{"canonical":"https://sealedbidder.com/opportunities/36c25926q0166","key":"36C25926Q0166","url":"https://sealedbidder.com/opportunities/36c25926q0166","title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","solicitation_number":"36C25926Q0166","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-03-16T16:00:00Z","first_posted":"2025-12-31","last_posted":"2026-04-09","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"236220","psc":"Z2DA","set_aside":"SDVOSBC","place_state":"CO","place_scope":"site","site":null,"place_state_source":"sam_state_name","place_evidence":null,"place_county":"08001","place_county_name":"Adams County","place_city":null,"place_city_name":null,"winner":"STERLING CONSTRUCTORS LLC","award_amount":"222589.56","publications":[{"notice_id":"f67cf9260b19430da7647f18dc638a5b","title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","solicitation_number":"36C25926Q0166","notice_type":"p","base_type":"p","posted":"2025-12-31","posted_at":"2025-12-31T20:49:32.579Z","due_at":"2026-01-29T17:00:00Z","due_date":"2026-01-29","cancelled":false,"archived":true,"archive_date":"2026-04-29","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f67cf9260b19430da7647f18dc638a5b/view","enriched":true,"history":[{"index":4,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T20:49:32.579Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"f67cf9260b19430da7647f18dc638a5b","solicitation_number":"36C25926Q0166"},{"index":2,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-17T18:52:08.534Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2f64b70e8324621ba34346820d2dce6","solicitation_number":"36C25926Q0166","related_opportunity_id":"f67cf9260b19430da7647f18dc638a5b"}]},{"notice_id":"b2f64b70e8324621ba34346820d2dce6","title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","solicitation_number":"36C25926Q0166","notice_type":"o","base_type":"p","posted":"2026-02-17","posted_at":"2026-02-17T18:52:08.534Z","due_at":"2026-03-16T16:00:00Z","due_date":"2026-03-16","cancelled":false,"archived":true,"archive_date":"2026-06-14","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b2f64b70e8324621ba34346820d2dce6/view","enriched":true,"history":[{"index":6,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T20:49:32.579Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"f67cf9260b19430da7647f18dc638a5b","solicitation_number":"36C25926Q0166"},{"index":4,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T17:50:49.659Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"609fbd42b1df47f580b3934e69015aab","solicitation_number":"36C25926Q0166","parent_opportunity_id":"b2f64b70e8324621ba34346820d2dce6"},{"index":2,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-17T18:52:08.534Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2f64b70e8324621ba34346820d2dce6","solicitation_number":"36C25926Q0166","related_opportunity_id":"f67cf9260b19430da7647f18dc638a5b"}]},{"notice_id":"609fbd42b1df47f580b3934e69015aab","title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","solicitation_number":"36C25926Q0166","notice_type":"o","base_type":"o","posted":"2026-03-03","posted_at":"2026-03-03T17:50:49.659Z","due_at":"2026-03-16T16:00:00Z","due_date":"2026-03-16","cancelled":false,"archived":true,"archive_date":"2026-04-15","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/609fbd42b1df47f580b3934e69015aab/view","enriched":true,"history":[{"index":6,"title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-09T20:02:11.930Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"3534d550f2544e24be5620fdb5dcf348","solicitation_number":"36C25926Q0166","related_opportunity_id":"609fbd42b1df47f580b3934e69015aab"},{"index":4,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T17:50:49.659Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"609fbd42b1df47f580b3934e69015aab","solicitation_number":"36C25926Q0166","parent_opportunity_id":"b2f64b70e8324621ba34346820d2dce6"},{"index":1,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-17T18:52:08.534Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2f64b70e8324621ba34346820d2dce6","solicitation_number":"36C25926Q0166","related_opportunity_id":"f67cf9260b19430da7647f18dc638a5b"}]},{"notice_id":"3534d550f2544e24be5620fdb5dcf348","title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","solicitation_number":"36C25926Q0166","notice_type":"a","base_type":"o","posted":"2026-04-09","posted_at":"2026-04-09T20:02:11.930Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2026-06-08","removed_at":null,"award_number":"36C25926P0351","awardee_name":"Sterling Constructors LLC","amount":"222589.56","link_sam":"https://sam.gov/workspace/contract/opp/3534d550f2544e24be5620fdb5dcf348/view","enriched":true,"history":[{"index":5,"title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-09T20:02:11.930Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"3534d550f2544e24be5620fdb5dcf348","solicitation_number":"36C25926Q0166","related_opportunity_id":"609fbd42b1df47f580b3934e69015aab"},{"index":3,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T17:50:49.659Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"609fbd42b1df47f580b3934e69015aab","solicitation_number":"36C25926Q0166","parent_opportunity_id":"b2f64b70e8324621ba34346820d2dce6"}]}],"latest_notice_id":"3534d550f2544e24be5620fdb5dcf348","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-12-31","posted_at":"2025-12-31T20:49:32.579Z","created_at":"2025-12-31T20:49:30.313Z","modified_at":"2026-04-30T03:55:46.667Z","response_deadline":{"raw":"2026-01-29T10:00:00-07:00","utc":"2026-01-29T17:00:00Z","date":"2026-01-29","time":"10:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f67cf9260b19430da7647f18dc638a5b/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","agency":{"office":{"code":"36C259","name":"NETWORK CONTRACT OFFICE 19 (36C259)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"organization_id":"100176750","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-29","archive_type":"auto_custom"},"history":[{"index":4,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T20:49:32.579Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"f67cf9260b19430da7647f18dc638a5b","solicitation_number":"36C25926Q0166"},{"index":2,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-17T18:52:08.534Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2f64b70e8324621ba34346820d2dce6","solicitation_number":"36C25926Q0166","related_opportunity_id":"f67cf9260b19430da7647f18dc638a5b"}],"contacts":[{"name":"Timothy Verburgt","role":"primary","email":"Timothy.Verburgt@va.gov","phone":"(303) 712-5707","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"f67cf9260b19430da7647f18dc638a5b","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"b2f64b70e8324621ba34346820d2dce6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-18T00:02:40.430894457Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T17:48:36.003679Z","row_sha256":"53345479e0ea6601c78c4198cb34c7fb887f2a122cae18cd9bb19c4298c1890b","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-18T00:02:40.430894457Z","first_seen_at":"2026-09-16T17:48:36.003679Z"},"description":{"html":"OBJECTIVE \n\nThe Department of Veteran s Affairs has a requirement to provide humidification monitoring and control for two storage rooms at the Rocky Mountain Regional Veteran s Affairs Medical Center (RMRVAMC), located at 1700 N. Wheeling St., Aurora CO 80045. The objective of this contract is to modify existing HVAC systems to ensure the relative humidity in the Pharmacy Cache storage rooms can be maintained within the required range. \n\n2.0 STATEMENT OF WORK\n\nThe contractor shall provide all labor, material, and equipment to complete the contact objective above per contact drawings and specifications. General tasks shall include but are not limited to the following:\n\nProvide Class II dust containment of work areas as required by ICRA. \nOrganize construction tasks to minimize downtime time of air handling equipment.\nDemolish and properly dispose of existing section of supply ductwork duct in penthouse.\nReplace section of duct with steam dispersion manifold and associated stainless steel ducting sloped, configured, and insulated per drawings and specifications.\nInstall low pressure steam, condensate, and drain lines with associated valves, strainers, steam traps, check valves, and fittings per drawings and specifications.\nInstall control system components (controllers, temperature sensors, relative humidity sensors, control valves, etc.)\nInstall electrical power wiring, control wiring, conduit and supports.\nIntegrate controls with existing building BAS to include configuration, programming, and graphics development.\nProvide O&M training for VA personnel.\nProvide redlined shop drawings for use in updating facility as-builts.\n\n3.0 GENERAL\n\nThe Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the contractor have a  Competent Person  on the job at all times (must have a 30-hour OSHA card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work.