{"canonical":"https://sealedbidder.com/opportunities/36c25225b0020","key":"36C25225B0020","url":"https://sealedbidder.com/opportunities/36c25225b0020","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"a","open":false,"removed":false,"removed_at":null,"response_deadline":"2025-08-06T16:00:00Z","first_posted":"2025-05-14","last_posted":"2025-09-16","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238220","psc":"Y1DZ","set_aside":"SDVOSBC","place_state":"IL","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"17097","place_county_name":"Lake County","place_city":"1753559","place_city_name":"North Chicago","winner":"AMERITECH CONTRACTING LLC","award_amount":"2094000.00","publications":[{"notice_id":"2bc79dbbdb1142b0a3f9258a9064ad94","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"p","base_type":"p","posted":"2025-05-14","posted_at":"2025-05-14T13:08:03.962Z","due_at":"2025-07-10T16:00:00Z","due_date":"2025-07-10","cancelled":false,"archived":true,"archive_date":"2025-09-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/2bc79dbbdb1142b0a3f9258a9064ad94/view","enriched":true,"history":[{"index":4,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T13:08:03.962Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94","solicitation_number":"36C25225B0020"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}]},{"notice_id":"110f7c8ab060434ca5fdba34d5848a73","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"o","base_type":"p","posted":"2025-06-05","posted_at":"2025-06-05T19:01:35.404Z","due_at":"2025-07-10T16:00:00Z","due_date":"2025-07-10","cancelled":false,"archived":true,"archive_date":"2025-09-08","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/110f7c8ab060434ca5fdba34d5848a73/view","enriched":true,"history":[{"index":7,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T13:08:03.962Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94","solicitation_number":"36C25225B0020"},{"index":6,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":4,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}]},{"notice_id":"f8a3f98da2f140beb14d541b764d6a2a","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"o","base_type":"o","posted":"2025-07-03","posted_at":"2025-07-03T19:55:47.855Z","due_at":"2025-07-24T16:00:00Z","due_date":"2025-07-24","cancelled":false,"archived":true,"archive_date":"2025-08-23","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f8a3f98da2f140beb14d541b764d6a2a/view","enriched":true,"history":[{"index":5,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":1,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}]},{"notice_id":"c34819dd0b874f6ba2ffccddb5cf0502","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"o","base_type":"o","posted":"2025-07-21","posted_at":"2025-07-21T16:49:34.384Z","due_at":"2025-08-06T16:00:00Z","due_date":"2025-08-06","cancelled":false,"archived":true,"archive_date":"2025-09-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c34819dd0b874f6ba2ffccddb5cf0502/view","enriched":true,"history":[{"index":5,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":1,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}]},{"notice_id":"c38395e656f54853a206473c35622707","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"o","base_type":"o","posted":"2025-07-30","posted_at":"2025-07-30T17:04:40.588Z","due_at":"2025-08-06T16:00:00Z","due_date":"2025-08-06","cancelled":false,"archived":true,"archive_date":"2025-09-05","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/c38395e656f54853a206473c35622707/view","enriched":true,"history":[{"index":5,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":1,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}]},{"notice_id":"09f7c443354342d792afb9389000ec67","title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","solicitation_number":"36C25225B0020","notice_type":"a","base_type":"a","posted":"2025-09-16","posted_at":"2025-09-16T12:12:30.591Z","due_at":null,"due_date":null,"cancelled":false,"archived":true,"archive_date":"2025-10-16","removed_at":null,"award_number":"36C25225C0052","awardee_name":"AmeriTech Contracting LLC","amount":"2094000.00","link_sam":"https://sam.gov/workspace/contract/opp/09f7c443354342d792afb9389000ec67/view","enriched":true,"history":[{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T12:12:30.591Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"09f7c443354342d792afb9389000ec67","solicitation_number":"36C25225B0020"}]}],"latest_notice_id":"09f7c443354342d792afb9389000ec67","first_type":"p","notices":[{"award":{"awardee":{}},"dates":{"posted":"2025-05-14","posted_at":"2025-05-14T13:08:03.962Z","created_at":"2025-05-14T13:08:01.753Z","modified_at":"2025-09-09T03:55:56.060Z","response_deadline":{"raw":"2025-07-10T11:00:00-05:00","utc":"2025-07-10T16:00:00Z","date":"2025-07-10","time":"11:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/2bc79dbbdb1142b0a3f9258a9064ad94/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-08","archive_type":"auto_custom"},"history":[{"index":4,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T13:08:03.962Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94","solicitation_number":"36C25225B0020"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}],"contacts":[{"name":"Lynn Vander Velde","role":"primary","email":"Lynn.VanderVelde@va.gov","phone":"414-844-4800","title":"Contract Specialist"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"2bc79dbbdb1142b0a3f9258a9064ad94","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"110f7c8ab060434ca5fdba34d5848a73","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-15T03:08:36.507956297Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6fdfbacdaa2cb614bf0a68cc4e60434065f99c1b8b50f60f0615ba35acca7561","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-15T03:08:36.507956297Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"Contractor shall provide all tools, materials, labor, quality assurance, and supervision in accordance with construction documents, drawings and specifications to complete project 556-24-106 Replace Chiller 2 at Captain James A. Lovell Federal Health Care Center (FHCC), North Chicago, IL. This project is for renovations resulting in a complete, compliant, and fully functional project, including complete and compliant demolition and replacement of an existing 1000-ton York centrifugal chiller and associated system. The replacement shall be a new 1000-ton water cooled centrifugal magnetic drive chiller, chilled water pump, condenser water pump, VFD's, local piping, valves, chemical feed system, electrical power, and controls, integrating them with the existing chiller plant as necessary to reestablish long-term reliability.\nThe contractor shall bring the chiller plant into compliance with all current VA and industry standards.\nThe solicitation, specifications and drawings will be posted on Contact Opportunities. There will be a pre-bid conference held for this project and all prospective bidders are strongly encouraged to attend. Details of the pre-bid conference will be included in the solicitation package.\n\nPursuant to Public Law 109-461, this solicitation is set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms.  In accordance with VAAR 819.7003(b), at the time of submission of bids, and prior to award of any contracts, the offeror must represent to the contracting officer that it is a; \n(1) SDVOSB eligible vendor IAW VAAR Subpart 819.70; \n(2) Small business concern under the NAICS code assigned to this acquisition; and \n(3) CertifiedÂ SDVOSB/VOSBÂ listed inÂ theÂ SBA certification database atÂ https://veterans.certify.sba.gov/Â (see 13 CFR 128).Â Â \nThe solicitation will be issued on or about June 6, 2025, with the bid opening on or about July 10, 2025. The bidder is responsible to monitor and download any amendments from Contact Opportunities which may be issued to this solicitation. The project magnitude range is between $1,000,000.00 and $2,000,000.00. The North American Industry Classification Code (NAICS) for this procurement is 238220; size standard $19.0 Million applies. Time for completion is 348 calendar days after receipt of Notice to Proceed.","text":"Contractor shall provide all tools, materials, labor, quality assurance, and supervision in accordance with construction documents, drawings and specifications to complete project 556-24-106 Replace Chiller 2 at Captain James A. Lovell Federal Health Care Center (FHCC), North Chicago, IL. This project is for renovations resulting in a complete, compliant, and fully functional project, including complete and compliant demolition and replacement of an existing 1000-ton York centrifugal chiller and associated system. The replacement shall be a new 1000-ton water cooled centrifugal magnetic drive chiller, chilled water pump, condenser water pump, VFD's, local piping, valves, chemical feed system, electrical power, and controls, integrating them with the existing chiller plant as necessary to reestablish long-term reliability.\nThe contractor shall bring the chiller plant into compliance with all current VA and industry standards.\nThe solicitation, specifications and drawings will be posted on Contact Opportunities. There will be a pre-bid conference held for this project and all prospective bidders are strongly encouraged to attend. Details of the pre-bid conference will be included in the solicitation package.\n\nPursuant to Public Law 109-461, this solicitation is set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. In accordance with VAAR 819.7003(b), at the time of submission of bids, and prior to award of any contracts, the offeror must represent to the contracting officer that it is a;\n(1) SDVOSB eligible vendor IAW VAAR Subpart 819.70;\n(2) Small business concern under the NAICS code assigned to this acquisition; and\n(3) CertifiedÂ SDVOSB/VOSBÂ listed inÂ theÂ SBA certification database atÂ https://veterans.certify.sba.gov/Â (see 13 CFR 128).