{"canonical":"https://sealedbidder.com/opportunities/36c25925q0183","key":"36C25925Q0183","url":"https://sealedbidder.com/opportunities/36c25925q0183","title":"6515--Actionable-436-S/S Waste sterilizer (VA-25-00017950) NEED 1-20-2025","solicitation_number":"36C25925Q0183","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-02-07T21:00:00Z","first_posted":"2025-01-31","last_posted":"2025-01-31","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"339112","psc":"6515","set_aside":null,"place_state":"MT","place_scope":"nationwide","site":null,"place_state_source":"sam_state_name","place_evidence":null,"place_county":"30049","place_county_name":"Lewis and Clark County","place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"84dd211bd7a146df8bdb1d058c2e2d8b","title":"6515--Actionable-436-S/S Waste sterilizer (VA-25-00017950) NEED 1-20-2025","solicitation_number":"36C25925Q0183","notice_type":"r","base_type":"r","posted":"2025-01-31","posted_at":"2025-01-31T19:32:38.984Z","due_at":"2025-02-07T21:00:00Z","due_date":"2025-02-07","cancelled":false,"archived":true,"archive_date":"2025-04-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/84dd211bd7a146df8bdb1d058c2e2d8b/view","enriched":true,"history":[{"index":3,"title":"6515--Actionable-436-S/S Waste sterilizer (VA-25-00017950) NEED 1-20-2025","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-31T19:32:38.984Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"84dd211bd7a146df8bdb1d058c2e2d8b","solicitation_number":"36C25925Q0183"}]}],"latest_notice_id":"84dd211bd7a146df8bdb1d058c2e2d8b","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-01-31","posted_at":"2025-01-31T19:32:38.984Z","created_at":"2025-01-31T19:32:36.821Z","modified_at":"2025-04-09T03:55:48.026Z","response_deadline":{"raw":"2025-02-07T14:00:00-07:00","utc":"2025-02-07T21:00:00Z","date":"2025-02-07","time":"14:00:00","timezone":"America/Denver","utc_offset_seconds":-25200}},"links":{"sam":"https://sam.gov/workspace/contract/opp/84dd211bd7a146df8bdb1d058c2e2d8b/view"},"naics":{"codes":["339112"],"primary":"339112"},"title":"6515--Actionable-436-S/S Waste sterilizer (VA-25-00017950) NEED 1-20-2025","agency":{"office":{"code":"36C259","name":"NETWORK CONTRACT OFFICE 19 (36C259)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"organization_id":"100176750","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-04-08","archive_type":"auto_custom"},"history":[{"index":3,"title":"6515--Actionable-436-S/S Waste sterilizer (VA-25-00017950) NEED 1-20-2025","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-01-31T19:32:38.984Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"84dd211bd7a146df8bdb1d058c2e2d8b","solicitation_number":"36C25925Q0183"}],"contacts":[{"name":"Contract Specialist","role":"primary","email":"barron.long@va.gov","phone":"303-712-5741","title":"Barron Long"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"84dd211bd7a146df8bdb1d058c2e2d8b","lineage_id":"84dd211bd7a146df8bdb1d058c2e2d8b","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-24T02:18:39.092493598Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"875580a4f14786b1ccd20c5bb90e9f93ed6a45ca8fa3754456e0fe6b59340462","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-24T02:18:39.092493598Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Sources Sought Notice   Medical Waste Sterilizing Autoclave\nDISCLAIMER\nThis RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.\nResponse Instructions:\nDo not provide more than 8 pages, including cover letter page.\nSubmit your response via email to: barron.long@va.gov\nSubmit your response NLT 14:00 (MST) on Friday February 7th\nMark your response as  Proprietary Information  if the information is considered business sensitive.\nVA has identified the appropriate North American Industry Classification System (NAICS) Code 332420 - Autoclaves, industrial-type, heavy gauge metal, manufacturing with a Small Business size of 750 employees.  Please identify and explain any NAICS codes your company believes would better represent the predominated work included in the attached Statement of Work draft / Salient Characteristics List;\n\nInformation Requested from Industry:\n\nIn response to the Sources Sought, interested Contractors shall submit the following information and any Capabilities/Qualifications Statement to include but not limited to an overview of proposed solution(s) and a description of the product your company possesses accordance with the Statement of Work draft / Salient Characteristics List.\n\n\nVendor Name:\n\nSAM UEI #:\n\nName of Manufacturer:\n\nManufacturer Address:\n\nEstimated Delivery Time:\n\nSAC FSS contract number\n\nVendor Point of Contract (POC) Name\n\nPOC Phone Number:\n\nPOC Email Address:\n\n\n\n\n\nSTATEMENT OF WORK\n\n\n\nINTRODUCTION:\nThe autoclave shall be delivered within 120 calendar days after the effective date of the contract. Delivery dates specified may be adjusted by the CO to coincide with the date the TCPF will be ready to receive installation. The CO will advise the contractor of the new delivery date at least 45 days prior to the original or adjusted delivery date(s). Deliveries, cranes, or haulage will be arranged with the Contracting Officer Representative (COR), as to NOT interfere with day-to-day ancillary VA Medical services such as nutrition/food service, laundry delivery, maintenance routes, etc. \n\nThe autoclave shall be delivered within 120 days after the effective award date. Installation of the autoclave shall take place no more than 30 days after the delivery date. The 2 days onsite shakedown and 1-day onsite training are included in the installation timeframe. Training shall consist of both operator and maintenance personnel at a minimum.Â TrainingsÂ shall not to be conducted concurrently. The total contract duration is 150 days.\n\nNote: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.\n\nSite Specific Project Requirements\nThe contractor shall furnish the supervision, labor, equipment, tools, safety, rigging, hoisting, supplies and installation services necessary to meet the terms and conditions in accordance with the Statement of Work (SOW).\n\nThis SOW includes removal of trade-in equipment, delivery, installation, and training of the new laundry equipment installed. The equipment and installation shall be conducted in conformance with the SOW and Technical Specifications provided herein. All items provided by the contractor shall be new. The contractor shall not utilize any refurbished equipment, machinery, or parts.\n\nThe autoclave is to be located within Building 154, near the waste removal area.\n\nWithin the new design layout of the autoclave area, the contractor shall relocate existing lighting fixtures, and provide new energy-efficient, light-emitting diode (LED) lighting for any new workstation or storage area. New lighting shall comply with VA Lighting Design Guide, January 2022; and shall be 50 foot-candles (minimum) measured 30-inches above floor for workstation task areas, and 35 foot-candles (minimum) for storage areas.\n\nAll valves within the layout of the autoclave and equipment shall be ball valves with the appropriate ratings and that are part of the scope of work within this RFQ.\n\nAll old piping, drain piping, ductwork, vents, hangers, and water piping associated with equipment shall be removed.\n\nAll piping, water, steam, condensate, and air will be new and originate from the nearest header within 35  of the new autoclave and electrical for the new equipment will originate from the electrical panel identified by the station. All piping, water, conduit, steam, condensate, and air lines within this RFQ shall be new.\n\nWaste Material Sorting/Recycling\nThe contractor shall divert discarded items and other wastes to recycling trash disposal scheduled regularly. Items which need to be sent for recycling or resale unless not feasible include pallets, metals (iron, copper, brass, etc.) cardboard, mercury items, used oil, electronic, rechargeable batteries, wood products and debris. \n\nThe contractor shall not store waste materials and items held for recycling. Waste materials shall be stored prior to pick up in a manner that does not allow the items to become a fire, health, environmental or safety hazard or provide harborage for pests and consistent with federal, state and VA (listed in order of preference) laws and regulations governing storage of waste materials. Actions include using drip drains pans, storing liquid wastes or items that rot in closed containers, removing Freon from junked air conditioning, observing Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA) limits on sizes of piles of lumber or wood products. Dumpsters larger than one and one-half (1 Â½) cubic yards in size must be located at least ten (10) feet from exterior walls of buildings.\n\nPainted or treated lumber, paint chips, a potential asbestos containing, or asbestos contaminated items should not be recycled but shall be disposed of properly. No waste material disposal is allowed on Government property.\n\nThe COR designated contractor staging area (TBD after award) will be fully enclosed completely with fencing and fence covering provided by the contractor. The fencing height shall be a minimum of six (6) feet high, with covering, signage and sandbags or plastic temporary fence weights.\n\nExternal Equipment/Motor Protection Filters are to be provided for all air intakes to include but not limited to washer extractors, electronic boxes, mechanical equipment, etc., wherever air intakes are located. These are used as a primary pre-filtration defense to help prevent damage and extensive maintenance that large volumes of lint/debris can cause. They are to fit all air intakes, motors etc. and be made of three-dimensional electrostatic media and encased in a 1/8\"-3/8\" rigid magnetic galvanized steel frame and contain 2 layers of polypropylene media. The media will not shed fibers, absorb moisture, or promote bacterial growth; the filter should be designed for UV protected, and stands up to extreme outdoor or indoor exposure, corrosive chemicals, high velocity air flow, as well as industrial cleaning and maintenance handling.\n\nThe contractor shall supply lock-out/tag-out devices for each piece of equipment. All lock-out/tag-out and Confined Space (CS) locations shall be marked and identified on the machine with instructions on lock-out or CS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air lines, hydraulic, etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air lines etc.\n\nThe contractor shall supply one (1) lock-out and tag-out kit with the lock-out/tag-out devices for each piece of equipment. The kits shall turned over to the COR. All lock-out / tag-out and Permit Required Confined Space (PRCS) locations shall be marked and identified on the machine with instructions on lock-out or PRCS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, steam, condensate, air lines, hydraulic etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air etc.\n\nNumber and nomenclature will separately identify all equipment with no less than two (2) inch numbers and letters. Each piece of equipment will be separately identified and labeled. Example:  Hot Water Heater 1, Hot Water Storage Tank etc. The equipment shall be made compatible to meet production requirements specified in the technical specifications.\n\nContractor bears all responsibility for all new utility connections. All new utility piping that has been added shall be leak tested (air, water, steam and condensate). \nConnections to VA supplied utilities shall be within 35  of new equipment supplied and electrical panel identified. Penetrations in floors, walls and ceilings not utilized will be filled with existing floor, wall, and ceiling like material. All braces, pipes (air, gas, water, steam, condensate, electrical), conduit and duct work that will not be utilized shall be removed back to the source that pertains to the equipment directly associated with this RFQ. \n\nThe contractor shall not damage equipment frame, door panels, cylinder, cylinder panels, control box on the Government installation. If the Contractor causes damages to any Government property, the Contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the Contractor fails or refuses to make such repair(s) or replacement(s), the Contractor shall be liable for the cost, which may be deducted from the contract price.\n\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\n\nUtility Shutdowns and hot work permits\n\nContractor shall provide ten (10) calendar days  advance notice for any planned utility shutdowns and should be indicated on the project schedule.\nContractor shall follow stations protocol on notice of any hot work permits needed.\n\nThe TCPF will be open during the project. The contractor will have access to the TCPF seven days a week from 7:00 am through 3:30pm. On the weekends there will be a staff member on station to allow entrance and will monitor the contractor while they are on station. \n\nNOTE: With COR approval the contractor may work evenings and/or weekends to accomplish the work required.\n\nBadge Requirements\n\nThe contractor s personnel (including subcontractors) anticipated to be on site for more than two (2) days will need to obtain a PIV badge through the VA COR. [Note: PIV badges require at least 30 days to secure so it would be beneficial for the contractor to start this process immediately.] \n\nSite Visit\n\nThe contractor has the responsibility of visiting the site and examine the the installation area. Failure on the part of the contractor to accomplish a site visit and become thoroughly familiar with all conditions that may affect their quote will be at the contractor s risk. \n\nThe Ft. Harrison TCPF will accommodate site visits as they are requested. The site visits may be on different dates or all on the same date, depending on if/when requests are made by the contractor. The contractor must request a scheduled date to visit the Ft. Harrison TCPF and the COR will determine if the requested date is available. Site visit requests shall be made by contacting.\n\nExemption Certificate\nThe COR will provide a valid certificate of exemption for the State of Montana sales and use tax to the Contractor.\n\nGeneral Installation Requirements\nExisting utilities shall be utilized to meet the performance requirements of the technical specifications. Connection points for all equipment shall be within 35  of new equipment. When existing service lines require demolition, they shall be removed back to the source.\n\nThe contractor shall ensure maximum utilization of existing equipment space to prevent additional plumbing, electrical or other utilities.\n\nShould additional utilities be required for the equipment, these utilities shall be the responsibility of the contractor. Utilities are electric, water, steam, condensate and air lines.\n\nAll exposed utility/ductwork/piping systems, control boxes and motors that are exposed to floor traffic shall be appropriately guarded and protected.\n\nEquipment and materials shall be suitable for installation in available space, arranged for safe, efficient, and convenient operation and maintenance, and if applicable with referenced specifications to include a summary of routine preventative maintenance for each piece of equipment.\n\nThe contractor shall furnish all labor and materials necessary for storage and installation of new equipment. Installation shall include, but is not limited to:\nAll mounting holes shall be utilized for anchoring equipment. Secure mounts shall be laid out in advance for review and approval by the COR.\n\nAny and all penetrations of walls, ceilings and floors for the installation or removal of electrical conduit, pipes, ductwork, liquid supply lines, communication wiring, etc. shall be sealed with an approved fire-retardant material (not foam) and shall match existing materials on both sides of the penetration. \n\nContractor is to supply new utility connections (i.e., wall/ceiling mounts, junction boxes, raceways, and conduits).\n\nThe contractor shall be responsible for all control wiring including disconnects interconnections, and conduit. Interconnecting consists of all control wiring, all ductwork, interconnecting pieces of equipment and outside vents, all airlines, and all connections from VA supplied utilities.\n\nAll installation and/or modifications of utilities and structures, shall match existing materials. No wooden platforms allowed.