{"canonical":"https://sealedbidder.com/opportunities/36c25226q0504","key":"36C25226Q0504","url":"https://sealedbidder.com/opportunities/36c25226q0504","title":"J061--Generator Maintenance","solicitation_number":"36C25226Q0504","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-06-10T11:00:00Z","first_posted":"2026-06-03","last_posted":"2026-06-03","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238210","psc":"J061","set_aside":null,"place_state":"IL","place_scope":"site","site":null,"place_state_source":"sam_street","place_evidence":"EDWARD HINES, JR. VA HOSPITAL 5000 SOUTH 5TH AVENUE HINES, IL 60141-5000","place_county":null,"place_county_name":null,"place_city":null,"place_city_name":null,"winner":null,"award_amount":null,"publications":[{"notice_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","title":"J061--Generator Maintenance","solicitation_number":"36C25226Q0504","notice_type":"r","base_type":"r","posted":"2026-06-03","posted_at":"2026-06-03T12:30:56.906Z","due_at":"2026-06-10T11:00:00Z","due_date":"2026-06-10","cancelled":false,"archived":true,"archive_date":"2026-06-25","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/b9d09e9d74ca4e779b4ffc70d1bbb043/view","enriched":true,"history":[{"index":3,"title":"J061--Generator Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-03T12:30:56.906Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","solicitation_number":"36C25226Q0504"}]}],"latest_notice_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-06-03","posted_at":"2026-06-03T12:30:56.906Z","created_at":"2026-06-03T12:30:26.590Z","modified_at":"2026-06-26T03:55:45.449Z","response_deadline":{"raw":"2026-06-10T06:00:00-05:00","utc":"2026-06-10T11:00:00Z","date":"2026-06-10","time":"06:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/b9d09e9d74ca4e779b4ffc70d1bbb043/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"J061--Generator Maintenance","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-06-25","archive_type":"auto_custom"},"history":[{"index":3,"title":"J061--Generator Maintenance","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-03T12:30:56.906Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","solicitation_number":"36C25226Q0504"}],"contacts":[{"name":"derrick.paquette@va.gov","role":"primary","email":"Derrick.Paquette@va.gov","phone":"414-844-4800","title":"Derrick Paquette"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","lineage_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T20:35:23.136339698Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"c8712572e694c633a5f65b5d3f5052effc7b62e6abaa3fe79ee044e2e762914c","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T20:35:23.136339698Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Scope of Work \nEdward Hines Jr. VA hospital requires the services of a contractor to perform load bank testing, and maintenance for (20) generators. These generators provide backup power and have a direct impact on patient health and life safety throughout the Hines VA Campus. The Contractor shall furnish all labor, management, materials, equipment to perform preventive maintenance, inspection, calibration, testing and documentation for the generators listed on the equipment listing. \n\nPlace of Performance\nEdward Hines Jr. VA hospital \n5000 S. 5th Avenue, \nHines, Illinois 60141\n\nPeriod of Performance\nBase Year: September 1 ,2026 through August 31,2027\nOption Year 1: September 1, 2027, through August 31, 2028\nOption Year 2: September 1, 2028, through August 31, 2029\nOption Year 3: September 1, 2029, through August 31, 2030\nOption Year 4: September 1, 2030, through August 31, 2031\n\nSchedule\nLoad Bank Testing shall be performed in September\nPreventive Maintenance (PM) Level 1 shall be performed in January.\nPreventive Maintenance (PM) Level 2 shall be performed in July.\nAny deviations from this schedule shall only be made with prior approval from the Contracting Officer Representative (COR)\nDescription of Services\nLoad Bank Testing Specifications:\nThe generators shall be load tested using the following sequence: \nIdle / No-Load Readings. \nBaseline data recorded before applying load. \n30% of Generator Load Rating for 30 minutes\n50% of Generator Load Rating for next 30 minutes\n75% of Generator Load Rating for 60 minutes (1 hour)\n100% of Generator Load Rating for 60 minutes (1 hour)\nPreventive Maintenance - Level 1\nThe Contractor shall perform:\nFuel System\nInspect main tank and day tank for leaks, level, condition\nDrain water traps/separators\nInspect primary/secondary filters; clean primary filter\nCheck governor, controls, linkages, and oil level\nInspect fuel lines, brackets, and connections\nCheck fuel pressure gauge for correct operation\nCooling System\nInspect radiator/heat exchanger (leaks, debris, louvers)\nInspect coolant level and condition; test protection level\nInspect hoses and connections for deterioration\nInspect/lubricate fan pulleys, fan bearings; check clearance\nInspect fan belts (wear, tension)\nInspect jacket water heater and thermostat setting\nInspect water pump for leaks/noise\nAir Induction & Exhaust\nInspect/clean primary & secondary air filters; reset indicators\nInspect air inlet piping, housings, gaskets\nInspect turbocharger (leaks, noise)\nInspect exhaust manifold (hardware, leakage, oil slobber)\nInspect muffler/silencer and piping for damage or corrosion\nLubrication System\nInspect oil level and contamination; inspect for leaks\nCheck oil pressure gauge for correct readings\nInspect pre lube pump\nInspect crankcase breather and hoses\nPerform full oil analysis (wear metals, contaminants, debris)\nStarting System\nInspect batteries (condition, leakage, terminals)\nCheck electrolyte level & specific gravity (if applicable)\nInspect battery charger, wiring, terminals\nInspect starting motor (connections, noise, operation)\nInspect alternator & drive components\nEngine Monitors & Safety Controls\nTest all engine safety devices (oil pressure, coolant temp, overspeed, over crank, etc.)