{"canonical":"https://sealedbidder.com/opportunities/36c25925q0780","key":"36C25925Q0780","url":"https://sealedbidder.com/opportunities/36c25925q0780","title":"H945--Boiler Semi-Annual Inspection/Testing 623-26-1-5064-0005","solicitation_number":"36C25925Q0780","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-09-11T20:30:00Z","first_posted":"2025-09-03","last_posted":"2025-09-03","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"541350","psc":"H945","set_aside":"SDVOSBC","place_state":"OK","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"40101","place_county_name":"Muskogee County","place_city":"4050050","place_city_name":"Muskogee","winner":null,"award_amount":null,"publications":[{"notice_id":"b8fb185741964d7a80d1777e4eadee97","title":"H945--Boiler Semi-Annual Inspection/Testing 623-26-1-5064-0005","solicitation_number":"36C25925Q0780","notice_type":"r","base_type":"r","posted":"2025-09-03","posted_at":"2025-09-03T13:58:40.064Z","due_at":"2025-09-11T20:30:00Z","due_date":"2025-09-11","cancelled":false,"archived":true,"archive_date":"2025-10-11","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b8fb185741964d7a80d1777e4eadee97/view","enriched":true,"history":[{"index":4,"title":"H945--Boiler Semi-Annual Inspection/Testing","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T16:30:44.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"918658dab3694305b6913563743a1a25","solicitation_number":"36C25926Q0023","related_opportunity_id":"b8fb185741964d7a80d1777e4eadee97"},{"index":3,"title":"H945--Boiler Semi-Annual Inspection/Testing 623-26-1-5064-0005","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-03T13:58:40.064Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b8fb185741964d7a80d1777e4eadee97","solicitation_number":"36C25925Q0780"}]}],"latest_notice_id":"b8fb185741964d7a80d1777e4eadee97","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-09-03","posted_at":"2025-09-03T13:58:40.064Z","created_at":"2025-09-03T13:58:37.828Z","modified_at":"2025-10-11T04:04:28.656Z","response_deadline":{"raw":"2025-09-11T15:30:00-05:00","utc":"2025-09-11T20:30:00Z","date":"2025-09-11","time":"15:30:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b8fb185741964d7a80d1777e4eadee97/view"},"naics":{"codes":["541350"],"primary":"541350"},"title":"H945--Boiler Semi-Annual Inspection/Testing 623-26-1-5064-0005","agency":{"office":{"code":"36C259","name":"NETWORK CONTRACT OFFICE 19 (36C259)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"organization_id":"100176750","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-11","archive_type":"auto_custom"},"history":[{"index":4,"title":"H945--Boiler Semi-Annual Inspection/Testing","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-10-15T16:30:44.766Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"918658dab3694305b6913563743a1a25","solicitation_number":"36C25926Q0023","related_opportunity_id":"b8fb185741964d7a80d1777e4eadee97"},{"index":3,"title":"H945--Boiler Semi-Annual Inspection/Testing 623-26-1-5064-0005","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-03T13:58:40.064Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b8fb185741964d7a80d1777e4eadee97","solicitation_number":"36C25925Q0780"}],"contacts":[{"name":"Orrellius Williams","role":"primary","email":"orrellius.williams@va.gov","phone":"918-252-8812","title":"Contract Specialist"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"b8fb185741964d7a80d1777e4eadee97","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"b8fb185741964d7a80d1777e4eadee97","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-01T03:18:14.929899187Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"f31e12d006935aa98fa47f97c36d72d22bd9fc410ac8131586565227fce1667a","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-01T03:18:14.929899187Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Boiler Safety Testing/Inspection Services\nJack C. Montgomery VAMC\nMuskogee OK 74401\n\nBRIEF SCOPE OF WORK\n(This is for information only)\n\n\nThis RFI (Request for Information) is for information only. No award will be made from this RFI. \n\nThe Department of Veterans Affairs has a requirement for a contractor to provide Boiler Safety Testing/Inspection/services and Feedwater Deaerator Tank inspection/services in accordance with the terms and conditions stated within this Statement of Work (SOW). All work shall be coordinated with the Jack C. Montgomery VA Health Care System s COR. This contract will have a Base Period  Period of Performance  (POP) with four (4) Optional  Periods of Performance  (Options may or may not be exercised).  \nLocation of Performance: \nJack C. Montgomery VA Medical Center\n1011 Honor Heights Drive \nMuskogee OK 74401\n\nINSPECTION SERVICES: \nGeneral:\nContractor shall perform combustion analysis and tuning, safety device testing, and boiler inspections on three (3) fire tube boilers as specified within all updated manufacturer specifications and requirements and provide inspections of two (2) feedwater deaerator tanks. Technicians shall have adequate experience, training, and applicable licensing, to perform required preventative maintenance.\nContractor shall provide all labor, materials, and equipment necessary for protection of VAMC personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish. Contractor must have adequate insurance protection against negligent work and other forms of liability and follow all federal, state, local, and VA Regulations related to this requirement.\nUpon request, contractor shall provide proof of certification attesting that all gauging and measurement equipment used has been currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nIntroduction:\n(VA) Jack C. Montgomery medical center has a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, sterilizing services, and laundry equipment.\nThe VA has a requirement for:\nAnnual internal and external inspections on three (3) (listed below) high pressure (over 15 psig) steam boilers \nA semi-annual requirement to perform burner and instrument inspecting, testing, calibrating burners and controls, and annual testing of all safety devices on the three (3) (listed below) high pressure (over 15 psig) steam boilers and two (2) (listed below) deaerator tanks \nAn annual external inspection of two (2) (listed below) feedwater deaerator / condensate surge tanks.\nA 6 year inspection and magnetic particle testing of welds of pressure vessel interior of the feedwater deaerator tank (listed below). To be completed in base year of contract only. List of Equipment:\nBoiler #1 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-9\nBoiler #2 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-10\nBoiler #3 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-8\nFeedwater Deaerator Tank: manufactured by: Wheeler Tank Mfg, Model number: 10ST5 (M), SN: 11572\nCondensate Tank: manufactured by: Wheeler Tank Mfg, Model number 10ST, SN: 15564\nQualifications of Testing Personnel:\nBoiler Inspectors shall be a  Qualified Professional Inspector . Proof of qualification shall be provided to the COR upon request. They shall be versed with and have access to the current versions of  reference materials  defined below. A  Qualified Professional Inspector  is defined as one who possess one or combination of below requirements:\nA boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).\nA boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state.\nA boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee.\nA boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance.\nCombustion Analysis and Safety Device Testing personnel shall be qualified for boiler plant burner, control and instrumentation testing. Proof of qualification shall be provided to the COR upon request. Qualifications include completing at least a one-year trade school and five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plants.\n Reference Materials  are comprised of the latest versions of the below, plus any other materials/manufacture reference materials needed to complete all contract requirements:\nASME Boiler and Pressure Vessel Code\nASME B31.1, Power Piping Code\nASME CSD-1, Controls and Safety Devices for Automatically Fired Boilers\nANSI/NB-23, National Board Inspection Code\nNFPA 85, Boiler and Combustion Systems Hazards Code\nVHA Boiler Plant Safety Device Testing Manual, 5th Ed.\nUtilize National Board Forms NB-6 and NB-7\nNATIONAL BOARD INSPECTION CODE,\nPart RB, In-service Inspection of Pressure-Retaining Items,\nThe testing personnel shall be equipped with portable electronic flue gas analyzers and all other test instruments necessary for the required tests and calibrations, all currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nInspection and Testing Requirements:\nAt least two weeks  notice to the Contracting Officer s Representative (COR) is required prior to an inspection. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her representative is available on site to monitor the work. The annual Internal/External Boiler inspections are to be performed in June, July and August. The semiannual tunings are to be performed in September and March. The annual safety device testing is to be performed in March.\nThe contractor is required to prepare the boilers for inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service.\nEach burner and the burner control, monitoring and safety interlock systems shall be inspected and tested and adjusted as necessary.\nVA will have the boilers that are to be serviced prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\nVA will comply with any other requirements of the test personnel that are considered reasonable by VA and have been presented in writing at least two weeks prior to the scheduled testing.\nThe COR or his/her representative will observe the work.\n\nCombustion Analysis/Tuning and Safety Device Testing summary of requirements:\nThe inspections, testing, and adjustments shall comply with:\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual.\nThe written recommendations of the equipment manufacturers.\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices.\nBurner performance requirements in this document.\nA summary of the work is as follows:\nReview boiler plant log sheets and alarm and trouble reports.\nReview records that show combustion performance (flue gas oxygen).\nPerform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract.\nTest the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.\nCompare the combustion performance data with VA requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR.\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\nImmediately inform COR of any recommended repairs, modifications, or safety related problems.\nList of interlocks and safety devices to be inspected and tested on each Boiler/Burner/Condensate/DA tank/Plant safety:\nLow Water alarm on Condensate Tank (LWACT)\nHigh Water alarm on Condensate Tank (HWACT)\nLow Water alarm on DA Tank (LWADT)\nHigh Water alarm on DA Tank (HWADT)\nDA Tank Overflow Drain System (DAODS)\nDA Tank Safety Valve (DASV)\nSteam Safety Valve following PRV (SVFPRV)- Deaerator\nLiquid Relief Valve on Oil Pump Set (LRVOPS)\nCarbon Monoxide and Combustible Gas Alarms in the Boiler plant.\n\nThe Following Items Are to Be performed on Each Boiler  \n             \n\nLiquid Relief Valve on Economizer (LRVE)\nPropane Pilot Backup System\nLow Water alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)\nHigh Water alarm on Boiler (HWAB)\nRecycle and Non-recycle Steam pressure limit switches (RBSPLS & NRBSPLS)\nSteam safety valves on Boiler (SVB)\nLow Fuel Gas Pressure Cutoff Switch (LFGPCS)\nHigh Fuel Gas Pressure Cutoff Switch (HFGPCS)\nAutomatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV)-Main Gas Line\nAutomatic Pilot Fuel Gas Shutoff Valves and Automatic Pilot Fuel Gas Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV)\nProof of closure on Automatic Fuel Shutoff Valves (POCAFGSOV)   Natural Gas\nFlame Scanner for main flame out (FSMFO)   Natural Gas\nFlame Scanner for main flame out (FSMFO)   Fuel Oil\nFlame Scanner Not Sensing Igniter Spark (FSNSIS)\nIgniter Timing (IT)\nMain Flame Ignition Timing (MFIT)\nPre-Purge and Post-Purge Timing (PPT)\nLow Fire Proving Switch (LFPS)\nForced Draft Damper Wide Open Pre-Purge Proving Switch (FDDWOPS)\nCombustion Air Pressure Switch (CAPS)\nPurge Airflow Proving Switch (PAPS)\nForced Draft Motor Interlock Switches (FDMIS)\nOutlet Stack Damper Position Interlock Switch (OSDPI)\nFurnace Pressure Interlock (FPI)\nLow Pilot Gas Pressure Cutoff Switch (LPFGPCS)\nFlue Gas Recirculation Damper Interlock (FGRDI)\nLow Flue Gas Oxygen Level Interlock (LFGOLI)\nLow Fuel Oil Pressure Cutoff Switch (LFOPCS)\nHigh Fuel Oil Pressure Cutoff Switch (HFOPCS)\nLow Atomizing Media Pressure Switch (LAMPS)\nAutomatic Fuel Oil Shutoff Valves (AFOSV)   for Seat Leakage\nProof of Closure on Automatic Fuel Oil Shutoff Valves (POC_AFOSV)   Oil\nOil Burner Position Switch (OBPS)\nEmergency Stop/Panic Buttons (ESPB)\n\nRequired burner performance (natural gas and fuel oil):\nTurndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\nMaximum carbon monoxide: 200 parts per million (ppm)\nMaximum NOx (Nitrous Oxide): _____ (Refer to original burner specification).\nFlue gas oxygen: 2.5   4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nFlue gas oxygen (low excess air burners): 1.0   2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\nFlames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls.\n\nBoiler Inspections summary of requirements:\nAnnual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required every six years or more frequently if welding repairs have been performed.\nContractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. The annual Internal/External Boiler inspections are to be performed in June, July and August.\n\nFeed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand.\nCoordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections.\nBoilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical  lock-out, tag-out  in place; connecting piping isolated; proper illumination provided; compliance with  confined space  access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection.\nVAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection.\nThe boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work.\nThe inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 5th Edition.\n\nSummary of the minimum inspection requirements for boilers:\nReview the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks.\nAssess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes.\nInspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets.\nInspect foundations for signs of stress such as cracking or movement.\nInspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation.\nInspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits.\nExamine all stays and stayed plates.\nInspect gas side baffles.\nInspect internal drum surfaces and steam separating internals.\nInspect tubes, tube ends and tube alignment. Check for sagging tubes.\nSet combustions for boilers number one, two, and three, on natural gas and number two oil.\nTest all safety devices and perform annually required accumulation tests on boilers one, two and three.\nVerify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions.\nInspect seating surfaces of man ways and hand holes.\nCheck that boiler structure is plumb and level with no excessive deformations.\nCheck for missing items such as bolts and nuts.\nExamine all valve and pipe connections to the pressure vessel.\nInspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor.\nVerify proper alignment of burner assembly.\nInspect furnace for evidence of flame impingement.\nTest operation of water level gage glass.\nPerform mechanical and electrical inspection of disassembled low water cutouts. After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually.\nVerify that steam pressure gage is properly calibrated.\nTest operation of high steam pressure cutouts on hot boilers by raising steam pressure.\nInspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ).\nInspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions.\nInspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions.\nInspect valves on boiler feed water, blow down, drain and steam systems.\nPerform service and Calibration of boiler instrumentation and controls.\nProvide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions.\n\nSummary of the minimum inspection requirements for Feed water Deaerators:\nReview the feed water de-aerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications.\nAssess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes.\nTest hazardous gas monitoring system.\nInspect for evidence of leakage.\nNote feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy.\nInspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ.\nVerify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases.\nInspect support structures for proper integrity and allowance for thermal expansion.\nInternal Inspections\nVisually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking.\nInspect spray nozzles and trays.\n\n\n\nIMPORTANT NOTE:  This RFI (Request for Information) is for information only.\nNo award will be made from this RFI. \n\nPlease communicate via e-mail to orrellius.williams@va.gov by COB (1530 PM CT) September11, 2025 as to your company s ability to perform service per this brief Scope of Work.  \n\nIf interested, please provide the following:\n1. Please state your company s business size \n2. Please provide DUNS number\n3. If you have an FSS/GSA contract that includes this service \n4. Provide FSS/GSA contract number if applicable","text":"Boiler Safety Testing/Inspection Services\nJack C. Montgomery VAMC\nMuskogee OK 74401\n\nBRIEF SCOPE OF WORK\n(This is for information only)\n\nThis RFI (Request for Information) is for information only. No award will be made from this RFI.