\n\nAll pipes, vents, drains, electrical boxes, ductwork, and conduit shall be new. \n\nAll pipes and ductwork shall be insulated. All conduits and air pipes shall not be painted. All vents and drains shall be painted, (REFER TO THE TABLE BELOW FOR COLORS). All insulation shall be wrapped with white PVC plastic as indicated below. PVC covering shall be a minimum .030  thickness. Flow markings and identification of all pipes, vents, ductwork, and airlines to equipment shall be appropriately marked with a minimum of two (2) inch letters. Pre-made adhesives are acceptable, spray-painting stencils are not acceptable. \n\nAir Piping:\n(Only identification/flow markings)\nAir Intake Ductwork:\nSafety White PVC (Identification and flow markings)\nLarge Dryer Air Exhaust Ductwork: \nSafety White PVC textured Aluminum (Identification & flow markings)\nSmall Dryer Air Exhaust Ductwork:\nSafety White PVC (Identification & flow markings)\nVent Pipe:\nPainted Flat Black (Identification and flow markings)\nDrain Line:\nPainted Flat Black (Identification and flow markings)\nDomestic Water:\nSafety White PVC (Identification and flow markings)\nFire Suppression Piping:\nPainted Bright Red (Identification and flow markings)\nOutside Exposed Ductwork:\nSealed watertight and weather-proofed to protect from the environment\nAll Conduits:\nNot Painted\nInstallation of piping, sleeves, inserts, hangers, and equipment shall be in accordance with the installation design drawing and shall be sealed by a licensed professional Architect and Engineer, which were previously approved by the COR. In the installation design drawings, the contractor shall locate drains, piping, sleeves, inserts, hangers, and equipment out of the way of windows, doors, openings, light outlets and other services and utilities. All piping shall be installed to comply with accepted national and local plumbing practices. Mechanical or grooved fittings on mechanical piping are acceptable.\n\nIf necessary to drill through structural sections, the contractor shall notify the COR immediately. The COR shall work with a structural engineer to determine proper location. The COR shall instruct contractor on structural location to continue work.\n\nInstall gauges, thermometers, valves, and other mechanical and electrical devices for ease of reading, operating, and maintaining. Servicing shall not require dismantling of adjacent equipment, electric or pipe work.\n\nValve Tags - Furnish and install valve tags on all compressed air, gas, steam, condensate and water valves on equipment and connection points. Tags shall be engraved with identification (gas, air etc.), black filled identification, numbers, and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2-inch round brass disc; tags shall be attached with brass hooks or brass chain.\n\nTrap Tags: Furnish and install all steam trap tags on equipment and connection points of the textile care processing equipment. Tags shall e engraved, black filled numbers and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2 inch round brass disc, tags shall be attached with brass hooks or brass chain.\n\nThe contractor shall provide two (2) valve lists and two (2) steam trap lists on typed plastic-coated cards, sized 8-1/2-inch X 11 inch showing tag number, valve type, valve function and location area of valve for each service or system to the COR.\n\nEquipment, motors, piping, ductwork and any other components or materials shall be protected against physical damage from carts with guardrails supplied by the contractor.\n\nBelts, chains, pulleys, couplings, motor shafts, gears or other moving parts shall be fully guarded in accordance with OSHA 1910.219. Guard parts shall be rigid and suitably secured and be readily removable without disassembling the guarded unit.\nA minimum clearance of 36 inches between moving parts and fixed objects and 24 inches between non-moving parts and fixed objects is required in accordance with OSHA 1910.219.  All conveyor rollers shall have roll caps installed and guards will be provided under all conveyors.\n\nPlumbing Requirements\n\nPlumbing\nGrooved or mechanical fittings are allowed on piping.\n\nThe contractor shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). The contractor shall only use cast steel or forged steel fittings and components, in accordance with applicable VA Master Specifications found at https://www.cfm.va.gov/til/spec.asp\n\nTraps\nThe contractor shall provide traps on all sanitary branch waste \nconnections from fixtures or equipment not provided with traps. Exposed brass shall be polished brass chromium plated with nipple and set screw escutcheons. Concealed traps may be rough cast brass. Slip joints are not permitted on sewer side of trap. Traps shall correspond to fittings on cast iron soil pipe or steel pipe respectively, and size shall be as required by connected service or fixture.\n\nPlumbing Installation\nIn accordance with the National Standard Plumbing Code, 2021 Edition.\nPipe saddles shall be installed on the outside of all insulation and PVC coverings.\n\nEscutcheons shall be installed at all floors, wall and ceiling locations that pipe, conduits, vents and ductwork penetrate.\n\nPipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to full size after cutting.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall valves with stem in horizontal position whenever possible. All valves shall be easily accessible.\n\nPiping shall conform to the following:\n\nWaste, Storm Water Drain and Vent:  Drain to main stack as follows:\n\nPipe Size                     Minimum Pitch\n3 inch and smaller  1/4 inch to the foot\n4 inch and larger             1/8 inch to the foot\n\nExhaust Vent\nExtend exhaust vents separately through roof. Sanitary vents shall not connect to exhaust vents.\n\nInsulation Requirements\nUnless specified in other sections of the Technical Specifications, cellular glass insulation is required for hot water piping. A minimum 1.5 inches thick for hot water is required. All Insulation on piping and equipment shall be terminated square at items not to be insulated, access openings and nameplates. Cover all exposed raw insulation with sealer or jacket material that does match the color of the insulation.\nWater Piping\nInterior domestic water piping shall be copper tube, type L drawn per ASTM B88. Fittings for copper tube must be wrought copper or bronze castings conforming to ANSI B16.18 and B16.22. Unions shall be bronze in accordance with federal specification WW-U-516 with solder or braze joints including adapters for joining screwed pipe to copper tubing.\nAir Piping \nInterior to the building and outdoor external air piping shall be copper tube.\n\nAll piping shall be installed parallel to walls and column centerlines. Pipe shall be round and straight. Cutting shall be done with proper tools. Except for plastic and glass, pipe shall be reamed to full size after cutting. Copper piping work shall be performed in accordance with best practices requiring accurately cut clean joints and soldering in accordance with the recommended practices for the material and solder employed.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall ball valves in horizontal position. All valves shall be easily accessible.\n\nPipe saddles shall be on the outside of all insulation and PVC coverings.\n\nPipe escutcheons will be used for all pipe penetrations through walls, floors, and ceilings.\n\nElectrical Requirements\n\nElectrical\nElectrical Installation\nConduits, Fittings, and Electrical Wire\n\nAll electrical installations shall conform to requirements of the National Electrical Code (NEC).\n\nInstall a new power disconnect box for each piece of equipment.\n\nAll electrical wire shall be copper, heat resistant grade, thermoplastic insulated. Control wiring shall be (stranded) Thermoplastic High Heat Nylon (THHN)/Thermoplastic Heat and Water-Resistant Nylon (THWN) or equal. Intermediate wall conduit is required. Provide conduit trapeze hangers.\n\nAll power wiring shall have a minimum conduit size of 3/4-inch in diameter. Color coding of all wiring shall be in accordance with established NFPA 70. \n\nAll low voltage communication wire used for data management systems, liquid supply systems and intercoms shall be installed in minimum 3/4-inch diameter protective conduit. Wire nuts shall not be used for any connections.\nElectrical Wiring Installation\nIn accordance with NFPA 79   Electrical Standard for Industrial Machinery 2021 edition:\nWiring shall not be cut, abraded, nor have excessive insulation stripped, and shall be properly and tightly joined at terminals.\n\nWire nuts shall not be used, and solderless connectors shall have insulation grip. Wiring shall have adequate slack to provide strain relief. Wire nuts are only acceptable for electrical installation of motors and terminal boxes.\n\nWiring shall be provided between motors, controllers, timers, pushbuttons, starters, and limit switches installed on or within the equipment and shall be done with materials as applicable, except liquid tight flexible conduit shall be used where required for belt adjustment by moving a motor or for vibration isolation.\n\nAll wiring shall terminate in connection boxes with provisions for connections beyond the machine; each conductor shall be identified by a different color.\n\nthe line voltage side of the work is a single point demo and termination to a prewired control cabinet.\nElectrical Identification Installation\nIn accordance with NFPA 79   Electrical Standard for Industrial Machinery 2021 edition:\n\nInstall nameplates - center on device, cover plate, or enclosure.\nUse power source designations defined in the Technical Specifications. Indicate electrical power loads served using designations from electrical schedules and designations from the appropriate trade furnishing the equipment served.\n\nLettering shall include name of equipment, the specific unit number, and any reference to ON/OFF or other instructions that are applicable.\n\nAll labeling shall be on laminated phenolic nameplates and shall be placed on equipment.\n\nNameplates shall be laminated phenolic with a Blue surface (480 Volts)/Black surface (208 Volts) and white core. Use 1/16-inch thick material for plates up to 2 inch X 4 inch. For larger sizes, use 1/8-inch thick material.\n\nThe contractor shall mark all 4-plex outlets and boxes with the electrical panel, circuit, and branch identification. \nElectrical Protection\nThe contractor shall provide any protective methodology or devices necessary to protect the equipment from:\nDamage due to electrical power problems, including brownouts, emergency power interruptions, electrical surges, sags, and electrical storms.\n\nAny equipment located outside the building or on the roof shall have lightning protection installed.\n\nData loss due to electrical power problems. All equipment electronics shall be protected with a power monitor hook-up point and power monitor.\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\nUninterrupted Power Supply (UPS) shall be installed for all equipment supplied. (Minimum 2-hour back-up).\nElectrical Receptacles and Outlets \nReceptacles shall be Underwriters Laboratories certified. \nMounting screws, mounting strap and terminal screws shall be brass or a copper alloy metal.\nReceptacles shall have provisions for back wiring from four (minimum) separate wiring holes and side wiring from four captivity held binding screws.\n\nGround Fault Interrupter (GFI) four-plex receptacles shall be single phase, 20 ampere, 120 volts, 2-pole, 3-wire, US National Electrical Manufacturers Association (NEMA) 5-2OR.\n\nThe duplex type receptacles shall have break-off feature for two circuit operation. The ungrounded pole of each receptacle shall be provided with a separate terminal.\n\nThe receptacle bodies shall be white in color.\n\nFour-plex receptacles with GFI shall be an integral unit suitable for mounting in a standard outlet box.\n\nGFI shall consist of a differential current transformer, solid state sensing circuitry and a circuit interrupter switch and shall be rated for operation on a 160 Hz, 120-volt, 20 ampere branch circuit. The device shall have nominal sensitivity to ground leakage current of five (5) milliamperes and shall function to interrupt the current supply for any value of ground leakage current above five (5) milliamperes on the load side of the device. The device shall have a minimum nominal tripping time of 1/30th of a second.\n\nReceptacles 20, 30 and 50 ampere, 250 volt:  Shall be complete with appropriate cord grip plug.\nWeatherproof Receptacles\nShall consist of a duplex receptacle, mounted in box with gasket, weatherproof, cast metal cover plate and cap over each receptacle opening. The cap shall be permanently attached to the cover plate by a spring hinged flap. The weatherproof integrity shall not be affected when heavy duty specification or hospital grade attachment plug caps are inserted. Cover plates on outlet boxes mounted flush in the wall shall be gasket to the wall in a watertight manner.\n\nWall Plates\nWall plates for switches and receptacles shall be as specified by the COR. Oversize plates will not be acceptable.\nWall Plate color shall be white.\n\nStandard NEMA design, so that products of different manufacturers must be interchangeable.\n\nFor receptacles or switches mounted adjacent to each other, wall plates shall be common for each group of receptacles or switches.\n\nThe contractor shall provide 4-Plex receptacle at each equipment location for mechanic s use.\n\nMarking Pen Labeling\nUse for all junction and outlet boxes or portions of junction boxes with power wiring, communication systems, pull and junction boxes, and conduit installed for future use. For all boxes with power wiring, indicate appropriate panel and circuit number(s) where applicable, etc. Label inside covers in finished areas and outside covers in unfinished areas. Labeling shall be completed using permanent, waterproof, quick drying marking pen.\n\nLabel Tapes\nLabel each conductor at origin and destination points and at all junction boxes where two or more feeder or control circuits are present. Identify with branch circuit or feeder number for power and lighting circuits, and with control conductors, number as indicated on schematic and interconnection diagrams or equipment manufacturer's drawings for control wiring. Using cloth, plastic, split sleeve or tubing type wire and cable label markers.\n\nDielectric Fittings\nProvide dielectric couplings or unions between ferrous and non-ferrous pipe. In addition, Provide threaded dielectric unions for pipe sizes 2 inches and under. For 2-1/2 inches and above, provide copper and steel flanges electrically isolated at gasket and by sleeves at bolts. Fittings on cold water and soft water lines shall be rated for 100 psi, 80 degrees F. Fittings on other services shall be rated for the maximum pressure and temperature conditions of the service. Where copper piping is connected to steel piping, provide dielectric connections.\n\nPrefabricated Roof Curbs\nGalvanized steel or extruded aluminum 12 inches overall height, continuous welded corner seams, treated wood nailer, 1-1/2 inch thick, 3-pound density rigid mineral fiberboard insulation with metal liner, and built-in curved cantilever strip. Provide raised cantilever strip (recessed mounting flange) to start at the upper surface of the insulation. Curbs shall be constructed for pitched roof or ridge mounting as required to keep top of curb level.\n\nInstallation Requirements\nApproval for the contractor to proceed with installation shall be contingent upon the acceptance of the design submittals and written notification to proceed with installation from the COR. \n\nThe contractor shall be responsible for the determination of, and compliance with, federal, state, and local code requirements, design data, and other factors necessary to design and install the system. \n\nThe contractor shall verify the location of extant utilities. Contractor shall connect to designated utilities in a manner conforming to a nationally recognized code and at a time satisfactory to minimize or preclude disruption to existing functions or clinical services. \n\nThe contractor shall be responsible for installation, which consists of assembling, positioning, and mounting of all equipment and connections of all cables. The contractor is responsible for furnishing and pulling all interconnecting wiring and cabling, including wiring, and cabling to be pulled through conduit and raceways. It is the responsibility of the contractor to supply and install junction boxes; wall/ceiling mounts and support structures.\n\nThe contractor shall provide certified field engineers or technicians to conduct all necessary tests during installation. Contractor shall provide copies of the certifications upon Government request. \n\nThe contractor shall inform the CO and COR of any problems as they occur in connection with installation, or issues which will affect optimum performance shall be reported prior to the start of installation. Installation shall not proceed under such circumstances until authorized by the CO.\nAvailability of Parts and Service\nThe Quoter shall guarantee the contractor availability of servicing and replacement parts for a period of ten (10) years to the government for the laundry equipment being procured under this RFQ.\n\nIncorporation of Documents\nThe following documents are hereby incorporated by reference and made a part of this RFQ.\nThe equipment and installation supplies shall conform to the following standards:\nAir Moving and Conditioning Association, Inc. (AMCA) Standards, 2009 Edition.\nAmerican National Standards Institute (ANSI), 2021 Edition. Z8.1-2006 Safety Requirements for Commercial Laundry and Dry Cleaning Operations.