{"canonical":"https://sealedbidder.com/opportunities/36c25026q0634","key":"36C25026Q0634","url":"https://sealedbidder.com/opportunities/36c25026q0634","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland","solicitation_number":"36C25026Q0634","notice_type":"r","open":false,"removed":false,"removed_at":null,"response_deadline":"2026-06-17T19:00:00Z","first_posted":"2026-06-10","last_posted":"2026-06-10","department":"VETERANS AFFAIRS, DEPARTMENT OF","subagency":"VETERANS AFFAIRS, DEPARTMENT OF","office":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":null,"place_state":"OH","place_scope":"site","site":null,"place_state_source":null,"place_evidence":null,"place_county":"39035","place_county_name":"Cuyahoga County","place_city":"3916000","place_city_name":"Cleveland","winner":null,"award_amount":null,"publications":[{"notice_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland","solicitation_number":"36C25026Q0634","notice_type":"r","base_type":"r","posted":"2026-06-10","posted_at":"2026-06-10T18:03:21.034Z","due_at":"2026-06-17T19:00:00Z","due_date":"2026-06-17","cancelled":false,"archived":true,"archive_date":"2026-08-16","removed_at":null,"award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/f8525ad8a3e545b6b30bbfd9fe260ad3/view","enriched":true,"history":[{"index":3,"title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T18:03:21.034Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","solicitation_number":"36C25026Q0634"}]}],"latest_notice_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","first_type":"r","notices":[{"award":{"awardee":{}},"dates":{"posted":"2026-06-10","posted_at":"2026-06-10T18:03:21.034Z","created_at":"2026-06-10T18:03:18.783Z","modified_at":"2026-08-16T05:07:02.804Z","response_deadline":{"raw":"2026-06-17T15:00:00-04:00","utc":"2026-06-17T19:00:00Z","date":"2026-06-17","time":"15:00:00","timezone":"America/New_York","utc_offset_seconds":-14400}},"links":{"sam":"https://sam.gov/workspace/contract/opp/f8525ad8a3e545b6b30bbfd9fe260ad3/view"},"naics":{"codes":["238210"],"primary":"238210"},"title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland","agency":{"office":{"code":"36C250","name":"250-NETWORK CONTRACT OFFICE 10 (36C250)"},"subtier":{"code":"3600","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"department":{"code":"036","name":"VETERANS AFFAIRS, DEPARTMENT OF"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"organization_id":"100167099","organization_type":"OFFICE"},"status":{"active":false,"latest":true,"deleted":false,"archived":true,"cancelled":false,"publication":"published","archive_date":"2026-08-16","archive_type":"auto_custom"},"history":[{"index":3,"title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance (VA-27-00000997) - VAMC Cleveland","action":"publish","latest":true,"deleted":false,"archived":true,"cancelled":false,"posted_at":"2026-06-10T18:03:21.034Z","notice_type":{"code":"r","label":"Sources Sought"},"request_type":"submit","opportunity_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","solicitation_number":"36C25026Q0634"}],"contacts":[{"fax":"N/A","name":"Christopher A. Callihan","role":"primary","email":"christopher.callihan@va.gov","phone":"216-707-7736","title":"Contracting Officer"}],"base_type":{"code":"r","label":"Sources Sought"},"notice_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","lineage_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","provenance":{"detail":{"endpoints":["opportunity","resources","history"],"fetched_at":"2026-10-02T12:20:26.149608636Z"},"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"26fce5416dad203e3f07b95da75d9690839c0cb32ca6bc725e78ee229c296bd8","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-10-02T12:20:26.149608636Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"html":"Page 3 of 3\nThis is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance. \n\nVAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance \nSTATEMENT OF WORK (SOW)\nas of 3/7/2026\n\n\n1.  Contracting Officer s Representative (COR).  \nName:\nTBD\nSection:\n\nAddress:\n10701 East Blvd, Cleveland, OH 44106\nPhone Number:\nTBD\nFax Number:\nTBD\nE-Mail Address:\nTBD\n\n2.  Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance \n\n3.  Background.  \nLouis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections.  Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s).  \n\n4.  Scope. \nThe contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance \nas defined in this Statement of Work except for those items specified as government furnished property and services.  The contractor shall meet the standards in this contract.\n\nIn the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification.  No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation.  All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection.  Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW.\n\n5. Specific Tasks.  \nOnsite testing, inspection, minor repair, and housekeeping.\n\n5.1  Substation and Transformer Maintenance completed tri-annually January   May  (Testing Period may be adjusted to meet medical center needs)\nVisually inspect, tighten hardware and torque bolted connections. \nManually operate each switch to check operation of auxiliaries and interlocks.      Check contact wipe, clearances and gaps as described in the manufacturer's instruction book.\nClean and lubricate all moving parts with manufacturer's approved lubricants. \nCheck electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service.\nVerify the Kirk Key interlock system. \nTest bus for insulation resistance.  \nThe vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment.  Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service.  \nLiquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets manufacturer's specification. The liquid must be re-filled to meet the manufacturer's specifications.  \nTest insulation resistance of both high and low voltage windings to ground and each other.\nInspect temperature relays, gauges, switches and alarms. \nIf equipped with fans and pumps, verify proper operation and test. \nVerify three (3} phase transformer turns ratio on all taps using a three (3} phase test set.\nPower factor test.  \nDry type transformers must be thoroughly cleaned exteriorly and inspected for overheating with infra-red thermal detecting equipment.   \nTest insulation resistance of both high and low voltage windings to ground. \nInspect temperature relays, gauges, switches, and alarms. \nTest fans, if equipped, and inspect all vent filters. Ensure proper routing of thermocouple leads. \nVerify transformer turns ratio on all taps. \nVisually inspect and clean transformer windings. \nCheck torque on all accessible bolted connections. \nClean cells and bus components. \nTest bus for insulation resistance. Visually inspect the main bus. \nTest all accessible bolted bus connections for proper torque and integrity. \nTest protective relays. \nVerify potential and control transformers. \nCheck the breaker lifting device for proper operation. \nVerify the key interlock system. \nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts. \nVerify the proper functioning of all indicating devices. \nBolted pressure switches: Clean, lubricate and verify electrical and mechanical operation.\nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts. \nVerify the proper functioning of all indicating devices. \nVerify the proper operation of the control power transfer equipment. \nFunctional test all protective relays, where permitted. \n\nSwitchgear and Switchboard Assemblies.\nTransformers 500 Kilovolt-Amps (kVA) or larger\nSwitches, Vacuum, Medium-Voltage\nSwitches, Air, Low-Voltage.\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nMotor Control, Motor Starter, Medium-Voltage\nMotor Control, Motor Starters, Low-Voltage.\nMetal Enclosed Busways\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nSwitches, Vacuum, Medium-Voltage\nTransformers, Dry Type, Air-Cooled, Low-voltage, Small.\nTransformers, Dry Type, Air-Cooled, Low-voltage, Large.\nTransformers, Liquid-Filled.\n\n  Circuit Breaker Maintenance 400 amps and above completed tri-annually January   May (Testing Period may be adjusted to meet medical center needs)\nClean and lubricate, as necessary. \nOperate the breaker racking mechanisms to verify smooth operation. \nOperate the breakers to check the operation of auxiliaries and interlocks. \nFor low voltage breakers, inspect arc chutes, contacts and insulation structures in accordance with the manufacturer's instruction manual. Test each breaker with a portable secondary injection test set or primary injection test set. \nFor medium voltage breakers, inspect interphase barriers and insulation structure for signs of damage or contamination. Check contacts in accordance with the manufacturer's instruction manual. \nTest insulation resistance. \nTest contact resistance. \nCircuit Breakers, Air, Insulated-Case/ Molded-Case.\nCircuit Breakers, Air, Low-Voltage Power.\nCircuit Breakers, Vacuum, Medium-Voltage.\n   \n5.3   Ground Resistance Testing   completed annually July\nTest Ground resistance for the main MV room and all 24 substations throughout the facility. Refer to VAH 1028 FY16.\nGrounding Systems.\nGround-fault Protection Systems.\n5.4   IR Imagery   completed annually in July\nInfra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.  \n\nUse an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System.  \nObjective of this work is to detect any loose, broken, or corroded connections in the system.  \nProblem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers  specifications.\nInfra-Red Report shall be prepared and submitted to COTR within seven (7} days of completion. \n\nTest report shall include nameplate data, test results, general condition and maintenance recommendations, and location. \n\nColor pictures shall be provided of any problem areas \nNote that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.\nThe report for infrared inspections shall provide complete documentation of thermal patterns detected in the electrical equipment within the Louis Stokes VA Facility. Provide qualitative evaluation to help prioritize repairs. \nThe infrared inspection report should meet the documentation requirements of the Infra-red inspection Institute Guideline for Infrared Inspection of Electrical and Mechanical Systems. All other published guidelines and standards pertaining to the infrared inspection of electrical and mechanical systems should be referenced and incorporated in the report and inspection. \nElectrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) is inspected, tested, maintained, and/or calibrated every 36 months, and all work must be documented. NOTE: The National Electrical Testing Association (NETA) provides guidance, which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the extent possible. \nIdentify the hot spots in the electrical equipment by using infra-red thermal detecting equipment. Tighten problem connections to meet equipment manufacturers  specifications using a torque wrench or other approved devices. \n\nRepair Priority Ratings \nTemperature Severity Ratings are the objective and based on temperatures measured by the thermography. The exception and other reference temperatures are compared to industry standards and guidelines to produce an objective Temperature Severity Rating. The vendor is to use the following temperature criteria to assign Temperature Severity Ratings to the exceptions: \n\nNETA Priority Criteria for Electrical & Mechanical Exceptions\n#1 (0 to 18Â°F} Possible deficiency and warrants investigation \n#2 (18 to 36 Â°F} Indicates probable deficiency, repair as time permits \n#3 (36 to 72 Â°F} Indicates definite discrepancy; repair as soon as possible \n#4 (Greater than 72 Â°F} Indicates major discrepancy; repair immediately\n\n5.5   Medium Voltage Relay Testing completed tri-annually January   May\nProtective Relays Microprocessor Based.\nCalibrate and maintain adjustable protective relays. \nVisual inspection. \nClean. \nTest. \n\n5.6   Medium Voltage Substation Control Power Batteries completed annually January   May\nInspect, clean and check torque on bolted connections. \nCheck for proper voltage and regulation. \nPerform battery impedance and resistance testing. \n\n5.7   Transformer Oil Testing completed annually April   June \nCollect cooling liquid oil sample for testing: \nGeneral quality tests \nDielectric strength \nAcid neutralization \nInterfacial tension \nVisual inspection \nWater content \nPower factor \nDissolved gas analysis \n\n5.8  Tri-annual 4-Hour Power Outage Test (2029)\n\nThe Contractor shall be present for and will participate as a resident expert in the VAMC 4- hour test of the Essential Electrical System (EES) to be conducted on a Saturday or Sunday. \nThis test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening all utility service connections serving the VAMC for a minimum of 4 hours. \nDuring the test period, verify operation of all EES components including the transfer to emergency power and return to normal service. \nThe Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8   12 hours. \nThe Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. \nContractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work.\n\n5.9  Maintenance Reports\nContractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer Representative for immediate actions.\nWork items, definitions, and references shall comply with the latest edition of the NETA   Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. \nNOTE: settings such as ATS settings, Adjustable Breaker Settings, etc must be provided by the VA. If not available from current coordination studies, then they should have the contractor conduct a study to determine proper settings.\nSystem Function Tests. Provide function tests for all equipment listed in this Scope of Work.\nTest Conditions. \n\n5.10  -- Tri-Annual Testing and Inspection\n\nBreaker Testing List\nBase Year:  November 1, 2026 Through October 31, 2027\n\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \nÂ \n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nRussel Gear \nN/A\nN/A\nÂ \nCutler Hammer MDS840\n4000\n1\nBE602\nÂ \nÂ \nÂ \nCutler Hammer MDS632\n3200\n2\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS620\n2000\n3\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n6\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS608\n800\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NE361200 LSG\n1200\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC1\n2\n2500 Dry\n1\n5KV SW/5 KV  Starters\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nTie-GPS-TGPB\nÂ \nÂ \nÂ \nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW32H\n3200\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nDPE-5\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEDSB3\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n2\nEDSB4\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEC3B\nÂ \nÂ \nÂ \nSquare D NW20H1\n2000\n2\nÂ \nÂ \nÂ \nÂ \nSquare D NW16H1\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW08H1\n800\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nGDS3\nÂ \nÂ \nÂ \nEaton SBS 630\n3000\n4\nDPE3\nÂ \nÂ \nÂ \nEaton LT360032\n450\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nMV Substation\nÂ \nÂ \nÂ \nC/H 150VCP-W 500\n1200\n33\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ \nÂ \nÂ \nGE AK25\n600\n4\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ \nÂ \nÂ \nÂ \nSchneider\n800\n3\n\n\n\nBreaker Testing List\nOption Year 1:  November 1, 2027 Through October 31, 2028\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ \nÂ \nÂ \nÂ \nÂ \nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ \nSquare D MH36800\n800\nEmergency\nÂ \nÂ \nÂ \nSquare D MH36600\n600\n Panel\nÂ \nÂ \nÂ \nSquare D MH36400\n400\nÂ \nÂ \nÂ \nÂ \nSquare D MH34250\n250\nÂ \nÂ \nÂ \nÂ \nSquare D MH34225\n225\nÂ \nÂ \nÂ \nÂ \nSquare D MH34200\n200\nÂ \nÂ \nÂ \nÂ \nSquare D SE\n2500\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n1200\nPenthouse\nÂ \nÂ \nÂ \nÂ \nÂ \nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ \nÂ \nÂ \nÂ \nGE AKRT-6D-30H\n800\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nElevator\nN/A\nN/A\nÂ \nGE AK2A-50\n1600\nÂ \nÂ \nÂ \nÂ \nGE AK2A-25\n600\nMICU\nÂ \nÂ \nÂ \nÂ \nÂ \nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n400\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1-G\nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB1-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB2-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nCB-T-UPS\nÂ \nÂ \nÂ \nSiemens MCCB\n600\n7th Floor\nÂ \nÂ \nÂ \nÂ \nÂ \nEDP\nÂ \nÂ \nÂ \nEaton RD320T36W\n2000\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\nDPHL71EQ\nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n250\nDPHL72EQ\nÂ \nÂ \nÂ \nSquare D Power Pact\n800\nÂ \nÂ \nÂ \nÂ \nSquare D Power Pact\n400\nDPEG2\nÂ \nÂ \nÂ \nEaton MCCB\n1200\nCares Tower\nÂ \nÂ \nÂ \nEaton MCCB\n800\n\n\nYearly Breaker  Testing List\nOption Year 2 :  November 1, 2028 Through October 31, 2029\n\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \nÂ \n2029/2032\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nAmb Care\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nSub H1\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS408\n800\n9\nSub H2\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS408\n800\n8\nEGSB1\nÂ \nÂ \nÂ \nCutler Hammer MCCB\n1200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MCCB\n1200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MCCB\n800\n2\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MCCB\n600\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEmergency\nN/A\n750 Dry\n1\nIn Amb Care\nÂ \nÂ \nEmergency\n1\n750 Dry\n1\nIn Energy Center\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nCares Tower\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \n1st Floor F1, F2\n4\n1500 Dry\n2\nEaton MDS630\n3000\n3\nBF-193\nÂ \nÂ \nÂ \nEaton MCCB\n800\n5\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n150\n1\nUpstairs F3, F4\n4\n1000 Dry\n2\nEaton MDS620\n2000\n3\nPF-105\nÂ \nÂ \nÂ \nEaton MCCB\n800\n6\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n160\n2\nDPEG2 - Cares PH\nÂ \nÂ \nÂ \nEaton MCCB\n1200\n1\nÂ \nÂ \nÂ \nEaton MHDL3400F\n400\n6\nRadiology\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nLeft side\n2\n500 Dry\n1\nEaton MDS612\n1200\n2\n2B-502\nÂ \nÂ \nÂ \nEaton MCCB\n800\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n225\n7\nRight Side\n2\n1000 Dry\n1\nEaton MDS620\n2000\n1\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n1\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n800\n1\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n160\n3\nPathology\n2\n1500 Dry\n1\nGE Wavepro\n2500\n2\nUSS-F2\nÂ \nÂ \nÂ \nGE MCCB\n400\n2\nÂ \nÂ \nÂ \nÂ \nGE MCCB\n150\n2\nÂ \nÂ \nÂ \nÂ \nGE MCCB\n125\n1\nÂ \nÂ \nÂ \nÂ \nGE MCCB\n100\n1\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nLab Warehouse\n2\n1500 Dry\n1\nEaton MDS625\n2500\n2\nUSS-F1\nÂ \nÂ \nÂ \nEaton MCCB\n630\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nParking Garage\n1\nOil\n1\nÂ \nÂ \nÂ \n\n\nYearly Breaker Refurbishing and Testing Listing\nOption Year 3 :  November 1, 2029 Through October 31, 2030\n\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \nÂ \n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nRussel Gear \nN/A\nN/A\nÂ \nCutler Hammer MDS840\n4000\n1\nBE602\nÂ \nÂ \nÂ \nCutler Hammer MDS632\n3200\n2\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS620\n2000\n3\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n6\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS608\n800\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NE361200 LSG\n1200\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC1\n6-Jun\n2500 Dry\n1\n5KV SW/5 KV  Starters\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nTie-GPS-TGPB\nÂ \nÂ \nÂ \nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW32H\n3200\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nDPE-5\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEDSB3\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n2\nEDSB4\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEC3B\nÂ \nÂ \nÂ \nSquare D NW20H1\n2000\n2\nÂ \nÂ \nÂ \nÂ \nSquare D NW16H1\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW08H1\n800\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nGDS3\nÂ \nÂ \nÂ \nEaton SBS 630\n3000\n4\nDPE3\nÂ \nÂ \nÂ \nEaton LT360032\n450\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nMV Substation\nÂ \nÂ \nÂ \nC/H 150VCP-W 500\n1200\n33\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ \nÂ \nÂ \nGE AK25\n600\n4\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ \nÂ \nÂ \nÂ \nSchneider\n800\n3\n\n\nBreaker Testing List\nOption Year 4:  