\n\nThe Department of Veterans Affairs has a requirement for a contractor to provide Boiler Safety Testing/Inspection/services and Feedwater Deaerator Tank inspection/services in accordance with the terms and conditions stated within this Statement of Work (SOW). All work shall be coordinated with the Jack C. Montgomery VA Health Care System s COR. This contract will have a Base Period Period of Performance (POP) with four (4) Optional Periods of Performance (Options may or may not be exercised).\nLocation of Performance:\nJack C. Montgomery VA Medical Center\n1011 Honor Heights Drive\nMuskogee OK 74401\n\nINSPECTION SERVICES:\nGeneral:\nContractor shall perform combustion analysis and tuning, safety device testing, and boiler inspections on three (3) fire tube boilers as specified within all updated manufacturer specifications and requirements and provide inspections of two (2) feedwater deaerator tanks. Technicians shall have adequate experience, training, and applicable licensing, to perform required preventative maintenance.\nContractor shall provide all labor, materials, and equipment necessary for protection of VAMC personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish. Contractor must have adequate insurance protection against negligent work and other forms of liability and follow all federal, state, local, and VA Regulations related to this requirement.\nUpon request, contractor shall provide proof of certification attesting that all gauging and measurement equipment used has been currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nIntroduction:\n(VA) Jack C. Montgomery medical center has a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, sterilizing services, and laundry equipment.\nThe VA has a requirement for:\nAnnual internal and external inspections on three (3) (listed below) high pressure (over 15 psig) steam boilers\nA semi-annual requirement to perform burner and instrument inspecting, testing, calibrating burners and controls, and annual testing of all safety devices on the three (3) (listed below) high pressure (over 15 psig) steam boilers and two (2) (listed below) deaerator tanks\nAn annual external inspection of two (2) (listed below) feedwater deaerator / condensate surge tanks.\nA 6 year inspection and magnetic particle testing of welds of pressure vessel interior of the feedwater deaerator tank (listed below). To be completed in base year of contract only. List of Equipment:\nBoiler #1 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-9\nBoiler #2 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-10\nBoiler #3 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-8\nFeedwater Deaerator Tank: manufactured by: Wheeler Tank Mfg, Model number: 10ST5 (M), SN: 11572\nCondensate Tank: manufactured by: Wheeler Tank Mfg, Model number 10ST, SN: 15564\nQualifications of Testing Personnel:\nBoiler Inspectors shall be a Qualified Professional Inspector . Proof of qualification shall be provided to the COR upon request. They shall be versed with and have access to the current versions of reference materials defined below. A Qualified Professional Inspector is defined as one who possess one or combination of below requirements:\nA boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).\nA boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state.\nA boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee.\nA boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance.\nCombustion Analysis and Safety Device Testing personnel shall be qualified for boiler plant burner, control and instrumentation testing. Proof of qualification shall be provided to the COR upon request. Qualifications include completing at least a one-year trade school and five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plants.\nReference Materials are comprised of the latest versions of the below, plus any other materials/manufacture reference materials needed to complete all contract requirements:\nASME Boiler and Pressure Vessel Code\nASME B31.1, Power Piping Code\nASME CSD-1, Controls and Safety Devices for Automatically Fired Boilers\nANSI/NB-23, National Board Inspection Code\nNFPA 85, Boiler and Combustion Systems Hazards Code\nVHA Boiler Plant Safety Device Testing Manual, 5th Ed.\nUtilize National Board Forms NB-6 and NB-7\nNATIONAL BOARD INSPECTION CODE,\nPart RB, In-service Inspection of Pressure-Retaining Items,\nThe testing personnel shall be equipped with portable electronic flue gas analyzers and all other test instruments necessary for the required tests and calibrations, all currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nInspection and Testing Requirements:\nAt least two weeks notice to the Contracting Officer s Representative (COR) is required prior to an inspection. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her representative is available on site to monitor the work. The annual Internal/External Boiler inspections are to be performed in June, July and August. The semiannual tunings are to be performed in September and March. The annual safety device testing is to be performed in March.\nThe contractor is required to prepare the boilers for inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service.\nEach burner and the burner control, monitoring and safety interlock systems shall be inspected and tested and adjusted as necessary.\nVA will have the boilers that are to be serviced prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\nVA will comply with any other requirements of the test personnel that are considered reasonable by VA and have been presented in writing at least two weeks prior to the scheduled testing.\nThe COR or his/her representative will observe the work.\n\nCombustion Analysis/Tuning and Safety Device Testing summary of requirements:\nThe inspections, testing, and adjustments shall comply with:\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual.\nThe written recommendations of the equipment manufacturers.\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices.\nBurner performance requirements in this document.\nA summary of the work is as follows:\nReview boiler plant log sheets and alarm and trouble reports.\nReview records that show combustion performance (flue gas oxygen).\nPerform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract.\nTest the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.\nCompare the combustion performance data with VA requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR.\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\nImmediately inform COR of any recommended repairs, modifications, or safety related problems.\nList of interlocks and safety devices to be inspected and tested on each Boiler/Burner/Condensate/DA tank/Plant safety:\nLow Water alarm on Condensate Tank (LWACT)\nHigh Water alarm on Condensate Tank (HWACT)\nLow Water alarm on DA Tank (LWADT)\nHigh Water alarm on DA Tank (HWADT)\nDA Tank Overflow Drain System (DAODS)\nDA Tank Safety Valve (DASV)\nSteam Safety Valve following PRV (SVFPRV)- Deaerator\nLiquid Relief Valve on Oil Pump Set (LRVOPS)\nCarbon Monoxide and Combustible Gas Alarms in the Boiler plant.\n\nThe Following Items Are to Be performed on Each Boiler\n\nLiquid Relief Valve on Economizer (LRVE)\nPropane Pilot Backup System\nLow Water alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)\nHigh Water alarm on Boiler (HWAB)\nRecycle and Non-recycle Steam pressure limit switches (RBSPLS & NRBSPLS)\nSteam safety valves on Boiler (SVB)\nLow Fuel Gas Pressure Cutoff Switch (LFGPCS)\nHigh Fuel Gas Pressure Cutoff Switch (HFGPCS)\nAutomatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV)-Main Gas Line\nAutomatic Pilot Fuel Gas Shutoff Valves and Automatic Pilot Fuel Gas Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV)\nProof of closure on Automatic Fuel Shutoff Valves (POCAFGSOV) Natural Gas\nFlame Scanner for main flame out (FSMFO) Natural Gas\nFlame Scanner for main flame out (FSMFO) Fuel Oil\nFlame Scanner Not Sensing Igniter Spark (FSNSIS)\nIgniter Timing (IT)\nMain Flame Ignition Timing (MFIT)\nPre-Purge and Post-Purge Timing (PPT)\nLow Fire Proving Switch (LFPS)\nForced Draft Damper Wide Open Pre-Purge Proving Switch (FDDWOPS)\nCombustion Air Pressure Switch (CAPS)\nPurge Airflow Proving Switch (PAPS)\nForced Draft Motor Interlock Switches (FDMIS)\nOutlet Stack Damper Position Interlock Switch (OSDPI)\nFurnace Pressure Interlock (FPI)\nLow Pilot Gas Pressure Cutoff Switch (LPFGPCS)\nFlue Gas Recirculation Damper Interlock (FGRDI)\nLow Flue Gas Oxygen Level Interlock (LFGOLI)\nLow Fuel Oil Pressure Cutoff Switch (LFOPCS)\nHigh Fuel Oil Pressure Cutoff Switch (HFOPCS)\nLow Atomizing Media Pressure Switch (LAMPS)\nAutomatic Fuel Oil Shutoff Valves (AFOSV) for Seat Leakage\nProof of Closure on Automatic Fuel Oil Shutoff Valves (POC_AFOSV) Oil\nOil Burner Position Switch (OBPS)\nEmergency Stop/Panic Buttons (ESPB)\n\nRequired burner performance (natural gas and fuel oil):\nTurndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\nMaximum carbon monoxide: 200 parts per million (ppm)\nMaximum NOx (Nitrous Oxide): _____ (Refer to original burner specification).