\nFEMP: Federal Energy Management Program (Energy efficient product rating).\nHVAC Duct Construction Standards-Metal & Flexible.\nNational Electrical Manufacturers Association (NEMA), 2021 Edition.\nNational Fire Protection Association (NFPA), 2021 Edition. ALL NFPA Standards and codes. National Electrical Code (NEC), 2020 Edition.\nNational Standard Plumbing Code, 2021 Edition.\nOccupational Safety and Health Administration (OSHA) 29 CFR 1910. \nSheet Metal and Air Conditioning Contractors National Association (SMACNA), 2021 Edition.\nSheet Metal Contractors National Association Inc. Publication, 2019 Edition.\nUnderwriters Laboratories Standards, 2022 Edition. \nCity, County, State, Federal, VA and National Environmental, Fire and Safety Regulations/Standards.","text":"Sources Sought Notice Medical Waste Sterilizing Autoclave\nDISCLAIMER\nThis RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.\nResponse Instructions:\nDo not provide more than 8 pages, including cover letter page.\nSubmit your response via email to: barron.long@va.gov\nSubmit your response NLT 14:00 (MST) on Friday February 7th\nMark your response as Proprietary Information if the information is considered business sensitive.\nVA has identified the appropriate North American Industry Classification System (NAICS) Code 332420 - Autoclaves, industrial-type, heavy gauge metal, manufacturing with a Small Business size of 750 employees. Please identify and explain any NAICS codes your company believes would better represent the predominated work included in the attached Statement of Work draft / Salient Characteristics List;\n\nInformation Requested from Industry:\n\nIn response to the Sources Sought, interested Contractors shall submit the following information and any Capabilities/Qualifications Statement to include but not limited to an overview of proposed solution(s) and a description of the product your company possesses accordance with the Statement of Work draft / Salient Characteristics List.\n\nVendor Name:\n\nSAM UEI #:\n\nName of Manufacturer:\n\nManufacturer Address:\n\nEstimated Delivery Time:\n\nSAC FSS contract number\n\nVendor Point of Contract (POC) Name\n\nPOC Phone Number:\n\nPOC Email Address:\n\nSTATEMENT OF WORK\n\nINTRODUCTION:\nThe autoclave shall be delivered within 120 calendar days after the effective date of the contract. Delivery dates specified may be adjusted by the CO to coincide with the date the TCPF will be ready to receive installation. The CO will advise the contractor of the new delivery date at least 45 days prior to the original or adjusted delivery date(s). Deliveries, cranes, or haulage will be arranged with the Contracting Officer Representative (COR), as to NOT interfere with day-to-day ancillary VA Medical services such as nutrition/food service, laundry delivery, maintenance routes, etc.\n\nThe autoclave shall be delivered within 120 days after the effective award date. Installation of the autoclave shall take place no more than 30 days after the delivery date. The 2 days onsite shakedown and 1-day onsite training are included in the installation timeframe. Training shall consist of both operator and maintenance personnel at a minimum.Â TrainingsÂ shall not to be conducted concurrently. The total contract duration is 150 days.\n\nNote: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.\n\nSite Specific Project Requirements\nThe contractor shall furnish the supervision, labor, equipment, tools, safety, rigging, hoisting, supplies and installation services necessary to meet the terms and conditions in accordance with the Statement of Work (SOW).\n\nThis SOW includes removal of trade-in equipment, delivery, installation, and training of the new laundry equipment installed. The equipment and installation shall be conducted in conformance with the SOW and Technical Specifications provided herein. All items provided by the contractor shall be new. The contractor shall not utilize any refurbished equipment, machinery, or parts.\n\nThe autoclave is to be located within Building 154, near the waste removal area.\n\nWithin the new design layout of the autoclave area, the contractor shall relocate existing lighting fixtures, and provide new energy-efficient, light-emitting diode (LED) lighting for any new workstation or storage area. New lighting shall comply with VA Lighting Design Guide, January 2022; and shall be 50 foot-candles (minimum) measured 30-inches above floor for workstation task areas, and 35 foot-candles (minimum) for storage areas.\n\nAll valves within the layout of the autoclave and equipment shall be ball valves with the appropriate ratings and that are part of the scope of work within this RFQ.\n\nAll old piping, drain piping, ductwork, vents, hangers, and water piping associated with equipment shall be removed.\n\nAll piping, water, steam, condensate, and air will be new and originate from the nearest header within 35 of the new autoclave and electrical for the new equipment will originate from the electrical panel identified by the station. All piping, water, conduit, steam, condensate, and air lines within this RFQ shall be new.\n\nWaste Material Sorting/Recycling\nThe contractor shall divert discarded items and other wastes to recycling trash disposal scheduled regularly. Items which need to be sent for recycling or resale unless not feasible include pallets, metals (iron, copper, brass, etc.) cardboard, mercury items, used oil, electronic, rechargeable batteries, wood products and debris.\n\nThe contractor shall not store waste materials and items held for recycling. Waste materials shall be stored prior to pick up in a manner that does not allow the items to become a fire, health, environmental or safety hazard or provide harborage for pests and consistent with federal, state and VA (listed in order of preference) laws and regulations governing storage of waste materials. Actions include using drip drains pans, storing liquid wastes or items that rot in closed containers, removing Freon from junked air conditioning, observing Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA) limits on sizes of piles of lumber or wood products. Dumpsters larger than one and one-half (1 Â½) cubic yards in size must be located at least ten (10) feet from exterior walls of buildings.\n\nPainted or treated lumber, paint chips, a potential asbestos containing, or asbestos contaminated items should not be recycled but shall be disposed of properly. No waste material disposal is allowed on Government property.\n\nThe COR designated contractor staging area (TBD after award) will be fully enclosed completely with fencing and fence covering provided by the contractor. The fencing height shall be a minimum of six (6) feet high, with covering, signage and sandbags or plastic temporary fence weights.\n\nExternal Equipment/Motor Protection Filters are to be provided for all air intakes to include but not limited to washer extractors, electronic boxes, mechanical equipment, etc., wherever air intakes are located. These are used as a primary pre-filtration defense to help prevent damage and extensive maintenance that large volumes of lint/debris can cause. They are to fit all air intakes, motors etc. and be made of three-dimensional electrostatic media and encased in a 1/8\"-3/8\" rigid magnetic galvanized steel frame and contain 2 layers of polypropylene media. The media will not shed fibers, absorb moisture, or promote bacterial growth; the filter should be designed for UV protected, and stands up to extreme outdoor or indoor exposure, corrosive chemicals, high velocity air flow, as well as industrial cleaning and maintenance handling.\n\nThe contractor shall supply lock-out/tag-out devices for each piece of equipment. All lock-out/tag-out and Confined Space (CS) locations shall be marked and identified on the machine with instructions on lock-out or CS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air lines, hydraulic, etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air lines etc.\n\nThe contractor shall supply one (1) lock-out and tag-out kit with the lock-out/tag-out devices for each piece of equipment. The kits shall turned over to the COR. All lock-out / tag-out and Permit Required Confined Space (PRCS) locations shall be marked and identified on the machine with instructions on lock-out or PRCS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, steam, condensate, air lines, hydraulic etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air etc.\n\nNumber and nomenclature will separately identify all equipment with no less than two (2) inch numbers and letters. Each piece of equipment will be separately identified and labeled. Example: Hot Water Heater 1, Hot Water Storage Tank etc. The equipment shall be made compatible to meet production requirements specified in the technical specifications.\n\nContractor bears all responsibility for all new utility connections. All new utility piping that has been added shall be leak tested (air, water, steam and condensate).\nConnections to VA supplied utilities shall be within 35 of new equipment supplied and electrical panel identified. Penetrations in floors, walls and ceilings not utilized will be filled with existing floor, wall, and ceiling like material. All braces, pipes (air, gas, water, steam, condensate, electrical), conduit and duct work that will not be utilized shall be removed back to the source that pertains to the equipment directly associated with this RFQ.\n\nThe contractor shall not damage equipment frame, door panels, cylinder, cylinder panels, control box on the Government installation. If the Contractor causes damages to any Government property, the Contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the Contractor fails or refuses to make such repair(s) or replacement(s), the Contractor shall be liable for the cost, which may be deducted from the contract price.\n\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\n\nUtility Shutdowns and hot work permits\n\nContractor shall provide ten (10) calendar days advance notice for any planned utility shutdowns and should be indicated on the project schedule.\nContractor shall follow stations protocol on notice of any hot work permits needed.\n\nThe TCPF will be open during the project. The contractor will have access to the TCPF seven days a week from 7:00 am through 3:30pm. On the weekends there will be a staff member on station to allow entrance and will monitor the contractor while they are on station.\n\nNOTE: With COR approval the contractor may work evenings and/or weekends to accomplish the work required.\n\nBadge Requirements\n\nThe contractor s personnel (including subcontractors) anticipated to be on site for more than two (2) days will need to obtain a PIV badge through the VA COR. [Note: PIV badges require at least 30 days to secure so it would be beneficial for the contractor to start this process immediately.]\n\nSite Visit\n\nThe contractor has the responsibility of visiting the site and examine the the installation area. Failure on the part of the contractor to accomplish a site visit and become thoroughly familiar with all conditions that may affect their quote will be at the contractor s risk.\n\nThe Ft. Harrison TCPF will accommodate site visits as they are requested. The site visits may be on different dates or all on the same date, depending on if/when requests are made by the contractor. The contractor must request a scheduled date to visit the Ft. Harrison TCPF and the COR will determine if the requested date is available. Site visit requests shall be made by contacting.\n\nExemption Certificate\nThe COR will provide a valid certificate of exemption for the State of Montana sales and use tax to the Contractor.\n\nGeneral Installation Requirements\nExisting utilities shall be utilized to meet the performance requirements of the technical specifications. Connection points for all equipment shall be within 35 of new equipment. When existing service lines require demolition, they shall be removed back to the source.\n\nThe contractor shall ensure maximum utilization of existing equipment space to prevent additional plumbing, electrical or other utilities.\n\nShould additional utilities be required for the equipment, these utilities shall be the responsibility of the contractor. Utilities are electric, water, steam, condensate and air lines.\n\nAll exposed utility/ductwork/piping systems, control boxes and motors that are exposed to floor traffic shall be appropriately guarded and protected.\n\nEquipment and materials shall be suitable for installation in available space, arranged for safe, efficient, and convenient operation and maintenance, and if applicable with referenced specifications to include a summary of routine preventative maintenance for each piece of equipment.\n\nThe contractor shall furnish all labor and materials necessary for storage and installation of new equipment. Installation shall include, but is not limited to:\nAll mounting holes shall be utilized for anchoring equipment. Secure mounts shall be laid out in advance for review and approval by the COR.\n\nAny and all penetrations of walls, ceilings and floors for the installation or removal of electrical conduit, pipes, ductwork, liquid supply lines, communication wiring, etc. shall be sealed with an approved fire-retardant material (not foam) and shall match existing materials on both sides of the penetration.\n\nContractor is to supply new utility connections (i.e., wall/ceiling mounts, junction boxes, raceways, and conduits).\n\nThe contractor shall be responsible for all control wiring including disconnects interconnections, and conduit. Interconnecting consists of all control wiring, all ductwork, interconnecting pieces of equipment and outside vents, all airlines, and all connections from VA supplied utilities.\n\nAll installation and/or modifications of utilities and structures, shall match existing materials. No wooden platforms allowed.\n\nAll pipes, vents, drains, electrical boxes, ductwork, and conduit shall be new.\n\nAll pipes and ductwork shall be insulated. All conduits and air pipes shall not be painted. All vents and drains shall be painted, (REFER TO THE TABLE BELOW FOR COLORS). All insulation shall be wrapped with white PVC plastic as indicated below. PVC covering shall be a minimum .030 thickness. Flow markings and identification of all pipes, vents, ductwork, and airlines to equipment shall be appropriately marked with a minimum of two (2) inch letters. Pre-made adhesives are acceptable, spray-painting stencils are not acceptable.\n\nAir Piping:\n(Only identification/flow markings)\nAir Intake Ductwork:\nSafety White PVC (Identification and flow markings)\nLarge Dryer Air Exhaust Ductwork:\nSafety White PVC textured Aluminum (Identification & flow markings)\nSmall Dryer Air Exhaust Ductwork:\nSafety White PVC (Identification & flow markings)\nVent Pipe:\nPainted Flat Black (Identification and flow markings)\nDrain Line:\nPainted Flat Black (Identification and flow markings)\nDomestic Water:\nSafety White PVC (Identification and flow markings)\nFire Suppression Piping:\nPainted Bright Red (Identification and flow markings)\nOutside Exposed Ductwork:\nSealed watertight and weather-proofed to protect from the environment\nAll Conduits:\nNot Painted\nInstallation of piping, sleeves, inserts, hangers, and equipment shall be in accordance with the installation design drawing and shall be sealed by a licensed professional Architect and Engineer, which were previously approved by the COR. In the installation design drawings, the contractor shall locate drains, piping, sleeves, inserts, hangers, and equipment out of the way of windows, doors, openings, light outlets and other services and utilities. All piping shall be installed to comply with accepted national and local plumbing practices. Mechanical or grooved fittings on mechanical piping are acceptable.\n\nIf necessary to drill through structural sections, the contractor shall notify the COR immediately. The COR shall work with a structural engineer to determine proper location. The COR shall instruct contractor on structural location to continue work.\n\nInstall gauges, thermometers, valves, and other mechanical and electrical devices for ease of reading, operating, and maintaining. Servicing shall not require dismantling of adjacent equipment, electric or pipe work.\n\nValve Tags - Furnish and install valve tags on all compressed air, gas, steam, condensate and water valves on equipment and connection points. Tags shall be engraved with identification (gas, air etc.), black filled identification, numbers, and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2-inch round brass disc; tags shall be attached with brass hooks or brass chain.\n\nTrap Tags: Furnish and install all steam trap tags on equipment and connection points of the textile care processing equipment. Tags shall e engraved, black filled numbers and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2 inch round brass disc, tags shall be attached with brass hooks or brass chain.