\n \nContractor must submit a company Site Specific Safety Plan (SSSP) that must be approved by VA Safety prior to work beginning. This plan shall detail fire, construction, and health-related safety measures, in addition to listing Training Records for all employees for the previous year. A company standard or boilerplate safety plan will not be acceptable   plan should contain a detailed hazard analysis for each element of construction to be performed in the form of a Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA). \n\nThis entire project shall conform to 100% of all VA standards and specifications, OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes. \n\nThe Contractor shall be responsible for the health and safety of their own employees. The VA will inform the Contractor of any hazards such as designated permit confined spaces, electrical hazards, etc. which may affect Contractor employees. The Contractor must take precautions appropriate for the safety of their employees as well as provide equipment necessary for these actions. Contractor employees will notify the VA Representative before entering a designated permit required confined space, so precautions can be taken in advance of the work. \n\nThe Contractor shall hold harmless and indemnify the Government against any and all liability, claims, and costs of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any property occurring in connection with, in any way incident to, or arising out of the occupancy , use, service, operation or performance of work under the terms of the contract, resulting in whole or in part from the negligence acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor\n\nThe Contractor is responsible for protection of existing finishes, and VA property (FF&E), located in the areas where preventative maintenance and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The contractor is liable for any damage to VA property during the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned furnishing, fixtures, equipment and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition.\n\n4.0 PROJECT MANAGEMENT\n\nBased on the above list of work items, the general contractor selected must complete, maintain, and submit the following documentation and managerial requirements: \nConstruction schedule including sequencing and durations.\nThe schedule will be provided to the COR ten (10) working days prior to the start of work.\nSite-Specific Safety Plan (SSSP) with an emphasis on, but not limited to, plumbing demolition, installation and safety. The SSSP must:\nInclude a detailed description of how the work will be performed and be submitted with sketches, supporting documents, submittals etc.\nInclude a Job-Safety-Analysis (JSA) for all tasks associated with Statement of Work (SOW)\nBe approved by VA-Safety prior to commencement of work.\nMaintain site supervision by a competent individual(s) with OSHA-30 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed.\nObtain VA identification PIV-I badges for all employees. Contractor to consider lead-time for badge procurement.\nManage job-site access and security.\nImplement and maintain required ICRA and ILSM measures.\n\n5.0 SUPPORTING DETAILS\n\nThis is the most up to date information available at this time. Contractor shall be required to field verify current conditions and accuracy of most current documentation.\nSpecifications for Project 554-26-102\nDrawings for Project 554-26-102\n\n6.0 CODE COMPLIANCE \n\nThe Contractor shall comply with the public laws and statutes including all changes and amendments of federal, state and local environmental statutes and regulations in effect of date of issuance of this delivery order, including, the applicable portions of the documents cited in the basic contract and below.\nNational Fire Protection Association (NFPA):\nNFPA 99-  Healthcare Facilities Code\nNFPA 101   Life Safety Code\nInternational Code Council (ICC): IBC: International Building,\nBuilding Officials and Code Administrators International (BOCA)\nInternational Conference of Building Officials (ICBO): UBC: Uniform Building Code \n29 CFR 1910 Occupational Safety and Health Standards\n29 CFR 1926 Safety and Health Regulations for Construction\nFederal Occupational Safety and Health Act (OSHA)\nUnderwriters Laboratories\nInternational Plumbing Code\nSBCCI Standard Plumbing Code\n\n7.0 SUBMITTALS\n\nContractor shall submit the following prior to beginning scope of work:\nProject schedule with sequencing, durations, phasing, and cost loading within 10 working days of Notice to Proceed (NTP), and monthly with invoices.\nSite Specific Safety Plan (SSSP)\nSSSP to be submitted to VA Safety staff for review 10 working days after issuance of NTP.\nSSSP to be approved by VA Safety staff prior to start of construction activities.\nConstruction Demolition Removal / Handover Plan\nInspection reports, manufacturer approval certificates, and warranties.\nPenetration and or hot work permits as necessary.\nManufacturer and construction warranties as noted in specifications.\nProject Schedule including sequencing and durations.\nSOV   Schedule of Value\nThe schedule will be provided to COR 10 working days prior to start of the work.\nSite superintendent OSHA-30, and tradesmen/laborer OSHA-10 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed.\nMaterial Submittals   Submit for COR approval\nPhysical and electronic Redline drawings of the completed work.\n\nTechnical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises.\n\nContractor shall submit hours worked, full report of completed piping which shall include location, hours worked, the full name of Contractor s employees on site, and digital photographs before and after work is completed. Reports shall be submitted within one day upon completion of work performed. Contractor will provide a completed redline drawing of the completed routing of piping. Reports shall be provided in hard copy as well as in an agreeable and compatible electronic format such as, but not limited to, pdf or Microsoft Word.\n\n8.0 ELECTRONIC / DIGITAL DELIVERABLES\n\nEmails to COR with specified documents in PDF format.\n\n9.0 RESOURCES\n\nThe Government will not furnish any resources for the fulfillment of the work required under this contract other than electricity for area where work is being conducted. Under this contract, the contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, supervision, and for testing and maintenance required for completion of this contract. \n\nContractor shall provide all necessary parts and equipment to complete the objective of this contract in accordance with manufacturer specifications. All new equipment, including parts and labor, shall be preapproved by the COR. \n\nTechnical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises.\n\nThe Contractor shall instruct his/her personnel in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities which shall include but not necessarily be limited to:\nLights shall be used only in areas where and at the time when work is actually being performed unless otherwise directed.\nContractor s personnel will not adjust mechanical equipment controls for heating, ventilation and air conditioning systems.\nGovernment telephones shall not be used for personal reasons or for any toll or long-distance calls.\n\n10.0 TECHNICIANS / INSPECTOR QUALIFICATIONS\n\nThe Government reserves the right to accept or reject Contractor s staff for cause.  Documented prior to the work, Contractor shall provide technicians throughout the contract qualified to perform work on plumbing systems. The Contractor shall notify the Government within 3 business days if it intends to replace a technician. At the time of notification, the Contractor shall submit all required certifications for all personnel working on the contract. In the event new, or replacement, personnel become involved in the contract, the Contractor must submit all required certification. Additions or changes in personnel require written approval from the Government. The Contractor shall have a back-up technician available in the event the primary technician is unable to perform his/her duties.\n\nThe Contractor will ensure their personnel and subcontractor personnel meet the privacy standards as set forth by HIPPA (Health Insurance Portability and Accountability Act of 1996) with respect to personal and confidential information that they may come upon, while contract work is being performed.\n\n11.0 PERSONNEL ASSIGNMENTS\n\nThe Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW. The Contractor shall maintain throughout the life of this contract, a current list of technicians and their credentials available for inspection by the Government at any time.\n\n12.0 ACCEPTANCE STANDARDS\n\nThe VA reserves the right to dispute completion of contract scope if contract work is found not in accordance with manufacturer recommendations, is not satisfactorily executed, or if the system is not properly tested and inspected to achieve certification. All work completed by the Contractor must be reviewed and approved by the VA. Work must be approved for one location of each type of fixture prior to proceeding with all other locations specified. If conditions that exist that are not like the location previously approved the contractor shall get approval prior proceeding with work in locations with similar conditions.