Â Â\nThe solicitation will be issued on or about June 6, 2025, with the bid opening on or about July 10, 2025. The bidder is responsible to monitor and download any amendments from Contact Opportunities which may be issued to this solicitation. The project magnitude range is between $1,000,000.00 and $2,000,000.00. The North American Industry Classification Code (NAICS) for this procurement is 238220; size standard $19.0 Million applies. Time for completion is 348 calendar days after receipt of Notice to Proceed.","origin":"detail"},"notice_type":{"code":"p","label":"Presolicitation"},"schema_version":1,"solicitation_number":"36C25225B0020","place_of_performance":{"zip":"60064-3048","city":{"code":"53559","name":"North Chicago"},"state":{"code":"IL","name":"Illinois"},"street":"Captain James A. Lovell Federal Health Care Center 3001 Green Bay Rd.","country":{"code":"USA","name":"UNITED STATES"}},"product_service_code":"Y1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2025-06-05","posted_at":"2025-06-05T19:01:35.404Z","created_at":"2025-06-05T19:01:22.118Z","modified_at":"2025-09-06T03:55:54.031Z","response_deadline":{"raw":"2025-07-10T11:00:00-05:00","utc":"2025-07-10T16:00:00Z","date":"2025-07-10","time":"11:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/110f7c8ab060434ca5fdba34d5848a73/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-08","archive_type":"auto_custom"},"history":[{"index":7,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-05-14T13:08:03.962Z","notice_type":{"code":"p","label":"Presolicitation"},"request_type":"submit","opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94","solicitation_number":"36C25225B0020"},{"index":6,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":4,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}],"contacts":[{"name":"Lynn H VanderVelde","role":"primary","email":"lynn.vandervelde@va.gov","title":"Contractor"}],"base_type":{"code":"p","label":"Presolicitation"},"notice_id":"110f7c8ab060434ca5fdba34d5848a73","lineage_id":"110f7c8ab060434ca5fdba34d5848a73","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-13T03:18:23.336525910Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"21bcf5c702a01f15921970f732eeea243def7e1a21b08e7224aafca5abfe23e1","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-13T03:18:23.336525910Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"CONSTRUCTION STATEMENT OF WORK\nDate: January 24, 2025\nProject Number: 556-24-106\nProject Name: Replace Chiller 2\nLocation: Captain James A. Lovell FHCC 3001 Green Bay Rd,\nNorth Chicago, IL 60064\nPart 1: Project Scope of Work Overview:\nContractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully functional project, including complete and compliant demolition and replacement of an existing 1000-ton York centrifugal chiller and associated system. The replacement shall be a new 1000-ton water cooled centrifugal magnetic drive chiller, chilled water pump, condenser water pump, VFD's, local piping, valves, chemical feed system, electrical power, and controls, integrating them with the existing chiller plant as necessary to reestablish long-term reliability.\nThe contractor shall bring the chiller plant into compliance with all current VA and industry standards.\nPart 2: Period of Performance:\nThe following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work.\nConstruction Period of Performance\n[Assumes HVAC or other long-lead time]\nCalendar Days\nVA Review\nTotal Days From NTP\nNTP [or Limited NTP]\nÂ \nÂ \n0\nAll Division 01 Submittals (esp. with Long Lead Times)\n21\n7\n28\nAll Division 02 Submittals (incl. factory ship date of long lead time items)\n42\n7\n77\n        Variable pause based on long lead time ship dates\nÂ \nÂ \n77\nMobilize and Demo (works back for Pre-HVAC)\n30\nÂ \n107\nPre-Longest Lead Construction (works back from factory ship date)\n120\nÂ \n227\nMilestone: Delivery Date of Longest Lead Item (HVAC, Transformer, custom doors and frames, dampers, etc.)\n1\nÂ \n228\nLongest Lead (HVAC, Transformer, etc.) and Balance of Construction \nEnd Date - Including Closeout Approval [may phase; add milestones]\n120\nÂ \n348\n\nNotes:\nSee Section 01 32 16.15 Project Schedules with Long Lead Items (D/B/B Projects at FHCC).\nThe dates are shown to model how the long lead schedule will work.\n\nPart 3: Detailed Project Requirements:\nProject Objectives:\nThis project is required to replace the obsolete chiller and bring the redundancy in the chiller plant up to the current standards.\nMeet or exceed all Code, technical, and programmatic requirements adopted, established, revised, and or published by VA or the many organizations listed in the several specifications.\nProject Scheduling and Mobilization on Site:\nPrior to beginning work, post and maintain at each work area all current emergency contact information, VA Infection Control Risk Assessment (ICRA)/Permit, Interim Life Safety Measures (ILSM), and other information required by VA and the GC project- specific safety plan, at all entry points to the work area.\nPerformance of the Work:\nContainment shall enable access to the work, without obstructing access to adjacent equipment or rooms. Establish HEPA air purification as needed. Review and follow specification 01 35 33 Infection Control Requirements as applicable to this location and work. Follow PCRA & ICRA plan and permit generated and issued by VA. Remove only upon completion approval of the COR.\nPerform selective demolition and construction as described in the specifications and drawings.\nSpecial Acceptance Criteria for the work shall include:\nChiller system shall not be acceptable in whole or in part unless and until Testing, Adjusting, and Balancing (TAB) is completed and accepted.\nThe contractor shall provide EIA/TIA testing and certification of all new Cat 6a communications cable.\nRestore all finishes damaged during the work   match existing.\nThoroughly clean all surfaces using HEPA-filtered vacuum cleaner and anti-bacterial wipes.\nPart 4: Meetings, Submittals, and Deliverables:\nKick-Off Meeting and Documentation\nThe contractor s Project Manager and Field Supervisor shall attend a Preconstruction Safety and Coordination Meeting to discuss project details.\nKick-Off Meeting Documentation:\nPrepare and submit for review and acceptance a DRAFT Critical Path Method (CPM) Baseline Schedule reflecting each phase and activity of the work beginning with mobilization, including each critical activity, and each essential task required to optimally meet the objectives of the project.\nTo enable objective assessment of costs and progress, the Baseline Schedule shall be cost-loaded at each work activity (essentially Division 02   on), ensuring that the total cost of each phase and Division of work match the corresponding Schedule of Values, and the total of the construction contract at Award.\nDevelop the CPM schedule in sufficient detail to enable readers to understand all planned activities, their predecessors, and successors, who is performing the work, durations, and costs. Activity durations shall not exceed two calendar weeks. Indicate resource SDVOSB status.\nThe Project Manual index of specifications is a useful guide for starting the CPM schedule and Schedule of Values in sufficient detail. For example: Simply listing  HVAC  is unacceptable for projects including more than basic work in this category. The inclusion of specifications for an AHU, controls, ductwork, demolition of each, testing and balancing, etc. also prompt their inclusion as categories of activities and tasks in the schedule. In fact, for larger work categories, breaking down the cost by system/material and installation and testing enables partial payment for higher cost items upon delivery into the facility work area.\nPreparation and processing of submittals are GC procurement (administrative) activities and not work activities contributing to the compensable work in the field. Should the contractor elect to include submittal planning in their internal use schedule for their own purposes, do not show those line items in the schedule submitted to VA for consideration in the Baseline Schedule.\nInclude all expected utility system shutdowns, road closures, crane lifts, and off- hours work in the CPM schedule.\nThe contractor shall prepare and submit SF-1413 for each subcontractor to the CO, copying the COR. List of all subcontractors and suppliers, including Company names, office address, and main point of contact name with telephone number, and SDVOSB status.\nAs required at 01 35 26 Safety Requirements: Develop and submit a Project- Specific Construction Safety and Accident Prevention Plan with project-specific procedures, processes, analysis, and details, including but not limited to:\nAccess and use the U.S. Army Corps of Engineers EM 385-1-1 Safety and Health Requirements and its Appendix A   Minimum Basic Outline for Accident Prevention Plans for development of meaningful, effective, and compliant project safety plans.\nSubmission of generic, non-project specific safety plans will be rejected, resulting in a contractor-caused delay in commencement of the work.\nProject-specific Activity Hazard Analysis (AHA), which forms the basis of the Construction Safety and Accident Prevention Plan highlighting identified risks such as isolation of stored energy (Lock-Out*), fall protection, or confined space access.\n(*) Note that tag-out is not an acceptable form of isolation, therefore it was intentional not to use the term LOTO.