\nTest remote annunciators and local alarm systems\nGenerator & Electrical Components\nRemove and inspect brushes, clean slip rings\nInspect space heaters for proper operation\nInspect control panel (manual/auto start, meters, adjustments)\nVerify voltmeter and ammeter readings\nLaboratory fuel sampling, including but not limited to:\nAccelerated Aging\nSuspended Particulates\nAssociation for Material Protection and Performance (AMPP) Corrosion inspection \nOrganic Material\nWater (suspended content)\nOperational Test Requirements\nCold engine start observation\n30 minute operating run\nMonitoring for leaks, noise, vibration\nVerification of all safety shutdowns\nRecording of: \nAmps\nVolts\nOil pressure\nCoolant temperature\nFuel pressure\nFrequency\nReal power (kW output)\nTiming and functional verification of: \nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer switch (ATS) operation\nRe transfer timing\nRestoration to Service\nDay Tank and Fuel System Functional Testing\nContractor shall conduct operational checks of the day tank, including:\nFloat switch operation\nTransfer pump operation\nSolenoid valve performance (if equipped)\nInspection of all fuel lines, hoses, connectors, and fittings for wear, corrosion, or leaks\nPreventive Maintenance - Level 2\nThe Contractor shall perform:\nFuel System\nInspect main and day tank for leaks and fuel level\nDrain water traps/separators\nInspect fuel lines, fittings, and brackets for leaks or looseness\nInspect governor oil level, linkages, and controls; add oil as needed\nInspect/clean primary and secondary fuel filters\nInspect fuel pressure gauge for correct operation\nInspect fuel condition for contaminants\nCooling System\nInspect radiator/heat exchanger for leaks, debris, damage\nVerify louver operation\nInspect coolant level, rust, oil contamination, top off to maintain serviceable level\nCheck coolant conditioner concentration and freeze/boil protection\nInspect filler cap sealing surfaces and gasket\nInspect hoses for deterioration; tighten connections\nLube and inspect fan-drive bearings and pulleys\nInspect fan belts for wear; adjust tension\nVerify jacket water heater operation and thermostat setting\nInspect water pump for leaks, noise, or malfunction\nAir Induction & Exhaust System\nInspect and clean primary/secondary air filters; reset indicators.\nInspect air inlet piping, housings, seals, and gaskets\nInspect turbocharger for oil or exhaust leakage, check for abnormal noise\nInspect exhaust manifold for leakage, missing hardware, oil slobber\nInspect exhaust muffler and piping for corrosion or damage\nLube Oil System\nProvide a full oil and filter change for all 20 generators during the base year. \nThereafter in the option years, change the oil filter every year and the oil every 250 hours or as needed based on the oil and filter inspection or the manufacturers  requirements. \nInspect oil level and contamination, top off to maintain serviceable level\nInspect generator and engine for leaks\nInspect pre lube pump operation\nInspect gaskets and seals for deterioration\nInspect crankcase breather operation and blow-by condition\nPerform full oil analysis (wear metals, contamination, debris)\nProvide oil analysis results to VA with NFPA acceptable thresholds\nStarting and Charging System\nInspect batteries for damage or leakage; clean/tighten terminals\nCheck battery electrolyte level and specific gravity (if applicable)\nInspect battery charger (operation, wiring, connections)\nInspect starting motor wiring and operation, check for abnormal noise\nInspect alternator condition, voltage output, belts, and pulleys\nEngine Monitors & Safety Controls\nTest all engine safety shutdowns (oil pressure, coolant temp, over crank, overspeed)\nInspect annunciators and remote alarm systems\nCheck gauge accuracy (oil pressure, temperature, alternator)\nGenerator & Mechanical Components\nRemove and inspect brushes; clean slip rings; make adjustments\nLubricate generator rear bearing\nInspect vibration isolators for wear and adjust to manufacturers specifications\nControl Panel & ATS\nTest manual/auto start controls\nVerify correct voltmeter readings (voltage level, gain, drop)\nTest ammeter with baseline load and no load readings\nInspect circuit breakers for tightness and free movement\nInspect ATS mechanical and electrical condition \nOperational Test to include at a minimum:\nCold start observation\n30 minute operating run\nMonitoring for abnormal vibration, leak, noise\nVerification of safety shutdown devices\nDocumenting: \nAmps & volts\nOil pressure\nWater temperature\nFuel pressure\nFrequency\nKilowatt output\nTiming and verification of: \nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer\nLoad return (re transfer)\nGeneral Emergency Power Supply System (EPSS) Condition Assessment\nDuring all PM 2 activities, the Contractor shall assess and document the overall condition of the EPSS including:\nVibration issues\nLeaks (fuel, oil, coolant, exhaust)\nExcessive temperature\nAbnormal noises\nComponent wear, corrosion, or deterioration\nAny condition that may indicate impending failure\nContractor shall restore generator and EPSS to automatic mode\nEnsure all equipment is fully operational\nReports and Documentation \nESR (Engineering Service Report)\nThe ESR shall at a minimum include:\nBuilding Number \nTest Date \nStart Time / Stop Time \nGenerator make, model, serial number\nkW/kVA rating\nFuel type\nHours of operation\nLocation/Building number\nATS identifier (if tested)\nHour Meter Start / Hour Meter Finish \nEngine Oil Pressure\nEngine Water Temperature \nExhaust Gas Temperature (IR, pre turbo) \nFrequency (Hz / cycles) \nVoltage readings \nGenerator Loading (Amperage per phase) \nName and Signature of Technician\nAll completed inspection checklists\nAll measured data and test results\nPhotos or quantifiable evidence before and after repairs, when applicable\nAll identified deficiencies\nList of required and recommended repairs with priority classifications\nItemized cost estimates\nComplete PM 1 test data\nASTM laboratory fuel test results\nOil analysis report\nA complete Load Bank ESR shall be submitted to the COR within 30 days of the test completion. \nThe contractor may create a customized ESR, but it must be approved by COR before implementation\nThe contractor shall document the services rendered on a legible, contractor service report and submit it to the COR for certification (signature) \nA copy of the signed service report must be provided to the COR by the contractor at the time the service is provided. \nIf the COR is unavailable, a signed, authorized copy of the ESR will be sent to the Contractor after the work can be reviewed (if requested or noted on the ESR).\n\nRequirements and Qualifications\nContractor shall have knowledge of and ensure compliance with the current version of the following throughout all performance and reporting requirements.