\n\n13.0 SAFETY AND FIRE PREVENTION\n\nIn the performance of this contract, the contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the building.\n\nThe Contractor shall immediately correct any fire and safety deficiencies caused by his/her personnel. If the Contractor fails or refused to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and hold the contractor in default of the contract.\n\nThe Contractor shall comply with applicable Federal, State and local safety and fire regulations and codes which are in effect at the beginning of the contract. The contractor shall keep abreast of and comply with changes in these requirements and codes applicable to the contract. The requirements include but are not limited to those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthy working conditions for its employees\n\nThe Contractor s personnel shall follow applicable facility policies concerning fire/disaster programs.\n\nAll materials and equipment will be removed from the facility or stored properly at the end of the workday and secured during the workday. Under no circumstances will the Contractor allow for any equipment to be left unattended for any length of time.\n\nThe Contractor shall comply with all applicable Federal, State and local legal requirements\nregarding workers  health and safety.\n\nThe Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.\n\nThe Contractor shall perform the work in a manner consistent with the area security and fire\nsafety regulations especially with regard to exits and exit way access. Utility shutdowns shall not\ncompromise security, communication or fire safety for occupants.\n\nNo flammable liquids shall be stored or used in the medical center.\n\nThe necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241. Contractor shall keep certification onsite at all times of extinguisher inspections.\n\nThe Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction.\n\nAll necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.\n\nThe Contractor shall assume responsibility of environmental protection of all material storage.\n\n14.0 ACCIDENT PREVENTION\n\nPrecaution shall always be exercised for the protection of persons (including employees)\nand property. These shall include, but not be limited to, the installation of adequate safety\nguards and protective devices for all equipment and machinery, whether used in the\nperformance of work or permanently installed as part of the work. Contractor shall comply with\nall applicable laws relating to safety precautions, including the safety regulations of the Division\nof Industrial Safety, Department of Industrial Regulations of the state.\n\n15.0 ENVIRONMENTAL PROTECTION\n\nIn order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers  Manual EM 385-1-1,  General Safety Requirements  as well as the specific requirements stated elsewhere in the Contract Documents.\n\nThe Contractor is responsible for daily cleanup of all areas affected by its work. Areas in use or affected shall be returned to condition in which they were turned over or initially found. VA\nHousekeeping shall not be dispatched for cleaning associated with contractor work.\n\nThe Contractor shall take every precaution in preserving flooring, finishes, equipment, and\nfurniture in areas of work. The Contractor shall repair or replace any damage incurred during its\nwork at their expense.\n\nContractor shall use freight elevators for transmission of materials and personnel. Contractor\nshall take every precaution in preserving the elevators, including the hoist way and lobby doors,\ninterior finishes, and shall conduct all good practices in observing lifting and motor components\ntolerances. Any damage incurred to any elevator component due to negligence will be repaired at the expense of the contractor within the workday of incurred damage.\n\n16.0 WORK STANDARDS AND ICRA / ILSM\n\nWork site shall be free of debris and returned to original condition upon completion of preventative maintenance or repairs. \n\nAll work is to be performed in areas used daily by facility clients and staff. Contractor will take\nsuitable measures to control all material and equipment to produce a minimum of interference\nin facility routine. All work shall be performed in a safe and prudent manner.\n\nContractor shall perform all work as to offer the least possible obstruction and\ninconvenience to staff and the public and shall have under construction no greater amount of\nwork than can be completed promptly and properly with due regard to the rights of staff and\nthe public. Any person the COR may deem incompetent or disorderly shall be promptly removed from the facility and not be allowed to return for the duration of the agreement.\n\nThe Contractor shall comply with an Infection Control Risk Assessment (ICRA) which will be\ndeveloped with the COR and the Infection Control Practitioner. Multiple ICRA s may be necessary to address specific risks at various stages of the project and must be approved prior to proceeding on each phase. \n\n17.0 HAZARDOUS MATERIAL REPORTING\n\nThe Contractor shall maintain hazardous material inventories and material safety data sheets\n(MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR s 355, 370, & 372) to be stored and used on this Medical Center. Hazardous materials must be inventoried when received and at the project s completion. The amounts used shall be maintained for the project duration, and for the calendar year (ending 31 December).\n\nHazardous Materials Inventories, Material Safety Data Sheets and material quantities used shall be submitted to the Contracting Officer for approval.\n\nIn the event of a spill, Contractor shall immediately notify the Contracting Officer s \nRepresentative as well as the Contracting Officer. The Contractor shall be solely\nresponsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761.\n\nAsbestos Containing Material (ACM) is not present in the workspace. If contractor locates suspected ACM in addition to material noted in report, they shall contact the COR immediately for further direction. If any ACM is disturbed or becomes friable due to contractor actions, the construction site shall be shut down until and contractor shall provide appropriate containment at their own expense. In addition, contractor shall be responsible for all abatement and disposal of affected material at their own expense, only after which the job site shall be reopened for continued work. In the event of an ACM disturbance event, the COR shall be immediately notified and shall provide specifications on asbestos abatement.\n\n18.0 HOURS OF WORK\n\nThe hours of work shall take place during the normal business hours of 7:30 AM and 4:00 PM, Monday through Friday, Federal Holidays excluded. Request for weekend, after-hour, and Federal holiday work is permitted with a request in writing submitted beforehand. Off hours are not to billed as overtime. Federal Holidays and any other day declared a federal holiday by the President of the United States are defined below.\n\nNew Year s Day Martin Luther King Jr s Day  Presidents Day \nMemorial Day  Independence Day   Labor Day\nColumbus Day  Veterans Day    Thanksgiving Day\nChristmas Day\n\nIf a holiday falls on Sunday, the following Monday will be observed as the National Holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National Holiday by the U.S. Government.\n\nIf work requires after hours work due to ICRA constraints or inclement weather, then Contractor shall inform FMS fourteen (14) days in advance.\n\nPostponement/Delays: In the event climate or weather conditions become unsuitable for work or may induce an environmental hazard, then the entire work shall be rescheduled to a date and time satisfactory to the Contractor and the COR. Postponement due to inclement weather will not cause assessment of the penalty provision outlined above, nor should there be an additional cost to the Government.\n\nAll work shall be scheduled and performed within the date and time approved by the COR, in conjunction with the department occupying the space served by this equipment.\n\n19.0 BADGES AND PARKING\n\nIf a given contractor s personnel will be working on-site for less than 5 working days, access to the facility can be attained by contacting the VA police and obtaining temporary access badges. If a contractor will be working on site for more than 5 working days, identification badges must be procured prior to beginning project work. All Contractor personnel are required comply with VAAR 852.273-74 (Available online at VA Technical Information Library) which covers the following requirements: background checks, and the wearing of identification (I. D.) badges issued by the VA RMR VAMC. Contractor must acquire PIV badge for all staff onsite prior to work beginning. While on VA Facilities grounds, temporary or official I.D. badges shall be worn continuously. Failure of the background check may result in specific personnel being disallowed to work on VA premises and the Contractor will need to provide replacement personnel. \nIt is the responsibility of the Contractor s personnel to park in the appropriate designated parking areas. The designated parking area will be specified by COR upon award of contract.