\nSubmit an electronic copy of the GC and all subcontractor competent persons OSHA 30-hour Construction Safety Training certificates with project-specific Construction Safety and Accident Prevention Plan.\nSubmit an electronic copy of all workers OSHA 30-hour Construction Safety Training certificates or cards prior to allowing entry to the site.\nAssist the COR in completing project-specific VA Infection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM) documentation.\nQuality Control Plan and Quality Assurance Plan:\n01 40 00 Quality Requirements is included in its entirety in this contract. This specification is brief but very informative and enabling to those who approach it as an opportunity.\nSubmittal Register (aka submittal log) is described in Quality Assurance of the above specification, and the Project Manual at 01 33 23.\nSubmittal Register must list each submission listed in each and every specification. Because each project is different, do not recycle submittal logs from other projects.\nConstruction Progress Meetings:\nThe Contractor s Project Manager and Field Supervisor shall provide on-site weekly construction progress meetings with the COR for the entire period of performance.\nInclude preparation of meeting agendas, and subsequent minutes of the meeting for each event not later than 1 day (next calendar day) after each meeting.\nConstruction Progress Meeting Agenda s and Minutes shall include no less than: List of invitees/attendees, list of past/ongoing and new issues or concerns, indicate days remaining per the contract, detail any safety incidents, and include current updated copies of the RFI Log, the Shop Drawing Log, and a detailed 3-week look- ahead and utility shutdown schedule.\nDaily Reports:\nThe Contractor shall provide a Daily Report each day, along with accompanying digital photos and other supporting documents. The Daily Report shall include: List of issues or concerns, days remaining per the contract, detail regarding any safety incidents, detail of daily safety inspections (including items checked and corrective actions taken), notations regarding any visitors to the work area.\nUse of VA Form 10101 Contractor Production Report (fillable PDF at https://www.va.gov/vaforms/va/pdf/VA10101.pdf) is required each day   even on days with no contractor activity, which is what to report on such days. Contractor may and should provide more information than shown in the standard form, but the standard form is required.\nThe report must be accompanied by relevant time and date-stamped photos of construction progress of sufficient quantity and detail to enable viewers to clearly see the progress of all work to-date, all issues discovered (including those which become the subject of RFI s). Email the VA Form 10101 Contractor Production Report and photos to the COR not later than 9 AM the next working day.\nIn no case shall the GC allow any team member to take photographs with patients, visitors, or employees in the picture.\nAcceptance and Closeout:\nAcceptance criteria for the work:\nSchedule demonstration of new equipment and systems at least 21 calendar days in advance with the COR.\nProvide factory startup and certification of all systems.\nDemonstrate the operation of the system.\nNewly installed water or medical gas piping and distribution system components shall be flushed and disinfected prior to being placed in service. Include documenting completion/certifications.\nStartup and testing of new systems or equipment, or moving in VA purchased equipment or furnishings, or their use, does not constitute any form of Acceptance (or Beneficial Occupancy). The project is planned around the complete, complaint, and unconditional fulfillment of all requirements of the contract which enable the work to be complete   by definition. Please work with VA to expedite this process.\nCloseout Records: Provide one full-size, and one half-size printed set of as-built drawings, as well as CD-ROM or DVD-ROM media containing a complete archive of all project documents and files, including but not limited to:\nAs-built record drawings of the installed condition as CAD and PDF files.\nApproved shop drawings.\nOperations and Maintenance Manuals.\nSpare parts lists.\nAll photographs.\nAll daily reports.\nAll communications.\nAll pay applications.\nAll communication, change, and cost data.\nAll safety records.\nA project Warranty for Construction written by the General Contractor, projected to start upon Final Acceptance by VA (typically within a business week of receiving a complete and compliant closeout package).\nWhere manufacturer s warranties exceed one year, provide all documentation necessary for VA to exercise warranty rights beyond the standard GC warranty.\nWhere specified, such as with roofing systems, provide the warranty written by the manufacturer to VA for the term specified or greater (typically 20 years).\nNote that moving furnishings or equipment into the space does not constitute occupancy or acceptance, however, damage to completed work during these activities shall be the responsibility of VA to correct.\nLien Waivers and other documents required by the Contracting Officer.\nPart 5: Applicable Performance Standards\nAll work shall comply with\nAll VA and FHCC policies including and not limited to: VA Construction Safety and VA Infection Control Policies.\nCodes, Standards and Executive Orders (Topic 1) found at http://www.cfm.va.gov/til/cPro.asp\n01 32 16.15 Project Schedules with Long Lead Items (D/B/B Projects at FHCC)\n01 35 26 Safety Requirements\n01 35 33 Infection Control Requirements\n01 40 00 Quality Requirements\n01 41 00 Regulatory Requirements\n01 42 16 Definitions and Abbreviations\nCoordinating with VA-retained Commissioning Agent (CxA) and Architect-Engineer (AE).\nVA intends to retain the services of an independent CxA.\nAE field-verification and documentation of compliant systems remains an essential part of Construction Period Services.\nThe General Contractor shall have a Competent Supervisory Person on site at all times when any worker(s) or subcontractor(s) are present. The General Contractor is also required to maintain on site a competent Site Safety and Health Officer (see 01 35 26 Safety Requirements when any worker(s) or subcontractor(s) are present. The VA COR may, at his or her discretion, may allow the Competent Supervisory Person to also act at the SSHO, based on demonstrated competency and performance in the two roles. If demonstrated lack of competency or effectiveness in either role is observed, the VA COR may revoke the privilege.\nSafety:\nPrior to any activity, review the following with all project and craft team leaders: 01 35 26\nSafety Requirements.\nThe Contractor shall provide a proactive and complaint Construction Safety and Accident Prevention plan in accordance with the Occupational Safety and Health Act, 01 35 26 Safety Requirements, and site-specific policies:\nAll persons working on any electrical systems rated 50 volts or more shall have the minimum qualification as a State Licensed Master Electrician or Registered Journeyman Electrician, and all activities shall follow the safe work practices in compliance with NFPA 70E Electrical Safety in the Workplace.\n01 35 26 Safety Requirements is included in its entirety in this contract. Each contractor-employer is required to be solely responsible for the health and safety of its employees in accordance with 29 CFR 1910, 1926, & 1960 of the Occupational Safety and Health Act of 1970, as amended.\nBecause each contractor-employer is required to be solely responsible for the health and safety of its employees, part of a compliant and effective safety management program requires each employer to plan and implement their own compliant permit- required work   including written permits. DO NOT rely on, or request that VA generate required permits such as Hot Work or Confined Space documents.\nPrior to the beginning of any work, fire extinguisher(s) complying with NFPA 10 shall be pedestal-mounted in the work area. Inspection of the work area includes verification that inspection tags are current. Where non-compliant, the contractor may be required to remove and replace the unit(s) before resuming work activity.\nAll work in crawl spaces shall be planned and carried out as OSHA Permit-Required Confined Space.\nImmediately stop work and notify the COR if asbestos is noticed or suspected in the area of work.\nException: The above will not necessarily apply to areas where the documents call for abatement activities. This item is concerned with unplanned locations.\nFire-seal all penetrations made or discovered through any wall or floor assembly with UL Listed fire-rated products or systems.\nInfection Control:\n01 35 33 Infection Control Requirements is included in its entirety in this contract. Its construct is enabling for each condition experienced through each phase of the work. The following are high-level requirements most often found deficient during inspections yet required.\nPrior to any activity, review the following with all project team leaders: 01 35 33\nInfection Control Requirements.\nReview and comply with containment construction and sequence described in the design and specification documents.\nProvide a modular dust-tight system designed and manufactured specifically to be used as a temporary construction isolation barrier.\nBefore the start of work provide pressure differential monitoring system at the entry door to the construction area to prove that the construction area is under negative pressure. Maintain daily logs of readings and submit to the COR weekly. Remove at the completion of construction.