\n\nThe contractor shall provide two (2) valve lists and two (2) steam trap lists on typed plastic-coated cards, sized 8-1/2-inch X 11 inch showing tag number, valve type, valve function and location area of valve for each service or system to the COR.\n\nEquipment, motors, piping, ductwork and any other components or materials shall be protected against physical damage from carts with guardrails supplied by the contractor.\n\nBelts, chains, pulleys, couplings, motor shafts, gears or other moving parts shall be fully guarded in accordance with OSHA 1910.219. Guard parts shall be rigid and suitably secured and be readily removable without disassembling the guarded unit.\nA minimum clearance of 36 inches between moving parts and fixed objects and 24 inches between non-moving parts and fixed objects is required in accordance with OSHA 1910.219. All conveyor rollers shall have roll caps installed and guards will be provided under all conveyors.\n\nPlumbing Requirements\n\nPlumbing\nGrooved or mechanical fittings are allowed on piping.\n\nThe contractor shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). The contractor shall only use cast steel or forged steel fittings and components, in accordance with applicable VA Master Specifications found at https://www.cfm.va.gov/til/spec.asp\n\nTraps\nThe contractor shall provide traps on all sanitary branch waste\nconnections from fixtures or equipment not provided with traps. Exposed brass shall be polished brass chromium plated with nipple and set screw escutcheons. Concealed traps may be rough cast brass. Slip joints are not permitted on sewer side of trap. Traps shall correspond to fittings on cast iron soil pipe or steel pipe respectively, and size shall be as required by connected service or fixture.\n\nPlumbing Installation\nIn accordance with the National Standard Plumbing Code, 2021 Edition.\nPipe saddles shall be installed on the outside of all insulation and PVC coverings.\n\nEscutcheons shall be installed at all floors, wall and ceiling locations that pipe, conduits, vents and ductwork penetrate.\n\nPipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to full size after cutting.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall valves with stem in horizontal position whenever possible. All valves shall be easily accessible.\n\nPiping shall conform to the following:\n\nWaste, Storm Water Drain and Vent: Drain to main stack as follows:\n\nPipe Size Minimum Pitch\n3 inch and smaller 1/4 inch to the foot\n4 inch and larger 1/8 inch to the foot\n\nExhaust Vent\nExtend exhaust vents separately through roof. Sanitary vents shall not connect to exhaust vents.\n\nInsulation Requirements\nUnless specified in other sections of the Technical Specifications, cellular glass insulation is required for hot water piping. A minimum 1.5 inches thick for hot water is required. All Insulation on piping and equipment shall be terminated square at items not to be insulated, access openings and nameplates. Cover all exposed raw insulation with sealer or jacket material that does match the color of the insulation.\nWater Piping\nInterior domestic water piping shall be copper tube, type L drawn per ASTM B88. Fittings for copper tube must be wrought copper or bronze castings conforming to ANSI B16.18 and B16.22. Unions shall be bronze in accordance with federal specification WW-U-516 with solder or braze joints including adapters for joining screwed pipe to copper tubing.\nAir Piping\nInterior to the building and outdoor external air piping shall be copper tube.\n\nAll piping shall be installed parallel to walls and column centerlines. Pipe shall be round and straight. Cutting shall be done with proper tools. Except for plastic and glass, pipe shall be reamed to full size after cutting. Copper piping work shall be performed in accordance with best practices requiring accurately cut clean joints and soldering in accordance with the recommended practices for the material and solder employed.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall ball valves in horizontal position. All valves shall be easily accessible.\n\nPipe saddles shall be on the outside of all insulation and PVC coverings.\n\nPipe escutcheons will be used for all pipe penetrations through walls, floors, and ceilings.\n\nElectrical Requirements\n\nElectrical\nElectrical Installation\nConduits, Fittings, and Electrical Wire\n\nAll electrical installations shall conform to requirements of the National Electrical Code (NEC).\n\nInstall a new power disconnect box for each piece of equipment.\n\nAll electrical wire shall be copper, heat resistant grade, thermoplastic insulated. Control wiring shall be (stranded) Thermoplastic High Heat Nylon (THHN)/Thermoplastic Heat and Water-Resistant Nylon (THWN) or equal. Intermediate wall conduit is required. Provide conduit trapeze hangers.\n\nAll power wiring shall have a minimum conduit size of 3/4-inch in diameter. Color coding of all wiring shall be in accordance with established NFPA 70.\n\nAll low voltage communication wire used for data management systems, liquid supply systems and intercoms shall be installed in minimum 3/4-inch diameter protective conduit. Wire nuts shall not be used for any connections.\nElectrical Wiring Installation\nIn accordance with NFPA 79 Electrical Standard for Industrial Machinery 2021 edition:\nWiring shall not be cut, abraded, nor have excessive insulation stripped, and shall be properly and tightly joined at terminals.\n\nWire nuts shall not be used, and solderless connectors shall have insulation grip. Wiring shall have adequate slack to provide strain relief. Wire nuts are only acceptable for electrical installation of motors and terminal boxes.\n\nWiring shall be provided between motors, controllers, timers, pushbuttons, starters, and limit switches installed on or within the equipment and shall be done with materials as applicable, except liquid tight flexible conduit shall be used where required for belt adjustment by moving a motor or for vibration isolation.\n\nAll wiring shall terminate in connection boxes with provisions for connections beyond the machine; each conductor shall be identified by a different color.\n\nthe line voltage side of the work is a single point demo and termination to a prewired control cabinet.\nElectrical Identification Installation\nIn accordance with NFPA 79 Electrical Standard for Industrial Machinery 2021 edition:\n\nInstall nameplates - center on device, cover plate, or enclosure.\nUse power source designations defined in the Technical Specifications. Indicate electrical power loads served using designations from electrical schedules and designations from the appropriate trade furnishing the equipment served.\n\nLettering shall include name of equipment, the specific unit number, and any reference to ON/OFF or other instructions that are applicable.\n\nAll labeling shall be on laminated phenolic nameplates and shall be placed on equipment.\n\nNameplates shall be laminated phenolic with a Blue surface (480 Volts)/Black surface (208 Volts) and white core. Use 1/16-inch thick material for plates up to 2 inch X 4 inch. For larger sizes, use 1/8-inch thick material.\n\nThe contractor shall mark all 4-plex outlets and boxes with the electrical panel, circuit, and branch identification.\nElectrical Protection\nThe contractor shall provide any protective methodology or devices necessary to protect the equipment from:\nDamage due to electrical power problems, including brownouts, emergency power interruptions, electrical surges, sags, and electrical storms.\n\nAny equipment located outside the building or on the roof shall have lightning protection installed.\n\nData loss due to electrical power problems. All equipment electronics shall be protected with a power monitor hook-up point and power monitor.\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\nUninterrupted Power Supply (UPS) shall be installed for all equipment supplied. (Minimum 2-hour back-up).\nElectrical Receptacles and Outlets\nReceptacles shall be Underwriters Laboratories certified.\nMounting screws, mounting strap and terminal screws shall be brass or a copper alloy metal.\nReceptacles shall have provisions for back wiring from four (minimum) separate wiring holes and side wiring from four captivity held binding screws.\n\nGround Fault Interrupter (GFI) four-plex receptacles shall be single phase, 20 ampere, 120 volts, 2-pole, 3-wire, US National Electrical Manufacturers Association (NEMA) 5-2OR.\n\nThe duplex type receptacles shall have break-off feature for two circuit operation. The ungrounded pole of each receptacle shall be provided with a separate terminal.\n\nThe receptacle bodies shall be white in color.\n\nFour-plex receptacles with GFI shall be an integral unit suitable for mounting in a standard outlet box.\n\nGFI shall consist of a differential current transformer, solid state sensing circuitry and a circuit interrupter switch and shall be rated for operation on a 160 Hz, 120-volt, 20 ampere branch circuit. The device shall have nominal sensitivity to ground leakage current of five (5) milliamperes and shall function to interrupt the current supply for any value of ground leakage current above five (5) milliamperes on the load side of the device. The device shall have a minimum nominal tripping time of 1/30th of a second.\n\nReceptacles 20, 30 and 50 ampere, 250 volt: Shall be complete with appropriate cord grip plug.\nWeatherproof Receptacles\nShall consist of a duplex receptacle, mounted in box with gasket, weatherproof, cast metal cover plate and cap over each receptacle opening. The cap shall be permanently attached to the cover plate by a spring hinged flap. The weatherproof integrity shall not be affected when heavy duty specification or hospital grade attachment plug caps are inserted. Cover plates on outlet boxes mounted flush in the wall shall be gasket to the wall in a watertight manner.\n\nWall Plates\nWall plates for switches and receptacles shall be as specified by the COR. Oversize plates will not be acceptable.\nWall Plate color shall be white.\n\nStandard NEMA design, so that products of different manufacturers must be interchangeable.\n\nFor receptacles or switches mounted adjacent to each other, wall plates shall be common for each group of receptacles or switches.\n\nThe contractor shall provide 4-Plex receptacle at each equipment location for mechanic s use.\n\nMarking Pen Labeling\nUse for all junction and outlet boxes or portions of junction boxes with power wiring, communication systems, pull and junction boxes, and conduit installed for future use. For all boxes with power wiring, indicate appropriate panel and circuit number(s) where applicable, etc. Label inside covers in finished areas and outside covers in unfinished areas. Labeling shall be completed using permanent, waterproof, quick drying marking pen.\n\nLabel Tapes\nLabel each conductor at origin and destination points and at all junction boxes where two or more feeder or control circuits are present. Identify with branch circuit or feeder number for power and lighting circuits, and with control conductors, number as indicated on schematic and interconnection diagrams or equipment manufacturer's drawings for control wiring. Using cloth, plastic, split sleeve or tubing type wire and cable label markers.\n\nDielectric Fittings\nProvide dielectric couplings or unions between ferrous and non-ferrous pipe. In addition, Provide threaded dielectric unions for pipe sizes 2 inches and under. For 2-1/2 inches and above, provide copper and steel flanges electrically isolated at gasket and by sleeves at bolts. Fittings on cold water and soft water lines shall be rated for 100 psi, 80 degrees F. Fittings on other services shall be rated for the maximum pressure and temperature conditions of the service. Where copper piping is connected to steel piping, provide dielectric connections.\n\nPrefabricated Roof Curbs\nGalvanized steel or extruded aluminum 12 inches overall height, continuous welded corner seams, treated wood nailer, 1-1/2 inch thick, 3-pound density rigid mineral fiberboard insulation with metal liner, and built-in curved cantilever strip. Provide raised cantilever strip (recessed mounting flange) to start at the upper surface of the insulation. Curbs shall be constructed for pitched roof or ridge mounting as required to keep top of curb level.\n\nInstallation Requirements\nApproval for the contractor to proceed with installation shall be contingent upon the acceptance of the design submittals and written notification to proceed with installation from the COR.\n\nThe contractor shall be responsible for the determination of, and compliance with, federal, state, and local code requirements, design data, and other factors necessary to design and install the system.\n\nThe contractor shall verify the location of extant utilities. Contractor shall connect to designated utilities in a manner conforming to a nationally recognized code and at a time satisfactory to minimize or preclude disruption to existing functions or clinical services.\n\nThe contractor shall be responsible for installation, which consists of assembling, positioning, and mounting of all equipment and connections of all cables. The contractor is responsible for furnishing and pulling all interconnecting wiring and cabling, including wiring, and cabling to be pulled through conduit and raceways. It is the responsibility of the contractor to supply and install junction boxes; wall/ceiling mounts and support structures.\n\nThe contractor shall provide certified field engineers or technicians to conduct all necessary tests during installation. Contractor shall provide copies of the certifications upon Government request.\n\nThe contractor shall inform the CO and COR of any problems as they occur in connection with installation, or issues which will affect optimum performance shall be reported prior to the start of installation. Installation shall not proceed under such circumstances until authorized by the CO.\nAvailability of Parts and Service\nThe Quoter shall guarantee the contractor availability of servicing and replacement parts for a period of ten (10) years to the government for the laundry equipment being procured under this RFQ.\n\nIncorporation of Documents\nThe following documents are hereby incorporated by reference and made a part of this RFQ.\nThe equipment and installation supplies shall conform to the following standards:\nAir Moving and Conditioning Association, Inc. (AMCA) Standards, 2009 Edition.\nAmerican National Standards Institute (ANSI), 2021 Edition. Z8.1-2006 Safety Requirements for Commercial Laundry and Dry Cleaning Operations.\nFEMP: Federal Energy Management Program (Energy efficient product rating).\nHVAC Duct Construction Standards-Metal & Flexible.\nNational Electrical Manufacturers Association (NEMA), 2021 Edition.\nNational Fire Protection Association (NFPA), 2021 Edition. ALL NFPA Standards and codes. National Electrical Code (NEC), 2020 Edition.\nNational Standard Plumbing Code, 2021 Edition.\nOccupational Safety and Health Administration (OSHA) 29 CFR 1910.\nSheet Metal and Air Conditioning Contractors National Association (SMACNA), 2021 Edition.\nSheet Metal Contractors National Association Inc. Publication, 2019 Edition.\nUnderwriters Laboratories Standards, 2022 Edition.\nCity, County, State, Federal, VA and National Environmental, Fire and Safety Regulations/Standards.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C25925Q0183","place_of_performance":{"zip":"59636","city":{"name":"Fort Harrison"},"state":{"name":"Montana"},"street":"Department of Veterans Affairs Montana VA Medical Center","street2":"3687 Veterans Drive"},"product_service_code":"6515"}],"due_at":"2025-02-07T21:00:00Z","due_date":"2025-02-07","closes_at":"2025-02-07T21:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","state":"MT","county":"30049","county_name":"Lewis and Clark County","city":null,"city_name":null,"country":null,"state_source":"sam_state_name","state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-11-24T02:40:54.809511Z","principal_notice_id":"84dd211bd7a146df8bdb1d058c2e2d8b","description":{"text":"Sources Sought Notice Medical Waste Sterilizing Autoclave\nDISCLAIMER\nThis RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.\nResponse Instructions:\nDo not provide more than 8 pages, including cover letter page.\nSubmit your response via email to: barron.long@va.gov\nSubmit your response NLT 14:00 (MST) on Friday February 7th\nMark your response as Proprietary Information if the information is considered business sensitive.\nVA has identified the appropriate North American Industry Classification System (NAICS) Code 332420 - Autoclaves, industrial-type, heavy gauge metal, manufacturing with a Small Business size of 750 employees. Please identify and explain any NAICS codes your company believes would better represent the predominated work included in the attached Statement of Work draft / Salient Characteristics List;\n\nInformation Requested from Industry:\n\nIn response to the Sources Sought, interested Contractors shall submit the following information and any Capabilities/Qualifications Statement to include but not limited to an overview of proposed solution(s) and a description of the product your company possesses accordance with the Statement of Work draft / Salient Characteristics List.