\nWhile performing under this contract, all vehicles used by the contractor shall be locked and the keys removed when not in use. This is intended to protect the contractor s property and the safety of the patients at the medical center.\n\n20.0 PERSONNEL QUALIFICATIONS\n\nThe Government reserves the right to accept or reject Contractor s staff for cause. \n\nAll inspectors/testers shall hold current OSHA 10/30 certification and membership. Documentation of this to be submitted by the Contractor to the COR prior to beginning project work. A competent person with OSHA 30 certification must be on site at all times.\n\nThe Contractor shall have a back-up technician in the event the primary technician is unable to perform his/her duties.\n\nThe Contractor will ensure that their personnel and subcontractor personnel meet the privacy standards as set forth by HIPAA (Health Insurance Portability and Accountability Act of 1996) with respect to personal and confidential information that they may come upon.\n\nAll personnel are required to hold OSHA 10 certification as a minimum. \n\n21.0 PERSONNEL REQUIREMENTS\n\nSupervision: The Contractor shall specify a Project Manager who will have responsibility for performance of contract services. The Project Manager shall be competent to supervise all aspects of contract and shall be available on-site during performance of contract work. The Contracting Officer shall be notified in writing of the names of the Project Manager and of changes in personnel appointed to fulfill this function or in the absence of the Contractor, act for the Contractor as the Contractor s Representative.\n\n22.0 QUALITY CONTROL\n\nThe Contractor shall have a quality control program to assure the requirements of this contract are provided as specified. The Contractor and COR will inspect the work. Deficiencies will be noted and corrected before beginning work in another area. Any damage done by Contractor will also be noted and corrected by the Contractor within 2 working days. Damage causing an immediate impact on the environment of the hospital shall be corrected immediately.\n\n23.0 ACCEPTANCE STANDARDS\n\nCompleted work will be to the entire satisfaction of the VA and the COR shall be the sole\njudge as to its acceptability. Any work not acceptable to the COR, shall be immediately, at\nContractor s own expense, refashioned to an acceptable level.\n\n24.0 PERSONNEL ASSIGNMENT\n\nThe Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW within the designated period of performance. The Contractor shall maintain throughout the life of this contract, a current list of laborers, tradesmen, superintendents, etc., and their credentials available for inspection by the Government at any time.\n\n25.0 KEYS\n\na. Keys: The COR shall provide the Contractor access to all buildings and rooms required in the provisions of this contract. The Contractor shall notify the COR when leaving these areas.\n\nb. Clearances/Access Controls: Contractor and all personnel shall comply with the security clearances or access controls of areas within the Medical Center. In the event that the Contractor has to obtain access to areas that require special security precautions the COR will notify the contractor prior to access.\n\n26.0 MEETINGS\n\nA Pre-Bid meeting and site walk will be held at a date and time specified by the COR to review scope, of service, site, and requirements with perspective contractors, and provide answers to any questions. Contractor and/or Sub-contractors shall attend a pre-bid walkthrough of the work before submitting a bid. VA reserves the right to reject any bidder not attending the Pre-Bid. The date and time of this walkthrough will be determined by the CO and COR. Contractor and/or subcontractors shall be responsible for making any clarification requests that arise at the pre-bid walkthrough directed to the CO prior to the bidding of the work. \n\n27.0 PERIOD OF PERFORMANCE\n\nGovernment intends to issue NTP immediately after kickoff meeting with Contractor. The period of performance for this contract is ninety (90) days. The period of performance includes thirty (30) days anticipated to complete initial administrative tasks.","text":"OBJECTIVE\n\nThe Department of Veteran s Affairs has a requirement to provide humidification monitoring and control for two storage rooms at the Rocky Mountain Regional Veteran s Affairs Medical Center (RMRVAMC), located at 1700 N. Wheeling St., Aurora CO 80045. The objective of this contract is to modify existing HVAC systems to ensure the relative humidity in the Pharmacy Cache storage rooms can be maintained within the required range.\n\n2.0 STATEMENT OF WORK\n\nThe contractor shall provide all labor, material, and equipment to complete the contact objective above per contact drawings and specifications. General tasks shall include but are not limited to the following:\n\nProvide Class II dust containment of work areas as required by ICRA.\nOrganize construction tasks to minimize downtime time of air handling equipment.\nDemolish and properly dispose of existing section of supply ductwork duct in penthouse.\nReplace section of duct with steam dispersion manifold and associated stainless steel ducting sloped, configured, and insulated per drawings and specifications.\nInstall low pressure steam, condensate, and drain lines with associated valves, strainers, steam traps, check valves, and fittings per drawings and specifications.\nInstall control system components (controllers, temperature sensors, relative humidity sensors, control valves, etc.)\nInstall electrical power wiring, control wiring, conduit and supports.\nIntegrate controls with existing building BAS to include configuration, programming, and graphics development.\nProvide O&M training for VA personnel.\nProvide redlined shop drawings for use in updating facility as-builts.\n\n3.0 GENERAL\n\nThe Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the contractor have a Competent Person on the job at all times (must have a 30-hour OSHA card), and that all contractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work.\n\nContractor must submit a company Site Specific Safety Plan (SSSP) that must be approved by VA Safety prior to work beginning. This plan shall detail fire, construction, and health-related safety measures, in addition to listing Training Records for all employees for the previous year. A company standard or boilerplate safety plan will not be acceptable plan should contain a detailed hazard analysis for each element of construction to be performed in the form of a Activity Hazard Analysis (AHA) or Job Hazard Analysis (JHA).\n\nThis entire project shall conform to 100% of all VA standards and specifications, OSHA, AIA Construction Guidelines, Joint Commission Environment of Care Standards, and applicable building codes.\n\nThe Contractor shall be responsible for the health and safety of their own employees. The VA will inform the Contractor of any hazards such as designated permit confined spaces, electrical hazards, etc. which may affect Contractor employees. The Contractor must take precautions appropriate for the safety of their employees as well as provide equipment necessary for these actions. Contractor employees will notify the VA Representative before entering a designated permit required confined space, so precautions can be taken in advance of the work.\n\nThe Contractor shall hold harmless and indemnify the Government against any and all liability, claims, and costs of whatsoever kind and nature for injury to or death of any person or persons and for loss or damage to any property occurring in connection with, in any way incident to, or arising out of the occupancy , use, service, operation or performance of work under the terms of the contract, resulting in whole or in part from the negligence acts or omissions of the Contractor, any subcontractor, or any employee, agent, or representative of the Contractor or subcontractor\n\nThe Contractor is responsible for protection of existing finishes, and VA property (FF&E), located in the areas where preventative maintenance and repair work is being performed, as well as along paths of travel to and from these areas. Both exterior and interior finishes and property must be maintained. The contractor is liable for any damage to VA property during the contract. Any damage to existing finishes must be repaired by the Contractor to equal or greater quality than existing finishes. All tasks accomplished by the Contractor personnel will be performed to preclude damage or disfigurement of government-owned furnishing, fixtures, equipment and architectural or building structures. Contractor will report any damage or disfigurement to these items when caused by the Contractor s personnel and will perform repairs or replace government-owned equipment, fixtures, furnishings, grounds and architectural or building structures to their previously existing condition.