\nWalk-off sticky mats are required at all times inside and outside all entry / exit points to all workspaces. Sticky mats must be changed at least once per shift, or more as required by the construction or COR. Size sticky mats to match the width of the door opening and ensure that no less than 24  depth is provided.\nBlock off all HVAC return ductwork and louvers to prevent introduction of dust into the HVAC system.\n1) Where existing HVAC ducts are being removed, immediately, permanently, and compliantly seal off the opening.\nProvide High-Efficiency Particulate Air Filtration (HEPA) recirculating air equipment inside the workspace. Size the air filtration system sufficiently large enough to ensure that negative pressure remains effective when doors are opened.\nWhen working above the ceiling outside of the work area, such as in a corridor, open only one ceiling tile at a time, and provide dust containment tent or portable containment cube, with HEPA filtering negative air system to seal the one opening.\nBroom-sweep the work area at the end of each day (or shift during days with multiple shifts). Provide HEPA vacuum and damp (not wet) mop daily where broom sweeping creates airborne dust.\nProvide fire-sealing of all existing wall and ceiling openings in area of work needed to allow the HEPA filtration equipment to effectively generate negative air pressure within the work area, with respect to the surrounding area.\nProvide HEPA-filtered vacuum cleaning of all surfaces, and damp mop the work area every day.\nDo not allow corrugated carboard to be stored for any period of time within the hospital. Upon arrival, unpack, and transfer all products from cardboard containers to sealed plastic containers, and immediately dispose of the cardboard   outside of the building.\nPart 6: Site-Specific Requirements\nProject number and the contract number in the subject line of all emails and documents. Example:  556-24-106 Replace Chiller 2 , or simply  556-24-106 Chiller 2  and then specific subject such as Pay App, RFI, Submittal, Meeting, etc.\nComply with all site-specific requirements and SOPs including and not limited to: Key Policy, Badging Policy, Rules of Behavior, and Smoking Policy.\nNormal construction work hours are 7:00 AM to 3:30 PM Monday through Friday.\nNo work by the Contractor on Federal Holidays, and no work on the weekend when the Federal Holiday is on the respective Monday or Friday.\nNo work in stairs, corridors, lobbies, or other interior / exterior public areas shall be performed during the above-designated work hours.\nAny work including and not limited to noise, vibration, dust, odors, core drilling, hammer- drilling, saw cutting, equipment moving in public corridors, soil compaction shall be performed during the above-designated work hours only.\nCrane lifts, or any work that closes drive isles, closes building entries, or closes public corridors shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.\nAll building systems shall be maintained in full operation at all times:\nRequest utility system shutdowns in writing not less than 21 calendar days in advance and scheduled with the COR at times least impacting patient care.\nShutdown work shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.\nWherever demolition is planned, ceiling tiles are to be removed, or the sprinkler system is to be disabled, GC shall first provide uniform heat detection throughout the work area, connected to the existing supervised building master fire alarm system, for the duration of the work. Fire and or smoke detection devices shall be provided prior to turnover and acceptance.\nDeliveries, Parking, Elevators:\nDeliveries at the dock: At time of delivery: Provide vehicle information to the VA Police and remove the vehicle as soon as delivery is complete. Move materials in public corridors during low patient times between 6 PM through 6 AM the following day.\nNo parking in the VA garages. As part of the Mobilization Plan submission, indicate where workers are to park.\nContractor shall use freight elevators. Do not move materials and employees in passenger elevators without written approval of the COR, and never within elevators occupied by staff or patients.\nThe Mobilization Plan submission shall indicate if and where a construction dumpster is intended to be placed. The contractor shall provide a construction dumpster with a locked safety fence surrounding it, at a location submitted to and approved by the COR. Pavement, concrete surfaces, and landscaping shall be protected from damage resulting from delivery and retrieval, loading and unloading, and dumpster weight.\nConstruction Waste Diversion Reports are required for every dumpster removed from every construction site at every VA facility. Provide these reports to VA COR immediately after the waste hauler removes each dumpster to comply with VA GEMS Policy.\nNo trash, used packaging, or construction spoils shall be stored in the work area. Never use dumpsters other than those rented for this work. Severe penalties, including potential criminal charges may be levied for use of government-rented or owned containers, or those of other contractors.\nTrash removal from the work area shall be within gondolas which have sealed covers (completely enclosed), and during non-business hours, via the freight elevators.\nNo on-site office trailer shall be allowed. Coordinate with the COR for staging materials within the area of work.\nNo music radios within work areas.\nNo noise generated within the work area can be allowed to leave it.\nThe use of powder-actuated fasteners is forbidden.\nPerforming demolition using motorized equipment, whether tracked or wheeled, pushed or driven, is forbidden.\nTwo-way communications radios are allowed where transmit/receive frequencies will not disrupt any hospital system.\nBefore starting work the contractor shall give 21 days  notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described elsewhere in this section.\nCompatible system procurements shall include the following:\nLocks and Keys: Temporary and permanent door hardware shall be compatible with BestÂ® 7-pin, G-keyway, interchangeable core. Prior to commencement of work, the contractor shall provide VA with blank cores; quantity matching the number of openings planned. VA shall then provide construction coring, and a key for same to the General Contractor, who will sign acknowledgement and receipt and responsibility for the key until returned to the VA COR. Final pinout and keying is provided by VA.\nExit Signs: All exit signs shall be City of Chicago approved specification red letters on white edge-lit LED fixtures continuously illuminated 90 mins. after loss of power, push-to- test switch and LED pilot light on the housing, available as single or double-sided models, and meeting UL924.\nBuilding Automation: Components, programming and start up: Native BACnet communications protocol for Building Automation and Control (BAC) connected to the existing Johnson Controls head end equipment.\n27 15 00 Communications Cabling (and other specifications which include telecom cabling): All new telecom cabling shall be Cat 6a vs. 5e. Cat 6a telecom cable, termination punch-down T-568-(B.1, B.2, C.2, etc.), tested and certified (submit result to COR), 6-port modular wall jacks with two RJ45 on top and bottom and two blanks in middle. While VA facilities generally do not include plenum return spaces above ceilings, it nonetheless requires plenum-rated teledata cabling complying with codes pertaining to plenum environments.","text":"CONSTRUCTION STATEMENT OF WORK\nDate: January 24, 2025\nProject Number: 556-24-106\nProject Name: Replace Chiller 2\nLocation: Captain James A. Lovell FHCC 3001 Green Bay Rd,\nNorth Chicago, IL 60064\nPart 1: Project Scope of Work Overview:\nContractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully functional project, including complete and compliant demolition and replacement of an existing 1000-ton York centrifugal chiller and associated system. The replacement shall be a new 1000-ton water cooled centrifugal magnetic drive chiller, chilled water pump, condenser water pump, VFD's, local piping, valves, chemical feed system, electrical power, and controls, integrating them with the existing chiller plant as necessary to reestablish long-term reliability.\nThe contractor shall bring the chiller plant into compliance with all current VA and industry standards.\nPart 2: Period of Performance:\nThe following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work.\nConstruction Period of Performance\n[Assumes HVAC or other long-lead time]\nCalendar Days\nVA Review\nTotal Days From NTP\nNTP [or Limited NTP]\nÂ\nÂ\n0\nAll Division 01 Submittals (esp. with Long Lead Times)\n21\n7\n28\nAll Division 02 Submittals (incl. factory ship date of long lead time items)\n42\n7\n77\nVariable pause based on long lead time ship dates\nÂ\nÂ\n77\nMobilize and Demo (works back for Pre-HVAC)\n30\nÂ\n107\nPre-Longest Lead Construction (works back from factory ship date)\n120\nÂ\n227\nMilestone: Delivery Date of Longest Lead Item (HVAC, Transformer, custom doors and frames, dampers, etc.)\n1\nÂ\n228\nLongest Lead (HVAC, Transformer, etc.) and Balance of Construction\nEnd Date - Including Closeout Approval [may phase; add milestones]\n120\nÂ\n348\n\nNotes:\nSee Section 01 32 16.15 Project Schedules with Long Lead Items (D/B/B Projects at FHCC).\nThe dates are shown to model how the long lead schedule will work.\n\nPart 3: Detailed Project Requirements:\nProject Objectives:\nThis project is required to replace the obsolete chiller and bring the redundancy in the chiller plant up to the current standards.