\n\nVendor Name:\n\nSAM UEI #:\n\nName of Manufacturer:\n\nManufacturer Address:\n\nEstimated Delivery Time:\n\nSAC FSS contract number\n\nVendor Point of Contract (POC) Name\n\nPOC Phone Number:\n\nPOC Email Address:\n\nSTATEMENT OF WORK\n\nINTRODUCTION:\nThe autoclave shall be delivered within 120 calendar days after the effective date of the contract. Delivery dates specified may be adjusted by the CO to coincide with the date the TCPF will be ready to receive installation. The CO will advise the contractor of the new delivery date at least 45 days prior to the original or adjusted delivery date(s). Deliveries, cranes, or haulage will be arranged with the Contracting Officer Representative (COR), as to NOT interfere with day-to-day ancillary VA Medical services such as nutrition/food service, laundry delivery, maintenance routes, etc.\n\nThe autoclave shall be delivered within 120 days after the effective award date. Installation of the autoclave shall take place no more than 30 days after the delivery date. The 2 days onsite shakedown and 1-day onsite training are included in the installation timeframe. Training shall consist of both operator and maintenance personnel at a minimum.Â TrainingsÂ shall not to be conducted concurrently. The total contract duration is 150 days.\n\nNote: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.\n\nSite Specific Project Requirements\nThe contractor shall furnish the supervision, labor, equipment, tools, safety, rigging, hoisting, supplies and installation services necessary to meet the terms and conditions in accordance with the Statement of Work (SOW).\n\nThis SOW includes removal of trade-in equipment, delivery, installation, and training of the new laundry equipment installed. The equipment and installation shall be conducted in conformance with the SOW and Technical Specifications provided herein. All items provided by the contractor shall be new. The contractor shall not utilize any refurbished equipment, machinery, or parts.\n\nThe autoclave is to be located within Building 154, near the waste removal area.\n\nWithin the new design layout of the autoclave area, the contractor shall relocate existing lighting fixtures, and provide new energy-efficient, light-emitting diode (LED) lighting for any new workstation or storage area. New lighting shall comply with VA Lighting Design Guide, January 2022; and shall be 50 foot-candles (minimum) measured 30-inches above floor for workstation task areas, and 35 foot-candles (minimum) for storage areas.\n\nAll valves within the layout of the autoclave and equipment shall be ball valves with the appropriate ratings and that are part of the scope of work within this RFQ.\n\nAll old piping, drain piping, ductwork, vents, hangers, and water piping associated with equipment shall be removed.\n\nAll piping, water, steam, condensate, and air will be new and originate from the nearest header within 35 of the new autoclave and electrical for the new equipment will originate from the electrical panel identified by the station. All piping, water, conduit, steam, condensate, and air lines within this RFQ shall be new.\n\nWaste Material Sorting/Recycling\nThe contractor shall divert discarded items and other wastes to recycling trash disposal scheduled regularly. Items which need to be sent for recycling or resale unless not feasible include pallets, metals (iron, copper, brass, etc.) cardboard, mercury items, used oil, electronic, rechargeable batteries, wood products and debris.\n\nThe contractor shall not store waste materials and items held for recycling. Waste materials shall be stored prior to pick up in a manner that does not allow the items to become a fire, health, environmental or safety hazard or provide harborage for pests and consistent with federal, state and VA (listed in order of preference) laws and regulations governing storage of waste materials. Actions include using drip drains pans, storing liquid wastes or items that rot in closed containers, removing Freon from junked air conditioning, observing Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA) limits on sizes of piles of lumber or wood products. Dumpsters larger than one and one-half (1 Â½) cubic yards in size must be located at least ten (10) feet from exterior walls of buildings.\n\nPainted or treated lumber, paint chips, a potential asbestos containing, or asbestos contaminated items should not be recycled but shall be disposed of properly. No waste material disposal is allowed on Government property.\n\nThe COR designated contractor staging area (TBD after award) will be fully enclosed completely with fencing and fence covering provided by the contractor. The fencing height shall be a minimum of six (6) feet high, with covering, signage and sandbags or plastic temporary fence weights.\n\nExternal Equipment/Motor Protection Filters are to be provided for all air intakes to include but not limited to washer extractors, electronic boxes, mechanical equipment, etc., wherever air intakes are located. These are used as a primary pre-filtration defense to help prevent damage and extensive maintenance that large volumes of lint/debris can cause. They are to fit all air intakes, motors etc. and be made of three-dimensional electrostatic media and encased in a 1/8\"-3/8\" rigid magnetic galvanized steel frame and contain 2 layers of polypropylene media. The media will not shed fibers, absorb moisture, or promote bacterial growth; the filter should be designed for UV protected, and stands up to extreme outdoor or indoor exposure, corrosive chemicals, high velocity air flow, as well as industrial cleaning and maintenance handling.\n\nThe contractor shall supply lock-out/tag-out devices for each piece of equipment. All lock-out/tag-out and Confined Space (CS) locations shall be marked and identified on the machine with instructions on lock-out or CS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air lines, hydraulic, etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air lines etc.\n\nThe contractor shall supply one (1) lock-out and tag-out kit with the lock-out/tag-out devices for each piece of equipment. The kits shall turned over to the COR. All lock-out / tag-out and Permit Required Confined Space (PRCS) locations shall be marked and identified on the machine with instructions on lock-out or PRCS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, steam, condensate, air lines, hydraulic etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air etc.\n\nNumber and nomenclature will separately identify all equipment with no less than two (2) inch numbers and letters. Each piece of equipment will be separately identified and labeled. Example: Hot Water Heater 1, Hot Water Storage Tank etc. The equipment shall be made compatible to meet production requirements specified in the technical specifications.\n\nContractor bears all responsibility for all new utility connections. All new utility piping that has been added shall be leak tested (air, water, steam and condensate).\nConnections to VA supplied utilities shall be within 35 of new equipment supplied and electrical panel identified. Penetrations in floors, walls and ceilings not utilized will be filled with existing floor, wall, and ceiling like material. All braces, pipes (air, gas, water, steam, condensate, electrical), conduit and duct work that will not be utilized shall be removed back to the source that pertains to the equipment directly associated with this RFQ.\n\nThe contractor shall not damage equipment frame, door panels, cylinder, cylinder panels, control box on the Government installation. If the Contractor causes damages to any Government property, the Contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the Contractor fails or refuses to make such repair(s) or replacement(s), the Contractor shall be liable for the cost, which may be deducted from the contract price.\n\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\n\nUtility Shutdowns and hot work permits\n\nContractor shall provide ten (10) calendar days advance notice for any planned utility shutdowns and should be indicated on the project schedule.\nContractor shall follow stations protocol on notice of any hot work permits needed.\n\nThe TCPF will be open during the project. The contractor will have access to the TCPF seven days a week from 7:00 am through 3:30pm. On the weekends there will be a staff member on station to allow entrance and will monitor the contractor while they are on station.\n\nNOTE: With COR approval the contractor may work evenings and/or weekends to accomplish the work required.\n\nBadge Requirements\n\nThe contractor s personnel (including subcontractors) anticipated to be on site for more than two (2) days will need to obtain a PIV badge through the VA COR. [Note: PIV badges require at least 30 days to secure so it would be beneficial for the contractor to start this process immediately.]\n\nSite Visit\n\nThe contractor has the responsibility of visiting the site and examine the the installation area. Failure on the part of the contractor to accomplish a site visit and become thoroughly familiar with all conditions that may affect their quote will be at the contractor s risk.\n\nThe Ft. Harrison TCPF will accommodate site visits as they are requested. The site visits may be on different dates or all on the same date, depending on if/when requests are made by the contractor. The contractor must request a scheduled date to visit the Ft. Harrison TCPF and the COR will determine if the requested date is available. Site visit requests shall be made by contacting.\n\nExemption Certificate\nThe COR will provide a valid certificate of exemption for the State of Montana sales and use tax to the Contractor.\n\nGeneral Installation Requirements\nExisting utilities shall be utilized to meet the performance requirements of the technical specifications. Connection points for all equipment shall be within 35 of new equipment. When existing service lines require demolition, they shall be removed back to the source.\n\nThe contractor shall ensure maximum utilization of existing equipment space to prevent additional plumbing, electrical or other utilities.\n\nShould additional utilities be required for the equipment, these utilities shall be the responsibility of the contractor. Utilities are electric, water, steam, condensate and air lines.\n\nAll exposed utility/ductwork/piping systems, control boxes and motors that are exposed to floor traffic shall be appropriately guarded and protected.\n\nEquipment and materials shall be suitable for installation in available space, arranged for safe, efficient, and convenient operation and maintenance, and if applicable with referenced specifications to include a summary of routine preventative maintenance for each piece of equipment.\n\nThe contractor shall furnish all labor and materials necessary for storage and installation of new equipment. Installation shall include, but is not limited to:\nAll mounting holes shall be utilized for anchoring equipment. Secure mounts shall be laid out in advance for review and approval by the COR.\n\nAny and all penetrations of walls, ceilings and floors for the installation or removal of electrical conduit, pipes, ductwork, liquid supply lines, communication wiring, etc. shall be sealed with an approved fire-retardant material (not foam) and shall match existing materials on both sides of the penetration.\n\nContractor is to supply new utility connections (i.e., wall/ceiling mounts, junction boxes, raceways, and conduits).\n\nThe contractor shall be responsible for all control wiring including disconnects interconnections, and conduit. Interconnecting consists of all control wiring, all ductwork, interconnecting pieces of equipment and outside vents, all airlines, and all connections from VA supplied utilities.\n\nAll installation and/or modifications of utilities and structures, shall match existing materials. No wooden platforms allowed.\n\nAll pipes, vents, drains, electrical boxes, ductwork, and conduit shall be new.\n\nAll pipes and ductwork shall be insulated. All conduits and air pipes shall not be painted. All vents and drains shall be painted, (REFER TO THE TABLE BELOW FOR COLORS). All insulation shall be wrapped with white PVC plastic as indicated below. PVC covering shall be a minimum .030 thickness. Flow markings and identification of all pipes, vents, ductwork, and airlines to equipment shall be appropriately marked with a minimum of two (2) inch letters. Pre-made adhesives are acceptable, spray-painting stencils are not acceptable.\n\nAir Piping:\n(Only identification/flow markings)\nAir Intake Ductwork:\nSafety White PVC (Identification and flow markings)\nLarge Dryer Air Exhaust Ductwork:\nSafety White PVC textured Aluminum (Identification & flow markings)\nSmall Dryer Air Exhaust Ductwork:\nSafety White PVC (Identification & flow markings)\nVent Pipe:\nPainted Flat Black (Identification and flow markings)\nDrain Line:\nPainted Flat Black (Identification and flow markings)\nDomestic Water:\nSafety White PVC (Identification and flow markings)\nFire Suppression Piping:\nPainted Bright Red (Identification and flow markings)\nOutside Exposed Ductwork:\nSealed watertight and weather-proofed to protect from the environment\nAll Conduits:\nNot Painted\nInstallation of piping, sleeves, inserts, hangers, and equipment shall be in accordance with the installation design drawing and shall be sealed by a licensed professional Architect and Engineer, which were previously approved by the COR. In the installation design drawings, the contractor shall locate drains, piping, sleeves, inserts, hangers, and equipment out of the way of windows, doors, openings, light outlets and other services and utilities. All piping shall be installed to comply with accepted national and local plumbing practices. Mechanical or grooved fittings on mechanical piping are acceptable.\n\nIf necessary to drill through structural sections, the contractor shall notify the COR immediately. The COR shall work with a structural engineer to determine proper location. The COR shall instruct contractor on structural location to continue work.\n\nInstall gauges, thermometers, valves, and other mechanical and electrical devices for ease of reading, operating, and maintaining. Servicing shall not require dismantling of adjacent equipment, electric or pipe work.\n\nValve Tags - Furnish and install valve tags on all compressed air, gas, steam, condensate and water valves on equipment and connection points. Tags shall be engraved with identification (gas, air etc.), black filled identification, numbers, and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2-inch round brass disc; tags shall be attached with brass hooks or brass chain.\n\nTrap Tags: Furnish and install all steam trap tags on equipment and connection points of the textile care processing equipment. Tags shall e engraved, black filled numbers and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2 inch round brass disc, tags shall be attached with brass hooks or brass chain.\n\nThe contractor shall provide two (2) valve lists and two (2) steam trap lists on typed plastic-coated cards, sized 8-1/2-inch X 11 inch showing tag number, valve type, valve function and location area of valve for each service or system to the COR.\n\nEquipment, motors, piping, ductwork and any other components or materials shall be protected against physical damage from carts with guardrails supplied by the contractor.\n\nBelts, chains, pulleys, couplings, motor shafts, gears or other moving parts shall be fully guarded in accordance with OSHA 1910.219. Guard parts shall be rigid and suitably secured and be readily removable without disassembling the guarded unit.\nA minimum clearance of 36 inches between moving parts and fixed objects and 24 inches between non-moving parts and fixed objects is required in accordance with OSHA 1910.219. All conveyor rollers shall have roll caps installed and guards will be provided under all conveyors.\n\nPlumbing Requirements\n\nPlumbing\nGrooved or mechanical fittings are allowed on piping.\n\nThe contractor shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). The contractor shall only use cast steel or forged steel fittings and components, in accordance with applicable VA Master Specifications found at https://www.cfm.va.gov/til/spec.asp\n\nTraps\nThe contractor shall provide traps on all sanitary branch waste\nconnections from fixtures or equipment not provided with traps. Exposed brass shall be polished brass chromium plated with nipple and set screw escutcheons. Concealed traps may be rough cast brass. Slip joints are not permitted on sewer side of trap. Traps shall correspond to fittings on cast iron soil pipe or steel pipe respectively, and size shall be as required by connected service or fixture.\n\nPlumbing Installation\nIn accordance with the National Standard Plumbing Code, 2021 Edition.\nPipe saddles shall be installed on the outside of all insulation and PVC coverings.