\n\n4.0 PROJECT MANAGEMENT\n\nBased on the above list of work items, the general contractor selected must complete, maintain, and submit the following documentation and managerial requirements:\nConstruction schedule including sequencing and durations.\nThe schedule will be provided to the COR ten (10) working days prior to the start of work.\nSite-Specific Safety Plan (SSSP) with an emphasis on, but not limited to, plumbing demolition, installation and safety. The SSSP must:\nInclude a detailed description of how the work will be performed and be submitted with sketches, supporting documents, submittals etc.\nInclude a Job-Safety-Analysis (JSA) for all tasks associated with Statement of Work (SOW)\nBe approved by VA-Safety prior to commencement of work.\nMaintain site supervision by a competent individual(s) with OSHA-30 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed.\nObtain VA identification PIV-I badges for all employees. Contractor to consider lead-time for badge procurement.\nManage job-site access and security.\nImplement and maintain required ICRA and ILSM measures.\n\n5.0 SUPPORTING DETAILS\n\nThis is the most up to date information available at this time. Contractor shall be required to field verify current conditions and accuracy of most current documentation.\nSpecifications for Project 554-26-102\nDrawings for Project 554-26-102\n\n6.0 CODE COMPLIANCE\n\nThe Contractor shall comply with the public laws and statutes including all changes and amendments of federal, state and local environmental statutes and regulations in effect of date of issuance of this delivery order, including, the applicable portions of the documents cited in the basic contract and below.\nNational Fire Protection Association (NFPA):\nNFPA 99- Healthcare Facilities Code\nNFPA 101 Life Safety Code\nInternational Code Council (ICC): IBC: International Building,\nBuilding Officials and Code Administrators International (BOCA)\nInternational Conference of Building Officials (ICBO): UBC: Uniform Building Code\n29 CFR 1910 Occupational Safety and Health Standards\n29 CFR 1926 Safety and Health Regulations for Construction\nFederal Occupational Safety and Health Act (OSHA)\nUnderwriters Laboratories\nInternational Plumbing Code\nSBCCI Standard Plumbing Code\n\n7.0 SUBMITTALS\n\nContractor shall submit the following prior to beginning scope of work:\nProject schedule with sequencing, durations, phasing, and cost loading within 10 working days of Notice to Proceed (NTP), and monthly with invoices.\nSite Specific Safety Plan (SSSP)\nSSSP to be submitted to VA Safety staff for review 10 working days after issuance of NTP.\nSSSP to be approved by VA Safety staff prior to start of construction activities.\nConstruction Demolition Removal / Handover Plan\nInspection reports, manufacturer approval certificates, and warranties.\nPenetration and or hot work permits as necessary.\nManufacturer and construction warranties as noted in specifications.\nProject Schedule including sequencing and durations.\nSOV Schedule of Value\nThe schedule will be provided to COR 10 working days prior to start of the work.\nSite superintendent OSHA-30, and tradesmen/laborer OSHA-10 certificates. OSHA-30 certified technician shall be onsite anytime work is being performed.\nMaterial Submittals Submit for COR approval\nPhysical and electronic Redline drawings of the completed work.\n\nTechnical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises.\n\nContractor shall submit hours worked, full report of completed piping which shall include location, hours worked, the full name of Contractor s employees on site, and digital photographs before and after work is completed. Reports shall be submitted within one day upon completion of work performed. Contractor will provide a completed redline drawing of the completed routing of piping. Reports shall be provided in hard copy as well as in an agreeable and compatible electronic format such as, but not limited to, pdf or Microsoft Word.\n\n8.0 ELECTRONIC / DIGITAL DELIVERABLES\n\nEmails to COR with specified documents in PDF format.\n\n9.0 RESOURCES\n\nThe Government will not furnish any resources for the fulfillment of the work required under this contract other than electricity for area where work is being conducted. Under this contract, the contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, supervision, and for testing and maintenance required for completion of this contract.\n\nContractor shall provide all necessary parts and equipment to complete the objective of this contract in accordance with manufacturer specifications. All new equipment, including parts and labor, shall be preapproved by the COR.\n\nTechnical literature and/or descriptions of all materials, equipment and tools proposed for use by the Contractor shall be submitted to the Contracting Officer or his/her designee for approval prior to contract start and whenever a change is required. All Contractor-furnished materials, equipment and tools used shall be standard products all manufacturers regularly engaged in the production of such items. The Contractor shall secure all materials. The Government assumes no liability for loss of or damage to Contractor-owned property held upon Government premises.\n\nThe Contractor shall instruct his/her personnel in utilities conservation practices. The Contractor shall be responsible for operating under conditions which preclude the waste of utilities which shall include but not necessarily be limited to:\nLights shall be used only in areas where and at the time when work is actually being performed unless otherwise directed.\nContractor s personnel will not adjust mechanical equipment controls for heating, ventilation and air conditioning systems.\nGovernment telephones shall not be used for personal reasons or for any toll or long-distance calls.\n\n10.0 TECHNICIANS / INSPECTOR QUALIFICATIONS\n\nThe Government reserves the right to accept or reject Contractor s staff for cause. Documented prior to the work, Contractor shall provide technicians throughout the contract qualified to perform work on plumbing systems. The Contractor shall notify the Government within 3 business days if it intends to replace a technician. At the time of notification, the Contractor shall submit all required certifications for all personnel working on the contract. In the event new, or replacement, personnel become involved in the contract, the Contractor must submit all required certification. Additions or changes in personnel require written approval from the Government. The Contractor shall have a back-up technician available in the event the primary technician is unable to perform his/her duties.\n\nThe Contractor will ensure their personnel and subcontractor personnel meet the privacy standards as set forth by HIPPA (Health Insurance Portability and Accountability Act of 1996) with respect to personal and confidential information that they may come upon, while contract work is being performed.\n\n11.0 PERSONNEL ASSIGNMENTS\n\nThe Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW. The Contractor shall maintain throughout the life of this contract, a current list of technicians and their credentials available for inspection by the Government at any time.\n\n12.0 ACCEPTANCE STANDARDS\n\nThe VA reserves the right to dispute completion of contract scope if contract work is found not in accordance with manufacturer recommendations, is not satisfactorily executed, or if the system is not properly tested and inspected to achieve certification. All work completed by the Contractor must be reviewed and approved by the VA. Work must be approved for one location of each type of fixture prior to proceeding with all other locations specified. If conditions that exist that are not like the location previously approved the contractor shall get approval prior proceeding with work in locations with similar conditions.\n\n13.0 SAFETY AND FIRE PREVENTION\n\nIn the performance of this contract, the contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the building.\n\nThe Contractor shall immediately correct any fire and safety deficiencies caused by his/her personnel. If the Contractor fails or refused to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and hold the contractor in default of the contract.\n\nThe Contractor shall comply with applicable Federal, State and local safety and fire regulations and codes which are in effect at the beginning of the contract. The contractor shall keep abreast of and comply with changes in these requirements and codes applicable to the contract. The requirements include but are not limited to those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthy working conditions for its employees\n\nThe Contractor s personnel shall follow applicable facility policies concerning fire/disaster programs.