campuses?

	Answer: Unknown /  This will be discussed at the kickoff meeting

Travel

	Is there any established travel or per diem provision for contractor personnel, or is site coverage assumed to be locally based?

	Answer: Unknown /  This will be discussed at the kickoff meeting

## Attachments

- [AMMENDMENT 0001 vanc por BAS.docx](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/62b3e15eb9d54e5ebd446e910e368799/download)
- [RFQ 36C26026Q0816.pdf](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/b3fa50e8114f47c7a2dae31de656a68a/download)

## Award on USAspending

- Recipient: Rjy Group LLC (UEI N593JWU6B5A7)
- Contract: 36C26026P0774, purchase order
- Obligated: $230,235.20, current value $732,936
- Competition: Competed Under SAP, 1 offers received
- Link: solicitation number 36C26026Q0816 equals the FPDS solicitation identifier; same awarding office 36C260 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_36C26026P0774_3600_-NONE-_-NONE-/


## Open now in the same industry

40 open in NAICS 561210.

- FA27 Fall Arrest Inspection Services (FA462026QA303), due November 26, 2026 at 1:00 PM EST. https://sealedbidder.com/opportunities/fa462026qa303
- R10 Lab: Region 10 Manchester Laboratory Facility (68HE0726R0038), due December 3, 2026 at 4:30 PM EST. https://sealedbidder.com/opportunities/68he0726r0038
- Fuel Tank Testing (36C26027Q0072), due December 4, 2026 at 10:00 AM EST. https://sealedbidder.com/opportunities/36c26027q0072

## Publications

- July 16, 2026: Solicitation, due August 7, 2026 at 7:30 PM EDT. Notice ace52c7be5b442c6b8f4c17a89b9a661. https://sam.gov/workspace/contract/opp/ace52c7be5b442c6b8f4c17a89b9a661/view
- August 11, 2026: Special notice, due August 28, 2026 at 7:30 PM EDT. Notice f780a3004ab947a79f68e6f98b06ff93. https://sam.gov/workspace/contract/opp/f780a3004ab947a79f68e6f98b06ff93/view
- August 20, 2026: Special notice, due August 28, 2026 at 7:30 PM EDT. Notice 736c8a34fbb14d4c8d51b651db02f171. https://sam.gov/workspace/contract/opp/736c8a34fbb14d4c8d51b651db02f171/view
- August 20, 2026: Special notice, due August 28, 2026 at 7:30 PM EDT. Notice a914db26dc02447392c2d407804d978c. https://sam.gov/workspace/contract/opp/a914db26dc02447392c2d407804d978c/view

## Points of contact

- Jeremiah Middleton, Jeremiah.Middleton2@va.gov, 2066584299

---
Source: SAM.gov Contract Opportunities bulk extract and USAspending.gov award data. Confirm deadlines on SAM.gov before responding. Cite https://sealedbidder.com/opportunities/36c26026q0816.