\n\nEscutcheons shall be installed at all floors, wall and ceiling locations that pipe, conduits, vents and ductwork penetrate.\n\nPipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to full size after cutting.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall valves with stem in horizontal position whenever possible. All valves shall be easily accessible.\n\nPiping shall conform to the following:\n\nWaste, Storm Water Drain and Vent: Drain to main stack as follows:\n\nPipe Size Minimum Pitch\n3 inch and smaller 1/4 inch to the foot\n4 inch and larger 1/8 inch to the foot\n\nExhaust Vent\nExtend exhaust vents separately through roof. Sanitary vents shall not connect to exhaust vents.\n\nInsulation Requirements\nUnless specified in other sections of the Technical Specifications, cellular glass insulation is required for hot water piping. A minimum 1.5 inches thick for hot water is required. All Insulation on piping and equipment shall be terminated square at items not to be insulated, access openings and nameplates. Cover all exposed raw insulation with sealer or jacket material that does match the color of the insulation.\nWater Piping\nInterior domestic water piping shall be copper tube, type L drawn per ASTM B88. Fittings for copper tube must be wrought copper or bronze castings conforming to ANSI B16.18 and B16.22. Unions shall be bronze in accordance with federal specification WW-U-516 with solder or braze joints including adapters for joining screwed pipe to copper tubing.\nAir Piping\nInterior to the building and outdoor external air piping shall be copper tube.\n\nAll piping shall be installed parallel to walls and column centerlines. Pipe shall be round and straight. Cutting shall be done with proper tools. Except for plastic and glass, pipe shall be reamed to full size after cutting. Copper piping work shall be performed in accordance with best practices requiring accurately cut clean joints and soldering in accordance with the recommended practices for the material and solder employed.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall ball valves in horizontal position. All valves shall be easily accessible.\n\nPipe saddles shall be on the outside of all insulation and PVC coverings.\n\nPipe escutcheons will be used for all pipe penetrations through walls, floors, and ceilings.\n\nElectrical Requirements\n\nElectrical\nElectrical Installation\nConduits, Fittings, and Electrical Wire\n\nAll electrical installations shall conform to requirements of the National Electrical Code (NEC).\n\nInstall a new power disconnect box for each piece of equipment.\n\nAll electrical wire shall be copper, heat resistant grade, thermoplastic insulated. Control wiring shall be (stranded) Thermoplastic High Heat Nylon (THHN)/Thermoplastic Heat and Water-Resistant Nylon (THWN) or equal. Intermediate wall conduit is required. Provide conduit trapeze hangers.\n\nAll power wiring shall have a minimum conduit size of 3/4-inch in diameter. Color coding of all wiring shall be in accordance with established NFPA 70.\n\nAll low voltage communication wire used for data management systems, liquid supply systems and intercoms shall be installed in minimum 3/4-inch diameter protective conduit. Wire nuts shall not be used for any connections.\nElectrical Wiring Installation\nIn accordance with NFPA 79 Electrical Standard for Industrial Machinery 2021 edition:\nWiring shall not be cut, abraded, nor have excessive insulation stripped, and shall be properly and tightly joined at terminals.\n\nWire nuts shall not be used, and solderless connectors shall have insulation grip. Wiring shall have adequate slack to provide strain relief. Wire nuts are only acceptable for electrical installation of motors and terminal boxes.\n\nWiring shall be provided between motors, controllers, timers, pushbuttons, starters, and limit switches installed on or within the equipment and shall be done with materials as applicable, except liquid tight flexible conduit shall be used where required for belt adjustment by moving a motor or for vibration isolation.\n\nAll wiring shall terminate in connection boxes with provisions for connections beyond the machine; each conductor shall be identified by a different color.\n\nthe line voltage side of the work is a single point demo and termination to a prewired control cabinet.\nElectrical Identification Installation\nIn accordance with NFPA 79 Electrical Standard for Industrial Machinery 2021 edition:\n\nInstall nameplates - center on device, cover plate, or enclosure.\nUse power source designations defined in the Technical Specifications. Indicate electrical power loads served using designations from electrical schedules and designations from the appropriate trade furnishing the equipment served.\n\nLettering shall include name of equipment, the specific unit number, and any reference to ON/OFF or other instructions that are applicable.\n\nAll labeling shall be on laminated phenolic nameplates and shall be placed on equipment.\n\nNameplates shall be laminated phenolic with a Blue surface (480 Volts)/Black surface (208 Volts) and white core. Use 1/16-inch thick material for plates up to 2 inch X 4 inch. For larger sizes, use 1/8-inch thick material.\n\nThe contractor shall mark all 4-plex outlets and boxes with the electrical panel, circuit, and branch identification.\nElectrical Protection\nThe contractor shall provide any protective methodology or devices necessary to protect the equipment from:\nDamage due to electrical power problems, including brownouts, emergency power interruptions, electrical surges, sags, and electrical storms.\n\nAny equipment located outside the building or on the roof shall have lightning protection installed.\n\nData loss due to electrical power problems. All equipment electronics shall be protected with a power monitor hook-up point and power monitor.\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\nUninterrupted Power Supply (UPS) shall be installed for all equipment supplied. (Minimum 2-hour back-up).\nElectrical Receptacles and Outlets\nReceptacles shall be Underwriters Laboratories certified.\nMounting screws, mounting strap and terminal screws shall be brass or a copper alloy metal.\nReceptacles shall have provisions for back wiring from four (minimum) separate wiring holes and side wiring from four captivity held binding screws.\n\nGround Fault Interrupter (GFI) four-plex receptacles shall be single phase, 20 ampere, 120 volts, 2-pole, 3-wire, US National Electrical Manufacturers Association (NEMA) 5-2OR.\n\nThe duplex type receptacles shall have break-off feature for two circuit operation. The ungrounded pole of each receptacle shall be provided with a separate terminal.\n\nThe receptacle bodies shall be white in color.\n\nFour-plex receptacles with GFI shall be an integral unit suitable for mounting in a standard outlet box.\n\nGFI shall consist of a differential current transformer, solid state sensing circuitry and a circuit interrupter switch and shall be rated for operation on a 160 Hz, 120-volt, 20 ampere branch circuit. The device shall have nominal sensitivity to ground leakage current of five (5) milliamperes and shall function to interrupt the current supply for any value of ground leakage current above five (5) milliamperes on the load side of the device. The device shall have a minimum nominal tripping time of 1/30th of a second.\n\nReceptacles 20, 30 and 50 ampere, 250 volt: Shall be complete with appropriate cord grip plug.\nWeatherproof Receptacles\nShall consist of a duplex receptacle, mounted in box with gasket, weatherproof, cast metal cover plate and cap over each receptacle opening. The cap shall be permanently attached to the cover plate by a spring hinged flap. The weatherproof integrity shall not be affected when heavy duty specification or hospital grade attachment plug caps are inserted. Cover plates on outlet boxes mounted flush in the wall shall be gasket to the wall in a watertight manner.\n\nWall Plates\nWall plates for switches and receptacles shall be as specified by the COR. Oversize plates will not be acceptable.\nWall Plate color shall be white.\n\nStandard NEMA design, so that products of different manufacturers must be interchangeable.\n\nFor receptacles or switches mounted adjacent to each other, wall plates shall be common for each group of receptacles or switches.\n\nThe contractor shall provide 4-Plex receptacle at each equipment location for mechanic s use.\n\nMarking Pen Labeling\nUse for all junction and outlet boxes or portions of junction boxes with power wiring, communication systems, pull and junction boxes, and conduit installed for future use. For all boxes with power wiring, indicate appropriate panel and circuit number(s) where applicable, etc. Label inside covers in finished areas and outside covers in unfinished areas. Labeling shall be completed using permanent, waterproof, quick drying marking pen.\n\nLabel Tapes\nLabel each conductor at origin and destination points and at all junction boxes where two or more feeder or control circuits are present. Identify with branch circuit or feeder number for power and lighting circuits, and with control conductors, number as indicated on schematic and interconnection diagrams or equipment manufacturer's drawings for control wiring. Using cloth, plastic, split sleeve or tubing type wire and cable label markers.\n\nDielectric Fittings\nProvide dielectric couplings or unions between ferrous and non-ferrous pipe. In addition, Provide threaded dielectric unions for pipe sizes 2 inches and under. For 2-1/2 inches and above, provide copper and steel flanges electrically isolated at gasket and by sleeves at bolts. Fittings on cold water and soft water lines shall be rated for 100 psi, 80 degrees F. Fittings on other services shall be rated for the maximum pressure and temperature conditions of the service. Where copper piping is connected to steel piping, provide dielectric connections.\n\nPrefabricated Roof Curbs\nGalvanized steel or extruded aluminum 12 inches overall height, continuous welded corner seams, treated wood nailer, 1-1/2 inch thick, 3-pound density rigid mineral fiberboard insulation with metal liner, and built-in curved cantilever strip. Provide raised cantilever strip (recessed mounting flange) to start at the upper surface of the insulation. Curbs shall be constructed for pitched roof or ridge mounting as required to keep top of curb level.\n\nInstallation Requirements\nApproval for the contractor to proceed with installation shall be contingent upon the acceptance of the design submittals and written notification to proceed with installation from the COR.\n\nThe contractor shall be responsible for the determination of, and compliance with, federal, state, and local code requirements, design data, and other factors necessary to design and install the system.\n\nThe contractor shall verify the location of extant utilities. Contractor shall connect to designated utilities in a manner conforming to a nationally recognized code and at a time satisfactory to minimize or preclude disruption to existing functions or clinical services.\n\nThe contractor shall be responsible for installation, which consists of assembling, positioning, and mounting of all equipment and connections of all cables. The contractor is responsible for furnishing and pulling all interconnecting wiring and cabling, including wiring, and cabling to be pulled through conduit and raceways. It is the responsibility of the contractor to supply and install junction boxes; wall/ceiling mounts and support structures.\n\nThe contractor shall provide certified field engineers or technicians to conduct all necessary tests during installation. Contractor shall provide copies of the certifications upon Government request.\n\nThe contractor shall inform the CO and COR of any problems as they occur in connection with installation, or issues which will affect optimum performance shall be reported prior to the start of installation. Installation shall not proceed under such circumstances until authorized by the CO.\nAvailability of Parts and Service\nThe Quoter shall guarantee the contractor availability of servicing and replacement parts for a period of ten (10) years to the government for the laundry equipment being procured under this RFQ.\n\nIncorporation of Documents\nThe following documents are hereby incorporated by reference and made a part of this RFQ.\nThe equipment and installation supplies shall conform to the following standards:\nAir Moving and Conditioning Association, Inc. (AMCA) Standards, 2009 Edition.\nAmerican National Standards Institute (ANSI), 2021 Edition. Z8.1-2006 Safety Requirements for Commercial Laundry and Dry Cleaning Operations.\nFEMP: Federal Energy Management Program (Energy efficient product rating).\nHVAC Duct Construction Standards-Metal & Flexible.\nNational Electrical Manufacturers Association (NEMA), 2021 Edition.\nNational Fire Protection Association (NFPA), 2021 Edition. ALL NFPA Standards and codes. National Electrical Code (NEC), 2020 Edition.\nNational Standard Plumbing Code, 2021 Edition.\nOccupational Safety and Health Administration (OSHA) 29 CFR 1910.\nSheet Metal and Air Conditioning Contractors National Association (SMACNA), 2021 Edition.\nSheet Metal Contractors National Association Inc. Publication, 2019 Edition.\nUnderwriters Laboratories Standards, 2022 Edition.\nCity, County, State, Federal, VA and National Environmental, Fire and Safety Regulations/Standards.","html":"Sources Sought Notice   Medical Waste Sterilizing Autoclave\nDISCLAIMER\nThis RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.\nResponse Instructions:\nDo not provide more than 8 pages, including cover letter page.\nSubmit your response via email to: barron.long@va.gov\nSubmit your response NLT 14:00 (MST) on Friday February 7th\nMark your response as  Proprietary Information  if the information is considered business sensitive.\nVA has identified the appropriate North American Industry Classification System (NAICS) Code 332420 - Autoclaves, industrial-type, heavy gauge metal, manufacturing with a Small Business size of 750 employees.  Please identify and explain any NAICS codes your company believes would better represent the predominated work included in the attached Statement of Work draft / Salient Characteristics List;\n\nInformation Requested from Industry:\n\nIn response to the Sources Sought, interested Contractors shall submit the following information and any Capabilities/Qualifications Statement to include but not limited to an overview of proposed solution(s) and a description of the product your company possesses accordance with the Statement of Work draft / Salient Characteristics List.\n\n\nVendor Name:\n\nSAM UEI #:\n\nName of Manufacturer:\n\nManufacturer Address:\n\nEstimated Delivery Time:\n\nSAC FSS contract number\n\nVendor Point of Contract (POC) Name\n\nPOC Phone Number:\n\nPOC Email Address:\n\n\n\n\n\nSTATEMENT OF WORK\n\n\n\nINTRODUCTION:\nThe autoclave shall be delivered within 120 calendar days after the effective date of the contract. Delivery dates specified may be adjusted by the CO to coincide with the date the TCPF will be ready to receive installation. The CO will advise the contractor of the new delivery date at least 45 days prior to the original or adjusted delivery date(s). Deliveries, cranes, or haulage will be arranged with the Contracting Officer Representative (COR), as to NOT interfere with day-to-day ancillary VA Medical services such as nutrition/food service, laundry delivery, maintenance routes, etc. \n\nThe autoclave shall be delivered within 120 days after the effective award date. Installation of the autoclave shall take place no more than 30 days after the delivery date. The 2 days onsite shakedown and 1-day onsite training are included in the installation timeframe. Training shall consist of both operator and maintenance personnel at a minimum.Â TrainingsÂ shall not to be conducted concurrently. The total contract duration is 150 days.\n\nNote: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.\n\nSite Specific Project Requirements\nThe contractor shall furnish the supervision, labor, equipment, tools, safety, rigging, hoisting, supplies and installation services necessary to meet the terms and conditions in accordance with the Statement of Work (SOW).\n\nThis SOW includes removal of trade-in equipment, delivery, installation, and training of the new laundry equipment installed. The equipment and installation shall be conducted in conformance with the SOW and Technical Specifications provided herein. All items provided by the contractor shall be new. The contractor shall not utilize any refurbished equipment, machinery, or parts.\n\nThe autoclave is to be located within Building 154, near the waste removal area.\n\nWithin the new design layout of the autoclave area, the contractor shall relocate existing lighting fixtures, and provide new energy-efficient, light-emitting diode (LED) lighting for any new workstation or storage area. New lighting shall comply with VA Lighting Design Guide, January 2022; and shall be 50 foot-candles (minimum) measured 30-inches above floor for workstation task areas, and 35 foot-candles (minimum) for storage areas.