\nVeteran Health Agency Directive 1028\nNFPA 99 and NFPA 110 \nJoint Commission standards \nlocal, state, and federal regulations\nASTM fuel testing standards \nOEM guidance\nVA Engineering policies\nFacility Check In\nUpon arrival at the Edward Hines Jr VA Hospital, the contractor shall be required to report when on-site and when services are completed with assigned shop.\nHours\nThe Contractor will coordinate and schedule all test(s) with Hines VA Engineering Department (1) week Prior to onsite visit. The Contractor is required to perform work and tests during normal work hours, Monday through Friday 7:00 am to 4:00 pm. CST.","text":"Scope of Work\nEdward Hines Jr. VA hospital requires the services of a contractor to perform load bank testing, and maintenance for (20) generators. These generators provide backup power and have a direct impact on patient health and life safety throughout the Hines VA Campus. The Contractor shall furnish all labor, management, materials, equipment to perform preventive maintenance, inspection, calibration, testing and documentation for the generators listed on the equipment listing.\n\nPlace of Performance\nEdward Hines Jr. VA hospital\n5000 S. 5th Avenue,\nHines, Illinois 60141\n\nPeriod of Performance\nBase Year: September 1 ,2026 through August 31,2027\nOption Year 1: September 1, 2027, through August 31, 2028\nOption Year 2: September 1, 2028, through August 31, 2029\nOption Year 3: September 1, 2029, through August 31, 2030\nOption Year 4: September 1, 2030, through August 31, 2031\n\nSchedule\nLoad Bank Testing shall be performed in September\nPreventive Maintenance (PM) Level 1 shall be performed in January.\nPreventive Maintenance (PM) Level 2 shall be performed in July.\nAny deviations from this schedule shall only be made with prior approval from the Contracting Officer Representative (COR)\nDescription of Services\nLoad Bank Testing Specifications:\nThe generators shall be load tested using the following sequence:\nIdle / No-Load Readings.\nBaseline data recorded before applying load.\n30% of Generator Load Rating for 30 minutes\n50% of Generator Load Rating for next 30 minutes\n75% of Generator Load Rating for 60 minutes (1 hour)\n100% of Generator Load Rating for 60 minutes (1 hour)\nPreventive Maintenance - Level 1\nThe Contractor shall perform:\nFuel System\nInspect main tank and day tank for leaks, level, condition\nDrain water traps/separators\nInspect primary/secondary filters; clean primary filter\nCheck governor, controls, linkages, and oil level\nInspect fuel lines, brackets, and connections\nCheck fuel pressure gauge for correct operation\nCooling System\nInspect radiator/heat exchanger (leaks, debris, louvers)\nInspect coolant level and condition; test protection level\nInspect hoses and connections for deterioration\nInspect/lubricate fan pulleys, fan bearings; check clearance\nInspect fan belts (wear, tension)\nInspect jacket water heater and thermostat setting\nInspect water pump for leaks/noise\nAir Induction & Exhaust\nInspect/clean primary & secondary air filters; reset indicators\nInspect air inlet piping, housings, gaskets\nInspect turbocharger (leaks, noise)\nInspect exhaust manifold (hardware, leakage, oil slobber)\nInspect muffler/silencer and piping for damage or corrosion\nLubrication System\nInspect oil level and contamination; inspect for leaks\nCheck oil pressure gauge for correct readings\nInspect pre lube pump\nInspect crankcase breather and hoses\nPerform full oil analysis (wear metals, contaminants, debris)\nStarting System\nInspect batteries (condition, leakage, terminals)\nCheck electrolyte level & specific gravity (if applicable)\nInspect battery charger, wiring, terminals\nInspect starting motor (connections, noise, operation)\nInspect alternator & drive components\nEngine Monitors & Safety Controls\nTest all engine safety devices (oil pressure, coolant temp, overspeed, over crank, etc.)\nTest remote annunciators and local alarm systems\nGenerator & Electrical Components\nRemove and inspect brushes, clean slip rings\nInspect space heaters for proper operation\nInspect control panel (manual/auto start, meters, adjustments)\nVerify voltmeter and ammeter readings\nLaboratory fuel sampling, including but not limited to:\nAccelerated Aging\nSuspended Particulates\nAssociation for Material Protection and Performance (AMPP) Corrosion inspection\nOrganic Material\nWater (suspended content)\nOperational Test Requirements\nCold engine start observation\n30 minute operating run\nMonitoring for leaks, noise, vibration\nVerification of all safety shutdowns\nRecording of:\nAmps\nVolts\nOil pressure\nCoolant temperature\nFuel pressure\nFrequency\nReal power (kW output)\nTiming and functional verification of:\nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer switch (ATS) operation\nRe transfer timing\nRestoration to Service\nDay Tank and Fuel System Functional Testing\nContractor shall conduct operational checks of the day tank, including:\nFloat switch operation\nTransfer pump operation\nSolenoid valve performance (if equipped)\nInspection of all fuel lines, hoses, connectors, and fittings for wear, corrosion, or leaks\nPreventive Maintenance - Level 2\nThe Contractor shall perform:\nFuel System\nInspect main and day tank for leaks and fuel level\nDrain water traps/separators\nInspect fuel lines, fittings, and brackets for leaks or looseness\nInspect governor oil level, linkages, and controls; add oil as needed\nInspect/clean primary and secondary fuel filters\nInspect fuel pressure gauge for correct operation\nInspect fuel condition for contaminants\nCooling System\nInspect radiator/heat exchanger for leaks, debris, damage\nVerify louver operation\nInspect coolant level, rust, oil contamination, top off to maintain serviceable level\nCheck coolant conditioner concentration and freeze/boil protection\nInspect filler cap sealing surfaces and gasket\nInspect hoses for deterioration; tighten connections\nLube and inspect fan-drive bearings and pulleys\nInspect fan belts for wear; adjust tension\nVerify jacket water heater operation and thermostat setting\nInspect water pump for leaks, noise, or malfunction\nAir Induction & Exhaust System\nInspect and clean primary/secondary air filters; reset indicators.\nInspect air inlet piping, housings, seals, and gaskets\nInspect turbocharger for oil or exhaust leakage, check for abnormal noise\nInspect exhaust manifold for leakage, missing hardware, oil slobber\nInspect exhaust muffler and piping for corrosion or damage\nLube Oil System\nProvide a full oil and filter change for all 20 generators during the base year.