\nFlue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nFlue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\nFlames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls.\n\nBoiler Inspections summary of requirements:\nAnnual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required every six years or more frequently if welding repairs have been performed.\nContractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. The annual Internal/External Boiler inspections are to be performed in June, July and August.\n\nFeed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand.\nCoordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections.\nBoilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection.\nVAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection.\nThe boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work.\nThe inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 5th Edition.\n\nSummary of the minimum inspection requirements for boilers:\nReview the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks.\nAssess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes.\nInspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets.\nInspect foundations for signs of stress such as cracking or movement.\nInspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation.\nInspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits.\nExamine all stays and stayed plates.\nInspect gas side baffles.\nInspect internal drum surfaces and steam separating internals.\nInspect tubes, tube ends and tube alignment. Check for sagging tubes.\nSet combustions for boilers number one, two, and three, on natural gas and number two oil.\nTest all safety devices and perform annually required accumulation tests on boilers one, two and three.\nVerify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions.\nInspect seating surfaces of man ways and hand holes.\nCheck that boiler structure is plumb and level with no excessive deformations.\nCheck for missing items such as bolts and nuts.\nExamine all valve and pipe connections to the pressure vessel.\nInspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor.\nVerify proper alignment of burner assembly.\nInspect furnace for evidence of flame impingement.\nTest operation of water level gage glass.\nPerform mechanical and electrical inspection of disassembled low water cutouts. After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually.\nVerify that steam pressure gage is properly calibrated.\nTest operation of high steam pressure cutouts on hot boilers by raising steam pressure.\nInspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ).\nInspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions.\nInspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions.\nInspect valves on boiler feed water, blow down, drain and steam systems.\nPerform service and Calibration of boiler instrumentation and controls.\nProvide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions.\n\nSummary of the minimum inspection requirements for Feed water Deaerators:\nReview the feed water de-aerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications.\nAssess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes.\nTest hazardous gas monitoring system.\nInspect for evidence of leakage.\nNote feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy.\nInspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ.\nVerify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases.\nInspect support structures for proper integrity and allowance for thermal expansion.\nInternal Inspections\nVisually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking.\nInspect spray nozzles and trays.\n\nIMPORTANT NOTE: This RFI (Request for Information) is for information only.\nNo award will be made from this RFI.\n\nPlease communicate via e-mail to orrellius.williams@va.gov by COB (1530 PM CT) September11, 2025 as to your company s ability to perform service per this brief Scope of Work.\n\nIf interested, please provide the following:\n1. Please state your company s business size\n2. Please provide DUNS number\n3. If you have an FSS/GSA contract that includes this service\n4. Provide FSS/GSA contract number if applicable","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C25925Q0780","place_of_performance":{"zip":"74401","city":{"code":"50050","name":"Muskogee"},"state":{"code":"OK","name":"Oklahoma"},"street":"Department of Veterans Affairs Jack C. Montgomery VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"1011 Honor Heights Drive"},"product_service_code":"H945"}],"due_at":"2025-09-11T20:30:00Z","due_date":"2025-09-11","closes_at":"2025-09-11T20:30:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","state":"OK","county":"40101","county_name":"Muskogee County","city":"4050050","city_name":"Muskogee","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-01T03:19:09.728457Z","principal_notice_id":"b8fb185741964d7a80d1777e4eadee97","description":{"text":"Boiler Safety Testing/Inspection Services\nJack C. Montgomery VAMC\nMuskogee OK 74401\n\nBRIEF SCOPE OF WORK\n(This is for information only)\n\nThis RFI (Request for Information) is for information only. No award will be made from this RFI.\n\nThe Department of Veterans Affairs has a requirement for a contractor to provide Boiler Safety Testing/Inspection/services and Feedwater Deaerator Tank inspection/services in accordance with the terms and conditions stated within this Statement of Work (SOW). All work shall be coordinated with the Jack C. Montgomery VA Health Care System s COR. This contract will have a Base Period Period of Performance (POP) with four (4) Optional Periods of Performance (Options may or may not be exercised).\nLocation of Performance:\nJack C. Montgomery VA Medical Center\n1011 Honor Heights Drive\nMuskogee OK 74401\n\nINSPECTION SERVICES:\nGeneral:\nContractor shall perform combustion analysis and tuning, safety device testing, and boiler inspections on three (3) fire tube boilers as specified within all updated manufacturer specifications and requirements and provide inspections of two (2) feedwater deaerator tanks. Technicians shall have adequate experience, training, and applicable licensing, to perform required preventative maintenance.\nContractor shall provide all labor, materials, and equipment necessary for protection of VAMC personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish. Contractor must have adequate insurance protection against negligent work and other forms of liability and follow all federal, state, local, and VA Regulations related to this requirement.\nUpon request, contractor shall provide proof of certification attesting that all gauging and measurement equipment used has been currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nIntroduction:\n(VA) Jack C. Montgomery medical center has a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, sterilizing services, and laundry equipment.\nThe VA has a requirement for:\nAnnual internal and external inspections on three (3) (listed below) high pressure (over 15 psig) steam boilers\nA semi-annual requirement to perform burner and instrument inspecting, testing, calibrating burners and controls, and annual testing of all safety devices on the three (3) (listed below) high pressure (over 15 psig) steam boilers and two (2) (listed below) deaerator tanks\nAn annual external inspection of two (2) (listed below) feedwater deaerator / condensate surge tanks.\nA 6 year inspection and magnetic particle testing of welds of pressure vessel interior of the feedwater deaerator tank (listed below). To be completed in base year of contract only. List of Equipment:\nBoiler #1 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-9\nBoiler #2 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-10\nBoiler #3 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-8\nFeedwater Deaerator Tank: manufactured by: Wheeler Tank Mfg, Model number: 10ST5 (M), SN: 11572\nCondensate Tank: manufactured by: Wheeler Tank Mfg, Model number 10ST, SN: 15564\nQualifications of Testing Personnel:\nBoiler Inspectors shall be a Qualified Professional Inspector . Proof of qualification shall be provided to the COR upon request. They shall be versed with and have access to the current versions of reference materials defined below. A Qualified Professional Inspector is defined as one who possess one or combination of below requirements:\nA boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).\nA boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state.\nA boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee.\nA boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance.\nCombustion Analysis and Safety Device Testing personnel shall be qualified for boiler plant burner, control and instrumentation testing. Proof of qualification shall be provided to the COR upon request. Qualifications include completing at least a one-year trade school and five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plants.\nReference Materials are comprised of the latest versions of the below, plus any other materials/manufacture reference materials needed to complete all contract requirements:\nASME Boiler and Pressure Vessel Code\nASME B31.1, Power Piping Code\nASME CSD-1, Controls and Safety Devices for Automatically Fired Boilers\nANSI/NB-23, National Board Inspection Code\nNFPA 85, Boiler and Combustion Systems Hazards Code\nVHA Boiler Plant Safety Device Testing Manual, 5th Ed.\nUtilize National Board Forms NB-6 and NB-7\nNATIONAL BOARD INSPECTION CODE,\nPart RB, In-service Inspection of Pressure-Retaining Items,\nThe testing personnel shall be equipped with portable electronic flue gas analyzers and all other test instruments necessary for the required tests and calibrations, all currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nInspection and Testing Requirements:\nAt least two weeks notice to the Contracting Officer s Representative (COR) is required prior to an inspection. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her representative is available on site to monitor the work. The annual Internal/External Boiler inspections are to be performed in June, July and August. The semiannual tunings are to be performed in September and March. The annual safety device testing is to be performed in March.\nThe contractor is required to prepare the boilers for inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service.\nEach burner and the burner control, monitoring and safety interlock systems shall be inspected and tested and adjusted as necessary.\nVA will have the boilers that are to be serviced prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\nVA will comply with any other requirements of the test personnel that are considered reasonable by VA and have been presented in writing at least two weeks prior to the scheduled testing.\nThe COR or his/her representative will observe the work.\n\nCombustion Analysis/Tuning and Safety Device Testing summary of requirements:\nThe inspections, testing, and adjustments shall comply with:\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual.\nThe written recommendations of the equipment manufacturers.\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices.\nBurner performance requirements in this document.\nA summary of the work is as follows:\nReview boiler plant log sheets and alarm and trouble reports.\nReview records that show combustion performance (flue gas oxygen).\nPerform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract.\nTest the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.\nCompare the combustion performance data with VA requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR.\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\nImmediately inform COR of any recommended repairs, modifications, or safety related problems.\nList of interlocks and safety devices to be inspected and tested on each Boiler/Burner/Condensate/DA tank/Plant safety:\nLow Water alarm on Condensate Tank (LWACT)\nHigh Water alarm on Condensate Tank (HWACT)\nLow Water alarm on DA Tank (LWADT)\nHigh Water alarm on DA Tank (HWADT)\nDA Tank Overflow Drain System (DAODS)\nDA Tank Safety Valve (DASV)\nSteam Safety Valve following PRV (SVFPRV)- Deaerator\nLiquid Relief Valve on Oil Pump Set (LRVOPS)\nCarbon Monoxide and Combustible Gas Alarms in the Boiler plant.\n\nThe Following Items Are to Be performed on Each Boiler\n\nLiquid Relief Valve on Economizer (LRVE)\nPropane Pilot Backup System\nLow Water alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)\nHigh Water alarm on Boiler (HWAB)\nRecycle and Non-recycle Steam pressure limit switches (RBSPLS & NRBSPLS)\nSteam safety valves on Boiler (SVB)\nLow Fuel Gas Pressure Cutoff Switch (LFGPCS)\nHigh Fuel Gas Pressure Cutoff Switch (HFGPCS)\nAutomatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV)-Main Gas Line\nAutomatic Pilot Fuel Gas Shutoff Valves and Automatic Pilot Fuel Gas Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV)\nProof of closure on Automatic Fuel Shutoff Valves (POCAFGSOV) Natural Gas\nFlame Scanner for main flame out (FSMFO) Natural Gas\nFlame Scanner for main flame out (FSMFO) Fuel Oil\nFlame Scanner Not Sensing Igniter Spark (FSNSIS)\nIgniter Timing (IT)\nMain Flame Ignition Timing (MFIT)\nPre-Purge and Post-Purge Timing (PPT)\nLow Fire Proving Switch (LFPS)\nForced Draft Damper Wide Open Pre-Purge Proving Switch (FDDWOPS)\nCombustion Air Pressure Switch (CAPS)\nPurge Airflow Proving Switch (PAPS)\nForced Draft Motor Interlock Switches (FDMIS)\nOutlet Stack Damper Position Interlock Switch (OSDPI)\nFurnace Pressure Interlock (FPI)\nLow Pilot Gas Pressure Cutoff Switch (LPFGPCS)\nFlue Gas Recirculation Damper Interlock (FGRDI)\nLow Flue Gas Oxygen Level Interlock (LFGOLI)\nLow Fuel Oil Pressure Cutoff Switch (LFOPCS)\nHigh Fuel Oil Pressure Cutoff Switch (HFOPCS)\nLow Atomizing Media Pressure Switch (LAMPS)\nAutomatic Fuel Oil Shutoff Valves (AFOSV) for Seat Leakage\nProof of Closure on Automatic Fuel Oil Shutoff Valves (POC_AFOSV) Oil\nOil Burner Position Switch (OBPS)\nEmergency Stop/Panic Buttons (ESPB)\n\nRequired burner performance (natural gas and fuel oil):\nTurndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\nMaximum carbon monoxide: 200 parts per million (ppm)\nMaximum NOx (Nitrous Oxide): _____ (Refer to original burner specification).\nFlue gas oxygen: 2.5 4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nFlue gas oxygen (low excess air burners): 1.0 2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\nFlames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls.\n\nBoiler Inspections summary of requirements:\nAnnual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required every six years or more frequently if welding repairs have been performed.\nContractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. The annual Internal/External Boiler inspections are to be performed in June, July and August.\n\nFeed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand.\nCoordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections.\nBoilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical lock-out, tag-out in place; connecting piping isolated; proper illumination provided; compliance with confined space access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection.\nVAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection.\nThe boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work.\nThe inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 5th Edition.\n\nSummary of the minimum inspection requirements for boilers:\nReview the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks.\nAssess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes.\nInspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets.\nInspect foundations for signs of stress such as cracking or movement.\nInspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation.\nInspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits.\nExamine all stays and stayed plates.\nInspect gas side baffles.\nInspect internal drum surfaces and steam separating internals.\nInspect tubes, tube ends and tube alignment. Check for sagging tubes.\nSet combustions for boilers number one, two, and three, on natural gas and number two oil.\nTest all safety devices and perform annually required accumulation tests on boilers one, two and three.\nVerify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions.\nInspect seating surfaces of man ways and hand holes.\nCheck that boiler structure is plumb and level with no excessive deformations.\nCheck for missing items such as bolts and nuts.\nExamine all valve and pipe connections to the pressure vessel.\nInspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor.\nVerify proper alignment of burner assembly.\nInspect furnace for evidence of flame impingement.\nTest operation of water level gage glass.\nPerform mechanical and electrical inspection of disassembled low water cutouts. After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually.\nVerify that steam pressure gage is properly calibrated.\nTest operation of high steam pressure cutouts on hot boilers by raising steam pressure.\nInspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ).\nInspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions.\nInspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions.\nInspect valves on boiler feed water, blow down, drain and steam systems.\nPerform service and Calibration of boiler instrumentation and controls.\nProvide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions.\n\nSummary of the minimum inspection requirements for Feed water Deaerators:\nReview the feed water de-aerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications.\nAssess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes.\nTest hazardous gas monitoring system.\nInspect for evidence of leakage.\nNote feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy.\nInspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ.\nVerify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases.\nInspect support structures for proper integrity and allowance for thermal expansion.\nInternal Inspections\nVisually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking.\nInspect spray nozzles and trays.\n\nIMPORTANT NOTE: This RFI (Request for Information) is for information only.\nNo award will be made from this RFI.\n\nPlease communicate via e-mail to orrellius.williams@va.gov by COB (1530 PM CT) September11, 2025 as to your company s ability to perform service per this brief Scope of Work.\n\nIf interested, please provide the following:\n1. Please state your company s business size\n2. Please provide DUNS number\n3. If you have an FSS/GSA contract that includes this service\n4. Provide FSS/GSA contract number if applicable","html":"Boiler Safety Testing/Inspection Services\nJack C. Montgomery VAMC\nMuskogee OK 74401\n\nBRIEF SCOPE OF WORK\n(This is for information only)\n\n\nThis RFI (Request for Information) is for information only. No award will be made from this RFI. \n\nThe Department of Veterans Affairs has a requirement for a contractor to provide Boiler Safety Testing/Inspection/services and Feedwater Deaerator Tank inspection/services in accordance with the terms and conditions stated within this Statement of Work (SOW). All work shall be coordinated with the Jack C. Montgomery VA Health Care System s COR. This contract will have a Base Period  Period of Performance  (POP) with four (4) Optional  Periods of Performance  (Options may or may not be exercised).  \nLocation of Performance: \nJack C. Montgomery VA Medical Center\n1011 Honor Heights Drive \nMuskogee OK 74401\n\nINSPECTION SERVICES: \nGeneral:\nContractor shall perform combustion analysis and tuning, safety device testing, and boiler inspections on three (3) fire tube boilers as specified within all updated manufacturer specifications and requirements and provide inspections of two (2) feedwater deaerator tanks. Technicians shall have adequate experience, training, and applicable licensing, to perform required preventative maintenance.\nContractor shall provide all labor, materials, and equipment necessary for protection of VAMC personnel, furnishings, equipment and buildings from damage, and shall replace or repair any damage due to work performed under this contract equal to its original construction and finish. Contractor must have adequate insurance protection against negligent work and other forms of liability and follow all federal, state, local, and VA Regulations related to this requirement.\nUpon request, contractor shall provide proof of certification attesting that all gauging and measurement equipment used has been currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nIntroduction:\n(VA) Jack C. Montgomery medical center has a central high-pressure boiler plant to provide steam for heating and air conditioning, domestic hot water, sterilizing services, and laundry equipment.\nThe VA has a requirement for:\nAnnual internal and external inspections on three (3) (listed below) high pressure (over 15 psig) steam boilers \nA semi-annual requirement to perform burner and instrument inspecting, testing, calibrating burners and controls, and annual testing of all safety devices on the three (3) (listed below) high pressure (over 15 psig) steam boilers and two (2) (listed below) deaerator tanks \nAn annual external inspection of two (2) (listed below) feedwater deaerator / condensate surge tanks.\nA 6 year inspection and magnetic particle testing of welds of pressure vessel interior of the feedwater deaerator tank (listed below). To be completed in base year of contract only. List of Equipment:\nBoiler #1 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-9\nBoiler #2 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-10\nBoiler #3 manufactured by: Hurst, Model number: S5-X-500-200 SN: S2500-200-8\nFeedwater Deaerator Tank: manufactured by: Wheeler Tank Mfg, Model number: 10ST5 (M), SN: 11572\nCondensate Tank: manufactured by: Wheeler Tank Mfg, Model number 10ST, SN: 15564\nQualifications of Testing Personnel:\nBoiler Inspectors shall be a  Qualified Professional Inspector . Proof of qualification shall be provided to the COR upon request. They shall be versed with and have access to the current versions of  reference materials  defined below. A  Qualified Professional Inspector  is defined as one who possess one or combination of below requirements:\nA boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors (NB).\nA boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state.\nA boiler inspector who is regularly employed as a boiler inspector by a jurisdiction which has adopted and administers one or more sections of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code as a legal requirement, and has a representative serving as a member of the ASME Conference Committee.\nA boiler inspector who is regularly employed by an insurance company which has been licensed or registered by the appropriate authority of a State of the United States to write boiler or pressure vessel insurance.\nCombustion Analysis and Safety Device Testing personnel shall be qualified for boiler plant burner, control and instrumentation testing. Proof of qualification shall be provided to the COR upon request. Qualifications include completing at least a one-year trade school and five years successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plants.\n Reference Materials  are comprised of the latest versions of the below, plus any other materials/manufacture reference materials needed to complete all contract requirements:\nASME Boiler and Pressure Vessel Code\nASME B31.1, Power Piping Code\nASME CSD-1, Controls and Safety Devices for Automatically Fired Boilers\nANSI/NB-23, National Board Inspection Code\nNFPA 85, Boiler and Combustion Systems Hazards Code\nVHA Boiler Plant Safety Device Testing Manual, 5th Ed.\nUtilize National Board Forms NB-6 and NB-7\nNATIONAL BOARD INSPECTION CODE,\nPart RB, In-service Inspection of Pressure-Retaining Items,\nThe testing personnel shall be equipped with portable electronic flue gas analyzers and all other test instruments necessary for the required tests and calibrations, all currently calibrated either according to the manufacturer s specifications or a standard traceable to the National Bureau of Standards.\n\nInspection and Testing Requirements:\nAt least two weeks  notice to the Contracting Officer s Representative (COR) is required prior to an inspection. Work cannot be scheduled during heavy steam load periods. Only one boiler at a time can be out of service for the inspection, testing and calibration procedures. Work must be conducted when the COR or his/her representative is available on site to monitor the work. The annual Internal/External Boiler inspections are to be performed in June, July and August. The semiannual tunings are to be performed in September and March. The annual safety device testing is to be performed in March.\nThe contractor is required to prepare the boilers for inspection by opening, cleaning watersides and firesides, and preparing the boiler for inspection following National Board, ASME, Veterans Administration and industry requirements/guidelines. The contractor will also be required to restore the boiler for service.\nEach burner and the burner control, monitoring and safety interlock systems shall be inspected and tested and adjusted as necessary.\nVA will have the boilers that are to be serviced prepared for the test personnel upon their scheduled arrival. This includes having the boilers clean of soot and loose scale; fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner and fuel train pressure gages and thermometers calibrated; fuel meters in accurate operation (pressure/temperature correction factors provided, if applicable); boiler steam flow, stack temperature and flue gas oxygen instruments operating.\nVA will comply with any other requirements of the test personnel that are considered reasonable by VA and have been presented in writing at least two weeks prior to the scheduled testing.\nThe COR or his/her representative will observe the work.\n\nCombustion Analysis/Tuning and Safety Device Testing summary of requirements:\nThe inspections, testing, and adjustments shall comply with:\nThe recommendations and requirements of VHA Boiler Plant Safety Devices Testing Manual.\nThe written recommendations of the equipment manufacturers.\nThe requirements and recommendations of NFPA 85 Boiler and Combustion Systems Hazard Code including applicable appendices.