\n\nAll valves within the layout of the autoclave and equipment shall be ball valves with the appropriate ratings and that are part of the scope of work within this RFQ.\n\nAll old piping, drain piping, ductwork, vents, hangers, and water piping associated with equipment shall be removed.\n\nAll piping, water, steam, condensate, and air will be new and originate from the nearest header within 35  of the new autoclave and electrical for the new equipment will originate from the electrical panel identified by the station. All piping, water, conduit, steam, condensate, and air lines within this RFQ shall be new.\n\nWaste Material Sorting/Recycling\nThe contractor shall divert discarded items and other wastes to recycling trash disposal scheduled regularly. Items which need to be sent for recycling or resale unless not feasible include pallets, metals (iron, copper, brass, etc.) cardboard, mercury items, used oil, electronic, rechargeable batteries, wood products and debris. \n\nThe contractor shall not store waste materials and items held for recycling. Waste materials shall be stored prior to pick up in a manner that does not allow the items to become a fire, health, environmental or safety hazard or provide harborage for pests and consistent with federal, state and VA (listed in order of preference) laws and regulations governing storage of waste materials. Actions include using drip drains pans, storing liquid wastes or items that rot in closed containers, removing Freon from junked air conditioning, observing Occupational Safety and Health Administration (OSHA) and National Fire Protection Association (NFPA) limits on sizes of piles of lumber or wood products. Dumpsters larger than one and one-half (1 Â½) cubic yards in size must be located at least ten (10) feet from exterior walls of buildings.\n\nPainted or treated lumber, paint chips, a potential asbestos containing, or asbestos contaminated items should not be recycled but shall be disposed of properly. No waste material disposal is allowed on Government property.\n\nThe COR designated contractor staging area (TBD after award) will be fully enclosed completely with fencing and fence covering provided by the contractor. The fencing height shall be a minimum of six (6) feet high, with covering, signage and sandbags or plastic temporary fence weights.\n\nExternal Equipment/Motor Protection Filters are to be provided for all air intakes to include but not limited to washer extractors, electronic boxes, mechanical equipment, etc., wherever air intakes are located. These are used as a primary pre-filtration defense to help prevent damage and extensive maintenance that large volumes of lint/debris can cause. They are to fit all air intakes, motors etc. and be made of three-dimensional electrostatic media and encased in a 1/8\"-3/8\" rigid magnetic galvanized steel frame and contain 2 layers of polypropylene media. The media will not shed fibers, absorb moisture, or promote bacterial growth; the filter should be designed for UV protected, and stands up to extreme outdoor or indoor exposure, corrosive chemicals, high velocity air flow, as well as industrial cleaning and maintenance handling.\n\nThe contractor shall supply lock-out/tag-out devices for each piece of equipment. All lock-out/tag-out and Confined Space (CS) locations shall be marked and identified on the machine with instructions on lock-out or CS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, air lines, hydraulic, etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air lines etc.\n\nThe contractor shall supply one (1) lock-out and tag-out kit with the lock-out/tag-out devices for each piece of equipment. The kits shall turned over to the COR. All lock-out / tag-out and Permit Required Confined Space (PRCS) locations shall be marked and identified on the machine with instructions on lock-out or PRCS procedures for the equipment. These instructions/procedures shall be permanently mounted on each piece of equipment. Lock-out/tag-out procedures include all sources of stored energy, including but not limited to: electrical, gas, water, steam, condensate, air lines, hydraulic etc. Relief valves shall be installed for lock-out/tag-out locations to relieve residual air etc.\n\nNumber and nomenclature will separately identify all equipment with no less than two (2) inch numbers and letters. Each piece of equipment will be separately identified and labeled. Example:  Hot Water Heater 1, Hot Water Storage Tank etc. The equipment shall be made compatible to meet production requirements specified in the technical specifications.\n\nContractor bears all responsibility for all new utility connections. All new utility piping that has been added shall be leak tested (air, water, steam and condensate). \nConnections to VA supplied utilities shall be within 35  of new equipment supplied and electrical panel identified. Penetrations in floors, walls and ceilings not utilized will be filled with existing floor, wall, and ceiling like material. All braces, pipes (air, gas, water, steam, condensate, electrical), conduit and duct work that will not be utilized shall be removed back to the source that pertains to the equipment directly associated with this RFQ. \n\nThe contractor shall not damage equipment frame, door panels, cylinder, cylinder panels, control box on the Government installation. If the Contractor causes damages to any Government property, the Contractor shall replace or repair the damage at no expense to the Government as the CO directs. If the Contractor fails or refuses to make such repair(s) or replacement(s), the Contractor shall be liable for the cost, which may be deducted from the contract price.\n\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\n\nUtility Shutdowns and hot work permits\n\nContractor shall provide ten (10) calendar days  advance notice for any planned utility shutdowns and should be indicated on the project schedule.\nContractor shall follow stations protocol on notice of any hot work permits needed.\n\nThe TCPF will be open during the project. The contractor will have access to the TCPF seven days a week from 7:00 am through 3:30pm. On the weekends there will be a staff member on station to allow entrance and will monitor the contractor while they are on station. \n\nNOTE: With COR approval the contractor may work evenings and/or weekends to accomplish the work required.\n\nBadge Requirements\n\nThe contractor s personnel (including subcontractors) anticipated to be on site for more than two (2) days will need to obtain a PIV badge through the VA COR. [Note: PIV badges require at least 30 days to secure so it would be beneficial for the contractor to start this process immediately.] \n\nSite Visit\n\nThe contractor has the responsibility of visiting the site and examine the the installation area. Failure on the part of the contractor to accomplish a site visit and become thoroughly familiar with all conditions that may affect their quote will be at the contractor s risk. \n\nThe Ft. Harrison TCPF will accommodate site visits as they are requested. The site visits may be on different dates or all on the same date, depending on if/when requests are made by the contractor. The contractor must request a scheduled date to visit the Ft. Harrison TCPF and the COR will determine if the requested date is available. Site visit requests shall be made by contacting.\n\nExemption Certificate\nThe COR will provide a valid certificate of exemption for the State of Montana sales and use tax to the Contractor.\n\nGeneral Installation Requirements\nExisting utilities shall be utilized to meet the performance requirements of the technical specifications. Connection points for all equipment shall be within 35  of new equipment. When existing service lines require demolition, they shall be removed back to the source.\n\nThe contractor shall ensure maximum utilization of existing equipment space to prevent additional plumbing, electrical or other utilities.\n\nShould additional utilities be required for the equipment, these utilities shall be the responsibility of the contractor. Utilities are electric, water, steam, condensate and air lines.\n\nAll exposed utility/ductwork/piping systems, control boxes and motors that are exposed to floor traffic shall be appropriately guarded and protected.\n\nEquipment and materials shall be suitable for installation in available space, arranged for safe, efficient, and convenient operation and maintenance, and if applicable with referenced specifications to include a summary of routine preventative maintenance for each piece of equipment.\n\nThe contractor shall furnish all labor and materials necessary for storage and installation of new equipment. Installation shall include, but is not limited to:\nAll mounting holes shall be utilized for anchoring equipment. Secure mounts shall be laid out in advance for review and approval by the COR.\n\nAny and all penetrations of walls, ceilings and floors for the installation or removal of electrical conduit, pipes, ductwork, liquid supply lines, communication wiring, etc. shall be sealed with an approved fire-retardant material (not foam) and shall match existing materials on both sides of the penetration. \n\nContractor is to supply new utility connections (i.e., wall/ceiling mounts, junction boxes, raceways, and conduits).\n\nThe contractor shall be responsible for all control wiring including disconnects interconnections, and conduit. Interconnecting consists of all control wiring, all ductwork, interconnecting pieces of equipment and outside vents, all airlines, and all connections from VA supplied utilities.\n\nAll installation and/or modifications of utilities and structures, shall match existing materials. No wooden platforms allowed.\n\nAll pipes, vents, drains, electrical boxes, ductwork, and conduit shall be new. \n\nAll pipes and ductwork shall be insulated. All conduits and air pipes shall not be painted. All vents and drains shall be painted, (REFER TO THE TABLE BELOW FOR COLORS). All insulation shall be wrapped with white PVC plastic as indicated below. PVC covering shall be a minimum .030  thickness. Flow markings and identification of all pipes, vents, ductwork, and airlines to equipment shall be appropriately marked with a minimum of two (2) inch letters. Pre-made adhesives are acceptable, spray-painting stencils are not acceptable. \n\nAir Piping:\n(Only identification/flow markings)\nAir Intake Ductwork:\nSafety White PVC (Identification and flow markings)\nLarge Dryer Air Exhaust Ductwork: \nSafety White PVC textured Aluminum (Identification & flow markings)\nSmall Dryer Air Exhaust Ductwork:\nSafety White PVC (Identification & flow markings)\nVent Pipe:\nPainted Flat Black (Identification and flow markings)\nDrain Line:\nPainted Flat Black (Identification and flow markings)\nDomestic Water:\nSafety White PVC (Identification and flow markings)\nFire Suppression Piping:\nPainted Bright Red (Identification and flow markings)\nOutside Exposed Ductwork:\nSealed watertight and weather-proofed to protect from the environment\nAll Conduits:\nNot Painted\nInstallation of piping, sleeves, inserts, hangers, and equipment shall be in accordance with the installation design drawing and shall be sealed by a licensed professional Architect and Engineer, which were previously approved by the COR. In the installation design drawings, the contractor shall locate drains, piping, sleeves, inserts, hangers, and equipment out of the way of windows, doors, openings, light outlets and other services and utilities. All piping shall be installed to comply with accepted national and local plumbing practices. Mechanical or grooved fittings on mechanical piping are acceptable.\n\nIf necessary to drill through structural sections, the contractor shall notify the COR immediately. The COR shall work with a structural engineer to determine proper location. The COR shall instruct contractor on structural location to continue work.\n\nInstall gauges, thermometers, valves, and other mechanical and electrical devices for ease of reading, operating, and maintaining. Servicing shall not require dismantling of adjacent equipment, electric or pipe work.\n\nValve Tags - Furnish and install valve tags on all compressed air, gas, steam, condensate and water valves on equipment and connection points. Tags shall be engraved with identification (gas, air etc.), black filled identification, numbers, and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2-inch round brass disc; tags shall be attached with brass hooks or brass chain.\n\nTrap Tags: Furnish and install all steam trap tags on equipment and connection points of the textile care processing equipment. Tags shall e engraved, black filled numbers and letters not less than Â½ inch high for number designation and not less than Â¼ inch for service designation on 19 gauge 1-1/2 inch round brass disc, tags shall be attached with brass hooks or brass chain.\n\nThe contractor shall provide two (2) valve lists and two (2) steam trap lists on typed plastic-coated cards, sized 8-1/2-inch X 11 inch showing tag number, valve type, valve function and location area of valve for each service or system to the COR.\n\nEquipment, motors, piping, ductwork and any other components or materials shall be protected against physical damage from carts with guardrails supplied by the contractor.\n\nBelts, chains, pulleys, couplings, motor shafts, gears or other moving parts shall be fully guarded in accordance with OSHA 1910.219. Guard parts shall be rigid and suitably secured and be readily removable without disassembling the guarded unit.\nA minimum clearance of 36 inches between moving parts and fixed objects and 24 inches between non-moving parts and fixed objects is required in accordance with OSHA 1910.219.  All conveyor rollers shall have roll caps installed and guards will be provided under all conveyors.\n\nPlumbing Requirements\n\nPlumbing\nGrooved or mechanical fittings are allowed on piping.\n\nThe contractor shall not use cast iron fittings, and components or malleable/ductile fittings anywhere in the high-pressure and medium pressure steam system (15 psi or above). The contractor shall only use cast steel or forged steel fittings and components, in accordance with applicable VA Master Specifications found at https://www.cfm.va.gov/til/spec.asp\n\nTraps\nThe contractor shall provide traps on all sanitary branch waste \nconnections from fixtures or equipment not provided with traps. Exposed brass shall be polished brass chromium plated with nipple and set screw escutcheons. Concealed traps may be rough cast brass. Slip joints are not permitted on sewer side of trap. Traps shall correspond to fittings on cast iron soil pipe or steel pipe respectively, and size shall be as required by connected service or fixture.\n\nPlumbing Installation\nIn accordance with the National Standard Plumbing Code, 2021 Edition.\nPipe saddles shall be installed on the outside of all insulation and PVC coverings.\n\nEscutcheons shall be installed at all floors, wall and ceiling locations that pipe, conduits, vents and ductwork penetrate.\n\nPipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to full size after cutting.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall valves with stem in horizontal position whenever possible. All valves shall be easily accessible.\n\nPiping shall conform to the following:\n\nWaste, Storm Water Drain and Vent:  Drain to main stack as follows:\n\nPipe Size                     Minimum Pitch\n3 inch and smaller  1/4 inch to the foot\n4 inch and larger             1/8 inch to the foot\n\nExhaust Vent\nExtend exhaust vents separately through roof. Sanitary vents shall not connect to exhaust vents.\n\nInsulation Requirements\nUnless specified in other sections of the Technical Specifications, cellular glass insulation is required for hot water piping. A minimum 1.5 inches thick for hot water is required. All Insulation on piping and equipment shall be terminated square at items not to be insulated, access openings and nameplates. Cover all exposed raw insulation with sealer or jacket material that does match the color of the insulation.\nWater Piping\nInterior domestic water piping shall be copper tube, type L drawn per ASTM B88. Fittings for copper tube must be wrought copper or bronze castings conforming to ANSI B16.18 and B16.22. Unions shall be bronze in accordance with federal specification WW-U-516 with solder or braze joints including adapters for joining screwed pipe to copper tubing.\nAir Piping \nInterior to the building and outdoor external air piping shall be copper tube.\n\nAll piping shall be installed parallel to walls and column centerlines. Pipe shall be round and straight. Cutting shall be done with proper tools. Except for plastic and glass, pipe shall be reamed to full size after cutting. Copper piping work shall be performed in accordance with best practices requiring accurately cut clean joints and soldering in accordance with the recommended practices for the material and solder employed.