\nThereafter in the option years, change the oil filter every year and the oil every 250 hours or as needed based on the oil and filter inspection or the manufacturers requirements.\nInspect oil level and contamination, top off to maintain serviceable level\nInspect generator and engine for leaks\nInspect pre lube pump operation\nInspect gaskets and seals for deterioration\nInspect crankcase breather operation and blow-by condition\nPerform full oil analysis (wear metals, contamination, debris)\nProvide oil analysis results to VA with NFPA acceptable thresholds\nStarting and Charging System\nInspect batteries for damage or leakage; clean/tighten terminals\nCheck battery electrolyte level and specific gravity (if applicable)\nInspect battery charger (operation, wiring, connections)\nInspect starting motor wiring and operation, check for abnormal noise\nInspect alternator condition, voltage output, belts, and pulleys\nEngine Monitors & Safety Controls\nTest all engine safety shutdowns (oil pressure, coolant temp, over crank, overspeed)\nInspect annunciators and remote alarm systems\nCheck gauge accuracy (oil pressure, temperature, alternator)\nGenerator & Mechanical Components\nRemove and inspect brushes; clean slip rings; make adjustments\nLubricate generator rear bearing\nInspect vibration isolators for wear and adjust to manufacturers specifications\nControl Panel & ATS\nTest manual/auto start controls\nVerify correct voltmeter readings (voltage level, gain, drop)\nTest ammeter with baseline load and no load readings\nInspect circuit breakers for tightness and free movement\nInspect ATS mechanical and electrical condition\nOperational Test to include at a minimum:\nCold start observation\n30 minute operating run\nMonitoring for abnormal vibration, leak, noise\nVerification of safety shutdown devices\nDocumenting:\nAmps & volts\nOil pressure\nWater temperature\nFuel pressure\nFrequency\nKilowatt output\nTiming and verification of:\nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer\nLoad return (re transfer)\nGeneral Emergency Power Supply System (EPSS) Condition Assessment\nDuring all PM 2 activities, the Contractor shall assess and document the overall condition of the EPSS including:\nVibration issues\nLeaks (fuel, oil, coolant, exhaust)\nExcessive temperature\nAbnormal noises\nComponent wear, corrosion, or deterioration\nAny condition that may indicate impending failure\nContractor shall restore generator and EPSS to automatic mode\nEnsure all equipment is fully operational\nReports and Documentation\nESR (Engineering Service Report)\nThe ESR shall at a minimum include:\nBuilding Number\nTest Date\nStart Time / Stop Time\nGenerator make, model, serial number\nkW/kVA rating\nFuel type\nHours of operation\nLocation/Building number\nATS identifier (if tested)\nHour Meter Start / Hour Meter Finish\nEngine Oil Pressure\nEngine Water Temperature\nExhaust Gas Temperature (IR, pre turbo)\nFrequency (Hz / cycles)\nVoltage readings\nGenerator Loading (Amperage per phase)\nName and Signature of Technician\nAll completed inspection checklists\nAll measured data and test results\nPhotos or quantifiable evidence before and after repairs, when applicable\nAll identified deficiencies\nList of required and recommended repairs with priority classifications\nItemized cost estimates\nComplete PM 1 test data\nASTM laboratory fuel test results\nOil analysis report\nA complete Load Bank ESR shall be submitted to the COR within 30 days of the test completion.\nThe contractor may create a customized ESR, but it must be approved by COR before implementation\nThe contractor shall document the services rendered on a legible, contractor service report and submit it to the COR for certification (signature)\nA copy of the signed service report must be provided to the COR by the contractor at the time the service is provided.\nIf the COR is unavailable, a signed, authorized copy of the ESR will be sent to the Contractor after the work can be reviewed (if requested or noted on the ESR).\n\nRequirements and Qualifications\nContractor shall have knowledge of and ensure compliance with the current version of the following throughout all performance and reporting requirements.\nVeteran Health Agency Directive 1028\nNFPA 99 and NFPA 110\nJoint Commission standards\nlocal, state, and federal regulations\nASTM fuel testing standards\nOEM guidance\nVA Engineering policies\nFacility Check In\nUpon arrival at the Edward Hines Jr VA Hospital, the contractor shall be required to report when on-site and when services are completed with assigned shop.\nHours\nThe Contractor will coordinate and schedule all test(s) with Hines VA Engineering Department (1) week Prior to onsite visit. The Contractor is required to perform work and tests during normal work hours, Monday through Friday 7:00 am to 4:00 pm. CST.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C25226Q0504","place_of_performance":{"street":"Edward Hines, Jr. VA Hospital 5000 South 5th Avenue","street2":"Hines, IL 60141-5000"},"product_service_code":"J061"}],"due_at":"2026-06-10T11:00:00Z","due_date":"2026-06-10","closes_at":"2026-06-10T11:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","state":"IL","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"state_source":"sam_street","state_evidence":"EDWARD HINES, JR. VA HOSPITAL 5000 SOUTH 5TH AVENUE HINES, IL 60141-5000","site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-02T20:52:37.844662Z","principal_notice_id":"b9d09e9d74ca4e779b4ffc70d1bbb043","description":{"text":"Scope of Work\nEdward Hines Jr. VA hospital requires the services of a contractor to perform load bank testing, and maintenance for (20) generators. These generators provide backup power and have a direct impact on patient health and life safety throughout the Hines VA Campus. The Contractor shall furnish all labor, management, materials, equipment to perform preventive maintenance, inspection, calibration, testing and documentation for the generators listed on the equipment listing.\n\nPlace of Performance\nEdward Hines Jr. VA hospital\n5000 S. 5th Avenue,\nHines, Illinois 60141\n\nPeriod of Performance\nBase Year: September 1 ,2026 through August 31,2027\nOption Year 1: September 1, 2027, through August 31, 2028\nOption Year 2: September 1, 2028, through August 31, 2029\nOption Year 3: September 1, 2029, through August 31, 2030\nOption Year 4: September 1, 2030, through August 31, 2031\n\nSchedule\nLoad Bank Testing shall be performed in September\nPreventive Maintenance (PM) Level 1 shall be performed in January.\nPreventive Maintenance (PM) Level 2 shall be performed in July.