\n\nAll materials and equipment will be removed from the facility or stored properly at the end of the workday and secured during the workday. Under no circumstances will the Contractor allow for any equipment to be left unattended for any length of time.\n\nThe Contractor shall comply with all applicable Federal, State and local legal requirements\nregarding workers health and safety.\n\nThe Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.\n\nThe Contractor shall perform the work in a manner consistent with the area security and fire\nsafety regulations especially with regard to exits and exit way access. Utility shutdowns shall not\ncompromise security, communication or fire safety for occupants.\n\nNo flammable liquids shall be stored or used in the medical center.\n\nThe necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241. Contractor shall keep certification onsite at all times of extinguisher inspections.\n\nThe Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction.\n\nAll necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.\n\nThe Contractor shall assume responsibility of environmental protection of all material storage.\n\n14.0 ACCIDENT PREVENTION\n\nPrecaution shall always be exercised for the protection of persons (including employees)\nand property. These shall include, but not be limited to, the installation of adequate safety\nguards and protective devices for all equipment and machinery, whether used in the\nperformance of work or permanently installed as part of the work. Contractor shall comply with\nall applicable laws relating to safety precautions, including the safety regulations of the Division\nof Industrial Safety, Department of Industrial Regulations of the state.\n\n15.0 ENVIRONMENTAL PROTECTION\n\nIn order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents.\n\nThe Contractor is responsible for daily cleanup of all areas affected by its work. Areas in use or affected shall be returned to condition in which they were turned over or initially found. VA\nHousekeeping shall not be dispatched for cleaning associated with contractor work.\n\nThe Contractor shall take every precaution in preserving flooring, finishes, equipment, and\nfurniture in areas of work. The Contractor shall repair or replace any damage incurred during its\nwork at their expense.\n\nContractor shall use freight elevators for transmission of materials and personnel. Contractor\nshall take every precaution in preserving the elevators, including the hoist way and lobby doors,\ninterior finishes, and shall conduct all good practices in observing lifting and motor components\ntolerances. Any damage incurred to any elevator component due to negligence will be repaired at the expense of the contractor within the workday of incurred damage.\n\n16.0 WORK STANDARDS AND ICRA / ILSM\n\nWork site shall be free of debris and returned to original condition upon completion of preventative maintenance or repairs.\n\nAll work is to be performed in areas used daily by facility clients and staff. Contractor will take\nsuitable measures to control all material and equipment to produce a minimum of interference\nin facility routine. All work shall be performed in a safe and prudent manner.\n\nContractor shall perform all work as to offer the least possible obstruction and\ninconvenience to staff and the public and shall have under construction no greater amount of\nwork than can be completed promptly and properly with due regard to the rights of staff and\nthe public. Any person the COR may deem incompetent or disorderly shall be promptly removed from the facility and not be allowed to return for the duration of the agreement.\n\nThe Contractor shall comply with an Infection Control Risk Assessment (ICRA) which will be\ndeveloped with the COR and the Infection Control Practitioner. Multiple ICRA s may be necessary to address specific risks at various stages of the project and must be approved prior to proceeding on each phase.\n\n17.0 HAZARDOUS MATERIAL REPORTING\n\nThe Contractor shall maintain hazardous material inventories and material safety data sheets\n(MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR s 355, 370, & 372) to be stored and used on this Medical Center. Hazardous materials must be inventoried when received and at the project s completion. The amounts used shall be maintained for the project duration, and for the calendar year (ending 31 December).\n\nHazardous Materials Inventories, Material Safety Data Sheets and material quantities used shall be submitted to the Contracting Officer for approval.\n\nIn the event of a spill, Contractor shall immediately notify the Contracting Officer s\nRepresentative as well as the Contracting Officer. The Contractor shall be solely\nresponsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761.\n\nAsbestos Containing Material (ACM) is not present in the workspace. If contractor locates suspected ACM in addition to material noted in report, they shall contact the COR immediately for further direction. If any ACM is disturbed or becomes friable due to contractor actions, the construction site shall be shut down until and contractor shall provide appropriate containment at their own expense. In addition, contractor shall be responsible for all abatement and disposal of affected material at their own expense, only after which the job site shall be reopened for continued work. In the event of an ACM disturbance event, the COR shall be immediately notified and shall provide specifications on asbestos abatement.\n\n18.0 HOURS OF WORK\n\nThe hours of work shall take place during the normal business hours of 7:30 AM and 4:00 PM, Monday through Friday, Federal Holidays excluded. Request for weekend, after-hour, and Federal holiday work is permitted with a request in writing submitted beforehand. Off hours are not to billed as overtime. Federal Holidays and any other day declared a federal holiday by the President of the United States are defined below.\n\nNew Year s Day Martin Luther King Jr s Day Presidents Day\nMemorial Day Independence Day Labor Day\nColumbus Day Veterans Day Thanksgiving Day\nChristmas Day\n\nIf a holiday falls on Sunday, the following Monday will be observed as the National Holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National Holiday by the U.S. Government.\n\nIf work requires after hours work due to ICRA constraints or inclement weather, then Contractor shall inform FMS fourteen (14) days in advance.\n\nPostponement/Delays: In the event climate or weather conditions become unsuitable for work or may induce an environmental hazard, then the entire work shall be rescheduled to a date and time satisfactory to the Contractor and the COR. Postponement due to inclement weather will not cause assessment of the penalty provision outlined above, nor should there be an additional cost to the Government.\n\nAll work shall be scheduled and performed within the date and time approved by the COR, in conjunction with the department occupying the space served by this equipment.\n\n19.0 BADGES AND PARKING\n\nIf a given contractor s personnel will be working on-site for less than 5 working days, access to the facility can be attained by contacting the VA police and obtaining temporary access badges. If a contractor will be working on site for more than 5 working days, identification badges must be procured prior to beginning project work. All Contractor personnel are required comply with VAAR 852.273-74 (Available online at VA Technical Information Library) which covers the following requirements: background checks, and the wearing of identification (I. D.) badges issued by the VA RMR VAMC. Contractor must acquire PIV badge for all staff onsite prior to work beginning. While on VA Facilities grounds, temporary or official I.D. badges shall be worn continuously. Failure of the background check may result in specific personnel being disallowed to work on VA premises and the Contractor will need to provide replacement personnel.\nIt is the responsibility of the Contractor s personnel to park in the appropriate designated parking areas. The designated parking area will be specified by COR upon award of contract.\nWhile performing under this contract, all vehicles used by the contractor shall be locked and the keys removed when not in use. This is intended to protect the contractor s property and the safety of the patients at the medical center.\n\n20.0 PERSONNEL QUALIFICATIONS\n\nThe Government reserves the right to accept or reject Contractor s staff for cause.\n\nAll inspectors/testers shall hold current OSHA 10/30 certification and membership. Documentation of this to be submitted by the Contractor to the COR prior to beginning project work. A competent person with OSHA 30 certification must be on site at all times.\n\nThe Contractor shall have a back-up technician in the event the primary technician is unable to perform his/her duties.