\n\nAll pipe runs shall be laid out to avoid interference with other work.\n\nInstall ball valves in horizontal position. All valves shall be easily accessible.\n\nPipe saddles shall be on the outside of all insulation and PVC coverings.\n\nPipe escutcheons will be used for all pipe penetrations through walls, floors, and ceilings.\n\nElectrical Requirements\n\nElectrical\nElectrical Installation\nConduits, Fittings, and Electrical Wire\n\nAll electrical installations shall conform to requirements of the National Electrical Code (NEC).\n\nInstall a new power disconnect box for each piece of equipment.\n\nAll electrical wire shall be copper, heat resistant grade, thermoplastic insulated. Control wiring shall be (stranded) Thermoplastic High Heat Nylon (THHN)/Thermoplastic Heat and Water-Resistant Nylon (THWN) or equal. Intermediate wall conduit is required. Provide conduit trapeze hangers.\n\nAll power wiring shall have a minimum conduit size of 3/4-inch in diameter. Color coding of all wiring shall be in accordance with established NFPA 70. \n\nAll low voltage communication wire used for data management systems, liquid supply systems and intercoms shall be installed in minimum 3/4-inch diameter protective conduit. Wire nuts shall not be used for any connections.\nElectrical Wiring Installation\nIn accordance with NFPA 79   Electrical Standard for Industrial Machinery 2021 edition:\nWiring shall not be cut, abraded, nor have excessive insulation stripped, and shall be properly and tightly joined at terminals.\n\nWire nuts shall not be used, and solderless connectors shall have insulation grip. Wiring shall have adequate slack to provide strain relief. Wire nuts are only acceptable for electrical installation of motors and terminal boxes.\n\nWiring shall be provided between motors, controllers, timers, pushbuttons, starters, and limit switches installed on or within the equipment and shall be done with materials as applicable, except liquid tight flexible conduit shall be used where required for belt adjustment by moving a motor or for vibration isolation.\n\nAll wiring shall terminate in connection boxes with provisions for connections beyond the machine; each conductor shall be identified by a different color.\n\nthe line voltage side of the work is a single point demo and termination to a prewired control cabinet.\nElectrical Identification Installation\nIn accordance with NFPA 79   Electrical Standard for Industrial Machinery 2021 edition:\n\nInstall nameplates - center on device, cover plate, or enclosure.\nUse power source designations defined in the Technical Specifications. Indicate electrical power loads served using designations from electrical schedules and designations from the appropriate trade furnishing the equipment served.\n\nLettering shall include name of equipment, the specific unit number, and any reference to ON/OFF or other instructions that are applicable.\n\nAll labeling shall be on laminated phenolic nameplates and shall be placed on equipment.\n\nNameplates shall be laminated phenolic with a Blue surface (480 Volts)/Black surface (208 Volts) and white core. Use 1/16-inch thick material for plates up to 2 inch X 4 inch. For larger sizes, use 1/8-inch thick material.\n\nThe contractor shall mark all 4-plex outlets and boxes with the electrical panel, circuit, and branch identification. \nElectrical Protection\nThe contractor shall provide any protective methodology or devices necessary to protect the equipment from:\nDamage due to electrical power problems, including brownouts, emergency power interruptions, electrical surges, sags, and electrical storms.\n\nAny equipment located outside the building or on the roof shall have lightning protection installed.\n\nData loss due to electrical power problems. All equipment electronics shall be protected with a power monitor hook-up point and power monitor.\nExisting equipment that will be re-used shall be protected from damage during installation up to and including removal and replacement where necessary to facilitate installation of new equipment.\nUninterrupted Power Supply (UPS) shall be installed for all equipment supplied. (Minimum 2-hour back-up).\nElectrical Receptacles and Outlets \nReceptacles shall be Underwriters Laboratories certified. \nMounting screws, mounting strap and terminal screws shall be brass or a copper alloy metal.\nReceptacles shall have provisions for back wiring from four (minimum) separate wiring holes and side wiring from four captivity held binding screws.\n\nGround Fault Interrupter (GFI) four-plex receptacles shall be single phase, 20 ampere, 120 volts, 2-pole, 3-wire, US National Electrical Manufacturers Association (NEMA) 5-2OR.\n\nThe duplex type receptacles shall have break-off feature for two circuit operation. The ungrounded pole of each receptacle shall be provided with a separate terminal.\n\nThe receptacle bodies shall be white in color.\n\nFour-plex receptacles with GFI shall be an integral unit suitable for mounting in a standard outlet box.\n\nGFI shall consist of a differential current transformer, solid state sensing circuitry and a circuit interrupter switch and shall be rated for operation on a 160 Hz, 120-volt, 20 ampere branch circuit. The device shall have nominal sensitivity to ground leakage current of five (5) milliamperes and shall function to interrupt the current supply for any value of ground leakage current above five (5) milliamperes on the load side of the device. The device shall have a minimum nominal tripping time of 1/30th of a second.\n\nReceptacles 20, 30 and 50 ampere, 250 volt:  Shall be complete with appropriate cord grip plug.\nWeatherproof Receptacles\nShall consist of a duplex receptacle, mounted in box with gasket, weatherproof, cast metal cover plate and cap over each receptacle opening. The cap shall be permanently attached to the cover plate by a spring hinged flap. The weatherproof integrity shall not be affected when heavy duty specification or hospital grade attachment plug caps are inserted. Cover plates on outlet boxes mounted flush in the wall shall be gasket to the wall in a watertight manner.\n\nWall Plates\nWall plates for switches and receptacles shall be as specified by the COR. Oversize plates will not be acceptable.\nWall Plate color shall be white.\n\nStandard NEMA design, so that products of different manufacturers must be interchangeable.\n\nFor receptacles or switches mounted adjacent to each other, wall plates shall be common for each group of receptacles or switches.\n\nThe contractor shall provide 4-Plex receptacle at each equipment location for mechanic s use.\n\nMarking Pen Labeling\nUse for all junction and outlet boxes or portions of junction boxes with power wiring, communication systems, pull and junction boxes, and conduit installed for future use. For all boxes with power wiring, indicate appropriate panel and circuit number(s) where applicable, etc. Label inside covers in finished areas and outside covers in unfinished areas. Labeling shall be completed using permanent, waterproof, quick drying marking pen.\n\nLabel Tapes\nLabel each conductor at origin and destination points and at all junction boxes where two or more feeder or control circuits are present. Identify with branch circuit or feeder number for power and lighting circuits, and with control conductors, number as indicated on schematic and interconnection diagrams or equipment manufacturer's drawings for control wiring. Using cloth, plastic, split sleeve or tubing type wire and cable label markers.\n\nDielectric Fittings\nProvide dielectric couplings or unions between ferrous and non-ferrous pipe. In addition, Provide threaded dielectric unions for pipe sizes 2 inches and under. For 2-1/2 inches and above, provide copper and steel flanges electrically isolated at gasket and by sleeves at bolts. Fittings on cold water and soft water lines shall be rated for 100 psi, 80 degrees F. Fittings on other services shall be rated for the maximum pressure and temperature conditions of the service. Where copper piping is connected to steel piping, provide dielectric connections.\n\nPrefabricated Roof Curbs\nGalvanized steel or extruded aluminum 12 inches overall height, continuous welded corner seams, treated wood nailer, 1-1/2 inch thick, 3-pound density rigid mineral fiberboard insulation with metal liner, and built-in curved cantilever strip. Provide raised cantilever strip (recessed mounting flange) to start at the upper surface of the insulation. Curbs shall be constructed for pitched roof or ridge mounting as required to keep top of curb level.\n\nInstallation Requirements\nApproval for the contractor to proceed with installation shall be contingent upon the acceptance of the design submittals and written notification to proceed with installation from the COR. \n\nThe contractor shall be responsible for the determination of, and compliance with, federal, state, and local code requirements, design data, and other factors necessary to design and install the system. \n\nThe contractor shall verify the location of extant utilities. Contractor shall connect to designated utilities in a manner conforming to a nationally recognized code and at a time satisfactory to minimize or preclude disruption to existing functions or clinical services. \n\nThe contractor shall be responsible for installation, which consists of assembling, positioning, and mounting of all equipment and connections of all cables. The contractor is responsible for furnishing and pulling all interconnecting wiring and cabling, including wiring, and cabling to be pulled through conduit and raceways. It is the responsibility of the contractor to supply and install junction boxes; wall/ceiling mounts and support structures.\n\nThe contractor shall provide certified field engineers or technicians to conduct all necessary tests during installation. Contractor shall provide copies of the certifications upon Government request. \n\nThe contractor shall inform the CO and COR of any problems as they occur in connection with installation, or issues which will affect optimum performance shall be reported prior to the start of installation. Installation shall not proceed under such circumstances until authorized by the CO.\nAvailability of Parts and Service\nThe Quoter shall guarantee the contractor availability of servicing and replacement parts for a period of ten (10) years to the government for the laundry equipment being procured under this RFQ.\n\nIncorporation of Documents\nThe following documents are hereby incorporated by reference and made a part of this RFQ.\nThe equipment and installation supplies shall conform to the following standards:\nAir Moving and Conditioning Association, Inc. (AMCA) Standards, 2009 Edition.\nAmerican National Standards Institute (ANSI), 2021 Edition. Z8.1-2006 Safety Requirements for Commercial Laundry and Dry Cleaning Operations.\nFEMP: Federal Energy Management Program (Energy efficient product rating).\nHVAC Duct Construction Standards-Metal & Flexible.\nNational Electrical Manufacturers Association (NEMA), 2021 Edition.\nNational Fire Protection Association (NFPA), 2021 Edition. ALL NFPA Standards and codes. National Electrical Code (NEC), 2020 Edition.\nNational Standard Plumbing Code, 2021 Edition.\nOccupational Safety and Health Administration (OSHA) 29 CFR 1910. \nSheet Metal and Air Conditioning Contractors National Association (SMACNA), 2021 Edition.\nSheet Metal Contractors National Association Inc. Publication, 2019 Edition.\nUnderwriters Laboratories Standards, 2022 Edition. \nCity, County, State, Federal, VA and National Environmental, Fire and Safety Regulations/Standards.","origin":"detail"},"contacts":[{"name":"Contract Specialist","role":"primary","email":"barron.long@va.gov","phone":"303-712-5741","title":"Barron Long"}],"place_of_performance":{"zip":"59636","city":{"name":"Fort Harrison"},"state":{"name":"Montana"},"street":"Department of Veterans Affairs Montana VA Medical Center","street2":"3687 Veterans Drive"},"office_address":{"zip":"80111","city":"Greenwood Village","state":"CO","country":"USA"},"naics_codes":["339112"],"award":{"awardee":{}},"attachments":[{"resource_id":"e31f7c9b6dc5461fb03124f93c14fd5b","name":"36C25925Q0183.docx","kind":"file","mime_type":".docx","size_bytes":45676,"posted_at":"2025-01-31T19:32:38.984Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/e31f7c9b6dc5461fb03124f93c14fd5b/download","mirrored":false}],"awards":[],"related":[{"key":"36C25927Q0059","latest_notice_id":"f35da348ba2e440ca3ee5c48608c0559","title":"S208--Linen Processing, 12/15/2026 to 12/14/2031","solicitation_number":"36C25927Q0059","notice_type":"r","first_type":"r","first_posted":"2026-11-25","last_posted":"2026-11-25","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"812320","psc":"S208","set_aside":null,"state":"OK","county":"40101","county_name":"Muskogee County","city":"4050050","city_name":"Muskogee","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"36C25927Q0061","latest_notice_id":"2844a59e27da407db5c5aac404bd35d7","title":"AI tool for Medication Reconciliation and Clinical Review","solicitation_number":"36C25927Q0061","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-19","notices":1,"due_at":"2026-11-30T22:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T22:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"541519","psc":"DA10","set_aside":null,"state":"CO","county":"08077","county_name":"Mesa County","city":"0831660","city_name":"Grand Junction","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25927Q0060","latest_notice_id":"dab1ae13fa4543da8629e3ba28875296","title":"J023-- Transmission Repair/Replacement x2","solicitation_number":"36C25927Q0060","notice_type":"k","first_type":"k","first_posted":"2026-11-16","last_posted":"2026-11-16","notices":1,"due_at":"2026-12-04T17:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T17:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"811111","psc":"J023","set_aside":"SBA","state":"UT","county":"49035","county_name":"Salt Lake County","city":"4967000","city_name":"Salt Lake City","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C25927Q0048","latest_notice_id":"fbc78696b6664ac4b7cf9fa0d88ed616","title":"Radiant Heating Panel Replacement","solicitation_number":"36C25927Q0048","notice_type":"k","first_type":"k","first_posted":"2026-11-04","last_posted":"2026-11-25","notices":4,"due_at":"2026-12-04T19:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"238220","psc":"J045","set_aside":"SBA","state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-26T04:43:42.403930Z"},{"key":"36C25927Q0063","latest_notice_id":"3aec52f34d1346bcb89262decf41e0e9","title":"J045--Annual Boiler Maintenance RMR VAMC","solicitation_number":"36C25927Q0063","notice_type":"r","first_type":"r","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-04T21:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T21:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C259","office_name":"NETWORK CONTRACT OFFICE 19 (36C259)","naics":"238220","psc":"J045","set_aside":null,"state":"CO","county":"08001","county_name":"Adams County","city":"0804000","city_name":"Aurora","country":"USA","place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"}],"similar_open":[{"key":"36C24727Q0119","latest_notice_id":"81776fecabf149c9867d6253acdc2478","title":"Vivarium Tunnel Washer","solicitation_number":"36C24727Q0119","notice_type":"r","first_type":"r","first_posted":"2026-11-19","last_posted":"2026-11-20","notices":2,"due_at":"2026-11-30T13:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T13:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C247","office_name":"247-NETWORK CONTRACT OFFICE 7 (36C247)","naics":"339112","psc":"6640","set_aside":null,"state":"GA","county":"13089","county_name":"DeKalb County","city":"1322052","city_name":"Decatur","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C10X27Q0025","latest_notice_id":"8c404062fbbc4212bb93120ad204ee50","title":"6515--NX EQ Microscope, Light, Operating, Hand/Plastic Surgery (VA-27-00017958)","solicitation_number":"36C10X27Q0025","notice_type":"r","first_type":"r","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-30T15:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T15:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C10X","office_name":"SAC FREDERICK (36C10X)","naics":"339112","psc":"6515","set_aside":null,"state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"nationwide","state_source":null,"state_evidence":"Product purchase (PSC 6515)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"},{"key":"36C26227Q0152","latest_notice_id":"9b6180e4020d4cb29db1bd3cb54509c4","title":"6515--Battery Packs and Wi-Fi Cards","solicitation_number":"36C26227Q0152","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T18:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C262","office_name":"262-NETWORK CONTRACT OFFICE 22 (36C262)","naics":"339112","psc":"6515","set_aside":null,"state":"AZ","county":"04013","county_name":"Maricopa County","city":"0455000","city_name":"Phoenix","country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":14,"indexable":false}