\nAny deviations from this schedule shall only be made with prior approval from the Contracting Officer Representative (COR)\nDescription of Services\nLoad Bank Testing Specifications:\nThe generators shall be load tested using the following sequence:\nIdle / No-Load Readings.\nBaseline data recorded before applying load.\n30% of Generator Load Rating for 30 minutes\n50% of Generator Load Rating for next 30 minutes\n75% of Generator Load Rating for 60 minutes (1 hour)\n100% of Generator Load Rating for 60 minutes (1 hour)\nPreventive Maintenance - Level 1\nThe Contractor shall perform:\nFuel System\nInspect main tank and day tank for leaks, level, condition\nDrain water traps/separators\nInspect primary/secondary filters; clean primary filter\nCheck governor, controls, linkages, and oil level\nInspect fuel lines, brackets, and connections\nCheck fuel pressure gauge for correct operation\nCooling System\nInspect radiator/heat exchanger (leaks, debris, louvers)\nInspect coolant level and condition; test protection level\nInspect hoses and connections for deterioration\nInspect/lubricate fan pulleys, fan bearings; check clearance\nInspect fan belts (wear, tension)\nInspect jacket water heater and thermostat setting\nInspect water pump for leaks/noise\nAir Induction & Exhaust\nInspect/clean primary & secondary air filters; reset indicators\nInspect air inlet piping, housings, gaskets\nInspect turbocharger (leaks, noise)\nInspect exhaust manifold (hardware, leakage, oil slobber)\nInspect muffler/silencer and piping for damage or corrosion\nLubrication System\nInspect oil level and contamination; inspect for leaks\nCheck oil pressure gauge for correct readings\nInspect pre lube pump\nInspect crankcase breather and hoses\nPerform full oil analysis (wear metals, contaminants, debris)\nStarting System\nInspect batteries (condition, leakage, terminals)\nCheck electrolyte level & specific gravity (if applicable)\nInspect battery charger, wiring, terminals\nInspect starting motor (connections, noise, operation)\nInspect alternator & drive components\nEngine Monitors & Safety Controls\nTest all engine safety devices (oil pressure, coolant temp, overspeed, over crank, etc.)\nTest remote annunciators and local alarm systems\nGenerator & Electrical Components\nRemove and inspect brushes, clean slip rings\nInspect space heaters for proper operation\nInspect control panel (manual/auto start, meters, adjustments)\nVerify voltmeter and ammeter readings\nLaboratory fuel sampling, including but not limited to:\nAccelerated Aging\nSuspended Particulates\nAssociation for Material Protection and Performance (AMPP) Corrosion inspection\nOrganic Material\nWater (suspended content)\nOperational Test Requirements\nCold engine start observation\n30 minute operating run\nMonitoring for leaks, noise, vibration\nVerification of all safety shutdowns\nRecording of:\nAmps\nVolts\nOil pressure\nCoolant temperature\nFuel pressure\nFrequency\nReal power (kW output)\nTiming and functional verification of:\nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer switch (ATS) operation\nRe transfer timing\nRestoration to Service\nDay Tank and Fuel System Functional Testing\nContractor shall conduct operational checks of the day tank, including:\nFloat switch operation\nTransfer pump operation\nSolenoid valve performance (if equipped)\nInspection of all fuel lines, hoses, connectors, and fittings for wear, corrosion, or leaks\nPreventive Maintenance - Level 2\nThe Contractor shall perform:\nFuel System\nInspect main and day tank for leaks and fuel level\nDrain water traps/separators\nInspect fuel lines, fittings, and brackets for leaks or looseness\nInspect governor oil level, linkages, and controls; add oil as needed\nInspect/clean primary and secondary fuel filters\nInspect fuel pressure gauge for correct operation\nInspect fuel condition for contaminants\nCooling System\nInspect radiator/heat exchanger for leaks, debris, damage\nVerify louver operation\nInspect coolant level, rust, oil contamination, top off to maintain serviceable level\nCheck coolant conditioner concentration and freeze/boil protection\nInspect filler cap sealing surfaces and gasket\nInspect hoses for deterioration; tighten connections\nLube and inspect fan-drive bearings and pulleys\nInspect fan belts for wear; adjust tension\nVerify jacket water heater operation and thermostat setting\nInspect water pump for leaks, noise, or malfunction\nAir Induction & Exhaust System\nInspect and clean primary/secondary air filters; reset indicators.\nInspect air inlet piping, housings, seals, and gaskets\nInspect turbocharger for oil or exhaust leakage, check for abnormal noise\nInspect exhaust manifold for leakage, missing hardware, oil slobber\nInspect exhaust muffler and piping for corrosion or damage\nLube Oil System\nProvide a full oil and filter change for all 20 generators during the base year.\nThereafter in the option years, change the oil filter every year and the oil every 250 hours or as needed based on the oil and filter inspection or the manufacturers requirements.\nInspect oil level and contamination, top off to maintain serviceable level\nInspect generator and engine for leaks\nInspect pre lube pump operation\nInspect gaskets and seals for deterioration\nInspect crankcase breather operation and blow-by condition\nPerform full oil analysis (wear metals, contamination, debris)\nProvide oil analysis results to VA with NFPA acceptable thresholds\nStarting and Charging System\nInspect batteries for damage or leakage; clean/tighten terminals\nCheck battery electrolyte level and specific gravity (if applicable)\nInspect battery charger (operation, wiring, connections)\nInspect starting motor wiring and operation, check for abnormal noise\nInspect alternator condition, voltage output, belts, and pulleys\nEngine Monitors & Safety Controls\nTest all engine safety shutdowns (oil pressure, coolant temp, over crank, overspeed)\nInspect annunciators and remote alarm systems\nCheck gauge accuracy (oil pressure, temperature, alternator)\nGenerator & Mechanical Components\nRemove and inspect brushes; clean slip rings; make adjustments\nLubricate generator rear bearing\nInspect vibration isolators for wear and adjust to manufacturers specifications\nControl Panel & ATS\nTest manual/auto start controls\nVerify correct voltmeter readings (voltage level, gain, drop)\nTest ammeter with baseline load and no load readings\nInspect circuit breakers for tightness and free movement\nInspect ATS mechanical and electrical