\n\nThe Contractor will ensure that their personnel and subcontractor personnel meet the privacy standards as set forth by HIPAA (Health Insurance Portability and Accountability Act of 1996) with respect to personal and confidential information that they may come upon.\n\nAll personnel are required to hold OSHA 10 certification as a minimum.\n\n21.0 PERSONNEL REQUIREMENTS\n\nSupervision: The Contractor shall specify a Project Manager who will have responsibility for performance of contract services. The Project Manager shall be competent to supervise all aspects of contract and shall be available on-site during performance of contract work. The Contracting Officer shall be notified in writing of the names of the Project Manager and of changes in personnel appointed to fulfill this function or in the absence of the Contractor, act for the Contractor as the Contractor s Representative.\n\n22.0 QUALITY CONTROL\n\nThe Contractor shall have a quality control program to assure the requirements of this contract are provided as specified. The Contractor and COR will inspect the work. Deficiencies will be noted and corrected before beginning work in another area. Any damage done by Contractor will also be noted and corrected by the Contractor within 2 working days. Damage causing an immediate impact on the environment of the hospital shall be corrected immediately.\n\n23.0 ACCEPTANCE STANDARDS\n\nCompleted work will be to the entire satisfaction of the VA and the COR shall be the sole\njudge as to its acceptability. Any work not acceptable to the COR, shall be immediately, at\nContractor s own expense, refashioned to an acceptable level.\n\n24.0 PERSONNEL ASSIGNMENT\n\nThe Contractor shall assign the appropriate quantity and type of personnel to successfully complete all functions specified in this SOW within the designated period of performance. The Contractor shall maintain throughout the life of this contract, a current list of laborers, tradesmen, superintendents, etc., and their credentials available for inspection by the Government at any time.\n\n25.0 KEYS\n\na. Keys: The COR shall provide the Contractor access to all buildings and rooms required in the provisions of this contract. The Contractor shall notify the COR when leaving these areas.\n\nb. Clearances/Access Controls: Contractor and all personnel shall comply with the security clearances or access controls of areas within the Medical Center. In the event that the Contractor has to obtain access to areas that require special security precautions the COR will notify the contractor prior to access.\n\n26.0 MEETINGS\n\nA Pre-Bid meeting and site walk will be held at a date and time specified by the COR to review scope, of service, site, and requirements with perspective contractors, and provide answers to any questions. Contractor and/or Sub-contractors shall attend a pre-bid walkthrough of the work before submitting a bid. VA reserves the right to reject any bidder not attending the Pre-Bid. The date and time of this walkthrough will be determined by the CO and COR. Contractor and/or subcontractors shall be responsible for making any clarification requests that arise at the pre-bid walkthrough directed to the CO prior to the bidding of the work.\n\n27.0 PERIOD OF PERFORMANCE\n\nGovernment intends to issue NTP immediately after kickoff meeting with Contractor. The period of performance for this contract is ninety (90) days. The period of performance includes thirty (30) days anticipated to complete initial administrative tasks.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C25926Q0166","place_of_performance":{"zip":"80045-7211","city":{"name":"Greenwood Village"},"state":{"name":"CO"},"street":"Department of Veterans Affairs Network Contracting Office","country":{"code":"USA","name":"UNITED STATES"},"street2":"NCO 19 6162 South Willow Drive, Suite 300"},"product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-02-17","posted_at":"2026-02-17T18:52:08.534Z","created_at":"2026-02-17T18:51:58.755Z","modified_at":"2026-04-16T03:55:45.936Z","response_deadline":{"raw":"2026-03-16T10:00:00-06:00","utc":"2026-03-16T16:00:00Z","date":"2026-03-16","time":"10:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b2f64b70e8324621ba34346820d2dce6/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","agency":{"office":{"code":"36C259","name":"NETWORK CONTRACT OFFICE 19 (36C259)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"organization_id":"100176750","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-14","archive_type":"auto_custom"},"history":[{"index":6,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-12-31T20:49:32.579Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"f67cf9260b19430da7647f18dc638a5b","solicitation_number":"36C25926Q0166"},{"index":4,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T17:50:49.659Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"609fbd42b1df47f580b3934e69015aab","solicitation_number":"36C25926Q0166","parent_opportunity_id":"b2f64b70e8324621ba34346820d2dce6"},{"index":2,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-17T18:52:08.534Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2f64b70e8324621ba34346820d2dce6","solicitation_number":"36C25926Q0166","related_opportunity_id":"f67cf9260b19430da7647f18dc638a5b"}],"contacts":[{"name":"Timothy R Verburgt (CS)","role":"primary","email":"Timothy.Verburgt@va.gov","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"b2f64b70e8324621ba34346820d2dce6","lineage_id":"b2f64b70e8324621ba34346820d2dce6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-13T00:55:18.693875857Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"e94fa1c35adca3edb679eabc1f7bd0e03c356a7e2ff9df358eb4343d432564a9","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-13T00:55:18.693875857Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Install Humidification Monitoring and Control for Pharmacy Cache","text":"Install Humidification Monitoring and Control for Pharmacy Cache","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25926Q0166","product_service_code":"Z2DA"},{"award":{"awardee":{}},"dates":{"posted":"2026-03-03","posted_at":"2026-03-03T17:50:49.659Z","created_at":"2026-03-03T17:50:16.355Z","modified_at":"2026-04-16T03:55:45.936Z","response_deadline":{"raw":"2026-03-16T10:00:00-06:00","utc":"2026-03-16T16:00:00Z","date":"2026-03-16","time":"10:00:00","timezone":"America/Denver","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/609fbd42b1df47f580b3934e69015aab/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","agency":{"office":{"code":"36C259","name":"NETWORK CONTRACT OFFICE 19 (36C259)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"organization_id":"100176750","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-04-15","archive_type":"auto_custom"},"history":[{"index":6,"title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-09T20:02:11.930Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"3534d550f2544e24be5620fdb5dcf348","solicitation_number":"36C25926Q0166","related_opportunity_id":"609fbd42b1df47f580b3934e69015aab"},{"index":4,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T17:50:49.659Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"609fbd42b1df47f580b3934e69015aab","solicitation_number":"36C25926Q0166","parent_opportunity_id":"b2f64b70e8324621ba34346820d2dce6"},{"index":1,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-02-17T18:52:08.534Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"b2f64b70e8324621ba34346820d2dce6","solicitation_number":"36C25926Q0166","related_opportunity_id":"f67cf9260b19430da7647f18dc638a5b"}],"contacts":[{"name":"Timothy R Verburgt (CS)","role":"primary","email":"Timothy.Verburgt@va.gov","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"609fbd42b1df47f580b3934e69015aab","lineage_id":"b2f64b70e8324621ba34346820d2dce6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-12T01:01:26.610764385Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"650e8aa621971d1ce48603a90596bc525e6d28023401f31847737238f7a33a0e","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-12T01:01:26.610764385Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Install Humidification Monitoring and Control for Pharmacy Cache","text":"Install Humidification Monitoring and Control for Pharmacy Cache","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25926Q0166","product_service_code":"Z2DA"},{"award":{"date":"2026-03-31","amount":"222589.56","number":"36C25926P0351","awardee":{"raw":"Sterling Constructors LLC DENVER 80229","uei":"Z92AAAUR66M9","cage":"12P25","name":"Sterling Constructors LLC","location":{"zip":"80229","city":{"name":"DENVER"},"state":{"name":"CO"},"country":{"name":"CO"}}}},"dates":{"posted":"2026-04-09","posted_at":"2026-04-09T20:02:11.930Z","award_date":"2026-03-31","created_at":"2026-04-09T20:02:09.716Z","modified_at":"2026-06-09T03:55:44.614Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/3534d550f2544e24be5620fdb5dcf348/view"},"naics":{"codes":["236220"],"primary":"236220"},"title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","agency":{"office":{"code":"36C259","name":"NETWORK