\nMeet or exceed all Code, technical, and programmatic requirements adopted, established, revised, and or published by VA or the many organizations listed in the several specifications.\nProject Scheduling and Mobilization on Site:\nPrior to beginning work, post and maintain at each work area all current emergency contact information, VA Infection Control Risk Assessment (ICRA)/Permit, Interim Life Safety Measures (ILSM), and other information required by VA and the GC project- specific safety plan, at all entry points to the work area.\nPerformance of the Work:\nContainment shall enable access to the work, without obstructing access to adjacent equipment or rooms. Establish HEPA air purification as needed. Review and follow specification 01 35 33 Infection Control Requirements as applicable to this location and work. Follow PCRA & ICRA plan and permit generated and issued by VA. Remove only upon completion approval of the COR.\nPerform selective demolition and construction as described in the specifications and drawings.\nSpecial Acceptance Criteria for the work shall include:\nChiller system shall not be acceptable in whole or in part unless and until Testing, Adjusting, and Balancing (TAB) is completed and accepted.\nThe contractor shall provide EIA/TIA testing and certification of all new Cat 6a communications cable.\nRestore all finishes damaged during the work match existing.\nThoroughly clean all surfaces using HEPA-filtered vacuum cleaner and anti-bacterial wipes.\nPart 4: Meetings, Submittals, and Deliverables:\nKick-Off Meeting and Documentation\nThe contractor s Project Manager and Field Supervisor shall attend a Preconstruction Safety and Coordination Meeting to discuss project details.\nKick-Off Meeting Documentation:\nPrepare and submit for review and acceptance a DRAFT Critical Path Method (CPM) Baseline Schedule reflecting each phase and activity of the work beginning with mobilization, including each critical activity, and each essential task required to optimally meet the objectives of the project.\nTo enable objective assessment of costs and progress, the Baseline Schedule shall be cost-loaded at each work activity (essentially Division 02 on), ensuring that the total cost of each phase and Division of work match the corresponding Schedule of Values, and the total of the construction contract at Award.\nDevelop the CPM schedule in sufficient detail to enable readers to understand all planned activities, their predecessors, and successors, who is performing the work, durations, and costs. Activity durations shall not exceed two calendar weeks. Indicate resource SDVOSB status.\nThe Project Manual index of specifications is a useful guide for starting the CPM schedule and Schedule of Values in sufficient detail. For example: Simply listing HVAC is unacceptable for projects including more than basic work in this category. The inclusion of specifications for an AHU, controls, ductwork, demolition of each, testing and balancing, etc. also prompt their inclusion as categories of activities and tasks in the schedule. In fact, for larger work categories, breaking down the cost by system/material and installation and testing enables partial payment for higher cost items upon delivery into the facility work area.\nPreparation and processing of submittals are GC procurement (administrative) activities and not work activities contributing to the compensable work in the field. Should the contractor elect to include submittal planning in their internal use schedule for their own purposes, do not show those line items in the schedule submitted to VA for consideration in the Baseline Schedule.\nInclude all expected utility system shutdowns, road closures, crane lifts, and off- hours work in the CPM schedule.\nThe contractor shall prepare and submit SF-1413 for each subcontractor to the CO, copying the COR. List of all subcontractors and suppliers, including Company names, office address, and main point of contact name with telephone number, and SDVOSB status.\nAs required at 01 35 26 Safety Requirements: Develop and submit a Project- Specific Construction Safety and Accident Prevention Plan with project-specific procedures, processes, analysis, and details, including but not limited to:\nAccess and use the U.S. Army Corps of Engineers EM 385-1-1 Safety and Health Requirements and its Appendix A Minimum Basic Outline for Accident Prevention Plans for development of meaningful, effective, and compliant project safety plans.\nSubmission of generic, non-project specific safety plans will be rejected, resulting in a contractor-caused delay in commencement of the work.\nProject-specific Activity Hazard Analysis (AHA), which forms the basis of the Construction Safety and Accident Prevention Plan highlighting identified risks such as isolation of stored energy (Lock-Out*), fall protection, or confined space access.\n(*) Note that tag-out is not an acceptable form of isolation, therefore it was intentional not to use the term LOTO.\nSubmit an electronic copy of the GC and all subcontractor competent persons OSHA 30-hour Construction Safety Training certificates with project-specific Construction Safety and Accident Prevention Plan.\nSubmit an electronic copy of all workers OSHA 30-hour Construction Safety Training certificates or cards prior to allowing entry to the site.\nAssist the COR in completing project-specific VA Infection Control Risk Assessment (ICRA) and Interim Life Safety Measures (ILSM) documentation.\nQuality Control Plan and Quality Assurance Plan:\n01 40 00 Quality Requirements is included in its entirety in this contract. This specification is brief but very informative and enabling to those who approach it as an opportunity.\nSubmittal Register (aka submittal log) is described in Quality Assurance of the above specification, and the Project Manual at 01 33 23.\nSubmittal Register must list each submission listed in each and every specification. Because each project is different, do not recycle submittal logs from other projects.\nConstruction Progress Meetings:\nThe Contractor s Project Manager and Field Supervisor shall provide on-site weekly construction progress meetings with the COR for the entire period of performance.\nInclude preparation of meeting agendas, and subsequent minutes of the meeting for each event not later than 1 day (next calendar day) after each meeting.\nConstruction Progress Meeting Agenda s and Minutes shall include no less than: List of invitees/attendees, list of past/ongoing and new issues or concerns, indicate days remaining per the contract, detail any safety incidents, and include current updated copies of the RFI Log, the Shop Drawing Log, and a detailed 3-week look- ahead and utility shutdown schedule.\nDaily Reports:\nThe Contractor shall provide a Daily Report each day, along with accompanying digital photos and other supporting documents. The Daily Report shall include: List of issues or concerns, days remaining per the contract, detail regarding any safety incidents, detail of daily safety inspections (including items checked and corrective actions taken), notations regarding any visitors to the work area.\nUse of VA Form 10101 Contractor Production Report (fillable PDF at https://www.va.gov/vaforms/va/pdf/VA10101.pdf) is required each day even on days with no contractor activity, which is what to report on such days. Contractor may and should provide more information than shown in the standard form, but the standard form is required.\nThe report must be accompanied by relevant time and date-stamped photos of construction progress of sufficient quantity and detail to enable viewers to clearly see the progress of all work to-date, all issues discovered (including those which become the subject of RFI s). Email the VA Form 10101 Contractor Production Report and photos to the COR not later than 9 AM the next working day.\nIn no case shall the GC allow any team member to take photographs with patients, visitors, or employees in the picture.\nAcceptance and Closeout:\nAcceptance criteria for the work:\nSchedule demonstration of new equipment and systems at least 21 calendar days in advance with the COR.\nProvide factory startup and certification of all systems.\nDemonstrate the operation of the system.\nNewly installed water or medical gas piping and distribution system components shall be flushed and disinfected prior to being placed in service. Include documenting completion/certifications.\nStartup and testing of new systems or equipment, or moving in VA purchased equipment or furnishings, or their use, does not constitute any form of Acceptance (or Beneficial Occupancy). The project is planned around the complete, complaint, and unconditional fulfillment of all requirements of the contract which enable the work to be complete by definition. Please work with VA to expedite this process.\nCloseout Records: Provide one full-size, and one half-size printed set of as-built drawings, as well as CD-ROM or DVD-ROM media containing a complete archive of all project documents and files, including but not limited to:\nAs-built record drawings of the installed condition as CAD and PDF files.\nApproved shop drawings.\nOperations and Maintenance Manuals.\nSpare parts lists.\nAll photographs.\nAll daily reports.\nAll communications.\nAll pay applications.\nAll communication, change, and cost data.\nAll safety records.\nA project Warranty for Construction written by the General Contractor, projected to start upon Final Acceptance by VA (typically within a business week of receiving a complete and compliant closeout package).\nWhere manufacturer s warranties exceed one year, provide all documentation necessary for VA to exercise warranty rights beyond the standard GC warranty.