condition\nOperational Test to include at a minimum:\nCold start observation\n30 minute operating run\nMonitoring for abnormal vibration, leak, noise\nVerification of safety shutdown devices\nDocumenting:\nAmps & volts\nOil pressure\nWater temperature\nFuel pressure\nFrequency\nKilowatt output\nTiming and verification of:\nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer\nLoad return (re transfer)\nGeneral Emergency Power Supply System (EPSS) Condition Assessment\nDuring all PM 2 activities, the Contractor shall assess and document the overall condition of the EPSS including:\nVibration issues\nLeaks (fuel, oil, coolant, exhaust)\nExcessive temperature\nAbnormal noises\nComponent wear, corrosion, or deterioration\nAny condition that may indicate impending failure\nContractor shall restore generator and EPSS to automatic mode\nEnsure all equipment is fully operational\nReports and Documentation\nESR (Engineering Service Report)\nThe ESR shall at a minimum include:\nBuilding Number\nTest Date\nStart Time / Stop Time\nGenerator make, model, serial number\nkW/kVA rating\nFuel type\nHours of operation\nLocation/Building number\nATS identifier (if tested)\nHour Meter Start / Hour Meter Finish\nEngine Oil Pressure\nEngine Water Temperature\nExhaust Gas Temperature (IR, pre turbo)\nFrequency (Hz / cycles)\nVoltage readings\nGenerator Loading (Amperage per phase)\nName and Signature of Technician\nAll completed inspection checklists\nAll measured data and test results\nPhotos or quantifiable evidence before and after repairs, when applicable\nAll identified deficiencies\nList of required and recommended repairs with priority classifications\nItemized cost estimates\nComplete PM 1 test data\nASTM laboratory fuel test results\nOil analysis report\nA complete Load Bank ESR shall be submitted to the COR within 30 days of the test completion.\nThe contractor may create a customized ESR, but it must be approved by COR before implementation\nThe contractor shall document the services rendered on a legible, contractor service report and submit it to the COR for certification (signature)\nA copy of the signed service report must be provided to the COR by the contractor at the time the service is provided.\nIf the COR is unavailable, a signed, authorized copy of the ESR will be sent to the Contractor after the work can be reviewed (if requested or noted on the ESR).\n\nRequirements and Qualifications\nContractor shall have knowledge of and ensure compliance with the current version of the following throughout all performance and reporting requirements.\nVeteran Health Agency Directive 1028\nNFPA 99 and NFPA 110\nJoint Commission standards\nlocal, state, and federal regulations\nASTM fuel testing standards\nOEM guidance\nVA Engineering policies\nFacility Check In\nUpon arrival at the Edward Hines Jr VA Hospital, the contractor shall be required to report when on-site and when services are completed with assigned shop.\nHours\nThe Contractor will coordinate and schedule all test(s) with Hines VA Engineering Department (1) week Prior to onsite visit. The Contractor is required to perform work and tests during normal work hours, Monday through Friday 7:00 am to 4:00 pm. CST.","html":"Scope of Work \nEdward Hines Jr. VA hospital requires the services of a contractor to perform load bank testing, and maintenance for (20) generators. These generators provide backup power and have a direct impact on patient health and life safety throughout the Hines VA Campus. The Contractor shall furnish all labor, management, materials, equipment to perform preventive maintenance, inspection, calibration, testing and documentation for the generators listed on the equipment listing. \n\nPlace of Performance\nEdward Hines Jr. VA hospital \n5000 S. 5th Avenue, \nHines, Illinois 60141\n\nPeriod of Performance\nBase Year: September 1 ,2026 through August 31,2027\nOption Year 1: September 1, 2027, through August 31, 2028\nOption Year 2: September 1, 2028, through August 31, 2029\nOption Year 3: September 1, 2029, through August 31, 2030\nOption Year 4: September 1, 2030, through August 31, 2031\n\nSchedule\nLoad Bank Testing shall be performed in September\nPreventive Maintenance (PM) Level 1 shall be performed in January.\nPreventive Maintenance (PM) Level 2 shall be performed in July.\nAny deviations from this schedule shall only be made with prior approval from the Contracting Officer Representative (COR)\nDescription of Services\nLoad Bank Testing Specifications:\nThe generators shall be load tested using the following sequence: \nIdle / No-Load Readings. \nBaseline data recorded before applying load. \n30% of Generator Load Rating for 30 minutes\n50% of Generator Load Rating for next 30 minutes\n75% of Generator Load Rating for 60 minutes (1 hour)\n100% of Generator Load Rating for 60 minutes (1 hour)\nPreventive Maintenance - Level 1\nThe Contractor shall perform:\nFuel System\nInspect main tank and day tank for leaks, level, condition\nDrain water traps/separators\nInspect primary/secondary filters; clean primary filter\nCheck governor, controls, linkages, and oil level\nInspect fuel lines, brackets, and connections\nCheck fuel pressure gauge for correct operation\nCooling System\nInspect radiator/heat exchanger (leaks, debris, louvers)\nInspect coolant level and condition; test protection level\nInspect hoses and connections for deterioration\nInspect/lubricate fan pulleys, fan bearings; check clearance\nInspect fan belts (wear, tension)\nInspect jacket water heater and thermostat setting\nInspect water pump for leaks/noise\nAir Induction & Exhaust\nInspect/clean primary & secondary air filters; reset indicators\nInspect air inlet piping, housings, gaskets\nInspect turbocharger (leaks, noise)\nInspect exhaust manifold (hardware, leakage, oil slobber)\nInspect muffler/silencer and piping for damage or corrosion\nLubrication System\nInspect oil level and contamination; inspect for leaks\nCheck oil pressure gauge for correct readings\nInspect pre lube pump\nInspect crankcase breather and hoses\nPerform full oil analysis (wear metals, contaminants, debris)\nStarting System\nInspect batteries (condition, leakage, terminals)\nCheck electrolyte level & specific gravity (if applicable)\nInspect battery charger, wiring, terminals\nInspect starting motor (connections, noise, operation)\nInspect alternator & drive components\nEngine Monitors & Safety Controls\nTest all engine safety devices (oil pressure, coolant temp, overspeed, over crank, etc.)