November 1, 2030 Through October 31, 2031\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ \nÂ \nÂ \nÂ \nÂ \nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ \nSquare D MH36800\n800\nEmergency\nÂ \nÂ \nÂ \nSquare D MH36600\n600\n Panel\nÂ \nÂ \nÂ \nSquare D MH36400\n400\nÂ \nÂ \nÂ \nÂ \nSquare D MH34250\n250\nÂ \nÂ \nÂ \nÂ \nSquare D MH34225\n225\nÂ \nÂ \nÂ \nÂ \nSquare D MH34200\n200\nÂ \nÂ \nÂ \nÂ \nSquare D SE\n2500\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n1200\nPenthouse\nÂ \nÂ \nÂ \nÂ \nÂ \nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ \nÂ \nÂ \nÂ \nGE AKRT-6D-30H\n800\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nElevator\nN/A\nN/A\nÂ \nGE AK2A-50\n1600\nÂ \nÂ \nÂ \nÂ \nGE AK2A-25\n600\nMICU\nÂ \nÂ \nÂ \nÂ \nÂ \nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n400\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1-G\nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB1-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB2-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nCB-T-UPS\nÂ \nÂ \nÂ \nSiemens MCCB\n600\n7th Floor\nÂ \nÂ \nÂ \nÂ \nÂ \nEDP\nÂ \nÂ \nÂ \nEaton RD320T36W\n2000\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\nDPHL71EQ\nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n250\nDPHL72EQ\nÂ \nÂ \nÂ \nSquare D Power Pact\n800\nÂ \nÂ \nÂ \nÂ \nSquare D Power Pact\n400\nDPEG2\nÂ \nÂ \nÂ \nEaton MCCB\n1200\nCares Tower\nÂ \nÂ \nÂ \nEaton MCCB\n800\n\n\n \n\nInfra-Red Line Items for Inspection\n  \nInfra-Red Line items for inspection ITEM # \nEQUIPMENT DESCRIPTION \nLOCATION \n1 \n16 Panels \nMain Basement, BA-151 Ambulatory Care \n2 \nATS # 1,2,3,4 \nMain Basement, BA-151 Ambulatory Care \n3 \nSubs H1 & H2 \nMain Basement, BA-151 Ambulatory Care \n4 \nMCC1 & MCC2 \nMain Basement, BA-151 Ambulatory Care \n5 \n6 Surge Arrestors \nMain Basement, BA-151 Ambulatory Care \n6 \nVFD 51 Return & Supply Fans \nMain Basement, BA-151 Ambulatory Care \n7 \nVFD 52 Return & Supply Fans \nMain Basement, BA-151 Ambulatory Care \n8 \nVFD 53 Return & Supply Fan \nMain Basement, BA-151 Ambulatory Care \n9 \n5 Cutler Hammer Switchboards \nMain Basement, BA-151 Ambulatory Care \n10 \n16 Disconnect Switches \nMain Basement, BA-151 Ambulatory Care \n11 \n8 Panels & 1 Disconnect Switch \nMain Basement, B-B362 Electrical Room \n12 \n5 Panels \nMain Basement, B-C315 Engineering Closet \n13 \nATS # 16,17,18,19 \nMain Basement, FES B-E261 \n14 \n24 Panels \nMain Basement, FES B-E261 \n15 \n4 Disconnect Switches \nMain Basement, FES B-E261 \n16 \n6 Disconnect Switches & 8 VFDs \nMain Basement, FES B-E260 \n17 \n1 Panel \nMain Basement, F12A \n18 \n3 Panels \nMain Basement, 1-E500 Generator Room \n19 \n14 Panels & 1 Disconnect \nMain Basement, H-01A \n20 \nSubs GPS 1 & GPS 2, 1 Panel \nMain Basement, B-E602 Russ Gear Room \n21 \n3 Disconnect Switches & 1 Panel \nMain Basement, B-E503 Pipe Tunnel \n22 \n7 Panels & 1 Disconnect Switch \nMain Basement, B-E361B Hall by Cares Tower \n23 \n4 Panels \nMain Basement, B-A148 Electrical Closet \n24 \n4 Panels & 2 Disconnect Switches \nMain Basement, B-C563 \n25 \nATS # 49,50 \nMain Basement, Unmarked by Room B-B549 \n26 \n7 Panels \nMain Basement, Unmarked by Room B-B549 \n27 \nAll Breakers \nMain Basement, B-E504 Main Sub \n28 \nIncoming Disconnects & Battery Rack \nMain Basement, B-E504 Main Sub \n29 \nATS # 23,24,25 \nMain Basement, B-D423 \n30 \n3 Panels & 1 Disconnect Switch \nMain Basement, B-D423 \n31 \n7 Eaton Switchboards \nMain Basement, B-D423 \n32 \nATS # 26 \nMain Basement, B-D424 \n33 \n5 Panels \nMain Basement, B-D424 \n34 \nATS # 5,8,22 \nMain Basement, D21 \n35 \n10 Panels \nMain Basement, D21 \n36 \nSub A & B, Lighting and Power \nMain Basement, D21 \n37 \nATS # 65 \nMain Basement, Energy Center, B-E603 \n38 \nEaton Subs GDS3 & EC3B \nMain Basement, Energy Center, B-E603 \n39 \nATS # 15, 51, 52 \nMain Basement, Energy Center, B-E601 \n40 \n9 Panels \nMain Basement, Energy Center, B-E601 \n41 \n4 Chiller Starter Switches \nMain Basement, Energy Center, B-E601 \n42 \nSubs 1, EC2, EC3, TGP \nMain Basement, Energy Center, B-E601 \n43 \n1 Panel \nMain Basement, Energy Center, Cat Gen Room \n44 \n8 Panels, 12 Disconnect Switches & 13 VFDs \nMain Basement, B-D607 Chiller Plant North \n45 \n7 VFDs \nMain Basement, Boiler Room \n46 \n9 Disconnect Switches \nMain Basement, B-F411 Water Filtration \n47 \n9 Panels \nMain 1st Floor, 129E by Surgery Sub \n48 \n5 Panels & 2 Disconnect Switches \nMain 1st Floor, K111-A \n49 \n4 Panels & 1 Disconnect Switch \nMain 1st Floor, K122B \n50 \n3 Panels \nMain 1st Floor, Kitchen \n51 \n1 Panel \nMain 1st Floor, 1-D392 \n52 \n1 Panel \nMain 1st Floor, 1-E401 \n53 \n8 Panels \nMain 1st Floor, A-105 Surgery Sub \n54 \nATS # 11,12,13 \nMain 1st Floor, A-105 Surgery Sub \n55 \n10 Disconnect Switches \nMain 1st Floor, A-107 AC Shop \n56 \nMCC N1 & E1 \nMain 1st Floor, A-107 AC Shop \n57 \n4 Panels & 1 Disconnect Switch \nMain 2nd Floor, 2A-102 \n58 \n6 Panels \nMain 2nd Floor, 2A-158 \n59 \n3 Panels & 1 Disconnect Switch \nMain 2nd Floor, 2A-187 \n60 \n11 Panels \nMain 2nd Floor, 2B-125 \n61 \n4 Panels \nMain 2nd Floor, 2B-126 \n62 \n8 Panels & 2 Disconnect Switches \nMain 2nd Floor, 2B-148 \n63 \n5 Panels & 2 Disconnect Switches \nMain 2nd Floor, 2B-223 \n64 \nATS # 20 \nMain 2nd Floor, 2B-480 Mech Room East \n65 \n5 Panels, 2 Disconnect Switches & 1 VFD \nMain 2nd Floor, 2B-480 Mech Room East \n66 \n4 Panels & 4 Disconnect Switches \nMain 2nd Floor, 2B-501 Mechanical Penthouse \n67 \nATS # 42 & Teledata ATS \nMain 2nd Floor, 2B-502 Penthouse \n68 \nSub Stations F1 & F2 \nMain 2nd Floor, 2B-502 Penthouse \n69 \n1 Panel, 3 Disconnect Switches & Eaton Panel \nMain 2nd Floor, 2B-502 Penthouse \n70 \n9 Panels \nMain 2nd Floor, 2C-411 \n71 \n1 Panel & Bus Duct \nMain 2nd Floor, 2C-412 \n72 \n1 Disconnect Switch & 1 VFD \nMain 2nd Floor, 2C-2041 \n73 \nMCC 22B \nMain 2nd Floor, 2C-2041 \n74 \n2 Panels \nMain 2nd Floor, 2D-177 \n75 \n1 Panel \nMain 2nd Floor, 2D-188 \n76 \n2 Panels \nMain 2nd Floor, 2D-190 \n77 \n3 Panels \nMain 2nd Floor, 2D-191 \n78 \n3 Panels \nMain 2nd Floor, 2E-320 \n79 \n2 Panels & 1 Disconnect Switch \nMain 2nd Floor, 2E-347 \n80 \n1 Panel \nMain 2nd Floor, 2E-361 \n81 \n9 Panels \nMain 2nd Floor, 2E-315 \n82 \nATS # 21 \nMain 2nd Floor, 2E-480 Mech Room West \n83 \n3 Panels, 3 Disconnect Switches & 1 VFD \nMain 2nd Floor, 2E-480 Mech Room West \n84 \n3 Panels & 2 Disconnect Switches \nMain 2nd Floor, k-214A \n85 \n4 Panels & 2 Disconnect Switches \nMain 2nd Floor, k-222 \n86 \n3 Disconnect Switches \nMain 2nd Floor, Rm 2004 \n87 \n2 Panels \nMain 3rd Floor, 3A-100 \n88 \n2 Panels \nMain 3rd Floor, 3A-113 \n89 \n3 Panels \nMain 3rd Floor, 3A-115, Mechanical \n90 \n2 Panels \nMain 3rd Floor, 3A-122 \n91 \n2 Panels \nMain 3rd Floor, 3A-136 \n92 \n3 Panels \nMain 3rd Floor, 3B-147 \n93 \n1 Panel \nMain 3rd Floor, 3B-148 \n94 \n2 Panels \nMain 3rd Floor, 3B-149 \n95 \n25 Panels \nMain 3rd Floor, 3B-162b Electrical Room \n96 \n3 Disconnect Switches \nMain 3rd Floor, 3B-162d Penthouse \n97 \n2 Panels \nMain 3rd Floor, 3C-105 \n98 \nBus Duct \nMain 3rd Floor, 3C-108 \n99 \nMCC 32, AC 25 MCC \nMain 3rd Floor, Penthouse \n100 \n1 Panel \nMain 4th Floor, 4A-109 \n101 \n1 Panel \nMain 4th Floor, 4A-109 \n102 \n3 Panels \nMain 4th Floor, 4A-114 \n103 \n1 Panel \nMain 4th Floor, 4A-116 \n104 \n2 Panels \nMain 4th Floor, 4A-125 \n105 \n2 Panels \nMain 4th Floor, 4A-149 \n106 \n1 Panel \nMain 4th Floor, 4A-160 \n107 \n4 Panels \nMain 4th Floor, 4AC-232, By Stair 4 Amb. Care \n108 \n1 Panel \nMain 4th Floor, 4B-106 \n109 \n6 Panels \nMain 4th Floor, 4B-111 \n110 \n1 Panel \nMain 4th Floor, 4B-112 \n111 \n3 Panels \nMain 4th Floor, 4B-121 \n112 \n1 Panel \nMain 4th Floor, 4B-147 \n113 \n1 Panel \nMain 4th Floor, 4B-155 \n114 \n6 Panels \nMain 4th Floor, 4C-103 \n115 \nBus Duct \nMain 4th Floor, 4C-106 \n116 \n4 Panels \nMain 5th Floor, 5A-114 \n117 \n2 Panels \nMain 5th Floor, 5A-125 \n118 \n2 Panels \nMain 5th Floor, 5A-152 \n119 \n3 Panels & 1 Disconnect Switch \nMain 5th Floor, 5B-115 \n120 \n2 Panels \nMain 5th Floor, 5B-125 \n121 \n2 Panels \nMain 5th Floor, 5B-152 \n122 \n3 Panels \nMain 5th Floor, 5C-111 \n123 \nBus Duct \nMain 5th Floor, 5C-Elevators \n124 \n3 Panels, 10 Disconnect Switches \nMain 5th Floor, Penthouse, Stair C,1 or 4 \n125 \n6 VFDs, 4 Control Panels \nMain 5th Floor, Penthouse, Stair C,1 or 4 \n126 \n2 Panels \nMain 6th Floor, 6A-105 \n127 \n1 Panel \nMain 6th Floor, 6A-111 \n128 \n2 Panels \nMain 6th Floor, 6A-112 \n129 \n3 Panels & 10 Disconnect Switches \nMain 6th Floor, 6A-126 \n130 \n1 Panel \nMain 6th Floor, 6A-140 \n131 \n2 Panels \nMain 6th Floor, 6B-105 \n132 \n2 Panels \nMain 6th Floor, 6B-117 \n133 \n1 Panel \nMain 6th Floor, 6B-124 \n134 \n2 Panels \nMain 6th Floor, 6B-130 \n135 \n1 Panels \nMain 6th Floor, 6B-144 \n136 \n2 Panels \nMain 6th Floor, 6C-100 \n137 \n1 Panels \nMain 6th Floor, 6C-101 \n138 \nBus Duct \nMain 6th Floor, 6C-Elevators \n139 \n10 Panels, 3 Disconnects & 5 VFDs \nMain 7th Floor Penthouse \n140 \nATS # 43,44,45,46 \nMain 7th Floor Penthouse \n141 \nMCC 71 \nMain 7th Floor Penthouse \n142 \n2 Panels \nMain 7th Floor Penthouse, AC-29 \n143 \n1 Panel & MCC 74 \nMain 7th Floor, 7B-100 Exhaust Fan Room \n144 \nGE Sub Station \nMain 7th Floor, 7C-107 Mechanical Roof \n145 \nATS # 14 & HVAC ATS \nMain 7th Floor, 7C-102 Elevator Penthouse \n146 \nPanels, MCC \nMain 7th Floor, 7C-102 Elevator Penthouse \n147 \n2 Panels \nCares A Floor, AF-193 \n148 \n6 Panels \nCares A Floor, AF-ELC1 \n149 \n7 Panels & Bus Duct \nCares A Floor, AF-ELC2 \n150 \n1 Panel \nCares A Floor, AF-LVC2 \n151 \n1 Disconnect Switch & 2 VFDs \nCares Basement, BF 192 \n152 \nSub F1 & F2 \nCares Basement, BF 193 \n153 \n3 Panels \nCares Basement, BF 193 \n154 \n7 Panels & Bus Duct \nCares Basement, BF-ELC1 \n155 \n10 Panels & Bus Duct \nCares Basement, BF-ELC2 \n156 \n1 Panel \nCares Basement, BF-LVC2 \n164 \n3 Disconnect Switches \nCares 1st Floor, FUT Card Elevator Eq. Room \n165 \n5 Panels & Bus Duct \nCares 2nd Floor, 2F-ELC1 \n166 \n6 Panels & Bus Duct \nCares 2nd Floor, 2F-ELC2 \n167 \n1 Panel \nCares 2nd Floor, 2F-LVC2 \n168 \nATS # 39,40,47 \nCares 2nd Floor, 2F-501A Electrical Penthouse \n169 \n11 Panels & 1 Disconnect Switch \nCares 2nd Floor, 2F-501A Electrical Penthouse \n170 \nLab Warehouse Sub \nCares 2nd Floor, 2F-501A Electrical Penthouse \n171 \n2 Disconnect Switches \nCares 2nd Floor, 2F-501B Mechanical Penthouse \n172 \n9 Disconnect Switches & 2 VFDs \nCares 2nd Floor, 2F-501C Mechanical Penthouse \n173 \nATS # 48 \nCares 2nd Floor, 2F-501D Electrical Penthouse \n174 \n3 Panels & 2 Disconnect Switches \nCares 2nd Floor, 2F-501D Electrical Penthouse \n175 \nPathology Sub \nCares 2nd Floor, 2F-501D Electrical Penthouse \n176 \n8 Panels & Bus Duct \nCares 3rd Floor, 3F-ELC1 \n177 \n7 Panels & Bus Duct \nCares 3rd Floor, 3F-ELC2 \n178 \n1 Panel \nCares 3rd Floor, 3F-LVC2 \n179 \n6 Panels & Bus Duct \nCares 4th Floor, 4F-ELC1 \n180 \n7 Panels & Bus Duct \nCares 4th Floor, 4F-ELC2 \n181 \n1 Panel \nCares 4th Floor, 4F-LVC2 \n182 \n6 Panels & Bus Duct \nCares 5th Floor, 5F-ELC1 \n183 \n7 Panels & Bus Duct \nCares 5th Floor, 5F-ELC2 \n184 \n1 Panel \nCares 5th Floor, 5F-LVC2 \n185 \nPanels & Bus Duct \nCares 6th Floor, 6F-ELC1 \n186 \nPanels & Bus Duct \nCares 6th Floor, 6F-ELC2 \n187 \n1 Panel \nCares 6th Floor, 6F-LVC2 \n188 \n2 Disconnect Switches \nCares Penthouse, PF-102 Elevator Controls \n189 \n14 Disconnect Switches & 15 VFDs \nCares Penthouse, PF-104 \n190 \n2 Panels \nCares Penthouse, PF-105 \n191 \nSub F3 & F4 \nCares Penthouse, PF-105 \n192 \nATS # 37,38 \nCares Penthouse, PF-105 \n193 \n8 Disconnect Switches \nCares Penthouse, PF-106 \n194 \n5 Panels \nSinai Skills Center, Room 116 \n195 \n2 Panels \nSinai Skills Center, 2nd Floor Restrooms \n196 \n6 Panels \nParking Garages, 1C-703 \n197 \n3 Panels & 2 Disconnect Switches \nParking Garages, 1G 703 Electrical Eq. Room \n198 \n2 Disconnect Switches \nParking Garages, 1G 702 Elevator Eq. Room \n199 \n1 Panel, 4 Disconnect Switches \nParking Garages, 2C-703 \n200 \n4 Disconnect Switches \nParking Garages, 3C-703 \n201 \n3 Disconnect Switches \nParking Garages, 4C-703 \n202 \nSquare D Switchgear \nParking Garages, 006 Main Electric Room \n203 \n4 Panels & 1 Disconnect Switch \nParking Garages, 006 Main Electric Room \n204 \nG/ATS 1 \nParking Garages, 006 Main Electric Room \n205 \nEaton Switchgear & 2 Panels \nParking Garages, 006A Electric Room \n206 \n7 Disconnect Switches \nParking Garages, 005A Elevator Mechanical \n\n6. Deliverables:\n Written Report\nA complete written report of the work performed shall be provided to the VA within 7 days of completion.  \nInformation shown in the report shall be as follows:\nCompany s name, addresses, telephone, & FAX numbers.\nName and signature of contractors who perform the maintenance and testing.\nVA Work Contract Number, name and number of VA Contracting Officer.\nDate and Time of work.\nCopies of contractors  valid licenses, professional and training certificates.\nDescriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.\nLocation, Type, Name, serial number, and nameplate information of electrical equipment to be maintained and tested.  \nDescriptions of work items.\nTest data.\nReference materials such as equipment manufacturer s specifications, coordination study, etc.\nRemarks on conditions of electrical equipment.  List all deficiencies, if any.\nRecommended corrective actions, if any.\nSubmit four (4) hard copies of the complete written report and emailed report to VA Contracting Officer Representative (COR) within seven (7) calendar days of visit.  \nAll reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.\n6.2 Awarded contractor shall submit a site-specific safety plan (SSSP) outlining how  inspections and testing will safely be conducted.  This safety plan will be submitted to VA  safety department for approval.  COR will provide SSSP packet to contractor for  completion.\nContractor shall meet all timeline requirements outlined in this SOW. \nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n100 %\n>30 days\n2\nMV Substation Inspection Report\nEmail   Word - Excel\n100 %\n>30 days\n3\nMV Control Power Batteries Report\nEmail   Word   Excel\n100 %\n>30 days\n4\nMV Substation Control Power Relay Testing Report\nEmail   Word   Excel\n100 %\n>30 days\n5\nSubstation Transformer Testing Report\nEmail   Word   Excel\n100 %\n>30 days\n6\nTransformer Oil Sample Report\nEmail   Word - Excel\n100 %\n>30 days\n7\nCircuit Breaker Testing Report\nEmail   Word   Excel\n100 %\n>30 days\n8\nGround Resistance Testing Report\nEmail   PDF - Excel\n100 %\n14 Days\n9\nIR Imagery Report\nEmail   PDF   Excel\n100 %\n14 Days\n10\n4 Hour Blackout Support\nEmail   PDF   Excel\n100 %\n14 Days\n11\nAll items completed during scheduled timeframe\nEmail   PDF   Excel\n95%\n14 Days\n\n \n7. Performance Monitoring\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the equipment listed within this SOW and the facility to establish to their satisfaction the condition of the Electrical Power Distribution equipment to be maintained and any other conditions affecting the work to be performed.  This equipment is offered in an \"as-is\" condition.  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. \n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership.\n\nContractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business.\n\nContractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. \n\nContractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years.  Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.\n\nContractors shall have safety trainings   either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S   Electrical, and the NFPA 70E   Standard for Electrical Safety in the Workplace.  Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E.  Training certifications shall be submitted to the VA Contracting Officer prior to work.  If no training certifications are available, the contractor  Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work.\n\nContractors shall have ready access to the latest versions of the following references:\nNFPA 70, National Electrical Code.\nNFPA 70B, Recommended Practice for Electrical Equipment Maintenance.\nNFPA 70E, Standard for Electrical Safety for the Workplace.\nNFPA 110, Standard for Emergency and Standby Power System.\nOSHA Standard 29 CFR 1910, Subparts I & S.\nInternational Electrical Testing Association, Inc. (NETA)   Maintenance and Testing Specifications.\nOperating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested.  These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.\nVHA Directive [2006-056][1028], Electrical Power Distribution System\n\nContractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely.  Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.  \n\nQuality Control : The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer s acceptance in writing of any proposed change to his QC system. \n\nQuality Assurance: The government shall evaluate the contractor s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). \n\nHours of Operation: The contractor is responsible for conducting business, between the hours of 7 a.m. to 11:30 p.m. Monday thru Friday or Saturday and Sunday 6 a.m.   6 p.m. when maintenance requires electrical power interruption, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential. \n\nWork is not to be performed during federal holidays without prior approval of the COR. \nNew Year s Day \nLabor Day \nMartin Luther King Jr. s Birthday \nColumbus Day \nPresident s Day \nVeteran s Day \nMemorial Day \nThanksgiving Day \nIndependence Day \nChristmas Day\nJuneteenth\n\nThe contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.\n\nCheck   In Requirements: \nThe Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. \n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\n\nSecurity Requirements:  The C&A requirements do not apply, and a Security Accreditation Package is not required.\nDedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information. \nContractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â \n\n11. General Security:  Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\nVA Information Custodial Language: \nInformation made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). \nThe contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\n  Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).  \nNo GFE will be issued to complete the requirements of this contract.\n\nOther Pertinent Information or Special Considerations. \nPrior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect facility equipment listed in this SOW to establish to their satisfaction the condition of the equipment to be maintained and any other conditions affecting the work to be performed.  This equipment is offered in an \"as-is\" condition.  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. \n\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractor shall have a minimum of five (5) years within the last seven (7) years of successful experience maintaining power distribution equipment identical or similar to the equipment listed in this Contract SOW. \n\nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\n\nThe Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of the Contract manager and an alternate shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) work days of the changes. \n\nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\n\nIdentification of Possible Follow-on Work.  Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. \n\nIdentification of Potential Conflicts of Interest (COI). \nNone\nIdentification of Non-Disclosure Requirements. \nNot Applicable\nPackaging, Packing and Shipping Instructions.  \nNone\nInspection and Acceptance Criteria.  \nContractor will be responsible for meeting timelines listed in this SOW to include monthly inspection, inspection reports, and response to service call. \n\n15. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.  \n\n16.  Place of Performance. \nWork will be performed at \nLouis Stokes VA Medical Center \n10701 East Blvd\nCleveland, Ohio\n44106\n\n17.  Period of Performance. \nBase Year:   November 1, 2026 through October 31, 2027\nOption Year One:  November 1, 2027 through October 31, 2028\nOption Year Two:  November 1, 2028 through October 31, 2029\nOption Year Three: November 1, 2029 through October 31, 2030\nOption Year Four:  November 1, 2030 through October 31, 2031\n\n18.  Point of Contact\n TBD\n\nThe NAICS code for this procurement is 238210 Electrical Contractors and Other Wiring Installation Contractors and the small business size standard is $19,000,000.00.\n\nResponses to this notice shall be e-mailed to Christopher A. Callihan at christopher.callihan@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than 3:00 p.m., Wednesday, June 17, 2026. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.","text":"Page 3 of 3\nThis is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance.\n\nVAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance\nSTATEMENT OF WORK (SOW)\nas of 3/7/2026\n\n1. Contracting Officer s Representative (COR).\nName:\nTBD\nSection:\n\nAddress:\n10701 East Blvd, Cleveland, OH 44106\nPhone Number:\nTBD\nFax Number:\nTBD\nE-Mail Address:\nTBD\n\n2. Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance\n\n3. Background.\nLouis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections. Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s).\n\n4. Scope.\nThe contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance\nas defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract.\n\nIn the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation. All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection. Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW.\n\n5. Specific Tasks.\nOnsite testing, inspection, minor repair, and housekeeping.\n\n5.1 Substation and Transformer Maintenance completed tri-annually January May (Testing Period may be adjusted to meet medical center needs)\nVisually inspect, tighten hardware and torque bolted connections.\nManually operate each switch to check operation of auxiliaries and interlocks. Check contact wipe, clearances and gaps as described in the manufacturer's instruction book.\nClean and lubricate all moving parts with manufacturer's approved lubricants.\nCheck electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service.\nVerify the Kirk Key interlock system.\nTest bus for insulation resistance.\nThe vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment. Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service.\nLiquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets manufacturer's specification. The liquid must be re-filled to meet the manufacturer's specifications.\nTest insulation resistance of both high and low voltage windings to ground and each other.\nInspect temperature relays, gauges, switches and alarms.\nIf equipped with fans and pumps, verify proper operation and test.\nVerify three (3} phase transformer turns ratio on all taps using a three (3} phase test set.\nPower factor test.\nDry type transformers must be thoroughly cleaned exteriorly and inspected for overheating with infra-red thermal detecting equipment.\nTest insulation resistance of both high and low voltage windings to ground.\nInspect temperature relays, gauges, switches, and alarms.\nTest fans, if equipped, and inspect all vent filters. Ensure proper routing of thermocouple leads.\nVerify transformer turns ratio on all taps.\nVisually inspect and clean transformer windings.\nCheck torque on all accessible bolted connections.\nClean cells and bus components.\nTest bus for insulation resistance. Visually inspect the main bus.\nTest all accessible bolted bus connections for proper torque and integrity.\nTest protective relays.\nVerify potential and control transformers.\nCheck the breaker lifting device for proper operation.\nVerify the key interlock system.\nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts.\nVerify the proper functioning of all indicating devices.\nBolted pressure switches: Clean, lubricate and verify electrical and mechanical operation.\nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts.\nVerify the proper functioning of all indicating devices.\nVerify the proper operation of the control power transfer equipment.\nFunctional test all protective relays, where permitted.\n\nSwitchgear and Switchboard Assemblies.\nTransformers 500 Kilovolt-Amps (kVA) or larger\nSwitches, Vacuum, Medium-Voltage\nSwitches, Air, Low-Voltage.\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nMotor Control, Motor Starter, Medium-Voltage\nMotor Control, Motor Starters, Low-Voltage.\nMetal Enclosed Busways\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nSwitches, Vacuum, Medium-Voltage\nTransformers, Dry Type, Air-Cooled, Low-voltage, Small.\nTransformers, Dry Type, Air-Cooled, Low-voltage, Large.\nTransformers, Liquid-Filled.\n\nCircuit Breaker Maintenance 400 amps and above completed tri-annually January May (Testing Period may be adjusted to meet medical center needs)\nClean and lubricate, as necessary.\nOperate the breaker racking mechanisms to verify smooth operation.\nOperate the breakers to check the operation of auxiliaries and interlocks.\nFor low voltage breakers, inspect arc chutes, contacts and insulation structures in accordance with the manufacturer's instruction manual. Test each breaker with a portable secondary injection test set or primary injection test set.\nFor medium voltage breakers, inspect interphase barriers and insulation structure for signs of damage or contamination. Check contacts in accordance with the manufacturer's instruction manual.\nTest insulation resistance.\nTest contact resistance.\nCircuit Breakers, Air, Insulated-Case/ Molded-Case.\nCircuit Breakers, Air, Low-Voltage Power.\nCircuit Breakers, Vacuum, Medium-Voltage.\n\n5.3 Ground Resistance Testing completed annually July\nTest Ground resistance for the main MV room and all 24 substations throughout the facility. Refer to VAH 1028 FY16.\nGrounding Systems.\nGround-fault Protection Systems.\n5.4 IR Imagery completed annually in July\nInfra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.\n\nUse an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System.\nObjective of this work is to detect any loose, broken, or corroded connections in the system.\nProblem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers specifications.\nInfra-Red Report shall be prepared and submitted to COTR within seven (7} days of completion.\n\nTest report shall include nameplate data, test results, general condition and maintenance recommendations, and location.\n\nColor pictures shall be provided of any problem areas\nNote that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.\nThe report for infrared inspections shall provide complete documentation of thermal patterns detected in the electrical equipment within the Louis Stokes VA Facility. Provide qualitative evaluation to help prioritize repairs.\nThe infrared inspection report should meet the documentation requirements of the Infra-red inspection Institute Guideline for Infrared Inspection of Electrical and Mechanical Systems. All other published guidelines and standards pertaining to the infrared inspection of electrical and mechanical systems should be referenced and incorporated in the report and inspection.\nElectrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) is inspected, tested, maintained, and/or calibrated every 36 months, and all work must be documented. NOTE: The National Electrical Testing Association (NETA) provides guidance, which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the extent possible.\nIdentify the hot spots in the electrical equipment by using infra-red thermal detecting equipment. Tighten problem connections to meet equipment manufacturers specifications using a torque wrench or other approved devices.\n\nRepair Priority Ratings\nTemperature Severity Ratings are the objective and based on temperatures measured by the thermography. The exception and other reference temperatures are compared to industry standards and guidelines to produce an objective Temperature Severity Rating. The vendor is to use the following temperature criteria to assign Temperature Severity Ratings to the exceptions:\n\nNETA Priority Criteria for Electrical & Mechanical Exceptions\n#1 (0 to 18Â°F} Possible deficiency and warrants investigation\n#2 (18 to 36 Â°F} Indicates probable deficiency, repair as time permits\n#3 (36 to 72 Â°F} Indicates definite discrepancy; repair as soon as possible\n#4 (Greater than 72 Â°F} Indicates major discrepancy; repair immediately\n\n5.5 Medium Voltage Relay Testing completed tri-annually January May\nProtective Relays Microprocessor Based.\nCalibrate and maintain adjustable protective relays.\nVisual inspection.\nClean.\nTest.\n\n5.6 Medium Voltage Substation Control Power Batteries completed annually January May\nInspect, clean and check torque on bolted connections.\nCheck for proper voltage and regulation.\nPerform battery impedance and resistance testing.\n\n5.7 Transformer Oil Testing completed annually April June\nCollect cooling liquid oil sample for testing:\nGeneral quality tests\nDielectric strength\nAcid neutralization\nInterfacial tension\nVisual inspection\nWater content\nPower factor\nDissolved gas analysis\n\n5.8 Tri-annual 4-Hour Power Outage Test (2029)\n\nThe Contractor shall be present for and will participate as a resident expert in the VAMC 4- hour test of the Essential Electrical System (EES) to be conducted on a Saturday or Sunday.\nThis test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening all utility service connections serving the VAMC for a minimum of 4 hours.\nDuring the test period, verify operation of all EES components including the transfer to emergency power and return to normal service.\nThe Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours.\nThe Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test.\nContractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work.\n\n5.9 Maintenance Reports\nContractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer Representative for immediate actions.\nWork items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System.\nNOTE: settings such as ATS settings, Adjustable Breaker Settings, etc must be provided by the VA. If not available from current coordination studies, then they should have the contractor conduct a study to determine proper settings.\nSystem Function Tests. Provide function tests for all equipment listed in this Scope of Work.\nTest Conditions.\n\n5.10 -- Tri-Annual Testing and Inspection\n\nBreaker Testing List\nBase Year: November 1, 2026 Through October 31, 2027\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\nÂ\n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nRussel Gear\nN/A\nN/A\nÂ\nCutler Hammer MDS840\n4000\n1\nBE602\nÂ\nÂ\nÂ\nCutler Hammer MDS632\n3200\n2\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS620\n2000\n3\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n6\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS608\n800\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NE361200 LSG\n1200\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC1\n2\n2500 Dry\n1\n5KV SW/5 KV Starters\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nTie-GPS-TGPB\nÂ\nÂ\nÂ\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW32H\n3200\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nDPE-5\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEDSB3\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n2\nEDSB4\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEC3B\nÂ\nÂ\nÂ\nSquare D NW20H1\n2000\n2\nÂ\nÂ\nÂ\nÂ\nSquare D NW16H1\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW08H1\n800\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nGDS3\nÂ\nÂ\nÂ\nEaton SBS 630\n3000\n4\nDPE3\nÂ\nÂ\nÂ\nEaton LT360032\n450\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nMV Substation\nÂ\nÂ\nÂ\nC/H 150VCP-W 500\n1200\n33\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ\nÂ\nÂ\nGE AK25\n600\n4\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ\nÂ\nÂ\nÂ\nSchneider\n800\n3\n\nBreaker Testing List\nOption Year 1: November 1, 2027 Through October 31, 2028\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ\nÂ\nÂ\nÂ\nÂ\nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ\nSquare D MH36800\n800\nEmergency\nÂ\nÂ\nÂ\nSquare D MH36600\n600\nPanel\nÂ\nÂ\nÂ\nSquare D MH36400\n400\nÂ\nÂ\nÂ\nÂ\nSquare D MH34250\n250\nÂ\nÂ\nÂ\nÂ\nSquare D MH34225\n225\nÂ\nÂ\nÂ\nÂ\nSquare D MH34200\n200\nÂ\nÂ\nÂ\nÂ\nSquare D SE\n2500\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n1200\nPenthouse\nÂ\nÂ\nÂ\nÂ\nÂ\nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ\nÂ\nÂ\nÂ\nGE AKRT-6D-30H\n800\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nElevator\nN/A\nN/A\nÂ\nGE AK2A-50\n1600\nÂ\nÂ\nÂ\nÂ\nGE AK2A-25\n600\nMICU\nÂ\nÂ\nÂ\nÂ\nÂ\nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n400\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1-G\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB1-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB2-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nCB-T-UPS\nÂ\nÂ\nÂ\nSiemens MCCB\n600\n7th Floor\nÂ\nÂ\nÂ\nÂ\nÂ\nEDP\nÂ\nÂ\nÂ\nEaton RD320T36W\n2000\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\nDPHL71EQ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n250\nDPHL72EQ\nÂ\nÂ\nÂ\nSquare D Power Pact\n800\nÂ\nÂ\nÂ\nÂ\nSquare D Power Pact\n400\nDPEG2\nÂ\nÂ\nÂ\nEaton MCCB\n1200\nCares Tower\nÂ\nÂ\nÂ\nEaton MCCB\n800\n\nYearly Breaker Testing List\nOption Year 2 : November 1, 2028 Through October 31, 2029\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\nÂ\n2029/2032\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nAmb Care\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nSub H1\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS408\n800\n9\nSub H2\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS408\n800\n8\nEGSB1\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n1200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n1200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n800\n2\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n600\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEmergency\nN/A\n750 Dry\n1\nIn Amb Care\nÂ\nÂ\nEmergency\n1\n750 Dry\n1\nIn Energy Center\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nCares Tower\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\n1st Floor F1, F2\n4\n1500 Dry\n2\nEaton MDS630\n3000\n3\nBF-193\nÂ\nÂ\nÂ\nEaton MCCB\n800\n5\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n150\n1\nUpstairs F3, F4\n4\n1000 Dry\n2\nEaton MDS620\n2000\n3\nPF-105\nÂ\nÂ\nÂ\nEaton MCCB\n800\n6\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n160\n2\nDPEG2 - Cares PH\nÂ\nÂ\nÂ\nEaton MCCB\n1200\n1\nÂ\nÂ\nÂ\nEaton MHDL3400F\n400\n6\nRadiology\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nLeft side\n2\n500 Dry\n1\nEaton MDS612\n1200\n2\n2B-502\nÂ\nÂ\nÂ\nEaton MCCB\n800\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n225\n7\nRight Side\n2\n1000 Dry\n1\nEaton MDS620\n2000\n1\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n1\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n800\n1\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n160\n3\nPathology\n2\n1500 Dry\n1\nGE Wavepro\n2500\n2\nUSS-F2\nÂ\nÂ\nÂ\nGE MCCB\n400\n2\nÂ\nÂ\nÂ\nÂ\nGE MCCB\n150\n2\nÂ\nÂ\nÂ\nÂ\nGE MCCB\n125\n1\nÂ\nÂ\nÂ\nÂ\nGE MCCB\n100\n1\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nLab Warehouse\n2\n1500 Dry\n1\nEaton MDS625\n2500\n2\nUSS-F1\nÂ\nÂ\nÂ\nEaton MCCB\n630\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nParking Garage\n1\nOil\n1\nÂ\nÂ\nÂ\n\nYearly Breaker Refurbishing and Testing Listing\nOption Year 3 : November 1, 2029 Through October 31, 2030\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\nÂ\n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nRussel Gear\nN/A\nN/A\nÂ\nCutler Hammer MDS840\n4000\n1\nBE602\nÂ\nÂ\nÂ\nCutler Hammer MDS632\n3200\n2\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS620\n2000\n3\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n6\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS608\n800\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NE361200 LSG\n1200\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC1\n6-Jun\n2500 Dry\n1\n5KV SW/5 KV Starters\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nTie-GPS-TGPB\nÂ\nÂ\nÂ\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW32H\n3200\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nDPE-5\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEDSB3\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n2\nEDSB4\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEC3B\nÂ\nÂ\nÂ\nSquare D NW20H1\n2000\n2\nÂ\nÂ\nÂ\nÂ\nSquare D NW16H1\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW08H1\n800\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nGDS3\nÂ\nÂ\nÂ\nEaton SBS 630\n3000\n4\nDPE3\nÂ\nÂ\nÂ\nEaton LT360032\n450\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nMV Substation\nÂ\nÂ\nÂ\nC/H 150VCP-W 500\n1200\n33\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ\nÂ\nÂ\nGE AK25\n600\n4\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ\nÂ\nÂ\nÂ\nSchneider\n800\n3\n\nBreaker Testing List\nOption Year 4: November 1, 2030 Through October 31, 2031\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ\nÂ\nÂ\nÂ\nÂ\nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ\nSquare D MH36800\n800\nEmergency\nÂ\nÂ\nÂ\nSquare D MH36600\n600\nPanel\nÂ\nÂ\nÂ\nSquare D MH36400\n400\nÂ\nÂ\nÂ\nÂ\nSquare D MH34250\n250\nÂ\nÂ\nÂ\nÂ\nSquare D MH34225\n225\nÂ\nÂ\nÂ\nÂ\nSquare D MH34200\n200\nÂ\nÂ\nÂ\nÂ\nSquare D SE\n2500\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n1200\nPenthouse\nÂ\nÂ\nÂ\nÂ\nÂ\nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ\nÂ\nÂ\nÂ\nGE AKRT-6D-30H\n800\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nElevator\nN/A\nN/A\nÂ\nGE AK2A-50\n1600\nÂ\nÂ\nÂ\nÂ\nGE AK2A-25\n600\nMICU\nÂ\nÂ\nÂ\nÂ\nÂ\nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n400\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1-G\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB1-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB2-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nCB-T-UPS\nÂ\nÂ\nÂ\nSiemens MCCB\n600\n7th Floor\nÂ\nÂ\nÂ\nÂ\nÂ\nEDP\nÂ\nÂ\nÂ\nEaton RD320T36W\n2000\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\nDPHL71EQ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n250\nDPHL72EQ\nÂ\nÂ\nÂ\nSquare D Power Pact\n800\nÂ\nÂ\nÂ\nÂ\nSquare D Power Pact\n400\nDPEG2\nÂ\nÂ\nÂ\nEaton MCCB\n1200\nCares Tower\nÂ\nÂ\nÂ\nEaton MCCB\n800\n\nInfra-Red Line Items for Inspection\n\nInfra-Red Line items for inspection ITEM #\nEQUIPMENT DESCRIPTION\nLOCATION\n1\n16 Panels\nMain Basement, BA-151 Ambulatory Care\n2\nATS # 1,2,3,4\nMain Basement, BA-151 Ambulatory Care\n3\nSubs H1 & H2\nMain Basement, BA-151 Ambulatory Care\n4\nMCC1 & MCC2\nMain Basement, BA-151 Ambulatory Care\n5\n6 Surge Arrestors\nMain Basement, BA-151 Ambulatory Care\n6\nVFD 51 Return & Supply Fans\nMain Basement, BA-151 Ambulatory Care\n7\nVFD 52 Return & Supply Fans\nMain Basement, BA-151 Ambulatory Care\n8\nVFD 53 Return & Supply Fan\nMain Basement, BA-151 Ambulatory Care\n9\n5 Cutler Hammer Switchboards\nMain Basement, BA-151 Ambulatory Care\n10\n16 Disconnect Switches\nMain Basement, BA-151 Ambulatory Care\n11\n8 Panels & 1 Disconnect Switch\nMain Basement, B-B362 Electrical Room\n12\n5 Panels\nMain Basement, B-C315 Engineering Closet\n13\nATS # 16,17,18,19\nMain Basement, FES B-E261\n14\n24 Panels\nMain Basement, FES B-E261\n15\n4 Disconnect Switches\nMain Basement, FES B-E261\n16\n6 Disconnect Switches & 8 VFDs\nMain Basement, FES B-E260\n17\n1 Panel\nMain Basement, F12A\n18\n3 Panels\nMain Basement, 1-E500 Generator Room\n19\n14 Panels & 1 Disconnect\nMain Basement, H-01A\n20\nSubs GPS 1 & GPS 2, 1 Panel\nMain Basement, B-E602 Russ Gear Room\n21\n3 Disconnect Switches & 1 Panel\nMain Basement, B-E503 Pipe Tunnel\n22\n7 Panels & 1 Disconnect Switch\nMain Basement, B-E361B Hall by Cares Tower\n23\n4 Panels\nMain Basement, B-A148 Electrical Closet\n24\n4 Panels & 2 Disconnect Switches\nMain Basement, B-C563\n25\nATS # 49,50\nMain Basement, Unmarked by Room B-B549\n26\n7 Panels\nMain Basement, Unmarked by Room B-B549\n27\nAll Breakers\nMain Basement, B-E504 Main Sub\n28\nIncoming Disconnects & Battery Rack\nMain Basement, B-E504 Main Sub\n29\nATS # 23,24,25\nMain Basement, B-D423\n30\n3 Panels & 1 Disconnect Switch\nMain Basement, B-D423\n31\n7 Eaton Switchboards\nMain Basement, B-D423\n32\nATS # 26\nMain Basement, B-D424\n33\n5 Panels\nMain Basement, B-D424\n34\nATS # 5,8,22\nMain Basement, D21\n35\n10 Panels\nMain Basement, D21\n36\nSub A & B, Lighting and Power\nMain Basement, D21\n37\nATS # 65\nMain Basement, Energy Center, B-E603\n38\nEaton Subs GDS3 & EC3B\nMain Basement, Energy Center, B-E603\n39\nATS # 15, 51, 52\nMain Basement, Energy Center, B-E601\n40\n9 Panels\nMain Basement, Energy Center, B-E601\n41\n4 Chiller Starter Switches\nMain Basement, Energy Center, B-E601\n42\nSubs 1, EC2, EC3, TGP\nMain Basement, Energy Center, B-E601\n43\n1 Panel\nMain Basement, Energy Center, Cat Gen Room\n44\n8 Panels, 12 Disconnect Switches & 13 VFDs\nMain Basement, B-D607 Chiller Plant North\n45\n7 VFDs\nMain Basement, Boiler Room\n46\n9 Disconnect Switches\nMain Basement, B-F411 Water Filtration\n47\n9 Panels\nMain 1st Floor, 129E by Surgery Sub\n48\n5 Panels & 2 Disconnect Switches\nMain 1st Floor, K111-A\n49\n4 Panels & 1 Disconnect Switch\nMain 1st Floor, K122B\n50\n3 Panels\nMain 1st Floor, Kitchen\n51\n1 