\nWhere specified, such as with roofing systems, provide the warranty written by the manufacturer to VA for the term specified or greater (typically 20 years).\nNote that moving furnishings or equipment into the space does not constitute occupancy or acceptance, however, damage to completed work during these activities shall be the responsibility of VA to correct.\nLien Waivers and other documents required by the Contracting Officer.\nPart 5: Applicable Performance Standards\nAll work shall comply with\nAll VA and FHCC policies including and not limited to: VA Construction Safety and VA Infection Control Policies.\nCodes, Standards and Executive Orders (Topic 1) found at http://www.cfm.va.gov/til/cPro.asp\n01 32 16.15 Project Schedules with Long Lead Items (D/B/B Projects at FHCC)\n01 35 26 Safety Requirements\n01 35 33 Infection Control Requirements\n01 40 00 Quality Requirements\n01 41 00 Regulatory Requirements\n01 42 16 Definitions and Abbreviations\nCoordinating with VA-retained Commissioning Agent (CxA) and Architect-Engineer (AE).\nVA intends to retain the services of an independent CxA.\nAE field-verification and documentation of compliant systems remains an essential part of Construction Period Services.\nThe General Contractor shall have a Competent Supervisory Person on site at all times when any worker(s) or subcontractor(s) are present. The General Contractor is also required to maintain on site a competent Site Safety and Health Officer (see 01 35 26 Safety Requirements when any worker(s) or subcontractor(s) are present. The VA COR may, at his or her discretion, may allow the Competent Supervisory Person to also act at the SSHO, based on demonstrated competency and performance in the two roles. If demonstrated lack of competency or effectiveness in either role is observed, the VA COR may revoke the privilege.\nSafety:\nPrior to any activity, review the following with all project and craft team leaders: 01 35 26\nSafety Requirements.\nThe Contractor shall provide a proactive and complaint Construction Safety and Accident Prevention plan in accordance with the Occupational Safety and Health Act, 01 35 26 Safety Requirements, and site-specific policies:\nAll persons working on any electrical systems rated 50 volts or more shall have the minimum qualification as a State Licensed Master Electrician or Registered Journeyman Electrician, and all activities shall follow the safe work practices in compliance with NFPA 70E Electrical Safety in the Workplace.\n01 35 26 Safety Requirements is included in its entirety in this contract. Each contractor-employer is required to be solely responsible for the health and safety of its employees in accordance with 29 CFR 1910, 1926, & 1960 of the Occupational Safety and Health Act of 1970, as amended.\nBecause each contractor-employer is required to be solely responsible for the health and safety of its employees, part of a compliant and effective safety management program requires each employer to plan and implement their own compliant permit- required work including written permits. DO NOT rely on, or request that VA generate required permits such as Hot Work or Confined Space documents.\nPrior to the beginning of any work, fire extinguisher(s) complying with NFPA 10 shall be pedestal-mounted in the work area. Inspection of the work area includes verification that inspection tags are current. Where non-compliant, the contractor may be required to remove and replace the unit(s) before resuming work activity.\nAll work in crawl spaces shall be planned and carried out as OSHA Permit-Required Confined Space.\nImmediately stop work and notify the COR if asbestos is noticed or suspected in the area of work.\nException: The above will not necessarily apply to areas where the documents call for abatement activities. This item is concerned with unplanned locations.\nFire-seal all penetrations made or discovered through any wall or floor assembly with UL Listed fire-rated products or systems.\nInfection Control:\n01 35 33 Infection Control Requirements is included in its entirety in this contract. Its construct is enabling for each condition experienced through each phase of the work. The following are high-level requirements most often found deficient during inspections yet required.\nPrior to any activity, review the following with all project team leaders: 01 35 33\nInfection Control Requirements.\nReview and comply with containment construction and sequence described in the design and specification documents.\nProvide a modular dust-tight system designed and manufactured specifically to be used as a temporary construction isolation barrier.\nBefore the start of work provide pressure differential monitoring system at the entry door to the construction area to prove that the construction area is under negative pressure. Maintain daily logs of readings and submit to the COR weekly. Remove at the completion of construction.\nWalk-off sticky mats are required at all times inside and outside all entry / exit points to all workspaces. Sticky mats must be changed at least once per shift, or more as required by the construction or COR. Size sticky mats to match the width of the door opening and ensure that no less than 24 depth is provided.\nBlock off all HVAC return ductwork and louvers to prevent introduction of dust into the HVAC system.\n1) Where existing HVAC ducts are being removed, immediately, permanently, and compliantly seal off the opening.\nProvide High-Efficiency Particulate Air Filtration (HEPA) recirculating air equipment inside the workspace. Size the air filtration system sufficiently large enough to ensure that negative pressure remains effective when doors are opened.\nWhen working above the ceiling outside of the work area, such as in a corridor, open only one ceiling tile at a time, and provide dust containment tent or portable containment cube, with HEPA filtering negative air system to seal the one opening.\nBroom-sweep the work area at the end of each day (or shift during days with multiple shifts). Provide HEPA vacuum and damp (not wet) mop daily where broom sweeping creates airborne dust.\nProvide fire-sealing of all existing wall and ceiling openings in area of work needed to allow the HEPA filtration equipment to effectively generate negative air pressure within the work area, with respect to the surrounding area.\nProvide HEPA-filtered vacuum cleaning of all surfaces, and damp mop the work area every day.\nDo not allow corrugated carboard to be stored for any period of time within the hospital. Upon arrival, unpack, and transfer all products from cardboard containers to sealed plastic containers, and immediately dispose of the cardboard outside of the building.\nPart 6: Site-Specific Requirements\nProject number and the contract number in the subject line of all emails and documents. Example: 556-24-106 Replace Chiller 2 , or simply 556-24-106 Chiller 2 and then specific subject such as Pay App, RFI, Submittal, Meeting, etc.\nComply with all site-specific requirements and SOPs including and not limited to: Key Policy, Badging Policy, Rules of Behavior, and Smoking Policy.\nNormal construction work hours are 7:00 AM to 3:30 PM Monday through Friday.\nNo work by the Contractor on Federal Holidays, and no work on the weekend when the Federal Holiday is on the respective Monday or Friday.\nNo work in stairs, corridors, lobbies, or other interior / exterior public areas shall be performed during the above-designated work hours.\nAny work including and not limited to noise, vibration, dust, odors, core drilling, hammer- drilling, saw cutting, equipment moving in public corridors, soil compaction shall be performed during the above-designated work hours only.\nCrane lifts, or any work that closes drive isles, closes building entries, or closes public corridors shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.\nAll building systems shall be maintained in full operation at all times:\nRequest utility system shutdowns in writing not less than 21 calendar days in advance and scheduled with the COR at times least impacting patient care.\nShutdown work shall be during low patient times and performed between Saturday 6 PM through midnight concluding by 6 PM on the following Sunday.\nWherever demolition is planned, ceiling tiles are to be removed, or the sprinkler system is to be disabled, GC shall first provide uniform heat detection throughout the work area, connected to the existing supervised building master fire alarm system, for the duration of the work. Fire and or smoke detection devices shall be provided prior to turnover and acceptance.\nDeliveries, Parking, Elevators:\nDeliveries at the dock: At time of delivery: Provide vehicle information to the VA Police and remove the vehicle as soon as delivery is complete. Move materials in public corridors during low patient times between 6 PM through 6 AM the following day.\nNo parking in the VA garages. As part of the Mobilization Plan submission, indicate where workers are to park.\nContractor shall use freight elevators. Do not move materials and employees in passenger elevators without written approval of the COR, and never within elevators occupied by staff or patients.\nThe Mobilization Plan submission shall indicate if and where a construction dumpster is intended to be placed. The contractor shall provide a construction dumpster with a locked safety fence surrounding it, at a location submitted to and approved by the COR. Pavement, concrete surfaces, and landscaping shall be protected from damage resulting from delivery and retrieval, loading and unloading, and dumpster weight.\nConstruction Waste Diversion Reports are required for every dumpster removed from every construction site at every VA facility. Provide these reports to VA COR immediately after the waste hauler removes each dumpster to comply with VA GEMS Policy.