CONTRACT OFFICE 19 (36C259)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"organization_id":"100176750","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-08","archive_type":"auto_custom"},"history":[{"index":5,"title":"Z2DA--554-26-102 | Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-04-09T20:02:11.930Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"3534d550f2544e24be5620fdb5dcf348","solicitation_number":"36C25926Q0166","related_opportunity_id":"609fbd42b1df47f580b3934e69015aab"},{"index":3,"title":"Z2DA--Install Humidification Monitoring and Control for Pharmacy Cache","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-03-03T17:50:49.659Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"609fbd42b1df47f580b3934e69015aab","solicitation_number":"36C25926Q0166","parent_opportunity_id":"b2f64b70e8324621ba34346820d2dce6"}],"contacts":[{"name":"Timothy Verburgt","role":"primary","email":"Timothy.Verburgt@va.gov","phone":"303-712-5707","title":"Contract Specialist"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"3534d550f2544e24be5620fdb5dcf348","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"b2f64b70e8324621ba34346820d2dce6","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-07T03:19:12.344403447Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"074c6bc62b17de922fcd52025ce3ac65b0f8fc3491d5ed78dab3757c4d45e45c","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-07T03:19:12.344403447Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C25926Q0166","product_service_code":"Z2DA"}],"due_at":"2026-03-16T16:00:00Z","due_date":"2026-03-16","closes_at":"2026-03-16T16:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","state":"CO","county":"08001","county_name":"Adams County","city":null,"city_name":null,"country":"USA","state_source":"sam_state_name","state_evidence":null,"site_key":null,"winner_key":"Z92AAAUR66M9","amount":"222589.56","linked_awards":4,"cancelled":false,"archived":true,"updated_at":"2026-10-07T04:12:11.843801Z","principal_notice_id":"609fbd42b1df47f580b3934e69015aab","description":{"text":"Install Humidification Monitoring and Control for Pharmacy Cache","html":"Install Humidification Monitoring and Control for Pharmacy Cache","origin":"detail"},"contacts":[{"name":"Timothy Verburgt","role":"primary","email":"Timothy.Verburgt@va.gov","phone":"303-712-5707","title":"Contract Specialist"}],"place_of_performance":null,"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"naics_codes":["236220"],"award":{"awardee":{}},"attachments":[{"resource_id":"dce7e0548067469d996b19fd8bbc0d9e","name":"36C25926P0351_1.docx","kind":"file","mime_type":".docx","size_bytes":13752,"posted_at":"2026-04-09T20:02:11.930Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/dce7e0548067469d996b19fd8bbc0d9e/download","mirrored":false},{"resource_id":"7142409ac15f45a7865e5223dfc2e70b","name":"36C25926Q0166.docx","kind":"file","mime_type":".docx","size_bytes":29884,"posted_at":"2025-12-31T20:49:32.579Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/7142409ac15f45a7865e5223dfc2e70b/download","mirrored":false},{"resource_id":"087ace42cc634fe7a4f0b6d100c1ab44","name":"36C25926Q0166_1.docx","kind":"file","mime_type":".docx","size_bytes":149181,"posted_at":"2026-02-17T18:52:08.534Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/087ace42cc634fe7a4f0b6d100c1ab44/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C25926P0351_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C25926P0351_3600_-NONE-_-NONE-/","piid":"36C25926P0351","parent_piid":null,"award_type":"PURCHASE ORDER","vendor_key":"Z92AAAUR66M9","recipient_name":"STERLING CONSTRUCTORS LLC","recipient_uei":"Z92AAAUR66M9","recipient_cage":"12P25","recipient_city":"DENVER","recipient_state":"CO","sub_name":"Department of Veterans Affairs","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","office_key":"o-36C259","first_action_date":"2026-03-31","last_action_date":"2026-09-10","actions":3,"obligated":"222589.56","current_total_value":"222589.56","potential_total_value":"222589.56","naics":"236220","psc":"Z2DA","extent_competed":"COMPETED UNDER SAP","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":1,"description":"INSTALL HUMIDIFICATION MONITORING AND CONTROL FOR PHARMACY CACHE","method":"piid","confidence":"high","evidence":["award number 36C25926P0351 equals the contract number","same awarding office 36C259"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C25927Q0048","latest_notice_id":"c63e9c1e32f4475caa79c878ba87ca2f","title":"Radiant Heating Panel Replacement","solicitation_number":"36C25927Q0048","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-23","notices":3,"due_at":"2026-11-27T19:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"238220","psc":"J045","set_aside":"SBA","state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C25927Q0061","latest_notice_id":"2844a59e27da407db5c5aac404bd35d7","title":"AI tool for Medication Reconciliation and Clinical Review","solicitation_number":"36C25927Q0061","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"541519","psc":"DA10","set_aside":null,"state":"CO","county":"08077","county_name":"Mesa County","city":"0831660","city_name":"Grand Junction","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25927Q0060","latest_notice_id":"dab1ae13fa4543da8629e3ba28875296","title":"J023-- Transmission Repair/Replacement x2","solicitation_number":"36C25927Q0060","notice_type":"k","first_type":"k","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-12-04T17:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"811111","psc":"J023","set_aside":"SBA","state":"UT","county":"49035","county_name":"Salt Lake County","city":"4967000","city_name":"Salt Lake City","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C25927Q0063","latest_notice_id":"3aec52f34d1346bcb89262decf41e0e9","title":"J045--Annual Boiler Maintenance RMR VAMC","solicitation_number":"36C25927Q0063","notice_type":"r","first_type":"r","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-04T21:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"238220","psc":"J045","set_aside":null,"state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":"sam_zip","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C25927Q0051","latest_notice_id":"65781a346f1d408a8306e07a5b7f57e4","title":"Q301--Request For Information (RFI)-Reference Lab Testing for Fort Harrison VA Medical Center (Fort Harrison, MT)","solicitation_number":"36C25927Q0051","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-12-11T17:00:00Z","due_date":"2026-12-11","closes_at":"2026-12-11T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"541380","psc":"Q301","set_aside":null,"state":"MT","county":"30049","county_name":"Lewis and Clark County","city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T07:05:42.989249Z"}],"similar_open":[{"key":"47PB5427R0003","latest_notice_id":"e87be19f02de482e99c7ad4ca3402fa8","title":"Department Of Energy - National Nuclear Security Administration Joint Cyber Facility Construction Solicitation","solicitation_number":"47PB5427R0003","notice_type":"o","first_type":"o","first_posted":"2026-11-02","last_posted":"2026-11-02","notices":1,"due_at":"2026-12-07T18:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PB54","office_name":"PBS CAPITAL PROJECTS - ZONE 7 BRANCH","naics":"236220","psc":"Z2JZ","set_aside":null,"state":"CO","county":"08059","county_name":"Jefferson County","city":"0843000","city_name":"Lakewood","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"W9128F27SM003","latest_notice_id":"bc345aa9229c4aa99ca91245e13614d9","title":"High Temp Hot Water Distribution System and Heat Plant Suite of Repairs to the US Air Force Academy COLORADO","solicitation_number":"W9128F27SM003","notice_type":"r","first_type":"r","first_posted":"2026-11-12","last_posted":"2026-11-12","notices":1,"due_at":"2026-12-14T20:00:00Z","due_date":"2026-12-14","closes_at":"2026-12-14T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W9128F","office_name":"W071 ENDIST OMAHA","naics":"236220","psc":"Z2NB","set_aside":null,"state":"CO","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"title","state_evidence":"ND HEAT PLANT SUITE OF REPAIRS TO THE US AIR FORCE ACADEMY COLORADO","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-13T05:18:31.697344Z"},{"key":"47PD5127Q9970","latest_notice_id":"dbe2e2fea3c2469595d5eb18d55cedf8","title":"Byron White Courthouse Rug Replacement","solicitation_number":"47PD5127Q9970","notice_type":"k","first_type":"k","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-15T22:00:00Z","due_date":"2026-12-15","closes_at":"2026-12-15T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-047","dept_name":"GENERAL SERVICES ADMINISTRATION","sub_key":"s-4740","sub_name":"PUBLIC BUILDINGS SERVICE","office_key":"o-47PD51","office_name":"PBS PROJECT DELIVERY ZONES 5-7 - ROCKY MOUNTAIN BRANCH","naics":"236220","psc":"Z2AA","set_aside":"SBA","state":"CO","county":"08031","county_name":"Denver County","city":"0820000","city_name":"Denver","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open_total":187,"indexable":false}