Panel\nMain 1st Floor, 1-D392\n52\n1 Panel\nMain 1st Floor, 1-E401\n53\n8 Panels\nMain 1st Floor, A-105 Surgery Sub\n54\nATS # 11,12,13\nMain 1st Floor, A-105 Surgery Sub\n55\n10 Disconnect Switches\nMain 1st Floor, A-107 AC Shop\n56\nMCC N1 & E1\nMain 1st Floor, A-107 AC Shop\n57\n4 Panels & 1 Disconnect Switch\nMain 2nd Floor, 2A-102\n58\n6 Panels\nMain 2nd Floor, 2A-158\n59\n3 Panels & 1 Disconnect Switch\nMain 2nd Floor, 2A-187\n60\n11 Panels\nMain 2nd Floor, 2B-125\n61\n4 Panels\nMain 2nd Floor, 2B-126\n62\n8 Panels & 2 Disconnect Switches\nMain 2nd Floor, 2B-148\n63\n5 Panels & 2 Disconnect Switches\nMain 2nd Floor, 2B-223\n64\nATS # 20\nMain 2nd Floor, 2B-480 Mech Room East\n65\n5 Panels, 2 Disconnect Switches & 1 VFD\nMain 2nd Floor, 2B-480 Mech Room East\n66\n4 Panels & 4 Disconnect Switches\nMain 2nd Floor, 2B-501 Mechanical Penthouse\n67\nATS # 42 & Teledata ATS\nMain 2nd Floor, 2B-502 Penthouse\n68\nSub Stations F1 & F2\nMain 2nd Floor, 2B-502 Penthouse\n69\n1 Panel, 3 Disconnect Switches & Eaton Panel\nMain 2nd Floor, 2B-502 Penthouse\n70\n9 Panels\nMain 2nd Floor, 2C-411\n71\n1 Panel & Bus Duct\nMain 2nd Floor, 2C-412\n72\n1 Disconnect Switch & 1 VFD\nMain 2nd Floor, 2C-2041\n73\nMCC 22B\nMain 2nd Floor, 2C-2041\n74\n2 Panels\nMain 2nd Floor, 2D-177\n75\n1 Panel\nMain 2nd Floor, 2D-188\n76\n2 Panels\nMain 2nd Floor, 2D-190\n77\n3 Panels\nMain 2nd Floor, 2D-191\n78\n3 Panels\nMain 2nd Floor, 2E-320\n79\n2 Panels & 1 Disconnect Switch\nMain 2nd Floor, 2E-347\n80\n1 Panel\nMain 2nd Floor, 2E-361\n81\n9 Panels\nMain 2nd Floor, 2E-315\n82\nATS # 21\nMain 2nd Floor, 2E-480 Mech Room West\n83\n3 Panels, 3 Disconnect Switches & 1 VFD\nMain 2nd Floor, 2E-480 Mech Room West\n84\n3 Panels & 2 Disconnect Switches\nMain 2nd Floor, k-214A\n85\n4 Panels & 2 Disconnect Switches\nMain 2nd Floor, k-222\n86\n3 Disconnect Switches\nMain 2nd Floor, Rm 2004\n87\n2 Panels\nMain 3rd Floor, 3A-100\n88\n2 Panels\nMain 3rd Floor, 3A-113\n89\n3 Panels\nMain 3rd Floor, 3A-115, Mechanical\n90\n2 Panels\nMain 3rd Floor, 3A-122\n91\n2 Panels\nMain 3rd Floor, 3A-136\n92\n3 Panels\nMain 3rd Floor, 3B-147\n93\n1 Panel\nMain 3rd Floor, 3B-148\n94\n2 Panels\nMain 3rd Floor, 3B-149\n95\n25 Panels\nMain 3rd Floor, 3B-162b Electrical Room\n96\n3 Disconnect Switches\nMain 3rd Floor, 3B-162d Penthouse\n97\n2 Panels\nMain 3rd Floor, 3C-105\n98\nBus Duct\nMain 3rd Floor, 3C-108\n99\nMCC 32, AC 25 MCC\nMain 3rd Floor, Penthouse\n100\n1 Panel\nMain 4th Floor, 4A-109\n101\n1 Panel\nMain 4th Floor, 4A-109\n102\n3 Panels\nMain 4th Floor, 4A-114\n103\n1 Panel\nMain 4th Floor, 4A-116\n104\n2 Panels\nMain 4th Floor, 4A-125\n105\n2 Panels\nMain 4th Floor, 4A-149\n106\n1 Panel\nMain 4th Floor, 4A-160\n107\n4 Panels\nMain 4th Floor, 4AC-232, By Stair 4 Amb. Care\n108\n1 Panel\nMain 4th Floor, 4B-106\n109\n6 Panels\nMain 4th Floor, 4B-111\n110\n1 Panel\nMain 4th Floor, 4B-112\n111\n3 Panels\nMain 4th Floor, 4B-121\n112\n1 Panel\nMain 4th Floor, 4B-147\n113\n1 Panel\nMain 4th Floor, 4B-155\n114\n6 Panels\nMain 4th Floor, 4C-103\n115\nBus Duct\nMain 4th Floor, 4C-106\n116\n4 Panels\nMain 5th Floor, 5A-114\n117\n2 Panels\nMain 5th Floor, 5A-125\n118\n2 Panels\nMain 5th Floor, 5A-152\n119\n3 Panels & 1 Disconnect Switch\nMain 5th Floor, 5B-115\n120\n2 Panels\nMain 5th Floor, 5B-125\n121\n2 Panels\nMain 5th Floor, 5B-152\n122\n3 Panels\nMain 5th Floor, 5C-111\n123\nBus Duct\nMain 5th Floor, 5C-Elevators\n124\n3 Panels, 10 Disconnect Switches\nMain 5th Floor, Penthouse, Stair C,1 or 4\n125\n6 VFDs, 4 Control Panels\nMain 5th Floor, Penthouse, Stair C,1 or 4\n126\n2 Panels\nMain 6th Floor, 6A-105\n127\n1 Panel\nMain 6th Floor, 6A-111\n128\n2 Panels\nMain 6th Floor, 6A-112\n129\n3 Panels & 10 Disconnect Switches\nMain 6th Floor, 6A-126\n130\n1 Panel\nMain 6th Floor, 6A-140\n131\n2 Panels\nMain 6th Floor, 6B-105\n132\n2 Panels\nMain 6th Floor, 6B-117\n133\n1 Panel\nMain 6th Floor, 6B-124\n134\n2 Panels\nMain 6th Floor, 6B-130\n135\n1 Panels\nMain 6th Floor, 6B-144\n136\n2 Panels\nMain 6th Floor, 6C-100\n137\n1 Panels\nMain 6th Floor, 6C-101\n138\nBus Duct\nMain 6th Floor, 6C-Elevators\n139\n10 Panels, 3 Disconnects & 5 VFDs\nMain 7th Floor Penthouse\n140\nATS # 43,44,45,46\nMain 7th Floor Penthouse\n141\nMCC 71\nMain 7th Floor Penthouse\n142\n2 Panels\nMain 7th Floor Penthouse, AC-29\n143\n1 Panel & MCC 74\nMain 7th Floor, 7B-100 Exhaust Fan Room\n144\nGE Sub Station\nMain 7th Floor, 7C-107 Mechanical Roof\n145\nATS # 14 & HVAC ATS\nMain 7th Floor, 7C-102 Elevator Penthouse\n146\nPanels, MCC\nMain 7th Floor, 7C-102 Elevator Penthouse\n147\n2 Panels\nCares A Floor, AF-193\n148\n6 Panels\nCares A Floor, AF-ELC1\n149\n7 Panels & Bus Duct\nCares A Floor, AF-ELC2\n150\n1 Panel\nCares A Floor, AF-LVC2\n151\n1 Disconnect Switch & 2 VFDs\nCares Basement, BF 192\n152\nSub F1 & F2\nCares Basement, BF 193\n153\n3 Panels\nCares Basement, BF 193\n154\n7 Panels & Bus Duct\nCares Basement, BF-ELC1\n155\n10 Panels & Bus Duct\nCares Basement, BF-ELC2\n156\n1 Panel\nCares Basement, BF-LVC2\n164\n3 Disconnect Switches\nCares 1st Floor, FUT Card Elevator Eq. Room\n165\n5 Panels & Bus Duct\nCares 2nd Floor, 2F-ELC1\n166\n6 Panels & Bus Duct\nCares 2nd Floor, 2F-ELC2\n167\n1 Panel\nCares 2nd Floor, 2F-LVC2\n168\nATS # 39,40,47\nCares 2nd Floor, 2F-501A Electrical Penthouse\n169\n11 Panels & 1 Disconnect Switch\nCares 2nd Floor, 2F-501A Electrical Penthouse\n170\nLab Warehouse Sub\nCares 2nd Floor, 2F-501A Electrical Penthouse\n171\n2 Disconnect Switches\nCares 2nd Floor, 2F-501B Mechanical Penthouse\n172\n9 Disconnect Switches & 2 VFDs\nCares 2nd Floor, 2F-501C Mechanical Penthouse\n173\nATS # 48\nCares 2nd Floor, 2F-501D Electrical Penthouse\n174\n3 Panels & 2 Disconnect Switches\nCares 2nd Floor, 2F-501D Electrical Penthouse\n175\nPathology Sub\nCares 2nd Floor, 2F-501D Electrical Penthouse\n176\n8 Panels & Bus Duct\nCares 3rd Floor, 3F-ELC1\n177\n7 Panels & Bus Duct\nCares 3rd Floor, 3F-ELC2\n178\n1 Panel\nCares 3rd Floor, 3F-LVC2\n179\n6 Panels & Bus Duct\nCares 4th Floor, 4F-ELC1\n180\n7 Panels & Bus Duct\nCares 4th Floor, 4F-ELC2\n181\n1 Panel\nCares 4th Floor, 4F-LVC2\n182\n6 Panels & Bus Duct\nCares 5th Floor, 5F-ELC1\n183\n7 Panels & Bus Duct\nCares 5th Floor, 5F-ELC2\n184\n1 Panel\nCares 5th Floor, 5F-LVC2\n185\nPanels & Bus Duct\nCares 6th Floor, 6F-ELC1\n186\nPanels & Bus Duct\nCares 6th Floor, 6F-ELC2\n187\n1 Panel\nCares 6th Floor, 6F-LVC2\n188\n2 Disconnect Switches\nCares Penthouse, PF-102 Elevator Controls\n189\n14 Disconnect Switches & 15 VFDs\nCares Penthouse, PF-104\n190\n2 Panels\nCares Penthouse, PF-105\n191\nSub F3 & F4\nCares Penthouse, PF-105\n192\nATS # 37,38\nCares Penthouse, PF-105\n193\n8 Disconnect Switches\nCares Penthouse, PF-106\n194\n5 Panels\nSinai Skills Center, Room 116\n195\n2 Panels\nSinai Skills Center, 2nd Floor Restrooms\n196\n6 Panels\nParking Garages, 1C-703\n197\n3 Panels & 2 Disconnect Switches\nParking Garages, 1G 703 Electrical Eq. Room\n198\n2 Disconnect Switches\nParking Garages, 1G 702 Elevator Eq. Room\n199\n1 Panel, 4 Disconnect Switches\nParking Garages, 2C-703\n200\n4 Disconnect Switches\nParking Garages, 3C-703\n201\n3 Disconnect Switches\nParking Garages, 4C-703\n202\nSquare D Switchgear\nParking Garages, 006 Main Electric Room\n203\n4 Panels & 1 Disconnect Switch\nParking Garages, 006 Main Electric Room\n204\nG/ATS 1\nParking Garages, 006 Main Electric Room\n205\nEaton Switchgear & 2 Panels\nParking Garages, 006A Electric Room\n206\n7 Disconnect Switches\nParking Garages, 005A Elevator Mechanical\n\n6. Deliverables:\nWritten Report\nA complete written report of the work performed shall be provided to the VA within 7 days of completion.\nInformation shown in the report shall be as follows:\nCompany s name, addresses, telephone, & FAX numbers.\nName and signature of contractors who perform the maintenance and testing.\nVA Work Contract Number, name and number of VA Contracting Officer.\nDate and Time of work.\nCopies of contractors valid licenses, professional and training certificates.\nDescriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.\nLocation, Type, Name, serial number, and nameplate information of electrical equipment to be maintained and tested.\nDescriptions of work items.\nTest data.\nReference materials such as equipment manufacturer s specifications, coordination study, etc.\nRemarks on conditions of electrical equipment. List all deficiencies, if any.\nRecommended corrective actions, if any.\nSubmit four (4) hard copies of the complete written report and emailed report to VA Contracting Officer Representative (COR) within seven (7) calendar days of visit.\nAll reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.\n6.2 Awarded contractor shall submit a site-specific safety plan (SSSP) outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval. COR will provide SSSP packet to contractor for completion.\nContractor shall meet all timeline requirements outlined in this SOW.\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n100 %\n>30 days\n2\nMV Substation Inspection Report\nEmail Word - Excel\n100 %\n>30 days\n3\nMV Control Power Batteries Report\nEmail Word Excel\n100 %\n>30 days\n4\nMV Substation Control Power Relay Testing Report\nEmail Word Excel\n100 %\n>30 days\n5\nSubstation Transformer Testing Report\nEmail Word Excel\n100 %\n>30 days\n6\nTransformer Oil Sample Report\nEmail Word - Excel\n100 %\n>30 days\n7\nCircuit Breaker Testing Report\nEmail Word Excel\n100 %\n>30 days\n8\nGround Resistance Testing Report\nEmail PDF - Excel\n100 %\n14 Days\n9\nIR Imagery Report\nEmail PDF Excel\n100 %\n14 Days\n10\n4 Hour Blackout Support\nEmail PDF Excel\n100 %\n14 Days\n11\nAll items completed during scheduled timeframe\nEmail PDF Excel\n95%\n14 Days\n\n7. Performance Monitoring\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the equipment listed within this SOW and the facility to establish to their satisfaction the condition of the Electrical Power Distribution equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an \"as-is\" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership.\n\nContractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business.\n\nContractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.\n\nContractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.\n\nContractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work.\n\nContractors shall have ready access to the latest versions of the following references:\nNFPA 70, National Electrical Code.\nNFPA 70B, Recommended Practice for Electrical Equipment Maintenance.\nNFPA 70E, Standard for Electrical Safety for the Workplace.\nNFPA 110, Standard for Emergency and Standby Power System.\nOSHA Standard 29 CFR 1910, Subparts I & S.\nInternational Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications.\nOperating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.\nVHA Directive [2006-056][1028], Electrical Power Distribution System\n\nContractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.\n\nQuality Control : The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer s acceptance in writing of any proposed change to his QC system.\n\nQuality Assurance: The government shall evaluate the contractor s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nHours of Operation: The contractor is responsible for conducting business, between the hours of 7 a.m. to 11:30 p.m. Monday thru Friday or Saturday and Sunday 6 a.m. 6 p.m. when maintenance requires electrical power interruption, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential.\n\nWork is not to be performed during federal holidays without prior approval of the COR.\nNew Year s Day\nLabor Day\nMartin Luther King Jr. s Birthday\nColumbus Day\nPresident s Day\nVeteran s Day\nMemorial Day\nThanksgiving Day\nIndependence Day\nChristmas Day\nJuneteenth\n\nThe contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.\n\nCheck In Requirements:\nThe Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out.\n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\n\nSecurity Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.\nDedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information.\nContractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â\n\n11. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\nVA Information Custodial Language:\nInformation made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).\nThe contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\nGovernment-Furnished Equipment (GFE)/Government-Furnished Information (GFI).\nNo GFE will be issued to complete the requirements of this contract.\n\nOther Pertinent Information or Special Considerations.\nPrior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect facility equipment listed in this SOW to establish to their satisfaction the condition of the equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an \"as-is\" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\n\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractor shall have a minimum of five (5) years within the last seven (7) years of successful experience maintaining power distribution equipment identical or similar to the equipment listed in this Contract SOW.\n\nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\n\nThe Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of the Contract manager and an alternate shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) work days of the changes.\n\nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\n\nIdentification of Possible Follow-on Work. Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work.\n\nIdentification of Potential Conflicts of Interest (COI).\nNone\nIdentification of Non-Disclosure Requirements.\nNot Applicable\nPackaging, Packing and Shipping Instructions.\nNone\nInspection and Acceptance Criteria.\nContractor will be responsible for meeting timelines listed in this SOW to include monthly inspection, inspection reports, and response to service call.\n\n15. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.\n\n16. Place of Performance.\nWork will be performed at\nLouis Stokes VA Medical Center\n10701 East Blvd\nCleveland, Ohio\n44106\n\n17. Period of Performance.\nBase Year: November 1, 2026 through October 31, 2027\nOption Year One: November 1, 2027 through October 31, 2028\nOption Year Two: November 1, 2028 through October 31, 2029\nOption Year Three: November 1, 2029 through October 31, 2030\nOption Year Four: November 1, 2030 through October 31, 2031\n\n18. Point of Contact\nTBD\n\nThe NAICS code for this procurement is 238210 Electrical Contractors and Other Wiring Installation Contractors and the small business size standard is $19,000,000.00.\n\nResponses to this notice shall be e-mailed to Christopher A. Callihan at christopher.callihan@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than 3:00 p.m., Wednesday, June 17, 2026. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.","origin":"detail"},"notice_type":{"code":"r","label":"Sources Sought"},"schema_version":1,"solicitation_number":"36C25026Q0634","place_of_performance":{"zip":"44106-1702","city":{"name":"Cleveland"},"state":{"code":"OH","name":"Ohio"},"street":"Department of Veterans Affairs Louis Stokes Celveland VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"10701 East Boulevard"},"product_service_code":"J061"}],"due_at":"2026-06-17T19:00:00Z","due_date":"2026-06-17","closes_at":"2026-06-17T19:00:00Z","awardable":true,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","state_source":null,"state_evidence":null,"site_key":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":true,"updated_at":"2026-10-02T12:23:52.099781Z","principal_notice_id":"f8525ad8a3e545b6b30bbfd9fe260ad3","description":{"text":"Page 3 of 3\nThis is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance.\n\nVAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance\nSTATEMENT OF WORK (SOW)\nas of 3/7/2026\n\n1. Contracting Officer s Representative (COR).\nName:\nTBD\nSection:\n\nAddress:\n10701 East Blvd, Cleveland, OH 44106\nPhone Number:\nTBD\nFax Number:\nTBD\nE-Mail Address:\nTBD\n\n2. Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance\n\n3. Background.\nLouis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections. Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s).\n\n4. Scope.\nThe contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance\nas defined in this Statement of Work except for those items specified as government furnished property and services. The contractor shall meet the standards in this contract.\n\nIn the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation. All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection. Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW.\n\n5. Specific Tasks.\nOnsite testing, inspection, minor repair, and housekeeping.\n\n5.1 Substation and Transformer Maintenance completed tri-annually January May (Testing Period may be adjusted to meet medical center needs)\nVisually inspect, tighten hardware and torque bolted connections.\nManually operate each switch to check operation of auxiliaries and interlocks. Check contact wipe, clearances and gaps as described in the manufacturer's instruction book.\nClean and lubricate all moving parts with manufacturer's approved lubricants.\nCheck electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service.\nVerify the Kirk Key interlock system.\nTest bus for insulation resistance.\nThe vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment. Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service.\nLiquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets manufacturer's specification. The liquid must be re-filled to meet the manufacturer's specifications.\nTest insulation resistance of both high and low voltage windings to ground and each other.\nInspect temperature relays, gauges, switches and alarms.\nIf equipped with fans and pumps, verify proper operation and test.\nVerify three (3} phase transformer turns ratio on all taps using a three (3} phase test set.\nPower factor test.\nDry type transformers must be thoroughly cleaned exteriorly and inspected for overheating with infra-red thermal detecting equipment.\nTest insulation resistance of both high and low voltage windings to ground.\nInspect temperature relays, gauges, switches, and alarms.\nTest fans, if equipped, and inspect all vent filters. Ensure proper routing of thermocouple leads.\nVerify transformer turns ratio on all taps.\nVisually inspect and clean transformer windings.\nCheck torque on all accessible bolted connections.\nClean cells and bus components.\nTest bus for insulation resistance. Visually inspect the main bus.\nTest all accessible bolted bus connections for proper torque and integrity.\nTest protective relays.\nVerify potential and control transformers.\nCheck the breaker lifting device for proper operation.\nVerify the key interlock system.\nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts.\nVerify the proper functioning of all indicating devices.\nBolted pressure switches: Clean, lubricate and verify electrical and mechanical operation.\nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts.\nVerify the proper functioning of all indicating devices.\nVerify the proper operation of the control power transfer equipment.\nFunctional test all protective relays, where permitted.\n\nSwitchgear and Switchboard Assemblies.\nTransformers 500 Kilovolt-Amps (kVA) or larger\nSwitches, Vacuum, Medium-Voltage\nSwitches, Air, Low-Voltage.\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nMotor Control, Motor Starter, Medium-Voltage\nMotor Control, Motor Starters, Low-Voltage.\nMetal Enclosed Busways\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nSwitches, Vacuum, Medium-Voltage\nTransformers, Dry Type, Air-Cooled, Low-voltage, Small.\nTransformers, Dry Type, Air-Cooled, Low-voltage, Large.\nTransformers, Liquid-Filled.\n\nCircuit Breaker Maintenance 400 amps and above completed tri-annually January May (Testing Period may be adjusted to meet medical center needs)\nClean and lubricate, as necessary.\nOperate the breaker racking mechanisms to verify smooth operation.\nOperate the breakers to check the operation of auxiliaries and interlocks.\nFor low voltage breakers, inspect arc chutes, contacts and insulation structures in accordance with the manufacturer's instruction manual. Test each breaker with a portable secondary injection test set or primary injection test set.\nFor medium voltage breakers, inspect interphase barriers and insulation structure for signs of damage or contamination. Check contacts in accordance with the manufacturer's instruction manual.\nTest insulation resistance.\nTest contact resistance.\nCircuit Breakers, Air, Insulated-Case/ Molded-Case.\nCircuit Breakers, Air, Low-Voltage Power.\nCircuit Breakers, Vacuum, Medium-Voltage.\n\n5.3 Ground Resistance Testing completed annually July\nTest Ground resistance for the main MV room and all 24 substations throughout the facility. Refer to VAH 1028 FY16.