\nNo trash, used packaging, or construction spoils shall be stored in the work area. Never use dumpsters other than those rented for this work. Severe penalties, including potential criminal charges may be levied for use of government-rented or owned containers, or those of other contractors.\nTrash removal from the work area shall be within gondolas which have sealed covers (completely enclosed), and during non-business hours, via the freight elevators.\nNo on-site office trailer shall be allowed. Coordinate with the COR for staging materials within the area of work.\nNo music radios within work areas.\nNo noise generated within the work area can be allowed to leave it.\nThe use of powder-actuated fasteners is forbidden.\nPerforming demolition using motorized equipment, whether tracked or wheeled, pushed or driven, is forbidden.\nTwo-way communications radios are allowed where transmit/receive frequencies will not disrupt any hospital system.\nBefore starting work the contractor shall give 21 days notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described elsewhere in this section.\nCompatible system procurements shall include the following:\nLocks and Keys: Temporary and permanent door hardware shall be compatible with BestÂ® 7-pin, G-keyway, interchangeable core. Prior to commencement of work, the contractor shall provide VA with blank cores; quantity matching the number of openings planned. VA shall then provide construction coring, and a key for same to the General Contractor, who will sign acknowledgement and receipt and responsibility for the key until returned to the VA COR. Final pinout and keying is provided by VA.\nExit Signs: All exit signs shall be City of Chicago approved specification red letters on white edge-lit LED fixtures continuously illuminated 90 mins. after loss of power, push-to- test switch and LED pilot light on the housing, available as single or double-sided models, and meeting UL924.\nBuilding Automation: Components, programming and start up: Native BACnet communications protocol for Building Automation and Control (BAC) connected to the existing Johnson Controls head end equipment.\n27 15 00 Communications Cabling (and other specifications which include telecom cabling): All new telecom cabling shall be Cat 6a vs. 5e. Cat 6a telecom cable, termination punch-down T-568-(B.1, B.2, C.2, etc.), tested and certified (submit result to COR), 6-port modular wall jacks with two RJ45 on top and bottom and two blanks in middle. While VA facilities generally do not include plenum return spaces above ceilings, it nonetheless requires plenum-rated teledata cabling complying with codes pertaining to plenum environments.","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25225B0020","product_service_code":"Y1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2025-07-03","posted_at":"2025-07-03T19:55:47.855Z","created_at":"2025-07-03T19:55:18.653Z","modified_at":"2025-09-06T03:55:54.031Z","response_deadline":{"raw":"2025-07-24T11:00:00-05:00","utc":"2025-07-24T16:00:00Z","date":"2025-07-24","time":"11:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f8a3f98da2f140beb14d541b764d6a2a/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-08-23","archive_type":"auto_custom"},"history":[{"index":5,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":1,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}],"contacts":[{"name":"Lynn H VanderVelde","role":"primary","email":"lynn.vandervelde@va.gov","title":"Contractor"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"f8a3f98da2f140beb14d541b764d6a2a","lineage_id":"110f7c8ab060434ca5fdba34d5848a73","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-11T04:02:14.668090321Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"c0387c715f0be5657c58660622de66ff1f0f76c92afaaaecdbfcc4e23e014430","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-11T04:02:14.668090321Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"End","text":"End","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25225B0020","product_service_code":"Y1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2025-07-21","posted_at":"2025-07-21T16:49:34.384Z","created_at":"2025-07-21T16:49:02.484Z","modified_at":"2025-09-06T03:55:54.031Z","response_deadline":{"raw":"2025-08-06T11:00:00-05:00","utc":"2025-08-06T16:00:00Z","date":"2025-08-06","time":"11:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c34819dd0b874f6ba2ffccddb5cf0502/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":false,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-05","archive_type":"auto_custom"},"history":[{"index":5,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":1,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}],"contacts":[{"name":"Lynn H VanderVelde","role":"primary","email":"lynn.vandervelde@va.gov","title":"Contractor"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c34819dd0b874f6ba2ffccddb5cf0502","lineage_id":"110f7c8ab060434ca5fdba34d5848a73","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-09T01:37:38.672149349Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"6dcc9290d7f80b002fa74ceed58fcb4d66d05148ae688c5ec88811a8d21c2bc2","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-09T01:37:38.672149349Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"End","text":"End","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25225B0020","product_service_code":"Y1DZ"},{"award":{"awardee":{}},"dates":{"posted":"2025-07-30","posted_at":"2025-07-30T17:04:40.588Z","created_at":"2025-07-30T17:04:37.612Z","modified_at":"2025-09-06T03:55:54.031Z","response_deadline":{"raw":"2025-08-06T11:00:00-05:00","utc":"2025-08-06T16:00:00Z","date":"2025-08-06","time":"11:00:00","timezone":"America/Chicago","utc_offset_seconds":-18000}},"links":{"sam":"https://sam.gov/workspace/contract/opp/c38395e656f54853a206473c35622707/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-09-05","archive_type":"auto_custom"},"history":[{"index":5,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-30T17:04:40.588Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"c38395e656f54853a206473c35622707","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-21T16:49:34.384Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"c34819dd0b874f6ba2ffccddb5cf0502","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":2,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-07-03T19:55:47.855Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"modify","opportunity_id":"f8a3f98da2f140beb14d541b764d6a2a","solicitation_number":"36C25225B0020","parent_opportunity_id":"110f7c8ab060434ca5fdba34d5848a73"},{"index":1,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":false,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-06-05T19:01:35.404Z","notice_type":{"code":"o","label":"Solicitation"},"request_type":"submit","opportunity_id":"110f7c8ab060434ca5fdba34d5848a73","solicitation_number":"36C25225B0020","related_opportunity_id":"2bc79dbbdb1142b0a3f9258a9064ad94"}],"contacts":[{"name":"Lynn H VanderVelde","role":"primary","email":"lynn.vandervelde@va.gov","title":"Contractor"}],"base_type":{"code":"o","label":"Solicitation"},"notice_id":"c38395e656f54853a206473c35622707","lineage_id":"110f7c8ab060434ca5fdba34d5848a73","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-11-07T02:30:28.272299415Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"4f1a13c22f8b9b3cf6e39d1860e49b9a78ddf7287080043b0085271b51cb9807","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-11-07T02:30:28.272299415Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"description":{"html":"End","text":"End","origin":"detail"},"notice_type":{"code":"o","label":"Solicitation"},"schema_version":1,"solicitation_number":"36C25225B0020","product_service_code":"Y1DZ"},{"award":{"date":"2025-09-11","amount":"2094000.00","number":"36C25225C0052","awardee":{"raw":"AmeriTech Contracting LLC BERLIN 06037-2637 CTE","uei":"CADSMUE9J2M4","cage":"8HBD7","name":"AmeriTech Contracting LLC","location":{"zip":"06037-2637","city":{"name":"BERLIN"},"state":{"name":"CT"},"country":{"code":"CTE","name":"CANTON AND ENDERBURY ISLANDS"}}}},"dates":{"posted":"2025-09-16","posted_at":"2025-09-16T12:12:30.591Z","award_date":"2025-09-11","created_at":"2025-09-16T12:12:29.413Z","modified_at":"2025-10-17T03:55:46.157Z"},"links":{"sam":"https://sam.gov/workspace/contract/opp/09f7c443354342d792afb9389000ec67/view"},"naics":{"codes":["238220"],"primary":"238220"},"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","agency":{"office":{"code":"36C252","name":"252-NETWORK CONTRACT OFFICE 12 (36C252)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"organization_id":"100180018","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2025-10-16","archive_type":"auto_custom"},"history":[{"index":3,"title":"Y1DZ--Replace Chiller No. 2 Construction 556-24-106","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2025-09-16T12:12:30.591Z","notice_type":{"code":"a","label":"Award Notice"},"request_type":"submit","opportunity_id":"09f7c443354342d792afb9389000ec67","solicitation_number":"36C25225B0020"}],"contacts":[{"name":"Lynn Vander Velde","role":"primary","email":"lynn.vandervelde@va.gov","phone":"414-844-4800","title":"ryan.mcmillin@va.gov"}],"base_type":{"code":"a","label":"Award Notice"},"notice_id":"09f7c443354342d792afb9389000ec67","set_aside":{"code":"SDVOSBC","label":"Service-Disabled Veteran-Owned Small Business Set-Aside (FAR 