\nTest remote annunciators and local alarm systems\nGenerator & Electrical Components\nRemove and inspect brushes, clean slip rings\nInspect space heaters for proper operation\nInspect control panel (manual/auto start, meters, adjustments)\nVerify voltmeter and ammeter readings\nLaboratory fuel sampling, including but not limited to:\nAccelerated Aging\nSuspended Particulates\nAssociation for Material Protection and Performance (AMPP) Corrosion inspection \nOrganic Material\nWater (suspended content)\nOperational Test Requirements\nCold engine start observation\n30 minute operating run\nMonitoring for leaks, noise, vibration\nVerification of all safety shutdowns\nRecording of: \nAmps\nVolts\nOil pressure\nCoolant temperature\nFuel pressure\nFrequency\nReal power (kW output)\nTiming and functional verification of: \nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer switch (ATS) operation\nRe transfer timing\nRestoration to Service\nDay Tank and Fuel System Functional Testing\nContractor shall conduct operational checks of the day tank, including:\nFloat switch operation\nTransfer pump operation\nSolenoid valve performance (if equipped)\nInspection of all fuel lines, hoses, connectors, and fittings for wear, corrosion, or leaks\nPreventive Maintenance - Level 2\nThe Contractor shall perform:\nFuel System\nInspect main and day tank for leaks and fuel level\nDrain water traps/separators\nInspect fuel lines, fittings, and brackets for leaks or looseness\nInspect governor oil level, linkages, and controls; add oil as needed\nInspect/clean primary and secondary fuel filters\nInspect fuel pressure gauge for correct operation\nInspect fuel condition for contaminants\nCooling System\nInspect radiator/heat exchanger for leaks, debris, damage\nVerify louver operation\nInspect coolant level, rust, oil contamination, top off to maintain serviceable level\nCheck coolant conditioner concentration and freeze/boil protection\nInspect filler cap sealing surfaces and gasket\nInspect hoses for deterioration; tighten connections\nLube and inspect fan-drive bearings and pulleys\nInspect fan belts for wear; adjust tension\nVerify jacket water heater operation and thermostat setting\nInspect water pump for leaks, noise, or malfunction\nAir Induction & Exhaust System\nInspect and clean primary/secondary air filters; reset indicators.\nInspect air inlet piping, housings, seals, and gaskets\nInspect turbocharger for oil or exhaust leakage, check for abnormal noise\nInspect exhaust manifold for leakage, missing hardware, oil slobber\nInspect exhaust muffler and piping for corrosion or damage\nLube Oil System\nProvide a full oil and filter change for all 20 generators during the base year. \nThereafter in the option years, change the oil filter every year and the oil every 250 hours or as needed based on the oil and filter inspection or the manufacturers  requirements. \nInspect oil level and contamination, top off to maintain serviceable level\nInspect generator and engine for leaks\nInspect pre lube pump operation\nInspect gaskets and seals for deterioration\nInspect crankcase breather operation and blow-by condition\nPerform full oil analysis (wear metals, contamination, debris)\nProvide oil analysis results to VA with NFPA acceptable thresholds\nStarting and Charging System\nInspect batteries for damage or leakage; clean/tighten terminals\nCheck battery electrolyte level and specific gravity (if applicable)\nInspect battery charger (operation, wiring, connections)\nInspect starting motor wiring and operation, check for abnormal noise\nInspect alternator condition, voltage output, belts, and pulleys\nEngine Monitors & Safety Controls\nTest all engine safety shutdowns (oil pressure, coolant temp, over crank, overspeed)\nInspect annunciators and remote alarm systems\nCheck gauge accuracy (oil pressure, temperature, alternator)\nGenerator & Mechanical Components\nRemove and inspect brushes; clean slip rings; make adjustments\nLubricate generator rear bearing\nInspect vibration isolators for wear and adjust to manufacturers specifications\nControl Panel & ATS\nTest manual/auto start controls\nVerify correct voltmeter readings (voltage level, gain, drop)\nTest ammeter with baseline load and no load readings\nInspect circuit breakers for tightness and free movement\nInspect ATS mechanical and electrical condition \nOperational Test to include at a minimum:\nCold start observation\n30 minute operating run\nMonitoring for abnormal vibration, leak, noise\nVerification of safety shutdown devices\nDocumenting: \nAmps & volts\nOil pressure\nWater temperature\nFuel pressure\nFrequency\nKilowatt output\nTiming and verification of: \nSignal delay\nEngine start time\nLoad pickup\nAutomatic transfer\nLoad return (re transfer)\nGeneral Emergency Power Supply System (EPSS) Condition Assessment\nDuring all PM 2 activities, the Contractor shall assess and document the overall condition of the EPSS including:\nVibration issues\nLeaks (fuel, oil, coolant, exhaust)\nExcessive temperature\nAbnormal noises\nComponent wear, corrosion, or deterioration\nAny condition that may indicate impending failure\nContractor shall restore generator and EPSS to automatic mode\nEnsure all equipment is fully operational\nReports and Documentation \nESR (Engineering Service Report)\nThe ESR shall at a minimum include:\nBuilding Number \nTest Date \nStart Time / Stop Time \nGenerator make, model, serial number\nkW/kVA rating\nFuel type\nHours of operation\nLocation/Building number\nATS identifier (if tested)\nHour Meter Start / Hour Meter Finish \nEngine Oil Pressure\nEngine Water Temperature \nExhaust Gas Temperature (IR, pre turbo) \nFrequency (Hz / cycles) \nVoltage readings \nGenerator Loading (Amperage per phase) \nName and Signature of Technician\nAll completed inspection checklists\nAll measured data and test results\nPhotos or quantifiable evidence before and after repairs, when applicable\nAll identified deficiencies\nList of required and recommended repairs with priority classifications\nItemized cost estimates\nComplete PM 1 test data\nASTM laboratory fuel test results\nOil analysis report\nA complete Load Bank ESR shall be submitted to the COR within 30 days of the test completion. \nThe contractor may create a customized ESR, but it must be approved by COR before implementation\nThe contractor shall document the services rendered on a legible, contractor service report and submit it to the COR for certification (signature) \nA copy of the signed service report must be provided to the COR by the contractor at the time the service is provided. \nIf the COR is unavailable, a signed, authorized copy of the ESR will be sent to the Contractor after the work can be reviewed (if requested or noted on the ESR).