\nGrounding Systems.\nGround-fault Protection Systems.\n5.4 IR Imagery completed annually in July\nInfra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.\n\nUse an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System.\nObjective of this work is to detect any loose, broken, or corroded connections in the system.\nProblem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers specifications.\nInfra-Red Report shall be prepared and submitted to COTR within seven (7} days of completion.\n\nTest report shall include nameplate data, test results, general condition and maintenance recommendations, and location.\n\nColor pictures shall be provided of any problem areas\nNote that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.\nThe report for infrared inspections shall provide complete documentation of thermal patterns detected in the electrical equipment within the Louis Stokes VA Facility. Provide qualitative evaluation to help prioritize repairs.\nThe infrared inspection report should meet the documentation requirements of the Infra-red inspection Institute Guideline for Infrared Inspection of Electrical and Mechanical Systems. All other published guidelines and standards pertaining to the infrared inspection of electrical and mechanical systems should be referenced and incorporated in the report and inspection.\nElectrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) is inspected, tested, maintained, and/or calibrated every 36 months, and all work must be documented. NOTE: The National Electrical Testing Association (NETA) provides guidance, which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the extent possible.\nIdentify the hot spots in the electrical equipment by using infra-red thermal detecting equipment. Tighten problem connections to meet equipment manufacturers specifications using a torque wrench or other approved devices.\n\nRepair Priority Ratings\nTemperature Severity Ratings are the objective and based on temperatures measured by the thermography. The exception and other reference temperatures are compared to industry standards and guidelines to produce an objective Temperature Severity Rating. The vendor is to use the following temperature criteria to assign Temperature Severity Ratings to the exceptions:\n\nNETA Priority Criteria for Electrical & Mechanical Exceptions\n#1 (0 to 18Â°F} Possible deficiency and warrants investigation\n#2 (18 to 36 Â°F} Indicates probable deficiency, repair as time permits\n#3 (36 to 72 Â°F} Indicates definite discrepancy; repair as soon as possible\n#4 (Greater than 72 Â°F} Indicates major discrepancy; repair immediately\n\n5.5 Medium Voltage Relay Testing completed tri-annually January May\nProtective Relays Microprocessor Based.\nCalibrate and maintain adjustable protective relays.\nVisual inspection.\nClean.\nTest.\n\n5.6 Medium Voltage Substation Control Power Batteries completed annually January May\nInspect, clean and check torque on bolted connections.\nCheck for proper voltage and regulation.\nPerform battery impedance and resistance testing.\n\n5.7 Transformer Oil Testing completed annually April June\nCollect cooling liquid oil sample for testing:\nGeneral quality tests\nDielectric strength\nAcid neutralization\nInterfacial tension\nVisual inspection\nWater content\nPower factor\nDissolved gas analysis\n\n5.8 Tri-annual 4-Hour Power Outage Test (2029)\n\nThe Contractor shall be present for and will participate as a resident expert in the VAMC 4- hour test of the Essential Electrical System (EES) to be conducted on a Saturday or Sunday.\nThis test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening all utility service connections serving the VAMC for a minimum of 4 hours.\nDuring the test period, verify operation of all EES components including the transfer to emergency power and return to normal service.\nThe Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8 12 hours.\nThe Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test.\nContractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work.\n\n5.9 Maintenance Reports\nContractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer Representative for immediate actions.\nWork items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System.\nNOTE: settings such as ATS settings, Adjustable Breaker Settings, etc must be provided by the VA. If not available from current coordination studies, then they should have the contractor conduct a study to determine proper settings.\nSystem Function Tests. Provide function tests for all equipment listed in this Scope of Work.\nTest Conditions.\n\n5.10 -- Tri-Annual Testing and Inspection\n\nBreaker Testing List\nBase Year: November 1, 2026 Through October 31, 2027\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\nÂ\n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nRussel Gear\nN/A\nN/A\nÂ\nCutler Hammer MDS840\n4000\n1\nBE602\nÂ\nÂ\nÂ\nCutler Hammer MDS632\n3200\n2\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS620\n2000\n3\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n6\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS608\n800\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NE361200 LSG\n1200\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC1\n2\n2500 Dry\n1\n5KV SW/5 KV Starters\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nTie-GPS-TGPB\nÂ\nÂ\nÂ\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW32H\n3200\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nDPE-5\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEDSB3\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n2\nEDSB4\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEC3B\nÂ\nÂ\nÂ\nSquare D NW20H1\n2000\n2\nÂ\nÂ\nÂ\nÂ\nSquare D NW16H1\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW08H1\n800\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nGDS3\nÂ\nÂ\nÂ\nEaton SBS 630\n3000\n4\nDPE3\nÂ\nÂ\nÂ\nEaton LT360032\n450\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nMV Substation\nÂ\nÂ\nÂ\nC/H 150VCP-W 500\n1200\n33\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ\nÂ\nÂ\nGE AK25\n600\n4\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ\nÂ\nÂ\nÂ\nSchneider\n800\n3\n\nBreaker Testing List\nOption Year 1: November 1, 2027 Through October 31, 2028\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ\nÂ\nÂ\nÂ\nÂ\nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ\nSquare D MH36800\n800\nEmergency\nÂ\nÂ\nÂ\nSquare D MH36600\n600\nPanel\nÂ\nÂ\nÂ\nSquare D MH36400\n400\nÂ\nÂ\nÂ\nÂ\nSquare D MH34250\n250\nÂ\nÂ\nÂ\nÂ\nSquare D MH34225\n225\nÂ\nÂ\nÂ\nÂ\nSquare D MH34200\n200\nÂ\nÂ\nÂ\nÂ\nSquare D SE\n2500\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n1200\nPenthouse\nÂ\nÂ\nÂ\nÂ\nÂ\nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ\nÂ\nÂ\nÂ\nGE AKRT-6D-30H\n800\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nElevator\nN/A\nN/A\nÂ\nGE AK2A-50\n1600\nÂ\nÂ\nÂ\nÂ\nGE AK2A-25\n600\nMICU\nÂ\nÂ\nÂ\nÂ\nÂ\nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n400\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1-G\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB1-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB2-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nCB-T-UPS\nÂ\nÂ\nÂ\nSiemens MCCB\n600\n7th Floor\nÂ\nÂ\nÂ\nÂ\nÂ\nEDP\nÂ\nÂ\nÂ\nEaton RD320T36W\n2000\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\nDPHL71EQ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n250\nDPHL72EQ\nÂ\nÂ\nÂ\nSquare D Power Pact\n800\nÂ\nÂ\nÂ\nÂ\nSquare D Power Pact\n400\nDPEG2\nÂ\nÂ\nÂ\nEaton MCCB\n1200\nCares Tower\nÂ\nÂ\nÂ\nEaton MCCB\n800\n\nYearly Breaker Testing List\nOption Year 2 : November 1, 2028 Through October 31, 2029\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\nÂ\n2029/2032\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nAmb Care\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nSub H1\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS408\n800\n9\nSub H2\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS408\n800\n8\nEGSB1\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n1200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n1200\n1\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n800\n2\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MCCB\n600\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEmergency\nN/A\n750 Dry\n1\nIn Amb Care\nÂ\nÂ\nEmergency\n1\n750 Dry\n1\nIn Energy Center\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nCares Tower\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\n1st Floor F1, F2\n4\n1500 Dry\n2\nEaton MDS630\n3000\n3\nBF-193\nÂ\nÂ\nÂ\nEaton MCCB\n800\n5\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n150\n1\nUpstairs F3, F4\n4\n1000 Dry\n2\nEaton MDS620\n2000\n3\nPF-105\nÂ\nÂ\nÂ\nEaton MCCB\n800\n6\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n160\n2\nDPEG2 - Cares PH\nÂ\nÂ\nÂ\nEaton MCCB\n1200\n1\nÂ\nÂ\nÂ\nEaton MHDL3400F\n400\n6\nRadiology\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nLeft side\n2\n500 Dry\n1\nEaton MDS612\n1200\n2\n2B-502\nÂ\nÂ\nÂ\nEaton MCCB\n800\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n225\n7\nRight Side\n2\n1000 Dry\n1\nEaton MDS620\n2000\n1\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n1\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n800\n1\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n160\n3\nPathology\n2\n1500 Dry\n1\nGE Wavepro\n2500\n2\nUSS-F2\nÂ\nÂ\nÂ\nGE MCCB\n400\n2\nÂ\nÂ\nÂ\nÂ\nGE MCCB\n150\n2\nÂ\nÂ\nÂ\nÂ\nGE MCCB\n125\n1\nÂ\nÂ\nÂ\nÂ\nGE MCCB\n100\n1\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nLab Warehouse\n2\n1500 Dry\n1\nEaton MDS625\n2500\n2\nUSS-F1\nÂ\nÂ\nÂ\nEaton MCCB\n630\n2\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nParking Garage\n1\nOil\n1\nÂ\nÂ\nÂ\n\nYearly Breaker Refurbishing and Testing Listing\nOption Year 3 : November 1, 2029 Through October 31, 2030\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\nÂ\n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nRussel Gear\nN/A\nN/A\nÂ\nCutler Hammer MDS840\n4000\n1\nBE602\nÂ\nÂ\nÂ\nCutler Hammer MDS632\n3200\n2\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS620\n2000\n3\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS616\n1600\n6\nÂ\nÂ\nÂ\nÂ\nCutler Hammer MDS608\n800\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NE361200 LSG\n1200\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC1\n6-Jun\n2500 Dry\n1\n5KV SW/5 KV Starters\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nTie-GPS-TGPB\nÂ\nÂ\nÂ\nSquare D NW40H\n4000\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW32H\n3200\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nDPE-5\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEDSB3\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n2\nEDSB4\nÂ\nÂ\nÂ\nSquare D PJ800\n800\n1\nÂ\nÂ\nÂ\nÂ\nSquare D LJ400\n400\n1\nEC3B\nÂ\nÂ\nÂ\nSquare D NW20H1\n2000\n2\nÂ\nÂ\nÂ\nÂ\nSquare D NW16H1\n1600\n1\nÂ\nÂ\nÂ\nÂ\nSquare D NW08H1\n800\n3\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nGDS3\nÂ\nÂ\nÂ\nEaton SBS 630\n3000\n4\nDPE3\nÂ\nÂ\nÂ\nEaton LT360032\n450\n2\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nMV Substation\nÂ\nÂ\nÂ\nC/H 150VCP-W 500\n1200\n33\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ\nÂ\nÂ\nGE AK25\n600\n4\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ\nÂ\nÂ\nÂ\nSchneider\n800\n3\n\nBreaker Testing List\nOption Year 4: November 1, 2030 Through October 31, 2031\n\nSubstation\nMV Sw\nXFMRs\nÂ\nCircuit Breakers\nÂ\n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ\nÂ\nÂ\nÂ\nÂ\nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ\nÂ\nÂ\nÂ\nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ\nSquare D MH36800\n800\nEmergency\nÂ\nÂ\nÂ\nSquare D MH36600\n600\nPanel\nÂ\nÂ\nÂ\nSquare D MH36400\n400\nÂ\nÂ\nÂ\nÂ\nSquare D MH34250\n250\nÂ\nÂ\nÂ\nÂ\nSquare D MH34225\n225\nÂ\nÂ\nÂ\nÂ\nSquare D MH34200\n200\nÂ\nÂ\nÂ\nÂ\nSquare D SE\n2500\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n1200\nPenthouse\nÂ\nÂ\nÂ\nÂ\nÂ\nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ\nÂ\nÂ\nÂ\nGE AKRT-6D-30H\n800\nÂ\nÂ\nÂ\nÂ\nÂ\nÂ\nElevator\nN/A\nN/A\nÂ\nGE AK2A-50\n1600\nÂ\nÂ\nÂ\nÂ\nGE AK2A-25\n600\nMICU\nÂ\nÂ\nÂ\nÂ\nÂ\nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n400\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1-G\nÂ\nÂ\nÂ\nSiemens MCCB\n800\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nÂ\nÂ\nÂ\nÂ\nSiemens MCCB\n300\nDPNB1\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB1-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nDPNB2-CR\nÂ\nÂ\nÂ\nSiemens MCCB\n600\nCB-T-UPS\nÂ\nÂ\nÂ\nSiemens MCCB\n600\n7th Floor\nÂ\nÂ\nÂ\nÂ\nÂ\nEDP\nÂ\nÂ\nÂ\nEaton RD320T36W\n2000\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n400\nDPHL71EQ\nÂ\nÂ\nÂ\nEaton MCCB\n800\nÂ\nÂ\nÂ\nÂ\nEaton MCCB\n250\nDPHL72EQ\nÂ\nÂ\nÂ\nSquare D Power Pact\n800\nÂ\nÂ\nÂ\nÂ\nSquare D Power Pact\n400\nDPEG2\nÂ\nÂ\nÂ\nEaton MCCB\n1200\nCares Tower\nÂ\nÂ\nÂ\nEaton MCCB\n800\n\nInfra-Red Line Items for Inspection\n\nInfra-Red Line items for inspection ITEM #\nEQUIPMENT DESCRIPTION\nLOCATION\n1\n16 Panels\nMain Basement, BA-151 Ambulatory Care\n2\nATS # 1,2,3,4\nMain Basement, BA-151 Ambulatory Care\n3\nSubs H1 & H2\nMain Basement, BA-151 Ambulatory Care\n4\nMCC1 & MCC2\nMain Basement, BA-151 Ambulatory Care\n5\n6 Surge Arrestors\nMain Basement, BA-151 Ambulatory Care\n6\nVFD 51 Return & Supply Fans\nMain Basement, BA-151 Ambulatory Care\n7\nVFD 52 Return & Supply Fans\nMain Basement, BA-151 Ambulatory Care\n8\nVFD 53 Return & Supply Fan\nMain Basement, BA-151 Ambulatory Care\n9\n5 Cutler Hammer Switchboards\nMain Basement, BA-151 Ambulatory Care\n10\n16 Disconnect Switches\nMain Basement, BA-151 Ambulatory Care\n11\n8 Panels & 1 Disconnect Switch\nMain Basement, B-B362 Electrical Room\n12\n5 Panels\nMain Basement, B-C315 Engineering Closet\n13\nATS # 16,17,18,19\nMain Basement, FES B-E261\n14\n24 Panels\nMain Basement, FES B-E261\n15\n4 Disconnect Switches\nMain Basement, FES B-E261\n16\n6 Disconnect Switches & 8 VFDs\nMain Basement, FES B-E260\n17\n1 Panel\nMain Basement, F12A\n18\n3 Panels\nMain Basement, 1-E500 Generator Room\n19\n14 Panels & 1 Disconnect\nMain Basement, H-01A\n20\nSubs GPS 1 & GPS 2, 1 Panel\nMain Basement, B-E602 Russ Gear Room\n21\n3 Disconnect Switches & 1 Panel\nMain Basement, B-E503 Pipe Tunnel\n22\n7 Panels & 1 Disconnect Switch\nMain Basement, B-E361B Hall by Cares Tower\n23\n4 Panels\nMain Basement, B-A148 Electrical Closet\n24\n4 Panels & 2 Disconnect Switches\nMain Basement, B-C563\n25\nATS # 49,50\nMain Basement, Unmarked by Room B-B549\n26\n7 Panels\nMain Basement, Unmarked by Room B-B549\n27\nAll Breakers\nMain Basement, B-E504 Main Sub\n28\nIncoming Disconnects & Battery Rack\nMain Basement, B-E504 Main Sub\n29\nATS # 23,24,25\nMain Basement, B-D423\n30\n3 Panels & 1 Disconnect Switch\nMain Basement, B-D423\n31\n7 Eaton Switchboards\nMain Basement, B-D423\n32\nATS # 26\nMain Basement, B-D424\n33\n5 Panels\nMain Basement, B-D424\n34\nATS # 5,8,22\nMain Basement, D21\n35\n10 Panels\nMain Basement, D21\n36\nSub A & B, Lighting and Power\nMain Basement, D21\n37\nATS # 65\nMain Basement, Energy Center, B-E603\n38\nEaton Subs GDS3 & EC3B\nMain Basement, Energy Center, B-E603\n39\nATS # 15, 51, 52\nMain Basement, Energy Center, B-E601\n40\n9 Panels\nMain Basement, Energy Center, B-E601\n41\n4 Chiller Starter Switches\nMain Basement, Energy Center, B-E601\n42\nSubs 1, EC2, EC3, TGP\nMain Basement, Energy Center, B-E601\n43\n1 Panel\nMain Basement, Energy Center, Cat Gen Room\n44\n8 Panels, 12 Disconnect Switches & 13 VFDs\nMain Basement, B-D607 Chiller Plant North\n45\n7 VFDs\nMain Basement, Boiler Room\n46\n9 Disconnect Switches\nMain Basement, B-F411 Water Filtration\n47\n9 Panels\nMain 1st Floor, 129E by Surgery Sub\n48\n5 Panels & 2 Disconnect Switches\nMain 1st Floor, K111-A\n49\n4 Panels & 1 Disconnect Switch\nMain 1st Floor, K122B\n50\n3 Panels\nMain 1st Floor, Kitchen\n51\n1 Panel\nMain 1st Floor, 1-D392\n52\n1 Panel\nMain 1st Floor, 1-E401\n53\n8 Panels\nMain 1st Floor, A-105 Surgery Sub\n54\nATS # 11,12,13\nMain 1st Floor, A-105 Surgery Sub\n55\n10 Disconnect Switches\nMain 1st Floor, A-107 AC Shop\n56\nMCC N1 & E1\nMain 1st Floor, A-107 AC Shop\n57\n4 Panels & 1 Disconnect Switch\nMain 2nd Floor, 2A-102\n58\n6 Panels\nMain 2nd Floor, 2A-158\n59\n3 Panels & 1 Disconnect Switch\nMain 2nd Floor, 2A-187\n60\n11 Panels\nMain 2nd Floor, 2B-125\n61\n4 Panels\nMain 2nd Floor, 2B-126\n62\n8 Panels & 2 Disconnect Switches\nMain 2nd Floor, 2B-148\n63\n5 Panels & 2 Disconnect Switches\nMain 2nd Floor, 2B-223\n64\nATS # 20\nMain 2nd Floor, 2B-480 Mech Room East\n65\n5 Panels, 2 Disconnect Switches & 1 VFD\nMain 2nd Floor, 2B-480 Mech Room East\n66\n4 Panels & 4 Disconnect Switches\nMain 2nd Floor, 2B-501 Mechanical Penthouse\n67\nATS # 42 & Teledata ATS\nMain 2nd Floor, 2B-502 Penthouse\n68\nSub Stations F1 & F2\nMain 2nd Floor, 2B-502 Penthouse\n69\n1 Panel, 3 Disconnect Switches & Eaton Panel\nMain 2nd Floor, 2B-502 Penthouse\n70\n9 Panels\nMain 2nd Floor, 2C-411\n71\n1 Panel & Bus Duct\nMain 2nd Floor, 2C-412\n72\n1 Disconnect Switch & 1 VFD\nMain 2nd Floor, 2C-2041\n73\nMCC 22B\nMain 2nd Floor, 2C-2041\n74\n2 Panels\nMain 2nd Floor, 2D-177\n75\n1 Panel\nMain 2nd Floor, 2D-188\n76\n2 Panels\nMain 2nd Floor, 2D-190\n77\n3 Panels\nMain 2nd Floor, 2D-191\n78\n3 Panels\nMain 2nd Floor, 2E-320\n79\n2 Panels & 1 Disconnect Switch\nMain 2nd Floor, 2E-347\n80\n1 Panel\nMain 2nd Floor, 2E-361\n81\n9 Panels\nMain 2nd Floor, 2E-315\n82\nATS # 21\nMain 2nd Floor, 2E-480 Mech Room West\n83\n3 Panels, 3 Disconnect Switches & 1 VFD\nMain 2nd Floor, 2E-480 Mech Room West\n84\n3 Panels & 2 Disconnect Switches\nMain 2nd Floor, k-214A\n85\n4 Panels & 2 Disconnect Switches\nMain 2nd Floor, k-222\n86\n3 Disconnect Switches\nMain 2nd Floor, Rm 2004\n87\n2 Panels\nMain 3rd Floor, 3A-100\n88\n2 Panels\nMain 3rd Floor, 3A-113\n89\n3 Panels\nMain 3rd Floor, 3A-115, Mechanical\n90\n2 Panels\nMain 3rd Floor, 3A-122\n91\n2 Panels\nMain 3rd Floor, 3A-136\n92\n3 Panels\nMain 3rd Floor, 3B-147\n93\n1 Panel\nMain 3rd Floor, 3B-148\n94\n2 Panels\nMain 3rd Floor, 3B-149\n95\n25 Panels\nMain 3rd Floor, 3B-162b Electrical Room\n96\n3 Disconnect Switches\nMain 3rd Floor, 3B-162d Penthouse\n97\n2 Panels\nMain 3rd Floor, 3C-105\n98\nBus Duct\nMain 3rd Floor, 3C-108\n99\nMCC 32, AC 25 MCC\nMain 3rd Floor, Penthouse\n100\n1 Panel\nMain 4th Floor, 4A-109\n101\n1 Panel\nMain 4th Floor, 4A-109\n102\n3 Panels\nMain 4th Floor, 4A-114\n103\n1 Panel\nMain 4th Floor, 4A-116\n104\n2 Panels\nMain 4th Floor, 4A-125\n105\n2 Panels\nMain 4th Floor, 4A-149\n106\n1 Panel\nMain 4th Floor, 4A-160\n107\n4 Panels\nMain 4th Floor, 4AC-232, By Stair 4 Amb. Care\n108\n1 Panel\nMain 4th Floor, 4B-106\n109\n6 Panels\nMain 4th Floor, 4B-111\n110\n1 Panel\nMain 4th Floor, 4B-112\n111\n3 Panels\nMain 4th Floor, 4B-121\n112\n1 Panel\nMain 4th Floor, 4B-147\n113\n1 Panel\nMain 4th Floor, 4B-155\n114\n6 Panels\nMain 4th Floor, 4C-103\n115\nBus Duct\nMain 4th Floor, 4C-106\n116\n4 Panels\nMain 5th Floor, 5A-114\n117\n2 Panels\nMain 5th Floor, 5A-125\n118\n2 Panels\nMain 5th Floor, 5A-152\n119\n3 Panels & 1 Disconnect Switch\nMain 5th Floor, 5B-115\n120\n2 Panels\nMain 5th Floor, 5B-125\n121\n2 Panels\nMain 5th Floor, 5B-152\n122\n3 Panels\nMain 5th Floor, 5C-111\n123\nBus Duct\nMain 5th Floor, 5C-Elevators\n124\n3 Panels, 10 Disconnect Switches\nMain 5th Floor, Penthouse, Stair C,1 or 4\n125\n6 VFDs, 4 Control Panels\nMain 5th Floor, Penthouse, Stair C,1 or 4\n126\n2 Panels\nMain 6th Floor, 6A-105\n127\n1 Panel\nMain 6th Floor, 6A-111\n128\n2 Panels\nMain 6th Floor, 6A-112\n129\n3 Panels & 10 Disconnect Switches\nMain 6th Floor, 6A-126\n130\n1 Panel\nMain 6th Floor, 6A-140\n131\n2 Panels\nMain 6th Floor, 6B-105\n132\n2 Panels\nMain 6th Floor, 6B-117\n133\n1 Panel\nMain 6th Floor, 6B-124\n134\n2 Panels\nMain 6th Floor, 6B-130\n135\n1 Panels\nMain 6th Floor, 6B-144\n136\n2 Panels\nMain 6th Floor, 6C-100\n137\n1 Panels\nMain 6th Floor, 6C-101\n138\nBus Duct\nMain 6th Floor, 6C-Elevators\n139\n10 Panels, 3 Disconnects & 5 VFDs\nMain 7th Floor Penthouse\n140\nATS # 43,44,45,46\nMain 7th Floor Penthouse\n141\nMCC 71\nMain 7th Floor Penthouse\n142\n2 Panels\nMain 7th Floor Penthouse, AC-29\n143\n1 Panel & MCC 74\nMain 7th Floor, 7B-100 Exhaust Fan Room\n144\nGE Sub Station\nMain 7th Floor, 7C-107 Mechanical Roof\n145\nATS # 14 & HVAC ATS\nMain 7th Floor, 7C-102 Elevator Penthouse\n146\nPanels, MCC\nMain 7th Floor, 7C-102 Elevator Penthouse\n147\n2 Panels\nCares A Floor, AF-193\n148\n6 Panels\nCares A Floor, AF-ELC1\n149\n7 Panels & Bus Duct\nCares A Floor, AF-ELC2\n150\n1 Panel\nCares A Floor, AF-LVC2\n151\n1 Disconnect Switch & 2 VFDs\nCares Basement, BF 192\n152\nSub F1 & F2\nCares Basement, BF 193\n153\n3 Panels\nCares Basement, BF 193\n154\n7 Panels & Bus Duct\nCares Basement, BF-ELC1\n155\n10 Panels & Bus Duct\nCares Basement, BF-ELC2\n156\n1 Panel\nCares Basement, BF-LVC2\n164\n3 Disconnect Switches\nCares 1st Floor, FUT Card Elevator Eq. Room\n165\n5 Panels & Bus Duct\nCares 2nd Floor, 2F-ELC1\n166\n6 Panels & Bus Duct\nCares 2nd Floor, 2F-ELC2\n167\n1 Panel\nCares 2nd Floor, 2F-LVC2\n168\nATS # 39,40,47\nCares 2nd Floor, 2F-501A Electrical Penthouse\n169\n11 Panels & 1 Disconnect Switch\nCares 2nd Floor, 2F-501A Electrical Penthouse\n170\nLab Warehouse Sub\nCares 2nd Floor, 2F-501A Electrical Penthouse\n171\n2 Disconnect Switches\nCares 2nd Floor, 2F-501B Mechanical Penthouse\n172\n9 Disconnect Switches & 2 VFDs\nCares 2nd Floor, 2F-501C Mechanical Penthouse\n173\nATS # 48\nCares 2nd Floor, 2F-501D Electrical Penthouse\n174\n3 Panels & 2 Disconnect Switches\nCares 2nd Floor, 2F-501D Electrical Penthouse\n175\nPathology Sub\nCares 2nd Floor, 2F-501D Electrical Penthouse\n176\n8 Panels & Bus Duct\nCares 3rd Floor, 3F-ELC1\n177\n7 Panels & Bus Duct\nCares 3rd Floor, 3F-ELC2\n178\n1 Panel\nCares 3rd Floor, 3F-LVC2\n179\n6 Panels & Bus Duct\nCares 4th Floor, 4F-ELC1\n180\n7 Panels & Bus Duct\nCares 4th Floor, 4F-ELC2\n181\n1 Panel\nCares 4th Floor, 4F-LVC2\n182\n6 Panels & Bus Duct\nCares 5th Floor, 5F-ELC1\n183\n7 Panels & Bus Duct\nCares 5th Floor, 5F-ELC2\n184\n1 Panel\nCares 5th Floor, 5F-LVC2\n185\nPanels & Bus Duct\nCares 6th Floor, 6F-ELC1\n186\nPanels & Bus Duct\nCares 6th Floor, 6F-ELC2\n187\n1 Panel\nCares 6th Floor, 6F-LVC2\n188\n2 Disconnect Switches\nCares Penthouse, PF-102 Elevator Controls\n189\n14 Disconnect Switches & 15 VFDs\nCares Penthouse, PF-104\n190\n2 Panels\nCares Penthouse, PF-105\n191\nSub F3 & F4\nCares Penthouse, PF-105\n192\nATS # 37,38\nCares Penthouse, PF-105\n193\n8 Disconnect Switches\nCares Penthouse, PF-106\n194\n5 Panels\nSinai Skills Center, Room 116\n195\n2 Panels\nSinai Skills Center, 2nd Floor Restrooms\n196\n6 Panels\nParking Garages, 1C-703\n197\n3 Panels & 2 Disconnect Switches\nParking Garages, 1G 703 Electrical Eq. Room\n198\n2 Disconnect Switches\nParking Garages, 1G 702 Elevator Eq. Room\n199\n1 Panel, 4 Disconnect Switches\nParking Garages, 2C-703\n200\n4 Disconnect Switches\nParking Garages, 3C-703\n201\n3 Disconnect Switches\nParking Garages, 4C-703\n202\nSquare D Switchgear\nParking Garages, 006 Main Electric Room\n203\n4 Panels & 1 Disconnect Switch\nParking Garages, 006 Main Electric Room\n204\nG/ATS 1\nParking Garages, 006 Main Electric Room\n205\nEaton Switchgear & 2 Panels\nParking Garages, 006A Electric Room\n206\n7 Disconnect Switches\nParking Garages, 005A Elevator Mechanical\n\n6. Deliverables:\nWritten Report\nA complete written report of the work performed shall be provided to the VA within 7 days of completion.