19.14)"},"lineage_id":"09f7c443354342d792afb9389000ec67","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-29T04:08:14.723184620Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2025_archived_opportunities.csv","etag":"\"d47226e3d2c6545974b252e103f82b34-139\"","fetched_at":"2026-09-16T17:45:50.850439Z","row_sha256":"02d8cc2fca6aa202a4ed89cd1162ca965c28ad3af9f7f987396206e54364b6ab","last_modified":"2026-09-13T14:49:20Z"},"updated_at":"2026-10-29T04:08:14.723184620Z","first_seen_at":"2026-09-16T17:45:50.850439Z"},"notice_type":{"code":"a","label":"Award Notice"},"schema_version":1,"solicitation_number":"36C25225B0020","product_service_code":"Y1DZ"}],"due_at":"2025-08-06T16:00:00Z","due_date":"2025-08-06","closes_at":"2025-08-06T16:00:00Z","awardable":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","state":"IL","county":"17097","county_name":"Lake County","city":"1753559","city_name":"North Chicago","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":"CADSMUE9J2M4","amount":"2094000.00","linked_awards":6,"cancelled":false,"archived":true,"updated_at":"2026-10-29T04:15:54.363094Z","principal_notice_id":"c38395e656f54853a206473c35622707","description":{"text":"End","html":"End","origin":"detail"},"contacts":[{"name":"Lynn Vander Velde","role":"primary","email":"lynn.vandervelde@va.gov","phone":"414-844-4800","title":"ryan.mcmillin@va.gov"}],"place_of_performance":null,"office_address":{"zip":"53214","city":"MILWAUKEE","state":"WI","country":"USA"},"naics_codes":["238220"],"award":{"awardee":{}},"attachments":[{"resource_id":"bee8e73572fb4e9996d5c44d9be43b7f","name":"36C25225B0020.docx","kind":"file","mime_type":".docx","size_bytes":17239,"posted_at":"2025-05-14T13:08:03.962Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/bee8e73572fb4e9996d5c44d9be43b7f/download","mirrored":false},{"resource_id":"341ec3783e034aec9280c1c11d447bba","name":"36C25225B0020_1.docx","kind":"file","mime_type":".docx","size_bytes":153439,"posted_at":"2025-06-05T19:01:35.404Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/341ec3783e034aec9280c1c11d447bba/download","mirrored":false},{"resource_id":"4a3a52314f674628878cb5ab473e9dba","name":"36C25225C0052_1.docx","kind":"file","mime_type":".docx","size_bytes":13667,"posted_at":"2025-09-16T12:12:30.591Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/4a3a52314f674628878cb5ab473e9dba/download","mirrored":false},{"resource_id":"c73d810c5b49404a9818f980c4b34be5","name":"S02 - Att 01 Construction Specs.pdf","kind":"file","mime_type":".pdf","size_bytes":5439704,"posted_at":"2025-06-05T19:01:35.404Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/c73d810c5b49404a9818f980c4b34be5/download","mirrored":false},{"resource_id":"740c5852dffe4ad8be675e68654cff20","name":"S02 - Att 02 Construction Dwgs Cmb.pdf","kind":"file","mime_type":".pdf","size_bytes":3882958,"posted_at":"2025-06-05T19:01:35.404Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/740c5852dffe4ad8be675e68654cff20/download","mirrored":false},{"resource_id":"ae541d912bd44cafbfe7201f6a928abc","name":"S02 - Att 03 Wage Determination -Building and Residential 20250425.pdf","kind":"file","mime_type":".pdf","size_bytes":55530,"posted_at":"2025-06-05T19:01:35.404Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/ae541d912bd44cafbfe7201f6a928abc/download","mirrored":false}],"awards":[{"award_key":"CONT_AWD_36C25225C0052_3600_-NONE-_-NONE-","permalink":"https://www.usaspending.gov/award/CONT_AWD_36C25225C0052_3600_-NONE-_-NONE-/","piid":"36C25225C0052","parent_piid":null,"award_type":"DEFINITIVE CONTRACT","vendor_key":"CADSMUE9J2M4","recipient_name":"AMERITECH CONTRACTING LLC","recipient_uei":"CADSMUE9J2M4","recipient_cage":"8HBD7","recipient_city":"BERLIN","recipient_state":"CT","sub_name":"Department of Veterans Affairs","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","office_key":"o-36C252","first_action_date":"2025-09-11","last_action_date":"2025-09-11","actions":1,"obligated":"2094000.00","current_total_value":"2094000.00","potential_total_value":"2094000.00","naics":"238220","psc":"Y1DZ","extent_competed":"FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES","set_aside":"SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE","offers_received":5,"description":"CONSTRUCTION PROJECT 556-24-106 REPLACE CHILLER NO. 2 AT CAPTAIN JAMES A. LOVELL FEDERAL HEALTH CARE CENTER NORTH CHICAGO, IL 60064-3048","method":"piid","confidence":"high","evidence":["award number 36C25225C0052 equals the contract number","same awarding office 36C252"],"opportunity_key":null,"opportunity_title":null}],"related":[{"key":"36C25227Q0069","latest_notice_id":"eed58f84a7f44ac98ced93c2b5e9ec8d","title":"S222--Grease Trap Service-FY27 Base-Tomah VAMC - December 2026 - November 2027","solicitation_number":"36C25227Q0069","notice_type":"o","first_type":"p","first_posted":"2026-11-04","last_posted":"2026-11-19","notices":3,"due_at":"2026-11-27T16:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"562998","psc":"S222","set_aside":"SBA","state":"WI","county":"55081","county_name":"Monroe County","city":"5580075","city_name":"Tomah","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":"Tomah VA Medical Center","site_key":"tomah-va-medical-center-wi","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25227Q0033","latest_notice_id":"4d3caf6262ae49649e71c4eadbda1187","title":"Q702--Great Lakes Region Durable Medical Equipment (DME) Delivery Services","solicitation_number":"36C25227Q0033","notice_type":"o","first_type":"o","first_posted":"2026-11-06","last_posted":"2026-11-19","notices":3,"due_at":"2026-11-30T12:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T12:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"621610","psc":"Q702","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-20T05:30:09.595354Z"},{"key":"36C25227B00020001","latest_notice_id":"7eafb50009534028818a8ee9836b9e30","title":"Z1DA--550-20-121 Demo Old Boiler Plant B100 (CON)","solicitation_number":"36C25227B0002-0001","notice_type":"o","first_type":"o","first_posted":"2026-10-21","last_posted":"2026-11-10","notices":2,"due_at":"2026-12-02T19:00:00Z","due_date":"2026-12-02","closes_at":"2026-12-02T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"IL","county":"17183","county_name":"Vermilion County","city":"1718563","city_name":"Danville","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-11T04:53:52.348876Z"},{"key":"36C25227Q0059","latest_notice_id":"356844aa4dfe401da0c9186aa3e03e85","title":"4130--Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228","solicitation_number":"36C25227Q0059","notice_type":"o","first_type":"r","first_posted":"2026-10-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238220","psc":"J043","set_aside":"SDVOSBC","state":"IL","county":"17031","county_name":"Cook County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C25227B0006","latest_notice_id":"e4fa6ced73cf448f9259359ef2b8eeab","title":"Z1DA--537-26-101 Construction of Ogden Elevator Cab Interiors Jesse Brown VA Medical Center","solicitation_number":"36C25227B0006","notice_type":"p","first_type":"p","first_posted":"2026-10-20","last_posted":"2026-10-20","notices":1,"due_at":"2026-12-04T16:00:00Z","due_date":"2026-12-04","closes_at":"2026-12-04T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238290","psc":"Z1DA","set_aside":"SDVOSBC","state":"IL","county":"17031","county_name":"Cook County","city":"1714000","city_name":"Chicago","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":"Jesse Brown VA Medical Center","site_key":"jesse-brown-va-medical-center-il","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-21T04:57:30.751375Z"}],"similar_open":[{"key":"15BGCS26Q00000077","latest_notice_id":"d31a57ae1f4348edb34963ea15417189","title":"Replace Water Tanks FCI Marion Marions, Illinois","solicitation_number":"15BGCS26Q00000077","notice_type":"p","first_type":"o","first_posted":"2026-10-29","last_posted":"2026-10-29","notices":2,"due_at":"2026-11-30T16:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-015","dept_name":"JUSTICE, DEPARTMENT OF","sub_key":"s-1540","sub_name":"FEDERAL PRISON SYSTEM / BUREAU OF PRISONS","office_key":"o-15BFA0","office_name":"FAO","naics":"238220","psc":"4520","set_aside":"SBA","state":"IL","county":"17199","county_name":"Williamson County","city":null,"city_name":null,"country":"USA","place_scope":"nationwide","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-30T03:41:17.879115Z"},{"key":"36C25227Q0059","latest_notice_id":"356844aa4dfe401da0c9186aa3e03e85","title":"4130--Chiller Compressor Replacement at the Edward Hines Jr. VA Hospital (Hines) Building 228","solicitation_number":"36C25227Q0059","notice_type":"o","first_type":"r","first_posted":"2026-10-16","last_posted":"2026-11-16","notices":2,"due_at":"2026-12-03T16:00:00Z","due_date":"2026-12-03","closes_at":"2026-12-03T16:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238220","psc":"J043","set_aside":"SDVOSBC","state":"IL","county":"17031","county_name":"Cook County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-17T04:42:47.571825Z"},{"key":"36C25227R0002","latest_notice_id":"cd0c4eb7b3e74fc2915583e23a9e9e8b","title":"Z1DA--FY27 Danville Mechanical MATOC SEED PROJECT NO: 550-26-106, Replace Air Handling Unit B58 at the VA Illiana Health Care System (VIHCS), Danville IL.","solicitation_number":"36C25227R0002","notice_type":"p","first_type":"p","first_posted":"2026-10-23","last_posted":"2026-10-23","notices":1,"due_at":"2026-12-15T05:59:00Z","due_date":"2026-12-14","closes_at":"2026-12-15T05:59:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C252","office_name":"252-NETWORK CONTRACT OFFICE 12 (36C252)","naics":"238220","psc":"Z1DA","set_aside":"SDVOSBC","state":"IL","county":"17183","county_name":"Vermilion County","city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":"sam_zip","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-10-24T03:56:54.139438Z"}],"similar_open_total":57,"indexable":false}