\nBurner performance requirements in this document.\nA summary of the work is as follows:\nReview boiler plant log sheets and alarm and trouble reports.\nReview records that show combustion performance (flue gas oxygen).\nPerform overall visual inspection of systems. Verify that systems comply with referenced codes and VA requirements stated in this contract.\nTest the operation and set points of all burner/boiler safety interlock devices. Refer to list below. Record the settings and compare with required settings. Make adjustments as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.\nOperate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, NOx where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.\nCompare the combustion performance data with VA requirements (see below) and previous readings. If necessary, make adjustments to the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance. Record the new performance data. If further work, such as repairs or burner modifications, is needed to correct any problems, provide recommendations to the COR.\nVerify accuracy of instrumentation listed below. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer s specifications for accuracy.\nImmediately inform COR of any recommended repairs, modifications, or safety related problems.\nList of interlocks and safety devices to be inspected and tested on each Boiler/Burner/Condensate/DA tank/Plant safety:\nLow Water alarm on Condensate Tank (LWACT)\nHigh Water alarm on Condensate Tank (HWACT)\nLow Water alarm on DA Tank (LWADT)\nHigh Water alarm on DA Tank (HWADT)\nDA Tank Overflow Drain System (DAODS)\nDA Tank Safety Valve (DASV)\nSteam Safety Valve following PRV (SVFPRV)- Deaerator\nLiquid Relief Valve on Oil Pump Set (LRVOPS)\nCarbon Monoxide and Combustible Gas Alarms in the Boiler plant.\n\nThe Following Items Are to Be performed on Each Boiler  \n             \n\nLiquid Relief Valve on Economizer (LRVE)\nPropane Pilot Backup System\nLow Water alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)\nHigh Water alarm on Boiler (HWAB)\nRecycle and Non-recycle Steam pressure limit switches (RBSPLS & NRBSPLS)\nSteam safety valves on Boiler (SVB)\nLow Fuel Gas Pressure Cutoff Switch (LFGPCS)\nHigh Fuel Gas Pressure Cutoff Switch (HFGPCS)\nAutomatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV)-Main Gas Line\nAutomatic Pilot Fuel Gas Shutoff Valves and Automatic Pilot Fuel Gas Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV)\nProof of closure on Automatic Fuel Shutoff Valves (POCAFGSOV)   Natural Gas\nFlame Scanner for main flame out (FSMFO)   Natural Gas\nFlame Scanner for main flame out (FSMFO)   Fuel Oil\nFlame Scanner Not Sensing Igniter Spark (FSNSIS)\nIgniter Timing (IT)\nMain Flame Ignition Timing (MFIT)\nPre-Purge and Post-Purge Timing (PPT)\nLow Fire Proving Switch (LFPS)\nForced Draft Damper Wide Open Pre-Purge Proving Switch (FDDWOPS)\nCombustion Air Pressure Switch (CAPS)\nPurge Airflow Proving Switch (PAPS)\nForced Draft Motor Interlock Switches (FDMIS)\nOutlet Stack Damper Position Interlock Switch (OSDPI)\nFurnace Pressure Interlock (FPI)\nLow Pilot Gas Pressure Cutoff Switch (LPFGPCS)\nFlue Gas Recirculation Damper Interlock (FGRDI)\nLow Flue Gas Oxygen Level Interlock (LFGOLI)\nLow Fuel Oil Pressure Cutoff Switch (LFOPCS)\nHigh Fuel Oil Pressure Cutoff Switch (HFOPCS)\nLow Atomizing Media Pressure Switch (LAMPS)\nAutomatic Fuel Oil Shutoff Valves (AFOSV)   for Seat Leakage\nProof of Closure on Automatic Fuel Oil Shutoff Valves (POC_AFOSV)   Oil\nOil Burner Position Switch (OBPS)\nEmergency Stop/Panic Buttons (ESPB)\n\nRequired burner performance (natural gas and fuel oil):\nTurndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).\nAchieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.\nMaximum carbon monoxide: 200 parts per million (ppm)\nMaximum NOx (Nitrous Oxide): _____ (Refer to original burner specification).\nFlue gas oxygen: 2.5   4.2% (Up to 5.2% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nFlue gas oxygen (low excess air burners): 1.0   2.0% (Up to 2.5% at loads below 40% of maximum steam output; no upper limit at minimum firing rate; oxygen can be one percentage point higher on oil firing).\nNo visible smoke, except on heavy oil fuel maximum opacity is 20%. Comply with local emissions regulations.\nFlames shall be stable with no pulsations, shall be retained near burner, no blow-off or flashbacks, no constant flame impingement on refractory or water-walls.\n\nBoiler Inspections summary of requirements:\nAnnual internal and external inspections are required for each boiler. Internal inspections of the feed water de-aerator pressure vessel are required every six years or more frequently if welding repairs have been performed.\nContractor shall coordinate with COR to schedule an inspection. The Contractor shall ensure coordination and scheduling of any inspection is conducted at least two weeks prior to the intended date of an inspection. Inspections must be scheduled for periods when the VA determines that the boilers that will be inspected internally will not be needed for steam supply and when the COR or his/her designate is available on site to monitor the inspections. To maintain steam service, typically only one boiler at a time will be scheduled for internal inspections per inspection visit. Thus, multiple visits will be necessary every year to inspect all the boilers internally. The annual Internal/External Boiler inspections are to be performed in June, July and August.\n\nFeed water de-aerator pressure vessel inspections must be scheduled during periods of low steam demand.\nCoordinate the inspection schedule with the COR so that VAMC can have personnel available to monitor the inspections.\nBoilers scheduled for internal inspection will be prepared by the contractor prior to the scheduled arrival of the Qualified Professional Inspector. This includes cooling the boilers to near ambient temperature and having all man ways, hand holes and furnace access doors open; the boilers cleaned of loose materials waterside and fireside; electrical  lock-out, tag-out  in place; connecting piping isolated; proper illumination provided; compliance with  confined space  access requirements including having safety personnel present in the boiler plant. Similar advance preparations will be made to the feed water de-aerator when it is scheduled for internal inspection.\nVAMC will comply with any other requirements of the contractor that are considered reasonable by VAMC and have been presented in writing at least two weeks prior to the scheduled inspection.\nThe boiler and feed water de-aerator inspections shall comply with the guidelines in the current issue of the NATIONAL BOARD INSPECTION CODE, Part RB, In-service Inspection of Pressure-Retaining Items, and ASME Boiler and Pressure Vessel Code, Section VI or VII as applicable. In addition to those guidelines, the inspections shall comply with all requirements listed in statement of work.\nThe inspector must completely enter the internal spaces of the boiler or feed water de-aerator and visually inspect all internal surfaces that can be accessed. Methods for testing safety devices shall comply with VHA Boiler Plant Safety Device Testing Manual, 5th Edition.\n\nSummary of the minimum inspection requirements for boilers:\nReview the boiler history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping on boiler, National Board registration number, history of repairs and modifications. Review boiler logs, water test reports, and reports on tests performed on the burner controls and interlocks.\nAssess the external parts of the boilers and boiler accessories and piping and valves for safety, accessibility, proper maintenance and operation, cleanliness, and compliance with codes.\nInspect for evidence of leakage of combustion gases or fluids, externally and internally, including all gaskets.\nInspect foundations for signs of stress such as cracking or movement.\nInspect boilers externally and internally for defects including bulges, blisters, cracks, wasted or eroded material, warping, general corrosion, grooving and pitting, damaged insulation.\nInspect all accessible internal surfaces for waterside and fireside deposits, including scaling, sediment, debris, carbon deposits.\nExamine all stays and stayed plates.\nInspect gas side baffles.\nInspect internal drum surfaces and steam separating internals.\nInspect tubes, tube ends and tube alignment. Check for sagging tubes.\nSet combustions for boilers number one, two, and three, on natural gas and number two oil.\nTest all safety devices and perform annually required accumulation tests on boilers one, two and three.\nVerify that all nozzles of internal piping such as feed water admission and bottom blow off collection are clear with no obstructions.\nInspect seating surfaces of man ways and hand holes.\nCheck that boiler structure is plumb and level with no excessive deformations.