\nInformation shown in the report shall be as follows:\nCompany s name, addresses, telephone, & FAX numbers.\nName and signature of contractors who perform the maintenance and testing.\nVA Work Contract Number, name and number of VA Contracting Officer.\nDate and Time of work.\nCopies of contractors valid licenses, professional and training certificates.\nDescriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.\nLocation, Type, Name, serial number, and nameplate information of electrical equipment to be maintained and tested.\nDescriptions of work items.\nTest data.\nReference materials such as equipment manufacturer s specifications, coordination study, etc.\nRemarks on conditions of electrical equipment. List all deficiencies, if any.\nRecommended corrective actions, if any.\nSubmit four (4) hard copies of the complete written report and emailed report to VA Contracting Officer Representative (COR) within seven (7) calendar days of visit.\nAll reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.\n6.2 Awarded contractor shall submit a site-specific safety plan (SSSP) outlining how inspections and testing will safely be conducted. This safety plan will be submitted to VA safety department for approval. COR will provide SSSP packet to contractor for completion.\nContractor shall meet all timeline requirements outlined in this SOW.\nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n100 %\n>30 days\n2\nMV Substation Inspection Report\nEmail Word - Excel\n100 %\n>30 days\n3\nMV Control Power Batteries Report\nEmail Word Excel\n100 %\n>30 days\n4\nMV Substation Control Power Relay Testing Report\nEmail Word Excel\n100 %\n>30 days\n5\nSubstation Transformer Testing Report\nEmail Word Excel\n100 %\n>30 days\n6\nTransformer Oil Sample Report\nEmail Word - Excel\n100 %\n>30 days\n7\nCircuit Breaker Testing Report\nEmail Word Excel\n100 %\n>30 days\n8\nGround Resistance Testing Report\nEmail PDF - Excel\n100 %\n14 Days\n9\nIR Imagery Report\nEmail PDF Excel\n100 %\n14 Days\n10\n4 Hour Blackout Support\nEmail PDF Excel\n100 %\n14 Days\n11\nAll items completed during scheduled timeframe\nEmail PDF Excel\n95%\n14 Days\n\n7. Performance Monitoring\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the equipment listed within this SOW and the facility to establish to their satisfaction the condition of the Electrical Power Distribution equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an \"as-is\" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership.\n\nContractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business.\n\nContractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training.\n\nContractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.\n\nContractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work.\n\nContractors shall have ready access to the latest versions of the following references:\nNFPA 70, National Electrical Code.\nNFPA 70B, Recommended Practice for Electrical Equipment Maintenance.\nNFPA 70E, Standard for Electrical Safety for the Workplace.\nNFPA 110, Standard for Emergency and Standby Power System.\nOSHA Standard 29 CFR 1910, Subparts I & S.\nInternational Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications.\nOperating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.\nVHA Directive [2006-056][1028], Electrical Power Distribution System\n\nContractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.\n\nQuality Control : The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer s acceptance in writing of any proposed change to his QC system.\n\nQuality Assurance: The government shall evaluate the contractor s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).\n\nHours of Operation: The contractor is responsible for conducting business, between the hours of 7 a.m. to 11:30 p.m. Monday thru Friday or Saturday and Sunday 6 a.m. 6 p.m. when maintenance requires electrical power interruption, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential.\n\nWork is not to be performed during federal holidays without prior approval of the COR.\nNew Year s Day\nLabor Day\nMartin Luther King Jr. s Birthday\nColumbus Day\nPresident s Day\nVeteran s Day\nMemorial Day\nThanksgiving Day\nIndependence Day\nChristmas Day\nJuneteenth\n\nThe contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.\n\nCheck In Requirements:\nThe Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out.\n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\n\nSecurity Requirements: The C&A requirements do not apply, and a Security Accreditation Package is not required.\nDedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information.\nContractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â\n\n11. General Security: Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\nVA Information Custodial Language:\nInformation made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1).\nThe contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\nGovernment-Furnished Equipment (GFE)/Government-Furnished Information (GFI).\nNo GFE will be issued to complete the requirements of this contract.\n\nOther Pertinent Information or Special Considerations.\nPrior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect facility equipment listed in this SOW to establish to their satisfaction the condition of the equipment to be maintained and any other conditions affecting the work to be performed. This equipment is offered in an \"as-is\" condition. No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract.\n\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractor shall have a minimum of five (5) years within the last seven (7) years of successful experience maintaining power distribution equipment identical or similar to the equipment listed in this Contract SOW.\n\nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\n\nThe Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of the Contract manager and an alternate shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) work days of the changes.\n\nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\n\nIdentification of Possible Follow-on Work. Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work.\n\nIdentification of Potential Conflicts of Interest (COI).\nNone\nIdentification of Non-Disclosure Requirements.\nNot Applicable\nPackaging, Packing and Shipping Instructions.\nNone\nInspection and Acceptance Criteria.\nContractor will be responsible for meeting timelines listed in this SOW to include monthly inspection, inspection reports, and response to service call.\n\n15. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.\n\n16. Place of Performance.\nWork will be performed at\nLouis Stokes VA Medical Center\n10701 East Blvd\nCleveland, Ohio\n44106\n\n17. Period of Performance.\nBase Year: November 1, 2026 through October 31, 2027\nOption Year One: November 1, 2027 through October 31, 2028\nOption Year Two: November 1, 2028 through October 31, 2029\nOption Year Three: November 1, 2029 through October 31, 2030\nOption Year Four: November 1, 2030 through October 31, 2031\n\n18. Point of Contact\nTBD\n\nThe NAICS code for this procurement is 238210 Electrical Contractors and Other Wiring Installation Contractors and the small business size standard is $19,000,000.00.\n\nResponses to this notice shall be e-mailed to Christopher A. Callihan at christopher.callihan@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than 3:00 p.m., Wednesday, June 17, 2026. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.","html":"Page 3 of 3\nThis is a Sources Sought (SS) Notice only, not a solicitation announcement and should not be considered as such. There is no solicitation available at this time. The Government will not pay for any information received in response to this SS, nor will the Government compensate any respondent for any cost incurred in developing the information provided to the Government. This SS does not constitute a commitment by the Government. Any information provided in response to this market survey will be used for informational purposes only and will not be released. Vendor participation is not a promise of future business with the Government. The purpose of this Sources Sought is to conduct Market Research to determine an acquisition strategy for the acquisition of Electrical Power Distribution Equipment Testing, Inspection, and Maintenance. \n\nVAMC Cleveland, is seeking sources capable of complete the services described in the Statement of Work below.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance \nSTATEMENT OF WORK (SOW)\nas of 3/7/2026\n\n\n1.  Contracting Officer s Representative (COR).  \nName:\nTBD\nSection:\n\nAddress:\n10701 East Blvd, Cleveland, OH 44106\nPhone Number:\nTBD\nFax Number:\nTBD\nE-Mail Address:\nTBD\n\n2.  Contract Title. Electrical Power Distribution Equipment Testing, Inspection, and Maintenance \n\n3.  Background.  \nLouis Stokes VA Medical Center, Cleveland, Ohio located at 10701 East Boulevard, Cleveland, Ohio 44106 is seeking a qualified contractor to provide, labor, materials, equipment, transportation, and supervision necessary to provide on-site full electrical power distribution equipment testing, maintenance, and inspections.  Full maintenance includes on-site testing, maintenance and annual preventative maintenance inspections (PMI s).  \n\n4.  Scope. \nThe contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and inspection, testing, and/or calibration of the Electrical Power Distribution Equipment and all of its components at the Cleveland VA Medical Center of facility Electrical Power Distribution Equipment meeting NETA standards.\n\nElectrical Power Distribution Equipment Testing, Inspection, and Maintenance \nas defined in this Statement of Work except for those items specified as government furnished property and services.  The contractor shall meet the standards in this contract.\n\nIn the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification.  No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation.  All quotes for repair parts shall be provided at the agreed upon discounted GSA rate. Power distribution equipment maintenance schedule includes tri-annual testing, maintenance and inspection.  Tri-annual testing of power distribution equipment outlined in section 5.10 of this SOW.\n\n5. Specific Tasks.  \nOnsite testing, inspection, minor repair, and housekeeping.\n\n5.1  Substation and Transformer Maintenance completed tri-annually January   May  (Testing Period may be adjusted to meet medical center needs)\nVisually inspect, tighten hardware and torque bolted connections. \nManually operate each switch to check operation of auxiliaries and interlocks.      Check contact wipe, clearances and gaps as described in the manufacturer's instruction book.\nClean and lubricate all moving parts with manufacturer's approved lubricants. \nCheck electrically operable devices by conducting operating tests as described by manufacturer s instructions. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service.\nVerify the Kirk Key interlock system. \nTest bus for insulation resistance.  \nThe vendor is responsible for a thorough cleaning of all substations which includes all the bus, wiring, inside panels, and any and all supporting parts. All cleaning products must meet substation manufacture factory specifications. Use lint-free rags to clean conductors, contact points between the circuit breakers and main buss bars, buss bars and interior of the electrical equipment.  Wipe down all sides and top of cabinet, substation or panel to remove dust/debris. Use a vacuum cleaner to remove large debris; compressed air is not to be used for this purpose. Visually inspect for signs of overheating, misaligned contacts, damaged insulation, or lose lugs. Upon completion the COR will inspect the substation for cleanliness. The vendor is responsible for inspecting the inside of the substation and confirms no foreign objects have been left inside the substation prior to returning to service.  \nLiquid cooled transformers must have the cooling liquid tested and replaced when tests indicate that the liquid no longer meets manufacturer's specification. The liquid must be re-filled to meet the manufacturer's specifications.  \nTest insulation resistance of both high and low voltage windings to ground and each other.\nInspect temperature relays, gauges, switches and alarms. \nIf equipped with fans and pumps, verify proper operation and test. \nVerify three (3} phase transformer turns ratio on all taps using a three (3} phase test set.\nPower factor test.  \nDry type transformers must be thoroughly cleaned exteriorly and inspected for overheating with infra-red thermal detecting equipment.   \nTest insulation resistance of both high and low voltage windings to ground. \nInspect temperature relays, gauges, switches, and alarms. \nTest fans, if equipped, and inspect all vent filters. Ensure proper routing of thermocouple leads. \nVerify transformer turns ratio on all taps. \nVisually inspect and clean transformer windings. \nCheck torque on all accessible bolted connections. \nClean cells and bus components. \nTest bus for insulation resistance. Visually inspect the main bus. \nTest all accessible bolted bus connections for proper torque and integrity. \nTest protective relays. \nVerify potential and control transformers. \nCheck the breaker lifting device for proper operation. \nVerify the key interlock system. \nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts. \nVerify the proper functioning of all indicating devices. \nBolted pressure switches: Clean, lubricate and verify electrical and mechanical operation.\nEnergize the control circuits and test the integrity of the breaker close and trip circuits by operating the control switches and relay contacts. \nVerify the proper functioning of all indicating devices. \nVerify the proper operation of the control power transfer equipment. \nFunctional test all protective relays, where permitted. \n\nSwitchgear and Switchboard Assemblies.\nTransformers 500 Kilovolt-Amps (kVA) or larger\nSwitches, Vacuum, Medium-Voltage\nSwitches, Air, Low-Voltage.\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nMotor Control, Motor Starter, Medium-Voltage\nMotor Control, Motor Starters, Low-Voltage.\nMetal Enclosed Busways\nSwitches, Air, Medium-Voltage, Metal-Enclosed\nSwitches, Vacuum, Medium-Voltage\nTransformers, Dry Type, Air-Cooled, Low-voltage, Small.\nTransformers, Dry Type, Air-Cooled, Low-voltage, Large.\nTransformers, Liquid-Filled.\n\n  Circuit Breaker Maintenance 400 amps and above completed tri-annually January   May (Testing Period may be adjusted to meet medical center needs)\nClean and lubricate, as necessary. \nOperate the breaker racking mechanisms to verify smooth operation. \nOperate the breakers to check the operation of auxiliaries and interlocks. \nFor low voltage breakers, inspect arc chutes, contacts and insulation structures in accordance with the manufacturer's instruction manual. Test each breaker with a portable secondary injection test set or primary injection test set. \nFor medium voltage breakers, inspect interphase barriers and insulation structure for signs of damage or contamination. Check contacts in accordance with the manufacturer's instruction manual. \nTest insulation resistance. \nTest contact resistance. \nCircuit Breakers, Air, Insulated-Case/ Molded-Case.\nCircuit Breakers, Air, Low-Voltage Power.\nCircuit Breakers, Vacuum, Medium-Voltage.\n   \n5.3   Ground Resistance Testing   completed annually July\nTest Ground resistance for the main MV room and all 24 substations throughout the facility. Refer to VAH 1028 FY16.\nGrounding Systems.\nGround-fault Protection Systems.\n5.4   IR Imagery   completed annually in July\nInfra-Red Scanning/Thermographic Survey shall be performed on electrical equipment.  \n\nUse an infra-red scanning camera to detect hot spots in the Electrical Power Distribution System.  \nObjective of this work is to detect any loose, broken, or corroded connections in the system.  \nProblem connections shall be replaced with new connectors, and/or tightened with torque wrench to meet the equipment manufacturers  specifications.\nInfra-Red Report shall be prepared and submitted to COTR within seven (7} days of completion. \n\nTest report shall include nameplate data, test results, general condition and maintenance recommendations, and location. \n\nColor pictures shall be provided of any problem areas \nNote that since this work item must be done while the Electrical Power Distribution System is energized, appropriate safety precautions must be taken before, during and after scanning the system.\nThe report for infrared inspections shall provide complete documentation of thermal patterns detected in the electrical equipment within the Louis Stokes VA Facility. Provide qualitative evaluation to help prioritize repairs. \nThe infrared inspection report should meet the documentation requirements of the Infra-red inspection Institute Guideline for Infrared Inspection of Electrical and Mechanical Systems. All other published guidelines and standards pertaining to the infrared inspection of electrical and mechanical systems should be referenced and incorporated in the report and inspection. \nElectrical equipment (including, but not limited to switchgears, switchboards, distribution panels, motor control centers, and all related components) is inspected, tested, maintained, and/or calibrated every 36 months, and all work must be documented. NOTE: The National Electrical Testing Association (NETA) provides guidance, which is considered best practice for the maintenance of electrical equipment; these practices should be followed to the extent possible. \nIdentify the hot spots in the electrical equipment by using infra-red thermal detecting equipment. Tighten problem connections to meet equipment manufacturers  specifications using a torque wrench or other approved devices. \n\nRepair Priority Ratings \nTemperature Severity Ratings are the objective and based on temperatures measured by the thermography. The exception and other reference temperatures are compared to industry standards and guidelines to produce an objective Temperature Severity Rating. The vendor is to use the following temperature criteria to assign Temperature Severity Ratings to the exceptions: \n\nNETA Priority Criteria for Electrical & Mechanical Exceptions\n#1 (0 to 18Â°F} Possible deficiency and warrants investigation \n#2 (18 to 36 Â°F} Indicates probable deficiency, repair as time permits \n#3 (36 to 72 Â°F} Indicates definite discrepancy; repair as soon as possible \n#4 (Greater than 72 Â°F} Indicates major discrepancy; repair immediately\n\n5.5   Medium Voltage Relay Testing completed tri-annually January   May\nProtective Relays Microprocessor Based.