\n\nRequirements and Qualifications\nContractor shall have knowledge of and ensure compliance with the current version of the following throughout all performance and reporting requirements.\nVeteran Health Agency Directive 1028\nNFPA 99 and NFPA 110 \nJoint Commission standards \nlocal, state, and federal regulations\nASTM fuel testing standards \nOEM guidance\nVA Engineering policies\nFacility Check In\nUpon arrival at the Edward Hines Jr VA Hospital, the contractor shall be required to report when on-site and when services are completed with assigned shop.\nHours\nThe Contractor will coordinate and schedule all test(s) with Hines VA Engineering Department (1) week Prior to onsite visit. The Contractor is required to perform work and tests during normal work hours, Monday through Friday 7:00 am to 4:00 pm. CST.","origin":"detail"},"contacts":[{"name":"derrick.paquette@va.gov","role":"primary","email":"Derrick.Paquette@va.gov","phone":"414-844-4800","title":"Derrick Paquette"}],"place_of_performance":{"street":"Edward Hines, Jr. VA Hospital 5000 South 5th Avenue","street2":"Hines, IL 60141-5000"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"naics_codes":["238210"],"award":{"awardee":{}},"attachments":[{"resource_id":"0024e8231df34affa675e25343eaf837","name":"36C25226Q0504.docx","kind":"file","mime_type":".docx","size_bytes":42192,"posted_at":"2026-06-03T12:30:56.906Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/0024e8231df34affa675e25343eaf837/download","mirrored":false}],"awards":[],"related":[{"key":"36C25227Q0069","latest_notice_id":"eed58f84a7f44ac98ced93c2b5e9ec8d","title":"S222--Grease Trap Service-FY27 Base-Tomah VAMC - December 2026 - November 2027","solicitation_number":"36C25227Q0069","notice_type":"o","first_type":"p","first_posted":"2026-11-04","last_posted":"2026-11-19","notices":3,"due_at":"2026-11-27T16:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"562998","psc":"S222","set_aside":"SBA","state":"WI","county":"55081","county_name":"Monroe County","city":"5580075","city_name":"Tomah","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Tomah VA Medical Center","site_key":"tomah-va-medical-center-wi","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25227Q0033","latest_notice_id":"4d3caf6262ae49649e71c4eadbda1187","title":"Q702--Great Lakes Region Durable Medical Equipment (DME) Delivery Services","solicitation_number":"36C25227Q0033","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-19","notices":3,"due_at":"2026-11-30T12:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T12:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"621610","psc":"Q702","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25227B00020001","latest_notice_id":"7eafb50009534028818a8ee9836b9e30","title":"Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON)","solicitation_number":"36C25227B0002-0001","notice_type":"o","first_type":"o","first_posted":"2026-10-21","last_posted":"2026-11-10","notices":2,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"IL","county":"17183","county_name":"Vermilion County","city":"1718563","city_name":"Danville","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"36C25227Q0059","latest_notice_id":"356844aa4dfe401da0c9186aa3e03e85","title":"4130--Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228","solicitation_number":"36C25227Q0059","notice_type":"o","first_type":"r","first_posted":"2026-10-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238220","psc":"J043","set_aside":"SDVOSBC","state":"IL","county":"17031","county_name":"Cook County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C25227B0006","latest_notice_id":"e4fa6ced73cf448f9259359ef2b8eeab","title":"Z1DA--537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical Center","solicitation_number":"36C25227B0006","notice_type":"p","first_type":"p","first_posted":"2026-10-20","last_posted":"2026-10-20","notices":1,"due_at":"2026-12-04T16:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238290","psc":"Z1DA","set_aside":"SDVOSBC","state":"IL","county":"17031","county_name":"Cook County","city":"1714000","city_name":"Chicago","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":"Jesse Brown VA Medical Center","site_key":"jesse-brown-va-medical-center-il","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-21T04:57:30.751375Z"}],"similar_open":[{"key":"W912P627MR027755","latest_notice_id":"5cc099a662c74ba1a59532a34d6f03e2","title":"Commercial Gear Backup Power (CGBP) and Control System Improvements at Fish Barrier","solicitation_number":"W912P627MR027755","notice_type":"r","first_type":"r","first_posted":"2026-11-10","last_posted":"2026-11-10","notices":1,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912P6","office_name":"W072 ENDIST CHICAGO","naics":"238210","psc":"Z2MZ","set_aside":null,"state":"IL","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"ROMEOVILLE, IL","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"W912P627X1CZ7","latest_notice_id":"d13db3ad548f4e1cb0a6bc7bef73a313","title":"MARKET SURVEY SOURCES SOUGHT NOTICE FOR BARRIER IIB ATS SYSTEMS REPLACEMENT","solicitation_number":"W912P627X1CZ7","notice_type":"r","first_type":"r","first_posted":"2026-11-24","last_posted":"2026-11-24","notices":1,"due_at":"2026-12-07T20:00:00Z","due_date":"2026-12-07","closes_at":"2026-12-07T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W912P6","office_name":"W072 ENDIST CHICAGO","naics":"238210","psc":"Z2BG","set_aside":null,"state":"IL","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"790 EAST OLD ROMEO RD LOCKPORT/ROMEOVILLE, IL 60441","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"1232SA27Q0021","latest_notice_id":"8c35373e3e5c4e3bb88b3fb51c3ea2c1","title":"Electrical Installation of 5-Station Cubicle and One Single Hotel Desk Arrangement","solicitation_number":"1232SA27Q0021","notice_type":"k","first_type":"k","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-25T19:00:00Z","due_date":"2026-11-25","closes_at":"2026-11-25T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12H2","sub_name":"AGRICULTURAL RESEARCH SERVICE","office_key":"o-1232SA","office_name":"USDA ARS AFM APD","naics":"238210","psc":"N059","set_aside":"SBA","state":"WI","county":"55025","county_name":"Dane County","city":"5548000","city_name":"Madison","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"}],"similar_open_total":41,"indexable":false}