\nCheck for missing items such as bolts and nuts.\nExamine all valve and pipe connections to the pressure vessel.\nInspect refractory including burner throat, expansion joint, bull ring, furnace seals, furnace walls and floor.\nVerify proper alignment of burner assembly.\nInspect furnace for evidence of flame impingement.\nTest operation of water level gage glass.\nPerform mechanical and electrical inspection of disassembled low water cutouts. After reinstallation, test operation to the extent possible. Test low water cutouts on hot boilers by lowering water level gradually.\nVerify that steam pressure gage is properly calibrated.\nTest operation of high steam pressure cutouts on hot boilers by raising steam pressure.\nInspect safety valve installations and verify that the valves have proper capacity and set pressure and valves, drains and vents are properly installed. Verify that valve locking seals are not broken. On boilers that are hot, perform an operation test under pressure to confirm operation at proper set pressures. Operate boiler with burner at high fire to verify adequate steam flow capacity of the safety valves ( accumulation test ).\nInspect piping connected to the boilers for evidence of leakage, provision for expansion, provision of adequate support, proper alignment, and evidence of detrimental conditions.\nInspect piping to the water column, low water cutoffs and alarms, gage glass. Verify that interior of piping is clear of obstructions.\nInspect valves on boiler feed water, blow down, drain and steam systems.\nPerform service and Calibration of boiler instrumentation and controls.\nProvide recommendations for non-destructive testing when the inspections indicate that this is necessary to assure continued safety and reliability under current operating conditions.\n\nSummary of the minimum inspection requirements for Feed water Deaerators:\nReview the feed water de-aerator history including: operating conditions, date of last inspection, current inspection certificate, ASME stamping, National Board registration number, materials of construction, extent of post weld heat treatment, history of repairs and modifications.\nAssess the external parts of the feed water de-aerator and accessories and piping for safety, accessibility, cleanliness, proper operation, and compliance with codes.\nTest hazardous gas monitoring system.\nInspect for evidence of leakage.\nNote feed water de-aerator pressure gage and thermometer readings and verify gage and thermometer accuracy.\nInspect safety valve installation and verify that the valves have proper set pressure and capacity and are properly installed. Perform an operation test under pressure to confirm operation at proper set pressures. Verify that the de-aerator can safety withstand the test pressure prior to testing the valve(s) in-situ.\nVerify that non-condensable gas vent line is open and proper orifice is provided to permit venting of gases.\nInspect support structures for proper integrity and allowance for thermal expansion.\nInternal Inspections\nVisually inspect all visible pressure vessel surfaces for corrosion, material thinning, deposits, and weld cracking.\nInspect spray nozzles and trays.\n\n\n\nIMPORTANT NOTE:  This RFI (Request for Information) is for information only.\nNo award will be made from this RFI. \n\nPlease communicate via e-mail to orrellius.williams@va.gov by COB (1530 PM CT) September11, 2025 as to your company s ability to perform service per this brief Scope of Work.  \n\nIf interested, please provide the following:\n1. Please state your company s business size \n2. Please provide DUNS number\n3. If you have an FSS/GSA contract that includes this service \n4. Provide FSS/GSA contract number if applicable","origin":"detail"},"contacts":[{"name":"Orrellius Williams","role":"primary","email":"orrellius.williams@va.gov","phone":"918-252-8812","title":"Contract Specialist"}],"place_of_performance":{"zip":"74401","city":{"code":"50050","name":"Muskogee"},"state":{"code":"OK","name":"Oklahoma"},"street":"Department of Veterans Affairs Jack C. Montgomery VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"1011 Honor Heights Drive"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"naics_codes":["541350"],"award":{"awardee":{}},"attachments":[{"resource_id":"0cf50eecdf964fdab273bc548cccdcfe","name":"36C25925Q0780.docx","kind":"file","mime_type":".docx","size_bytes":26132,"posted_at":"2025-09-03T13:58:40.064Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0cf50eecdf964fdab273bc548cccdcfe/download","mirrored":false}],"awards":[],"related":[{"key":"36C25927Q0058","latest_notice_id":"f7ba8da853564af6a36ca00b9a898459","title":"Q301--NEW | Automated Blood Bank Solid Phase Analyzer and Associated Reagents/Consumables","solicitation_number":"36C25927Q0058","notice_type":"r","first_type":"r","first_posted":"2026-11-13","last_posted":"2026-11-13","notices":1,"due_at":"2026-11-25T22:30:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T22:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"334516","psc":"Q301","set_aside":null,"state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-14T05:16:40.707321Z"},{"key":"36C25927Q0048","latest_notice_id":"c63e9c1e32f4475caa79c878ba87ca2f","title":"Radiant Heating Panel Replacement","solicitation_number":"36C25927Q0048","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-23","notices":3,"due_at":"2026-11-27T19:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"238220","psc":"J045","set_aside":"SBA","state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-24T04:44:58.053639Z"},{"key":"36C25927Q0061","latest_notice_id":"2844a59e27da407db5c5aac404bd35d7","title":"AI tool for Medication Reconciliation and Clinical Review","solicitation_number":"36C25927Q0061","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"541519","psc":"DA10","set_aside":null,"state":"CO","county":"08077","county_name":"Mesa County","city":"0831660","city_name":"Grand Junction","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25927Q0060","latest_notice_id":"dab1ae13fa4543da8629e3ba28875296","title":"J023-- Transmission Repair/Replacement x2","solicitation_number":"36C25927Q0060","notice_type":"k","first_type":"k","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-12-04T17:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"811111","psc":"J023","set_aside":"SBA","state":"UT","county":"49035","county_name":"Salt Lake County","city":"4967000","city_name":"Salt Lake City","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C25927Q0063","latest_notice_id":"3aec52f34d1346bcb89262decf41e0e9","title":"J045--Annual Boiler Maintenance RMR VAMC","solicitation_number":"36C25927Q0063","notice_type":"r","first_type":"r","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-04T21:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"238220","psc":"J045","set_aside":null,"state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":"sam_zip","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"36C25526Q0617","latest_notice_id":"3506983a2af048deaf442eae0f8b8a04","title":"H112--Annual/Sem-i annual fire smoke inspections and auto door services l EKH","solicitation_number":"36C25526Q0617","notice_type":"o","first_type":"r","first_posted":"2026-08-19","last_posted":"2026-11-18","notices":11,"due_at":"2026-11-27T21:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C255","office_name":"255-NETWORK CONTRACT OFFICE 15 (36C255)","naics":"541350","psc":"H112","set_aside":"SBA","state":"KS","county":"20103","county_name":"Leavenworth County","city":"2039000","city_name":"Leavenworth","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"15DDHQ27R00000001","latest_notice_id":"bf980e13286649b7a1ed1898b4d44b95","title":"Aviation Operations Center (AOC)- Building Engineer Report (BER)","solicitation_number":"15DDHQ27R00000001","notice_type":"k","first_type":"k","first_posted":"2026-10-28","last_posted":"2026-10-28","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1524","sub_name":"DRUG ENFORCEMENT ADMINISTRATION","office_key":"o-15DDFA","office_name":"OFFICE ACQUISITION MANAGEMENT","naics":"541350","psc":"H156","set_aside":"SBA","state":"TX","county":null,"county_name":null,"city":"4827000","city_name":"Fort Worth","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-29T04:15:54.363094Z"},{"key":"36C25727Q00310002","latest_notice_id":"c463c6aa97b7496d99268a3c961117de","title":"NTX Elevator Inspection - Amendment","solicitation_number":"36C25727Q0031-0002","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-04","notices":1,"due_at":"2026-11-30T21:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C257","office_name":"257-NETWORK CONTRACT OFFICE 17 (36C257)","naics":"541350","psc":"J036","set_aside":"SDVOSBC","state":"TX","county":"48113","county_name":"Dallas County","city":"4819000","city_name":"Dallas","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-05T04:36:35.392694Z"}],"similar_open_total":9,"indexable":false}