\nCalibrate and maintain adjustable protective relays. \nVisual inspection. \nClean. \nTest. \n\n5.6   Medium Voltage Substation Control Power Batteries completed annually January   May\nInspect, clean and check torque on bolted connections. \nCheck for proper voltage and regulation. \nPerform battery impedance and resistance testing. \n\n5.7   Transformer Oil Testing completed annually April   June \nCollect cooling liquid oil sample for testing: \nGeneral quality tests \nDielectric strength \nAcid neutralization \nInterfacial tension \nVisual inspection \nWater content \nPower factor \nDissolved gas analysis \n\n5.8  Tri-annual 4-Hour Power Outage Test (2029)\n\nThe Contractor shall be present for and will participate as a resident expert in the VAMC 4- hour test of the Essential Electrical System (EES) to be conducted on a Saturday or Sunday. \nThis test shall fulfill the requirements of VHA Directive, Electrical Power Distribution System, NFPA 110 (e.g. Para. 8.4.9.) and The Joint Commission. This test will include opening all utility service connections serving the VAMC for a minimum of 4 hours. \nDuring the test period, verify operation of all EES components including the transfer to emergency power and return to normal service. \nThe Contractor shall include in their bid proposal all costs associated with the services of the local utility company for the duration of the test. The estimated duration of the Contractor s involvement is between 8   12 hours. \nThe Contractor shall assist the VAMC staff with troubleshooting and correcting malfunctioning electrical equipment discovered during the test. \nContractor shall make any required adjustments and/or re-calibrations to all equipment which has been otherwise maintained, inspected, and tested under this Scope of Work.\n\n5.9  Maintenance Reports\nContractors shall report deficiencies that are deemed critical or catastrophic immediately to the Contracting Officer Representative for immediate actions.\nWork items, definitions, and references shall comply with the latest edition of the NETA   Maintenance Testing Specifications (MTS) and with the VHA Directive, Electrical Power Distribution System. \nNOTE: settings such as ATS settings, Adjustable Breaker Settings, etc must be provided by the VA. If not available from current coordination studies, then they should have the contractor conduct a study to determine proper settings.\nSystem Function Tests. Provide function tests for all equipment listed in this Scope of Work.\nTest Conditions. \n\n5.10  -- Tri-Annual Testing and Inspection\n\nBreaker Testing List\nBase Year:  November 1, 2026 Through October 31, 2027\n\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \nÂ \n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nRussel Gear \nN/A\nN/A\nÂ \nCutler Hammer MDS840\n4000\n1\nBE602\nÂ \nÂ \nÂ \nCutler Hammer MDS632\n3200\n2\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS620\n2000\n3\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n6\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS608\n800\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NE361200 LSG\n1200\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC1\n2\n2500 Dry\n1\n5KV SW/5 KV  Starters\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nTie-GPS-TGPB\nÂ \nÂ \nÂ \nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW32H\n3200\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nDPE-5\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEDSB3\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n2\nEDSB4\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEC3B\nÂ \nÂ \nÂ \nSquare D NW20H1\n2000\n2\nÂ \nÂ \nÂ \nÂ \nSquare D NW16H1\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW08H1\n800\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nGDS3\nÂ \nÂ \nÂ \nEaton SBS 630\n3000\n4\nDPE3\nÂ \nÂ \nÂ \nEaton LT360032\n450\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nMV Substation\nÂ \nÂ \nÂ \nC/H 150VCP-W 500\n1200\n33\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ \nÂ \nÂ \nGE AK25\n600\n4\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ \nÂ \nÂ \nÂ \nSchneider\n800\n3\n\n\n\nBreaker Testing List\nOption Year 1:  November 1, 2027 Through October 31, 2028\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ \nÂ \nÂ \nÂ \nÂ \nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ \nSquare D MH36800\n800\nEmergency\nÂ \nÂ \nÂ \nSquare D MH36600\n600\n Panel\nÂ \nÂ \nÂ \nSquare D MH36400\n400\nÂ \nÂ \nÂ \nÂ \nSquare D MH34250\n250\nÂ \nÂ \nÂ \nÂ \nSquare D MH34225\n225\nÂ \nÂ \nÂ \nÂ \nSquare D MH34200\n200\nÂ \nÂ \nÂ \nÂ \nSquare D SE\n2500\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n1200\nPenthouse\nÂ \nÂ \nÂ \nÂ \nÂ \nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ \nÂ \nÂ \nÂ \nGE AKRT-6D-30H\n800\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nElevator\nN/A\nN/A\nÂ \nGE AK2A-50\n1600\nÂ \nÂ \nÂ \nÂ \nGE AK2A-25\n600\nMICU\nÂ \nÂ \nÂ \nÂ \nÂ \nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n400\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1-G\nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB1-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB2-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nCB-T-UPS\nÂ \nÂ \nÂ \nSiemens MCCB\n600\n7th Floor\nÂ \nÂ \nÂ \nÂ \nÂ \nEDP\nÂ \nÂ \nÂ \nEaton RD320T36W\n2000\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\nDPHL71EQ\nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n250\nDPHL72EQ\nÂ \nÂ \nÂ \nSquare D Power Pact\n800\nÂ \nÂ \nÂ \nÂ \nSquare D Power Pact\n400\nDPEG2\nÂ \nÂ \nÂ \nEaton MCCB\n1200\nCares Tower\nÂ \nÂ \nÂ \nEaton MCCB\n800\n\n\nYearly Breaker  Testing List\nOption Year 2 :  November 1, 2028 Through October 31, 2029\n\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \nÂ \n2029/2032\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nAmb Care\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nSub H1\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS408\n800\n9\nSub H2\n2\n1500 Dry\n1\nCutler Hammer MDS632\n3200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS408\n800\n8\nEGSB1\nÂ \nÂ \nÂ \nCutler Hammer MCCB\n1200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MCCB\n1200\n1\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MCCB\n800\n2\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MCCB\n600\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEmergency\nN/A\n750 Dry\n1\nIn Amb Care\nÂ \nÂ \nEmergency\n1\n750 Dry\n1\nIn Energy Center\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nCares Tower\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \n1st Floor F1, F2\n4\n1500 Dry\n2\nEaton MDS630\n3000\n3\nBF-193\nÂ \nÂ \nÂ \nEaton MCCB\n800\n5\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n150\n1\nUpstairs F3, F4\n4\n1000 Dry\n2\nEaton MDS620\n2000\n3\nPF-105\nÂ \nÂ \nÂ \nEaton MCCB\n800\n6\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n160\n2\nDPEG2 - Cares PH\nÂ \nÂ \nÂ \nEaton MCCB\n1200\n1\nÂ \nÂ \nÂ \nEaton MHDL3400F\n400\n6\nRadiology\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nLeft side\n2\n500 Dry\n1\nEaton MDS612\n1200\n2\n2B-502\nÂ \nÂ \nÂ \nEaton MCCB\n800\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n225\n7\nRight Side\n2\n1000 Dry\n1\nEaton MDS620\n2000\n1\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n1\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n800\n1\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n160\n3\nPathology\n2\n1500 Dry\n1\nGE Wavepro\n2500\n2\nUSS-F2\nÂ \nÂ \nÂ \nGE MCCB\n400\n2\nÂ \nÂ \nÂ \nÂ \nGE MCCB\n150\n2\nÂ \nÂ \nÂ \nÂ \nGE MCCB\n125\n1\nÂ \nÂ \nÂ \nÂ \nGE MCCB\n100\n1\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nLab Warehouse\n2\n1500 Dry\n1\nEaton MDS625\n2500\n2\nUSS-F1\nÂ \nÂ \nÂ \nEaton MCCB\n630\n2\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nParking Garage\n1\nOil\n1\nÂ \nÂ \nÂ \n\n\nYearly Breaker Refurbishing and Testing Listing\nOption Year 3 :  November 1, 2029 Through October 31, 2030\n\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \nÂ \n2027/2030\nQty\nKVA\nQty\nMFG\nAmpacity\nQty\nEnergy Center\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nRussel Gear \nN/A\nN/A\nÂ \nCutler Hammer MDS840\n4000\n1\nBE602\nÂ \nÂ \nÂ \nCutler Hammer MDS632\n3200\n2\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS620\n2000\n3\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS616\n1600\n6\nÂ \nÂ \nÂ \nÂ \nCutler Hammer MDS608\n800\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC2\n2\n1000 Dry\n1\nSquare D RJ1600\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NE361200 LSG\n1200\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC1\n6-Jun\n2500 Dry\n1\n5KV SW/5 KV  Starters\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nEC3A\n2\n3000 Oil\n1\nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nTie-GPS-TGPB\nÂ \nÂ \nÂ \nSquare D NW40H\n4000\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW32H\n3200\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nDPE-5\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEDSB3\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n2\nEDSB4\nÂ \nÂ \nÂ \nSquare D PJ800\n800\n1\nÂ \nÂ \nÂ \nÂ \nSquare D LJ400\n400\n1\nEC3B\nÂ \nÂ \nÂ \nSquare D NW20H1\n2000\n2\nÂ \nÂ \nÂ \nÂ \nSquare D NW16H1\n1600\n1\nÂ \nÂ \nÂ \nÂ \nSquare D NW08H1\n800\n3\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nGDS3\nÂ \nÂ \nÂ \nEaton SBS 630\n3000\n4\nDPE3\nÂ \nÂ \nÂ \nEaton LT360032\n450\n2\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nMV Substation\nÂ \nÂ \nÂ \nC/H 150VCP-W 500\n1200\n33\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nResearch K03\n1\n1000 Oil\n1\nGE AK50\n1600\n2\nBF458\nÂ \nÂ \nÂ \nGE AK25\n600\n4\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nSurgery\n4\nDry\n2\nSchneider\n1600\n3\nÂ \nÂ \nÂ \nÂ \nSchneider\n800\n3\n\n\nBreaker Testing List\nOption Year 4:  November 1, 2030 Through October 31, 2031\n\n\n\n\n\n\nSubstation\nMV Sw\nXFMRs\nÂ \nCircuit Breakers\nÂ \n2028/2031\nQty\nKVA\nQty\nMFG\nAmpacity\nD21\nÂ \nÂ \nÂ \nÂ \nÂ \nSub A\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nSub B\nN/A\n1500 Oil\n2\nGE AK2-75\n3000\nÂ \nÂ \nÂ \nÂ \nGE AK2-50\n1600\nEDSB-2\nN/A\nN/A\nÂ \nSquare D MH36800\n800\nEmergency\nÂ \nÂ \nÂ \nSquare D MH36600\n600\n Panel\nÂ \nÂ \nÂ \nSquare D MH36400\n400\nÂ \nÂ \nÂ \nÂ \nSquare D MH34250\n250\nÂ \nÂ \nÂ \nÂ \nSquare D MH34225\n225\nÂ \nÂ \nÂ \nÂ \nSquare D MH34200\n200\nÂ \nÂ \nÂ \nÂ \nSquare D SE\n2500\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n1200\nPenthouse\nÂ \nÂ \nÂ \nÂ \nÂ \nSub W\n2\n1500 Oil\n2\nGE AKRT-6D-50H\n2000\nÂ \nÂ \nÂ \nÂ \nGE AKRT-6D-30H\n800\nÂ \nÂ \nÂ \nÂ \nÂ \nÂ \nElevator\nN/A\nN/A\nÂ \nGE AK2A-50\n1600\nÂ \nÂ \nÂ \nÂ \nGE AK2A-25\n600\nMICU\nÂ \nÂ \nÂ \nÂ \nÂ \nMSB-N1\n2\n750 Dry\n1\nSiemens WLS2A316\n1200\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n400\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1-G\nÂ \nÂ \nÂ \nSiemens MCCB\n800\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n600\nÂ \nÂ \nÂ \nÂ \nSiemens MCCB\n300\nDPNB1\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB1-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nDPNB2-CR\nÂ \nÂ \nÂ \nSiemens MCCB\n600\nCB-T-UPS\nÂ \nÂ \nÂ \nSiemens MCCB\n600\n7th Floor\nÂ \nÂ \nÂ \nÂ \nÂ \nEDP\nÂ \nÂ \nÂ \nEaton RD320T36W\n2000\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n400\nDPHL71EQ\nÂ \nÂ \nÂ \nEaton MCCB\n800\nÂ \nÂ \nÂ \nÂ \nEaton MCCB\n250\nDPHL72EQ\nÂ \nÂ \nÂ \nSquare D Power Pact\n800\nÂ \nÂ \nÂ \nÂ \nSquare D Power Pact\n400\nDPEG2\nÂ \nÂ \nÂ \nEaton MCCB\n1200\nCares Tower\nÂ \nÂ \nÂ \nEaton MCCB\n800\n\n\n \n\nInfra-Red Line Items for Inspection\n  \nInfra-Red Line items for inspection ITEM # \nEQUIPMENT DESCRIPTION \nLOCATION \n1 \n16 Panels \nMain Basement, BA-151 Ambulatory Care \n2 \nATS # 1,2,3,4 \nMain Basement, BA-151 Ambulatory Care \n3 \nSubs H1 & H2 \nMain Basement, BA-151 Ambulatory Care \n4 \nMCC1 & MCC2 \nMain Basement, BA-151 Ambulatory Care \n5 \n6 Surge Arrestors \nMain Basement, BA-151 Ambulatory Care \n6 \nVFD 51 Return & Supply Fans \nMain Basement, BA-151 Ambulatory Care \n7 \nVFD 52 Return & Supply Fans \nMain Basement, BA-151 Ambulatory Care \n8 \nVFD 53 Return & Supply Fan \nMain Basement, BA-151 Ambulatory Care \n9 \n5 Cutler Hammer Switchboards \nMain Basement, BA-151 Ambulatory Care \n10 \n16 Disconnect Switches \nMain Basement, BA-151 Ambulatory Care \n11 \n8 Panels & 1 Disconnect Switch \nMain Basement, B-B362 Electrical Room \n12 \n5 Panels \nMain Basement, B-C315 Engineering Closet \n13 \nATS # 16,17,18,19 \nMain Basement, FES B-E261 \n14 \n24 Panels \nMain Basement, FES B-E261 \n15 \n4 Disconnect Switches \nMain Basement, FES B-E261 \n16 \n6 Disconnect Switches & 8 VFDs \nMain Basement, FES B-E260 \n17 \n1 Panel \nMain Basement, F12A \n18 \n3 Panels \nMain Basement, 1-E500 Generator Room \n19 \n14 Panels & 1 Disconnect \nMain Basement, H-01A \n20 \nSubs GPS 1 & GPS 2, 1 Panel \nMain Basement, B-E602 Russ Gear Room \n21 \n3 Disconnect Switches & 1 Panel \nMain Basement, B-E503 Pipe Tunnel \n22 \n7 Panels & 1 Disconnect Switch \nMain Basement, B-E361B Hall by Cares Tower \n23 \n4 Panels \nMain Basement, B-A148 Electrical Closet \n24 \n4 Panels & 2 Disconnect Switches \nMain Basement, B-C563 \n25 \nATS # 49,50 \nMain Basement, Unmarked by Room B-B549 \n26 \n7 Panels \nMain Basement, Unmarked by Room B-B549 \n27 \nAll Breakers \nMain Basement, B-E504 Main Sub \n28 \nIncoming Disconnects & Battery Rack \nMain Basement, B-E504 Main Sub \n29 \nATS # 23,24,25 \nMain Basement, B-D423 \n30 \n3 Panels & 1 Disconnect Switch \nMain Basement, B-D423 \n31 \n7 Eaton Switchboards \nMain Basement, B-D423 \n32 \nATS # 26 \nMain Basement, B-D424 \n33 \n5 Panels \nMain Basement, B-D424 \n34 \nATS # 5,8,22 \nMain Basement, D21 \n35 \n10 Panels \nMain Basement, D21 \n36 \nSub A & B, Lighting and Power \nMain Basement, D21 \n37 \nATS # 65 \nMain Basement, Energy Center, B-E603 \n38 \nEaton Subs GDS3 & EC3B \nMain Basement, Energy Center, B-E603 \n39 \nATS # 15, 51, 52 \nMain Basement, Energy Center, B-E601 \n40 \n9 Panels \nMain Basement, Energy Center, B-E601 \n41 \n4 Chiller Starter Switches \nMain Basement, Energy Center, B-E601 \n42 \nSubs 1, EC2, EC3, TGP \nMain Basement, Energy Center, B-E601 \n43 \n1 Panel \nMain Basement, Energy Center, Cat Gen Room \n44 \n8 Panels, 12 Disconnect Switches & 13 VFDs \nMain Basement, B-D607 Chiller Plant North \n45 \n7 VFDs \nMain Basement, Boiler Room \n46 \n9 Disconnect Switches \nMain Basement, B-F411 Water Filtration \n47 \n9 Panels \nMain 1st Floor, 129E by Surgery Sub \n48 \n5 Panels & 2 Disconnect Switches \nMain 1st Floor, K111-A \n49 \n4 Panels & 1 Disconnect Switch \nMain 1st Floor, K122B \n50 \n3 Panels \nMain 1st Floor, Kitchen \n51 \n1 Panel \nMain 1st Floor, 1-D392 \n52 \n1 Panel \nMain 1st Floor, 1-E401 \n53 \n8 Panels \nMain 1st Floor, A-105 Surgery Sub \n54 \nATS # 11,12,13 \nMain 1st Floor, A-105 Surgery Sub \n55 \n10 Disconnect Switches \nMain 1st Floor, A-107 AC Shop \n56 \nMCC N1 & E1 \nMain 1st Floor, A-107 AC Shop \n57 \n4 Panels & 1 Disconnect Switch \nMain 2nd Floor, 2A-102 \n58 \n6 Panels \nMain 2nd Floor, 2A-158 \n59 \n3 Panels & 1 Disconnect Switch \nMain 2nd Floor, 2A-187 \n60 \n11 Panels \nMain 2nd Floor, 2B-125 \n61 \n4 Panels \nMain 2nd Floor, 2B-126 \n62 \n8 Panels & 2 Disconnect Switches \nMain 2nd Floor, 2B-148 \n63 \n5 Panels & 2 Disconnect Switches \nMain 2nd Floor, 2B-223 \n64 \nATS # 20 \nMain 2nd Floor, 2B-480 Mech Room East \n65 \n5 Panels, 2 Disconnect Switches & 1 VFD \nMain 2nd Floor, 2B-480 Mech Room East \n66 \n4 Panels & 4 Disconnect Switches \nMain 2nd Floor, 2B-501 Mechanical Penthouse \n67 \nATS # 42 & Teledata ATS \nMain 2nd Floor, 2B-502 Penthouse \n68 \nSub Stations F1 & F2 \nMain 2nd Floor, 2B-502 Penthouse \n69 \n1 Panel, 3 Disconnect Switches & Eaton Panel \nMain 2nd Floor, 2B-502 Penthouse \n70 \n9 Panels \nMain 2nd Floor, 2C-411 \n71 \n1 Panel & Bus Duct \nMain 2nd Floor, 2C-412 \n72 \n1 Disconnect Switch & 1 VFD \nMain 2nd Floor, 2C-2041 \n73 \nMCC 22B \nMain 2nd Floor, 2C-2041 \n74 \n2 Panels \nMain 2nd Floor, 2D-177 \n75 \n1 Panel \nMain 2nd Floor, 2D-188 \n76 \n2 Panels \nMain 2nd Floor, 2D-190 \n77 \n3 Panels \nMain 2nd Floor, 2D-191 \n78 \n3 Panels \nMain 2nd Floor, 2E-320 \n79 \n2 Panels & 1 Disconnect Switch \nMain 2nd Floor, 2E-347 \n80 \n1 Panel \nMain 2nd Floor, 2E-361 \n81 \n9 Panels \nMain 2nd Floor, 2E-315 \n82 \nATS # 21 \nMain 2nd Floor, 2E-480 Mech Room West \n83 \n3 Panels, 3 Disconnect Switches & 1 VFD \nMain 2nd Floor, 2E-480 Mech Room West \n84 \n3 Panels & 2 Disconnect Switches \nMain 2nd Floor, k-214A \n85 \n4 Panels & 2 Disconnect Switches \nMain 2nd Floor, k-222 \n86 \n3 Disconnect Switches \nMain 2nd Floor, Rm 2004 \n87 \n2 Panels \nMain 3rd Floor, 3A-100 \n88 \n2 Panels \nMain 3rd Floor, 3A-113 \n89 \n3 Panels \nMain 3rd Floor, 3A-115, Mechanical \n90 \n2 Panels \nMain 3rd Floor, 3A-122 \n91 \n2 Panels \nMain 3rd Floor, 3A-136 \n92 \n3 Panels \nMain 3rd Floor, 3B-147 \n93 \n1 Panel \nMain 3rd Floor, 3B-148 \n94 \n2 Panels \nMain 3rd Floor, 3B-149 \n95 \n25 Panels \nMain 3rd Floor, 3B-162b Electrical Room \n96 \n3 Disconnect Switches \nMain 3rd Floor, 3B-162d Penthouse \n97 \n2 Panels \nMain 3rd Floor, 3C-105 \n98 \nBus Duct \nMain 3rd Floor, 3C-108 \n99 \nMCC 32, AC 25 MCC \nMain 3rd Floor, Penthouse \n100 \n1 Panel \nMain 4th Floor, 4A-109 \n101 \n1 Panel \nMain 4th Floor, 4A-109 \n102 \n3 Panels \nMain 4th Floor, 4A-114 \n103 \n1 Panel \nMain 4th Floor, 4A-116 \n104 \n2 Panels \nMain 4th Floor, 4A-125 \n105 \n2 Panels \nMain 4th Floor, 4A-149 \n106 \n1 Panel \nMain 4th Floor, 4A-160 \n107 \n4 Panels \nMain 4th Floor, 4AC-232, By Stair 4 Amb. Care \n108 \n1 Panel \nMain 4th Floor, 4B-106 \n109 \n6 Panels \nMain 4th Floor, 4B-111 \n110 \n1 Panel \nMain 4th Floor, 4B-112 \n111 \n3 Panels \nMain 4th Floor, 4B-121 \n112 \n1 Panel \nMain 4th Floor, 4B-147 \n113 \n1 Panel \nMain 4th Floor, 4B-155 \n114 \n6 Panels \nMain 4th Floor, 4C-103 \n115 \nBus Duct \nMain 4th Floor, 4C-106 \n116 \n4 Panels \nMain 5th Floor, 5A-114 \n117 \n2 Panels \nMain 5th Floor, 5A-125 \n118 \n2 Panels \nMain 5th Floor, 5A-152 \n119 \n3 Panels & 1 Disconnect Switch \nMain 5th Floor, 5B-115 \n120 \n2 Panels \nMain 5th Floor, 5B-125 \n121 \n2 Panels \nMain 5th Floor, 5B-152 \n122 \n3 Panels \nMain 5th Floor, 5C-111 \n123 \nBus Duct \nMain 5th Floor, 5C-Elevators \n124 \n3 Panels, 10 Disconnect Switches \nMain 5th Floor, Penthouse, Stair C,1 or 4 \n125 \n6 VFDs, 4 Control Panels \nMain 5th Floor, Penthouse, Stair C,1 or 4 \n126 \n2 Panels \nMain 6th Floor, 6A-105 \n127 \n1 Panel \nMain 6th Floor, 6A-111 \n128 \n2 Panels \nMain 6th Floor, 6A-112 \n129 \n3 Panels & 10 Disconnect Switches \nMain 6th Floor, 6A-126 \n130 \n1 Panel \nMain 6th Floor, 6A-140 \n131 \n2 Panels \nMain 6th Floor, 6B-105 \n132 \n2 Panels \nMain 6th Floor, 6B-117 \n133 \n1 Panel \nMain 6th Floor, 6B-124 \n134 \n2 Panels \nMain 6th Floor, 6B-130 \n135 \n1 Panels \nMain 6th Floor, 6B-144 \n136 \n2 Panels \nMain 6th Floor, 6C-100 \n137 \n1 Panels \nMain 6th Floor, 6C-101 \n138 \nBus Duct \nMain 6th Floor, 6C-Elevators \n139 \n10 Panels, 3 Disconnects & 5 VFDs \nMain 7th Floor Penthouse \n140 \nATS # 43,44,45,46 \nMain 7th Floor Penthouse \n141 \nMCC 71 \nMain 7th Floor Penthouse \n142 \n2 Panels \nMain 7th Floor Penthouse, AC-29 \n143 \n1 Panel & MCC 74 \nMain 7th Floor, 7B-100 Exhaust Fan Room \n144 \nGE Sub Station \nMain 7th Floor, 7C-107 Mechanical Roof \n145 \nATS # 14 & HVAC ATS \nMain 7th Floor, 7C-102 Elevator Penthouse \n146 \nPanels, MCC \nMain 7th Floor, 7C-102 Elevator Penthouse \n147 \n2 Panels \nCares A Floor, AF-193 \n148 \n6 Panels \nCares A Floor, AF-ELC1 \n149 \n7 Panels & Bus Duct \nCares A Floor, AF-ELC2 \n150 \n1 Panel \nCares A Floor, AF-LVC2 \n151 \n1 Disconnect Switch & 2 VFDs \nCares Basement, BF 192 \n152 \nSub F1 & F2 \nCares Basement, BF 193 \n153 \n3 Panels \nCares Basement, BF 193 \n154 \n7 Panels & Bus Duct \nCares Basement, BF-ELC1 \n155 \n10 Panels & Bus Duct \nCares Basement, BF-ELC2 \n156 \n1 Panel \nCares Basement, BF-LVC2 \n164 \n3 Disconnect Switches \nCares 1st Floor, FUT Card Elevator Eq. Room \n165 \n5 Panels & Bus Duct \nCares 2nd Floor, 2F-ELC1 \n166 \n6 Panels & Bus Duct \nCares 2nd Floor, 2F-ELC2 \n167 \n1 Panel \nCares 2nd Floor, 2F-LVC2 \n168 \nATS # 39,40,47 \nCares 2nd Floor, 2F-501A Electrical Penthouse \n169 \n11 Panels & 1 Disconnect Switch \nCares 2nd Floor, 2F-501A Electrical Penthouse \n170 \nLab Warehouse Sub \nCares 2nd Floor, 2F-501A Electrical Penthouse \n171 \n2 Disconnect Switches \nCares 2nd Floor, 2F-501B Mechanical Penthouse \n172 \n9 Disconnect Switches & 2 VFDs \nCares 2nd Floor, 2F-501C Mechanical Penthouse \n173 \nATS # 48 \nCares 2nd Floor, 2F-501D Electrical Penthouse \n174 \n3 Panels & 2 Disconnect Switches \nCares 2nd Floor, 2F-501D Electrical Penthouse \n175 \nPathology Sub \nCares 2nd Floor, 2F-501D Electrical Penthouse \n176 \n8 Panels & Bus Duct \nCares 3rd Floor, 3F-ELC1 \n177 \n7 Panels & Bus Duct \nCares 3rd Floor, 3F-ELC2 \n178 \n1 Panel \nCares 3rd Floor, 3F-LVC2 \n179 \n6 Panels & Bus Duct \nCares 4th Floor, 4F-ELC1 \n180 \n7 Panels & Bus Duct \nCares 4th Floor, 4F-ELC2 \n181 \n1 Panel \nCares 4th Floor, 4F-LVC2 \n182 \n6 Panels & Bus Duct \nCares 5th Floor, 5F-ELC1 \n183 \n7 Panels & Bus Duct \nCares 5th Floor, 5F-ELC2 \n184 \n1 Panel \nCares 5th Floor, 5F-LVC2 \n185 \nPanels & Bus Duct \nCares 6th Floor, 6F-ELC1 \n186 \nPanels & Bus Duct \nCares 6th Floor, 6F-ELC2 \n187 \n1 Panel \nCares 6th Floor, 6F-LVC2 \n188 \n2 Disconnect Switches \nCares Penthouse, PF-102 Elevator Controls \n189 \n14 Disconnect Switches & 15 VFDs \nCares Penthouse, PF-104 \n190 \n2 Panels \nCares Penthouse, PF-105 \n191 \nSub F3 & F4 \nCares Penthouse, PF-105 \n192 \nATS # 37,38 \nCares Penthouse, PF-105 \n193 \n8 Disconnect Switches \nCares Penthouse, PF-106 \n194 \n5 Panels \nSinai Skills Center, Room 116 \n195 \n2 Panels \nSinai Skills Center, 2nd Floor Restrooms \n196 \n6 Panels \nParking Garages, 1C-703 \n197 \n3 Panels & 2 Disconnect Switches \nParking Garages, 1G 703 Electrical Eq. Room \n198 \n2 Disconnect Switches \nParking Garages, 1G 702 Elevator Eq. Room \n199 \n1 Panel, 4 Disconnect Switches \nParking Garages, 2C-703 \n200 \n4 Disconnect Switches \nParking Garages, 3C-703 \n201 \n3 Disconnect Switches \nParking Garages, 4C-703 \n202 \nSquare D Switchgear \nParking Garages, 006 Main Electric Room \n203 \n4 Panels & 1 Disconnect Switch \nParking Garages, 006 Main Electric Room \n204 \nG/ATS 1 \nParking Garages, 006 Main Electric Room \n205 \nEaton Switchgear & 2 Panels \nParking Garages, 006A Electric Room \n206 \n7 Disconnect Switches \nParking Garages, 005A Elevator Mechanical \n\n6. Deliverables:\n Written Report\nA complete written report of the work performed shall be provided to the VA within 7 days of completion.  \nInformation shown in the report shall be as follows:\nCompany s name, addresses, telephone, & FAX numbers.\nName and signature of contractors who perform the maintenance and testing.\nVA Work Contract Number, name and number of VA Contracting Officer.\nDate and Time of work.\nCopies of contractors  valid licenses, professional and training certificates.\nDescriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera.\nLocation, Type, Name, serial number, and nameplate information of electrical equipment to be maintained and tested.  \nDescriptions of work items.\nTest data.\nReference materials such as equipment manufacturer s specifications, coordination study, etc.\nRemarks on conditions of electrical equipment.  List all deficiencies, if any.\nRecommended corrective actions, if any.\nSubmit four (4) hard copies of the complete written report and emailed report to VA Contracting Officer Representative (COR) within seven (7) calendar days of visit.  \nAll reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods.\n6.2 Awarded contractor shall submit a site-specific safety plan (SSSP) outlining how  inspections and testing will safely be conducted.  This safety plan will be submitted to VA  safety department for approval.  COR will provide SSSP packet to contractor for  completion.\nContractor shall meet all timeline requirements outlined in this SOW. \nSOW Task#\nDeliverable Title\nFormat\nNumber\nCalendar Days After Start\n1\nSite Specific Safety Plan\nWord - PDF\n100 %\n>30 days\n2\nMV Substation Inspection Report\nEmail   Word - Excel\n100 %\n>30 days\n3\nMV Control Power Batteries Report\nEmail   Word   Excel\n100 %\n>30 days\n4\nMV Substation Control Power Relay Testing Report\nEmail   Word   Excel\n100 %\n>30 days\n5\nSubstation Transformer Testing Report\nEmail   Word   Excel\n100 %\n>30 days\n6\nTransformer Oil Sample Report\nEmail   Word - Excel\n100 %\n>30 days\n7\nCircuit Breaker Testing Report\nEmail   Word   Excel\n100 %\n>30 days\n8\nGround Resistance Testing Report\nEmail   PDF - Excel\n100 %\n14 Days\n9\nIR Imagery Report\nEmail   PDF   Excel\n100 %\n14 Days\n10\n4 Hour Blackout Support\nEmail   PDF   Excel\n100 %\n14 Days\n11\nAll items completed during scheduled timeframe\nEmail   PDF   Excel\n95%\n14 Days\n\n \n7. Performance Monitoring\nPrior to bidding, it shall be the responsibility of the bidder to visit Cleveland VAMC and inspect the equipment listed within this SOW and the facility to establish to their satisfaction the condition of the Electrical Power Distribution equipment to be maintained and any other conditions affecting the work to be performed.  This equipment is offered in an \"as-is\" condition.  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. \n\nQuarterly meetings will be conducted with CO, COR, and contractor leadership.\n\nContractors shall be experienced Electrical Contractors, having properly trained and licensed permanent staff required to perform the proposed work. Electrical Contracting (i.e. the construction, repair, testing and maintenance of industrial and commercial electrical distribution systems) shall be the primary interest/specialty of the Contractor s business.\n\nContractors shall be certified by the International Electrical Testing Association (NETA) or equivalent certifying organization as Certified Technicians with each having completed the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training. \n\nContractors shall have technical training and demonstrable track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution Systems and related components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years.  Electrical components on which the Contractors have experience shall include, but not be limited to, switchboards & switchgear (low and medium voltage); low voltage controls; emergency and standby generators; automatic transfer switches, wiring, transformers, meters, and other electrical appurtenances.\n\nContractors shall have safety trainings   either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S   Electrical, and the NFPA 70E   Standard for Electrical Safety in the Workplace.  Training certification shall be provided indicating each technician is a Qualified Person as defined by NFPA 70E.  Training certifications shall be submitted to the VA Contracting Officer prior to work.  If no training certifications are available, the contractor  Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to work.\n\nContractors shall have ready access to the latest versions of the following references:\nNFPA 70, National Electrical Code.\nNFPA 70B, Recommended Practice for Electrical Equipment Maintenance.\nNFPA 70E, Standard for Electrical Safety for the Workplace.\nNFPA 110, Standard for Emergency and Standby Power System.\nOSHA Standard 29 CFR 1910, Subparts I & S.\nInternational Electrical Testing Association, Inc. (NETA)   Maintenance and Testing Specifications.\nOperating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested.  These documents may be obtained from the VHA Medical Center, or the equipment manufacturers.\nVHA Directive [2006-056][1028], Electrical Power Distribution System\n\nContractors shall have and provide all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely.  Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. Prior to initiating work, Contractor shall provide documentation that all instruments, test equipment, tools and PPE have current calibration. Dated calibration labels shall be visible on all instruments, test equipment, tools and PPE as appropriate.  \n\nQuality Control : The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer s acceptance in writing of any proposed change to his QC system. \n\nQuality Assurance: The government shall evaluate the contractor s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). \n\nHours of Operation: The contractor is responsible for conducting business, between the hours of 7 a.m. to 11:30 p.m. Monday thru Friday or Saturday and Sunday 6 a.m.   6 p.m. when maintenance requires electrical power interruption, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor should keep in mind that the stability and continuity of the workforce are essential. \n\nWork is not to be performed during federal holidays without prior approval of the COR. \nNew Year s Day \nLabor Day \nMartin Luther King Jr. s Birthday \nColumbus Day \nPresident s Day \nVeteran s Day \nMemorial Day \nThanksgiving Day \nIndependence Day \nChristmas Day\nJuneteenth\n\nThe contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.\n\nCheck   In Requirements: \nThe Contractor Service Personnel and/or representative must report to the Electric Shop Supervisor within the engineering department or designated point of contact (POC) to sign with department staff before work begins. Upon completion of work, the Contractor Service Personnel and/or representative must report to the appropriate department to sign out. \n\nParking: Onsite parking is not available, and all contractor personnel will be required to obtain street side parking.\n\nSecurity Requirements:  The C&A requirements do not apply, and a Security Accreditation Package is not required.\nDedicated personnel will be assigned solely to observe, interact, assist, and assure protection of VA sensitive information. \nContractor employees providing services at VA facilities may undergo a security clearance in the form of a basic background investigation.Â \n\n11. General Security:  Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and VA Directives and Handbooks as VA and VA personnel regarding information and information system security.\n\nVA Information Custodial Language: \nInformation made available to the contractor or subcontractor by VA for the performance or administration of this contract or information developed by the contractor/subcontractor in performance or administration of the contract shall be used only for those purposes and shall not be used in any other way without the prior written agreement of the VA. This clause expressly limits the contractor/subcontractor's rights to use data as described in Rights in Data - General, FAR 52.227-14(d) (1). \nThe contractor/subcontractor must store, transport, or transmit VA sensitive information in an encrypted form, using VA-approved encryption tools that are, at a minimum, FIPS 140-2 validated.\n\n  Government-Furnished Equipment (GFE)/Government-Furnished Information (GFI).  \nNo GFE will be issued to complete the requirements of this contract.\n\nOther Pertinent Information or Special Considerations. \nPrior to bidding, it shall be the responsibility of the bidder to visit the job site and inspect facility equipment listed in this SOW to establish to their satisfaction the condition of the equipment to be maintained and any other conditions affecting the work to be performed.  This equipment is offered in an \"as-is\" condition.  No claim shall be allowed for correction of deficiencies claimed to exist prior to award of contract. \n\nContractor shall be currently engaged in maintenance, repair, inspection, and testing of electrical power distribution equipment. Contractor shall have a minimum of five (5) years within the last seven (7) years of successful experience maintaining power distribution equipment identical or similar to the equipment listed in this Contract SOW. \n\nOfferors shall submit references for the five (5) years of experience including names, addresses, and telephone numbers of specific companies and key personnel to contact.\n\nThe Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of the Contract manager and an alternate shall be designated in writing to the CO/COR prior to the Contract start date. Changes to personnel shall be submitted to the Government within five (5) work days of the changes. \n\nThe Contract Manager or alternate shall have full authority to act on all Contract matters relating to the daily operation of the Contract. The Contract Manager or alternate shall be available to speak/meet with the CO or COR within 24 hours of request during normal operating hours, and or within the next business day after Friday or a Federal holiday.\n\nIdentification of Possible Follow-on Work.  Any additional repair or replacement work required outside this contract will require contractor to submit a quote to COR and receive an approved PO before beginning work. \n\nIdentification of Potential Conflicts of Interest (COI). \nNone\nIdentification of Non-Disclosure Requirements. \nNot Applicable\nPackaging, Packing and Shipping Instructions.  \nNone\nInspection and Acceptance Criteria.  \nContractor will be responsible for meeting timelines listed in this SOW to include monthly inspection, inspection reports, and response to service call. \n\n15. Risk Control\nWork performed within the medical center may present health risks including exposure to illness and infection control. Contractor will take action to recognize and follow warning information throughout the facility.  \n\n16.  Place of Performance. \nWork will be performed at \nLouis Stokes VA Medical Center \n10701 East Blvd\nCleveland, Ohio\n44106\n\n17.  Period of Performance. \nBase Year:   November 1, 2026 through October 31, 2027\nOption Year One:  November 1, 2027 through October 31, 2028\nOption Year Two:  November 1, 2028 through October 31, 2029\nOption Year Three: November 1, 2029 through October 31, 2030\nOption Year Four:  November 1, 2030 through October 31, 2031\n\n18.  Point of Contact\n TBD\n\nThe NAICS code for this procurement is 238210 Electrical Contractors and Other Wiring Installation Contractors and the small business size standard is $19,000,000.00.\n\nResponses to this notice shall be e-mailed to Christopher A. Callihan at christopher.callihan@va.gov. Telephone responses will not be accepted. Responses must be received in writing no later than 3:00 p.m., Wednesday, June 17, 2026. This notice is to assist the VA in determining sources only. A solicitation is not currently available.\n\nTHE VA IS NOT SEEKING PRICING OR OFFERS OF ANY KIND. There is no guarantee, expressed or implicit, that the market research for this acquisition will result in a particular set-aside or sole source award, or any other guarantee of award strategy. All information is to be provided on a voluntary basis at no charge to the Government.","origin":"detail"},"contacts":[{"fax":"N/A","name":"Christopher A. Callihan","role":"primary","email":"christopher.callihan@va.gov","phone":"216-707-7736","title":"Contracting Officer"}],"place_of_performance":{"zip":"44106-1702","city":{"name":"Cleveland"},"state":{"code":"OH","name":"Ohio"},"street":"Department of Veterans Affairs Louis Stokes Celveland VA Medical Center","country":{"code":"USA","name":"UNITED STATES"},"street2":"10701 East Boulevard"},"office_address":{"zip":"45428","city":"DAYTON","state":"OH","country":"USA"},"naics_codes":["238210"],"award":{"awardee":{}},"attachments":[{"resource_id":"fa9ce7ab283844aebb30fa8061868bbe","name":"36C25026Q0634.docx","kind":"file","mime_type":".docx","size_bytes":78810,"posted_at":"2026-06-10T18:03:21.034Z","export_controlled":false,"sha256":null,"url":"https://sam.gov/api/prod/opps/v3/opportunities/resources/files/fa9ce7ab283844aebb30fa8061868bbe/download","mirrored":false}],"awards":[],"related":[{"key":"36C25027Q0014","latest_notice_id":"b13cc87179e947e7b42da2de44a6bde1","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland","solicitation_number":"36C25027Q0014","notice_type":"k","first_type":"k","first_posted":"2026-10-09","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"36C25027Q0123","latest_notice_id":"fb53a332644a4c8fa983bf28c8643d2d","title":"S222--Sources Sought - Hazardous Waste Removal/Disposal Northeast Ohio VA Healthcare System - Cleveland, OH","solicitation_number":"36C25027Q0123","notice_type":"r","first_type":"r","first_posted":"2026-11-20","last_posted":"2026-11-20","notices":1,"due_at":"2026-11-30T18:30:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T18:30:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"562112","psc":"S222","set_aside":null,"state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-21T05:30:25.727497Z"},{"key":"36C25027B0009","latest_notice_id":"85b83d408f1f422885991142c2734b45","title":"Z1DA--FY27 NRM - VISN Base Modernize Nurse Call - 539-23-101","solicitation_number":"36C25027B0009","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"},{"key":"36C25027B0008","latest_notice_id":"5afe716a38494a6f84b1e84205805f86","title":"Z1DA--FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206","solicitation_number":"36C25027B0008","notice_type":"p","first_type":"p","first_posted":"2026-11-08","last_posted":"2026-11-08","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":null,"county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"unknown","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-09T05:16:39.607305Z"},{"key":"36C25027B0005","latest_notice_id":"2cb4a6354be04cc89c5d6125945b1892","title":"Z1DA--***FY27 Requirement*** First Floor X Ray - Room CC157 553-CSI-022","solicitation_number":"36C25027B0005","notice_type":"p","first_type":"p","first_posted":"2026-11-17","last_posted":"2026-11-17","notices":1,"due_at":"2026-11-30T20:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"236220","psc":"Z1DA","set_aside":"SDVOSBC","state":"MI","county":"26163","county_name":"Wayne County","city":"2622000","city_name":"Detroit","country":null,"place_scope":"site","state_source":"sam_state_name","state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T00:57:17.217280Z"}],"similar_open":[{"key":"36C25027Q0014","latest_notice_id":"b13cc87179e947e7b42da2de44a6bde1","title":"J061--541 Electrical Power Distribution Equipment Testing, Inspection, and Maintenance - VAMC Cleveland","solicitation_number":"36C25027Q0014","notice_type":"k","first_type":"k","first_posted":"2026-10-09","last_posted":"2026-11-24","notices":5,"due_at":"2026-11-27T20:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-27T20:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-036","dept_name":"VETERANS AFFAIRS, DEPARTMENT OF","sub_key":"s-3600","sub_name":"VETERANS AFFAIRS, DEPARTMENT OF","office_key":"o-36C250","office_name":"250-NETWORK CONTRACT OFFICE 10 (36C250)","naics":"238210","psc":"J061","set_aside":"SBA","state":"OH","county":"39035","county_name":"Cuyahoga County","city":"3916000","city_name":"Cleveland","country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-25T05:14:59.249783Z"},{"key":"FA860126R0017","latest_notice_id":"59f44571c30d4709882ea30f93877e40","title":"Repair Electrical Systems","solicitation_number":"FA860126R0017","notice_type":"o","first_type":"p","first_posted":"2026-04-20","last_posted":"2026-11-18","notices":5,"due_at":"2026-11-30T19:00:00Z","due_date":"2026-11-30","closes_at":"2026-11-30T19:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-057","dept_name":"DEPT OF DEFENSE","sub_key":"s-5700","sub_name":"DEPT OF THE AIR FORCE","office_key":"o-FA8601","office_name":"FA8601 AFLCMC PZIO","naics":"238210","psc":"J059","set_aside":null,"state":"OH","county":null,"county_name":null,"city":null,"city_name":null,"country":null,"place_scope":"site","state_source":"sam_street","state_evidence":"WRIGHT-PATTERSON AFB, OH 45433 (AREA A, AREA B AND ALL OTHER PROPERTIES OWNED BY WRIGHT-PATTERSON AIR FORCE BASE, OHIO)","site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-19T04:41:36.780616Z"},{"key":"127EAW27Q0002","latest_notice_id":"59c24c6aad3541448f35b465324ba88b","title":"Forest Service - Solar Batteries Frenchman Work Center","solicitation_number":"127EAW27Q0002","notice_type":"k","first_type":"k","first_posted":"2026-11-05","last_posted":"2026-11-17","notices":3,"due_at":"2026-11-28T00:00:00Z","due_date":"2026-11-27","closes_at":"2026-11-28T00:00:00Z","awardable":true,"open":true,"removed":false,"dept_key":"d-012","dept_name":"AGRICULTURE, DEPARTMENT OF","sub_key":"s-12C2","sub_name":"FOREST SERVICE","office_key":"o-127EAW","office_name":"USDA-FS, CSA SOUTHWEST 6","naics":"238210","psc":"N061","set_aside":"SBA","state":"CA","county":null,"county_name":null,"city":null,"city_name":null,"country":"USA","place_scope":"site","state_source":null,"state_evidence":null,"site":null,"site_key":null,"winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"removed_at":null,"updated_at":"2026-11-18T05:19:57.406887Z"}],"similar_open_total":39,"indexable":false}